ML20248D503
ML20248D503 | |
Person / Time | |
---|---|
Site: | General Atomics |
Issue date: | 09/28/1989 |
From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
To: | Asmussen K GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER |
References | |
NUDOCS 8910040294 | |
Download: ML20248D503 (1) | |
Similar Documents at General Atomics | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3581999-10-25025 October 1999
[Table view]Ack Receipt of Ref Author Ltr of 990720, Transmitting Changes to Fixed Site & Transportation Plan for Protection of Special Nuclear Matl of Moderate & Low Strategic Significance.Nrc Approval Not Required ML20217C4981999-10-0101 October 1999 Informs That Based on NRC Review of General Atomics Info Concerning Decommissioning Cost Estimates.Nrc Has Determined That Submittal Listed Should Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211L9961999-08-27027 August 1999 Forwards Semiannual Effluent Rept Required for Period 990101-990630.All Airborne & Liquid Effluent Releases Were Well within Allowable State of CA & NRC 10CFR20 Limits ML20216G7361999-08-16016 August 1999 Identifies Listed Revs Which Impact Portion of Physical Protection Plan Applying to Mark I And/Or Mark F Triga Reactors,To Assist in Review of Jul 1999 Version of Plan ML20210Q8571999-08-12012 August 1999 Forwards Amends 36 & 45 to Licenses R-38 & R-67,respectively & Se.Amends Approve Decommissioning Plan for Ga Triga Mark 1 & F Research Reactors & Authorized Approved Decommissioning Plan to Be Included as Suppl to SAR ML20210G2371999-07-29029 July 1999 Forwards EA Re Issuance of Amend 36 to Amended Facility License R-38 & Amend 45 to Amended Facility License R-67 for General Atomics ML20216G7161999-07-26026 July 1999 Documents That Changes Applicable to Two Triga Reactors Have Been Made Per 10CFR50.54 Re Revised Fixed Site & Transportation Plan for Protection of Special Nuclear Matl of Moderate & Low Strategic Significance ML20212H5571999-07-20020 July 1999 Forwards Proprietary Revised Fixed Site & Transportation Plan for Protection of Special Nuclear Matl of Moderate & Low Strategic Significance. Encl Withheld,Per 10CFR2.790 ML20196F2361999-06-22022 June 1999 Forwards Pages with Revised Organization Chart for Proposed Revised Tech Specs & for Decommissioning Plan ML20206S0341999-05-12012 May 1999 Responds to NRC 990414 RAI Re Licensee Submittal of Decommissioning Plan & Request for Termination of Triga Mark I & Mark F non-power Reactor Licenses R-38 & R-67.Revised Triga Ts,Encl,For Review & Approval ML20217B6491999-05-0707 May 1999 Informs of Staff Determination That Document Re Decommissioning Cost Estimates Should Be Withheld from Public Disclosure in Response to & Affidavit,Per 10CFR2.790 ML20206F4141999-05-0303 May 1999 Responds to Recent RAI Re Submittal of Decommissioning Plan & Request for Termination of Triga Mark & Mark F non-power Reactor Licenses R-38 & R-67.Decommissioning Plan,Encl ML20205S1981999-04-22022 April 1999 Responds to NRC 990414 RAI Re General Atomics Submittal of Decommissioning Plan & Request for Termination of Triga Mark I & Mark F non-power Reactor Licenses R-38 & R-67 ML20195E6471999-04-14014 April 1999 Forwards Triga Mark I 1998 Annual Rept. Sections of Rept Are Numbered Consistent with Items of Info Referred to in Section 9.6e of TSs for Mark I Triga Reactor ML20205P4251999-04-14014 April 1999 Discusses Continuing Review of Amend Request for Amended Facility License Numbers R-38 & R-67 Submitted 970418. Forwards Rai.Response Requested within 30 Days of Date of Ltr ML20205D6181999-03-31031 March 1999 Forwards Proprietary Rept on Agreed Upon Procedures & Rept & Consolidated Financial Statements Re Financial Assurance for Decommissioning.Encls Withheld,Per 10CFR2.790 ML20203D7261999-02-11011 February 1999 Ack Receipt of Which Transmitted Changes to General Atomic Radiological Contingency Plan Submitted Under Provisions of 10CFR50.54(q).Informs That