ML20209C405

From kanterella
Revision as of 15:29, 11 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Amend 27 to License R-38 & Safety Evaluation.Amend Changes License & Tech Specs to Include Max Reactivity Insertion Allowed in Pulsing Mode & Eliminates Inconsistency Between License Condition for Max Power Level
ML20209C405
Person / Time
Site: General Atomics
Issue date: 04/14/1987
From: Alexander Adams
Office of Nuclear Reactor Regulation
To: Asmussen K
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
Shared Package
ML20209C412 List:
References
NUDOCS 8704280675
Download: ML20209C405 (1)


Text

-w- - - -_.

}

April-14, 1987 Docket No. 50-89 Mr. Keith E. Asmussen Manager, Licensing and Nuclear Material' Control GA Technologies, Inc.

Post Office Box 85608 San Diego, California 92138

Dear Mr. Asmussen:

SUBJECT:

ISSUANCE OF AMENDMENT NO. 27 TO FACILITY OPERATING LICENSE NO. R GA TECHNOLOGIES, INC. (GA)

The Comission has issued Amendment No. 27 to Facility Operating License No. l R-38 for the TRIGA Mark I reactor. The.amendnent consists of changes to the <

Facility Operating License and the Technical Specifications, Appendix A, in  !

response to your submittal dated February 26, 1987.

1 The amendment changes, to make the license condition more complete, Paragraph-2.C.(1) of License No. R-38 to include the maximum reactivity insertion allowed in the pulsing mode. Also changed is Technical. Specification 7.1 to eliminate an inconsistency between the license condition for the maximum power level at which the reactor may operate and-the Technical Specification for the maximum operating power level by eliminating the exception of the 1 250 kW maximum power level for the purpose of safety circuit testing. Safety circuits must be tested by a method other than raising the reactor power -

level above the licensed limit. We understand that GA has conducted this testing for several years by introducing an electrical signal into the circuit.

Copies of Amendment No. 27 and the related Safety Evaluation are enclosed.

Sincerely, original signed by Alexander Adams, Jr., Project Manager ,

_ Standardization and Non-Power '

8704280675 870414 9 Reactor Project Directorate l PDR ADOCK 0500 Division of Reactor Projects III, IV, P l V and Special Projects -!

Office of Nuclear Reactor Regulation

Enclosures:

TS"RLBUTION:

1.

2.

Amendment No. 27 Safety Evaluation la cle ty11ej LHannon ACRS (10)

NRC PDR EJordan OPA Local PDR BGrimes LFMB cc w/ enclosures: PBSS Reading JPartlow- Olynch See next page FMiraglia TBarnhart(4) HBerkow PNoonan WJones AAdams EButcher OGC-BETH HThompson an dds w OD h e 1 )<

10/87 OQ/p/87 /t/87 04/) 87 0 to/