NRC Approval Not Needed Since Changes Do Not Decrease Plan Effectiveness ML20203C4571999-02-0303 February 1999 Forwards Issue a to QAPD-9009-2, Triga Reactor Facility Decommissioning QA Program Document ML20202C6241999-01-28028 January 1999 Responds to NRC 980116 RAI Re Decommissioning Plan & Request for Termination of Triga Mark I & Mark F non-power Reactor Licenses R-38 & R-67 ML20202A6821999-01-25025 January 1999 Ack Receipt of Which Transmitted Changes to Ga Radiological Contingency Plan Submitted,Per 10CFR50.54(q). NRC Approval Not Required ML20198K8811998-12-21021 December 1998 Informs That 981120 Affidavit of Jr Edwards & Listed Investment Statement of Account,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of Aea,As Amended ML20196F5371998-12-0101 December 1998 Informs That from General Atomics Technologies Corp Will Be Withheld from Public Disclosure,Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20195H3721998-11-20020 November 1998 Responds to RAI Re Submittal of Decommissioning Plan & Request for Termination of Triga Mark I & Mark F non-power Reactor Licenses R-38 & R-67.Item 6 Addressed Separately as It Contains Proprietary Info.Proprietary Encl Withheld ML20155H0921998-11-0505 November 1998 Forwards Bracketed Version of Proprietary Re Financial Assurance for Decommissioning,As Requested in NRC .Pdr Copy of Subject Ltr,Encl.Proprietary Info Withheld ML20154M3191998-10-0909 October 1998 Forwards Revised Pages 10-1 & 10-2 to Licensee NRC Approved Radiological Contingency Plan.Pages Were Revised to Require Radiation Safety Training for Triga Reactor Personnel Annually,Per NRC ML20154M3021998-10-0909 October 1998 Forwards Revised Pages 10-1 & 10-2 of Licensee NRC Approved Radiological Contingency Plan.Pages Were Revised to Require Radiation Safety Training for Triga Reactor Personnel Annually,Per NRC ML20154G9531998-10-0101 October 1998 Submits Reissued ,Forwarding Signed License Amend 44,which Replaces Criticality Safeguards Committee with Criticality & Radiation Safety Committee & Decreasing Frequency of Audits from Quarterly to Annually ML20154B4661998-10-0101 October 1998 Forwards Amend 44 to License R-67 & Safety Evaluation.Amend Replaces Criticality Safeguards Committee with Criticality & Radiation Safety Committee & Decreases Frequency of Audits from Quarterly to Annually ML20153C2831998-09-18018 September 1998 Ack Receipt of Transmitting Changes to Licensee Fixed Site & Transportation Plan for Protection of Special Nuclear Matls of Moderate & Low Strategic Significance NUREG-0849, Informs That General Atomics Radiological Contingency Plan for Training & Familiarization Onsite for Offsite Response Organizations Acceptable & Approved by Nrc.Changes Were Revised Using NUREG-08491998-08-24024 August 1998 Informs That General Atomics Radiological Contingency Plan for Training & Familiarization Onsite for Offsite Response Organizations Acceptable & Approved by Nrc.Changes Were Revised Using NUREG-0849 ML20239A2661998-08-24024 August 1998 Forwards Proprietary Revised Pp 4-7 & 4-8 of Licensee Radiological Contingency Plan. Revs Update Selected Names & Telephone Numbers of Licensee Emergency Response Personnel.Proprietary Info Withheld ML20237D0591998-08-20020 August 1998 Forwards Revised Pp 4-7 & 4-8 of Licensee Radiological Contingency Plan. Revs Update Selected Names & Telephone Numbers of Ga Emergency Response Personnel.Changes Do Not Represent Decrease in Effectiveness of Plan ML20238E7581998-08-20020 August 1998 Forwards Semiannual Effluent Rept for Jan-Jun 1998, IAW 10CFR70.59.Attachment a to Rept Provides Detailed Info Concerning Triga Ar-41 releases,Kr-85 & XE-133 Releases & Stack Sample Results Over Reported Period ML20237A2741998-08-11011 August 1998 Forwards Certificate to Js Greenwood Newly Licensed Individual at General Atomics.W/O Encl ML20236Y4551998-08-0707 August 1998 Responds to 980730 Request for Info,Providing Justification for Reducing Training Frequency ML20236V5411998-07-30030 July 1998 Informs That NRC Has Completed Review of Changes to General Atomics Radiological Contingency Plan Submitted on 971010 ML20236U2461998-07-27027 July 1998 Informs That Effective 980731,J Greenwood Will Be Replacing J Razvi as Physicist-in-charge for Licensee Triga Mark I & Mark F Reactors ML20236U7321998-07-22022 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-089/98-202 & 50-163/98-202 Issued on 980611 ML20236R5601998-07-20020 July 1998 Informs That J Greenwood Submitted Applications to Be Licensed for Both non-power Reactors Mark I & Mark F,But Has Only Received License for Mark I.Ga Would Appreciate Nrc'S Help in Correcting Oversight ML20236N0121998-07-10010 July 1998 Responds to NRC Re Violations Noted in Insp Repts 50-089/98-202 & 50-163/98-202.Corrective Actions:Discussed Violation W/Health Physics Technician Responsible for Drill & Distributed Memo Re Criticality Warning Alarm Sys Drills ML20249A8481998-06-17017 June 1998 Informs of Arrangements Made W/J Razvi for Administration of OL Exams at General Atomics Mark I/Mark F Reactor During Week of 980706.Requests Matl Listed in Encl 1 as Soon as Possible ML20249A6821998-06-12012 June 1998 Advises NRC of Licensee Plans for Portion of Bldg That Houses Some of Offices & Bathrooms Near Mark I Triga Reactor.Security & Emergency Plans Will Be Revised to Show New Entrance ML20249A6971998-06-11011 June 1998 Forwards Insp Repts 50-089/98-202 & 50-163/98-202 on 980504- 07 & Notice of Violation.Various Aspects of Safety & Security Programs Inspected ML20216B6761998-05-12012 May 1998 Informs That 980331 Submittal Re Affidavit of Je Jones, Secretary & Treasurer of General Atomics Technologies Corp, Will Be Withheld Per 10CFR2.790 & Section 103(b) of AEC Act of 1954 ML20217H7541998-04-28028 April 1998 Forwards Proprietary New Parent Company Guarantee to Replace 920909 Guarantee,To Be Consistent W/Agreed Upon Alternative Method.Encl Withheld ML20217F8601998-04-24024 April 1998 Advises NRC That as Licensee Recently Discussed by Telcon, Need Addl Time to Prepare Appropriate & Complete Responses ML20216G0621998-04-14014 April 1998 Forwards Triga Mark I Reactor Annual Rept CY97, Per Applicable Ts.Sections of Rept Are Numbered Consistent W/ Items of Info Referred in Licensee TS Section 9.6e ML20217J3081998-03-31031 March 1998 Forwards Proprietary Revised Financial Documents for 1997 Re Financial Assurance for Decommissioning.Proprietary Encls Withheld ML20217C2101998-03-18018 March 1998 Forwards Insp Repts 50-089/98-201 & 50-163/98-201 on 980217- 18.No Violations Noted ML20197B7351998-03-0303 March 1998 Concludes That General Atomics Triga Reactors Facility Reactor Operator Requalification Program Meet Requirements of Regulations & Acceptable,Per 971216 Submittal & Suppl, 1999-08-27 Category:NRC TO VENDOR/MANUFACTURER MONTHYEARIR 05000089/19900011990-08-15015 August 1990
[Table view]Forwards Safeguards Insp Repts 50-089/90-01 & 50-163/90-01 on 900710-27.No Violations or Deviations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML20248D5031989-09-28028 September 1989 Advises That Reactor Operator & Senior Reactor Operator Written Exams Rescheduled for 891031 & Operating Exams Rescheduled for 891101-03 ML20247H5911989-07-24024 July 1989 Advises That Senior Operator Licensing Written Exams & Operating Exams Scheduled for 891024 & 25-27,respectively. Ref Matls Listed on Encl Should Be Provided by 890825.W/o Encl ML20247G1531989-03-24024 March 1989 Forwards Insp Rept 50-089/OL-89-01 on 890314-16.No Items of Noncompliance Noted ML20206J2691988-11-18018 November 1988 Forwards Amend 40 to License R-67 & Safety Evaluation. Amend Adds Requirements for Site Boundary,Allowing Reactor Bldg Air Leakage & Verification Thereof & Installation, Availability & Surveillance of Operability of Reactor Room ML20205T6961988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region ML20151U6711988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.Notification of NRC Required When Operator Reassigned to Nonlicensed Position W/No Intent to Return to Licensed Position ML20154P1081988-05-25025 May 1988 Forwards Request for Addl Info Re 871222 Application for Amend to License R-67.Response Requested within 30 Days of Ltr Date ML20195J1611988-01-0808 January 1988 Forwards Insp Rept 50-089/87-03 on 871217.No Noncompliance Noted ML20234F2731987-12-24024 December 1987 Forwards Exam Repts 50-089/OL-87-03 & 50-163/OL-87-03 of Exams Administered on 871214 ML20236L3601987-11-0303 November 1987 Informs That Written Senior Operator Licensing Exams Scheduled for 871214.Facility Mgt Responsible for Providing Adequate Space & Facilities for Exams. Requirements for Administration of Written Exams Encl ML20238A6461987-08-28028 August 1987 Forwards Amend 39 to License R-67 & Safety Evaluation.Amend Adds Triga Fuel Containing Max U Content of 30 Weight Percent W/Enrichment of Less than 20% to Category of Std Triga Fuel.W/O Evaluation ML20238D6041987-08-26026 August 1987 Forwards Exam Rept 50-089/OL-87-02 of Exam Administered on 870804-05 ML20236D5271987-07-16016 July 1987 Documents Previous Discussions W/Whittemore & Furnishes Addl Info Re 870804 Visit of Representatives from China to Observe Administration of Written Exam to Personnel ML20235E8901987-07-0606 July 1987 Forwards Amend 38 to License R-67 & Safety Evaluation.Amend Authorizes Increase in Irradiation Time for Fueled Incore Thermionic Direct Conversion Devices W/Irradiation Time Not to Exceed 40,000 H for One Fueled Incore Thermionic Device ML20234E1631987-06-18018 June 1987 Forwards Exam Rept 50-089/OL-87-01 of Exams Administered on 870519 & 20.Results of Exams Found Two Reactor Operator Candidates Meeting Min Qualification Requirements for Licensing.Personal Privacy Info Withheld (10CFR9.5(a)(6)) ML20215A3881987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.A Adams Designated as Facility Project Manager ML20209C4051987-04-14014 April 1987 Forwards Amend 27 to License R-38 & Safety Evaluation.Amend Changes License & Tech Specs to Include Max Reactivity Insertion Allowed in Pulsing Mode & Eliminates Inconsistency Between License Condition for Max Power Level ML20209C4291987-04-10010 April 1987 Forwards Amend 27 to License R-38 & Safety Evaluation.Amend Changes License & Tech Specs to Include Max Reactivity Insertion Allowed in Pulsing Mode ML20205A1241987-03-19019 March 1987 Forwards Amend 37 to License R-67 & Safety Evaluation.Amend Increases Number of fueled,in-core,thermionic,direct Conversion Devices Which May Be Irradiated Simultaneously from Four to Seven ML20205E6841987-03-13013 March 1987 Forwards Insp Repts 50-089/87-01 & 50-163/87-01 on 870227.No Noncompliance Noted ML20210F5251987-02-0404 February 1987 Confirms Telcon Re Scheduling of Reactor Operator (RO) & Senior RO Licensing Exams.Exams Scheduled for 870331 & 0401- 03.Ref Matl Requirements & Requirements for Administration of Written Exams Encl ML20207E3311986-12-23023 December 1986 Forwards Request for Addl Info Re 860520 Application as Supplemented on 860520 for Amend to License R-67.Response Requested within 30 Days of Ltr Date ML20214D6801986-11-0606 November 1986 Forwards Insp Repts 50-089/86-02 & 50-163/86-02 on 861007-10.No Noncompliance Noted ML20213G9791986-11-0303 November 1986 Forwards Exam Rept 50-089/OL-86-02 of Exams Administered on 861021 & 22 ML20205G7931986-08-0808 August 1986 Forwards Environ Assessment & Notice of Finding of No Significant Environ Impact Re Licensee 860507 Application for Approval to Transfer Control of Licenses R-38,R-67 & SNM-696 to Ga Technologies Corp ML20212H6611986-08-0606 August 1986 Requests Fee for Review of 840525 Application Submitting Revised Radiological Contingency Plan (Emergency Plan) ML20207H6641986-07-22022 July 1986 Ack Receipt of 860508 Application for Approval of Transfer of Ga Co Control for Licenses R-38,R-67 & SNM-0696. Application Fee Required IR 05000089/19860011986-07-10010 July 1986 Forwards Safeguards Insp Repts 50-089/86-01 & 50-163/86-01 on 860623-27.No Violations Noted.Repts Withheld (Ref 10CFR2.790) ML20206G7181986-06-16016 June 1986 Informs That Encl Notice of Receipt of Application for Approval of Transfer of Control of Licenses Being Forwarded for Fr Publication.Publication Required Prior to Transfer of Control to Ga Technologies Corp ML20198H9611986-05-14014 May 1986 Forwards Exam Rept 50-089/OL-86-01 of Exams Administered on 860429-30.Three Reactor Operator Candidates Found to Meet Min Qualification Requirements for Licensing.Exam Answer Key Encl ML20141E0681986-04-0202 April 1986 Ack Receipt of 860221 Payment of Fee for 10CFR55 Svcs for Reactor Facilities.Late Issuance of Bills for 6-month Billing Cycle Not Anticipated ML20210H7331986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20140C3041986-03-20020 March 1986 Forwards Amend 36 to License R-67,correcting Tech Spec Page 14,due to Administrative Error in Amend 35,dtd 860305,which Should Be Destroyed.Safety Evaluation Encl ML20137X6241986-03-0505 March 1986 Forwards Amend 35 to License R-67 & Safety Evaluation.Amend Changes Tech Specs to Increase Irradiation Time of Fueled in-core Thermionic Direct Conversion Devices to 20,000 H ML20137J6441986-01-17017 January 1986 Lists Types of Applications Which Fall Under 6-month Billing Process,Per 840620 Rev to 10CFR170, Fees for Facilities & Matls Licenses & Other Regulatory Svcs.... Bills Will Be Issued in Dec & June ML20133K3201985-10-17017 October 1985 Forwards Amend 35 to License R-67 & Safety Evaluation.Amend Authorizes Substitution of Temporary Radiation Detectors & Temporary Bypass of Certain Radiation Detector Scram Functions During Calibr & Maint on Permanent Detectors ML20128L7601985-06-24024 June 1985 Forwards Amend 34 to License R-67 & Safety Evaluation. Amend Authorizes Performance of Calibr of Power Channels by Calorimetric or Heat Balance Methods Semiannually,But W/No Interval Greater than 7 1/2 Months IR 05000089/19850011985-06-0505 June 1985 Forwards Safeguards Insp Repts 50-089/85-01,50-163/85-01 & 70-0734/85-08 on 850521-24 & Notice of Violation.Encls Withheld (Ref 10CFR2.790) ML20128A8611985-05-20020 May 1985 Ack Receipt of Transmitting Change to Feb 1983 Fixed Site & Transportation Plan for Protection of SNM of Moderate & Low Strategic Significance.Consistent W/ 10CFR50.54(p) & Acceptable ML20132A9451979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML20150B2391978-10-25025 October 1978 Advises That Changes to Reactor Operator Requalification Program Acceptable.Changes Do Not Substantially Decrease Frequency,Duration or Scope of Program 1990-08-15 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217N3581999-10-25025 October 1999
[Table view]Ack Receipt of Ref Author Ltr of 990720, Transmitting Changes to Fixed Site & Transportation Plan for Protection of Special Nuclear Matl of Moderate & Low Strategic Significance.Nrc Approval Not Required ML20217C4981999-10-0101 October 1999 Informs That Based on NRC Review of General Atomics Info Concerning Decommissioning Cost Estimates.Nrc Has Determined That Submittal Listed Should Be Withheld from Public Disclosure,Per 10CFR2.790 ML20210Q8571999-08-12012 August 1999 Forwards Amends 36 & 45 to Licenses R-38 & R-67,respectively & Se.Amends Approve Decommissioning Plan for Ga Triga Mark 1 & F Research Reactors & Authorized Approved Decommissioning Plan to Be Included as Suppl to SAR ML20210G2371999-07-29029 July 1999 Forwards EA Re Issuance of Amend 36 to Amended Facility License R-38 & Amend 45 to Amended Facility License R-67 for General Atomics ML20217B6491999-05-0707 May 1999 Informs of Staff Determination That Document Re Decommissioning Cost Estimates Should Be Withheld from Public Disclosure in Response to & Affidavit,Per 10CFR2.790 ML20205P4251999-04-14014 April 1999 Discusses Continuing Review of Amend Request for Amended Facility License Numbers R-38 & R-67 Submitted 970418. Forwards Rai.Response Requested within 30 Days of Date of Ltr ML20203D7261999-02-11011 February 1999 Ack Receipt of Which Transmitted Changes to General Atomic Radiological Contingency Plan Submitted Under Provisions of 10CFR50.54(q).Informs That NRC Approval Not Needed Since Changes Do Not Decrease Plan Effectiveness ML20202A6821999-01-25025 January 1999 Ack Receipt of Which Transmitted Changes to Ga Radiological Contingency Plan Submitted,Per 10CFR50.54(q). NRC Approval Not Required ML20198K8811998-12-21021 December 1998 Informs That 981120 Affidavit of Jr Edwards & Listed Investment Statement of Account,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of Aea,As Amended ML20196F5371998-12-0101 December 1998 Informs That from General Atomics Technologies Corp Will Be Withheld from Public Disclosure,Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20154G9531998-10-0101 October 1998 Submits Reissued ,Forwarding Signed License Amend 44,which Replaces Criticality Safeguards Committee with Criticality & Radiation Safety Committee & Decreasing Frequency of Audits from Quarterly to Annually ML20154B4661998-10-0101 October 1998 Forwards Amend 44 to License R-67 & Safety Evaluation.Amend Replaces Criticality Safeguards Committee with Criticality & Radiation Safety Committee & Decreases Frequency of Audits from Quarterly to Annually ML20153C2831998-09-18018 September 1998 Ack Receipt of Transmitting Changes to Licensee Fixed Site & Transportation Plan for Protection of Special Nuclear Matls of Moderate & Low Strategic Significance NUREG-0849, Informs That General Atomics Radiological Contingency Plan for Training & Familiarization Onsite for Offsite Response Organizations Acceptable & Approved by Nrc.Changes Were Revised Using NUREG-08491998-08-24024 August 1998 Informs That General Atomics Radiological Contingency Plan for Training & Familiarization Onsite for Offsite Response Organizations Acceptable & Approved by Nrc.Changes Were Revised Using NUREG-0849 ML20237A2741998-08-11011 August 1998 Forwards Certificate to Js Greenwood Newly Licensed Individual at General Atomics.W/O Encl ML20236V5411998-07-30030 July 1998 Informs That NRC Has Completed Review of Changes to General Atomics Radiological Contingency Plan Submitted on 971010 ML20236U7321998-07-22022 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-089/98-202 & 50-163/98-202 Issued on 980611 ML20249A8481998-06-17017 June 1998 Informs of Arrangements Made W/J Razvi for Administration of OL Exams at General Atomics Mark I/Mark F Reactor During Week of 980706.Requests Matl Listed in Encl 1 as Soon as Possible ML20249A6971998-06-11011 June 1998 Forwards Insp Repts 50-089/98-202 & 50-163/98-202 on 980504- 07 & Notice of Violation.Various Aspects of Safety & Security Programs Inspected ML20216B6761998-05-12012 May 1998 Informs That 980331 Submittal Re Affidavit of Je Jones, Secretary & Treasurer of General Atomics Technologies Corp, Will Be Withheld Per 10CFR2.790 & Section 103(b) of AEC Act of 1954 ML20217C2101998-03-18018 March 1998 Forwards Insp Repts 50-089/98-201 & 50-163/98-201 on 980217- 18.No Violations Noted ML20197B7351998-03-0303 March 1998 Concludes That General Atomics Triga Reactors Facility Reactor Operator Requalification Program Meet Requirements of Regulations & Acceptable,Per 971216 Submittal & Suppl, ML20198S8061998-01-16016 January 1998 Forwards Request for Addl Info Re Licensee 970418 Request for Amends to Licenses R-38 & R-67.Response Requested within 90 Days of Ltr Date ML20198H5161998-01-0505 January 1998 Forwards RAI Re Revised Reactor Operator Requalification Program.Response Requested within 60 Days of Date of Ltr ML20212G4031997-10-29029 October 1997 Forwards Amend 35 to License R-38 & Safety Evaluation.Amend Removes Authority from License to Operate Reactor,Authorizes Possession Only of Reactor & Changes TS to Remove Operational Requirements Not Needed for Possessions Only ML20211P3211997-10-0909 October 1997 Forwards Amend 34 to License R-38 & Se.Amend Changes Requirements for Calibration of Power Measuring Channels to Require Calibrations Only If Reactor Could Achieve Criticality ML20137C8621997-03-20020 March 1997 Forwards RAI Re Review of 961217 Amend Request for Facility OL R-38 for Triga Mark I Research Reactor.Response to Be Provided within 30 Days ML20128Q1121996-10-10010 October 1996 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in Pdr.App B Records Withheld in Part (Ref FOIA Exemptions 4 & 5) & App C Records Completely Withheld (Ref FOIA Exemptions 4 & 5) ML20134E6471996-07-0909 July 1996 Partially Deleted Ltr Responding to Re Financial Assurance for Funding Decommissioning of Facilities Located in San Diego ML20057C4761993-09-0101 September 1993 Forwards Insp Repts 50-089/93-01,50-163/93-01 & 70-0734/93-04 on 930803-06.Non-cited Violations Identified. Insp Rept Partially Withheld Ref 10CFR2.790(d) ML20062G2801990-11-0808 November 1990 Forwards Exam Rept 50-089/OL-90-01 on 901023-24 IR 05000089/19900011990-08-15015 August 1990 Forwards Safeguards Insp Repts 50-089/90-01 & 50-163/90-01 on 900710-27.No Violations or Deviations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML20248D5031989-09-28028 September 1989 Advises That Reactor Operator & Senior Reactor Operator Written Exams Rescheduled for 891031 & Operating Exams Rescheduled for 891101-03 ML20247H5911989-07-24024 July 1989 Advises That Senior Operator Licensing Written Exams & Operating Exams Scheduled for 891024 & 25-27,respectively. Ref Matls Listed on Encl Should Be Provided by 890825.W/o Encl ML20247G1531989-03-24024 March 1989 Forwards Insp Rept 50-089/OL-89-01 on 890314-16.No Items of Noncompliance Noted ML20206J2691988-11-18018 November 1988 Forwards Amend 40 to License R-67 & Safety Evaluation. Amend Adds Requirements for Site Boundary,Allowing Reactor Bldg Air Leakage & Verification Thereof & Installation, Availability & Surveillance of Operability of Reactor Room ML20205T6961988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region ML20151U6711988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.Notification of NRC Required When Operator Reassigned to Nonlicensed Position W/No Intent to Return to Licensed Position ML20154P1081988-05-25025 May 1988 Forwards Request for Addl Info Re 871222 Application for Amend to License R-67.Response Requested within 30 Days of Ltr Date ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20195J1611988-01-0808 January 1988 Forwards Insp Rept 50-089/87-03 on 871217.No Noncompliance Noted ML20234F2731987-12-24024 December 1987 Forwards Exam Repts 50-089/OL-87-03 & 50-163/OL-87-03 of Exams Administered on 871214 ML20236L3601987-11-0303 November 1987 Informs That Written Senior Operator Licensing Exams Scheduled for 871214.Facility Mgt Responsible for Providing Adequate Space & Facilities for Exams. Requirements for Administration of Written Exams Encl ML20238A6461987-08-28028 August 1987 Forwards Amend 39 to License R-67 & Safety Evaluation.Amend Adds Triga Fuel Containing Max U Content of 30 Weight Percent W/Enrichment of Less than 20% to Category of Std Triga Fuel.W/O Evaluation ML20238D6041987-08-26026 August 1987 Forwards Exam Rept 50-089/OL-87-02 of Exam Administered on 870804-05 ML20236D5271987-07-16016 July 1987 Documents Previous Discussions W/Whittemore & Furnishes Addl Info Re 870804 Visit of Representatives from China to Observe Administration of Written Exam to Personnel ML20235E8901987-07-0606 July 1987 Forwards Amend 38 to License R-67 & Safety Evaluation.Amend Authorizes Increase in Irradiation Time for Fueled Incore Thermionic Direct Conversion Devices W/Irradiation Time Not to Exceed 40,000 H for One Fueled Incore Thermionic Device ML20234E1631987-06-18018 June 1987 Forwards Exam Rept 50-089/OL-87-01 of Exams Administered on 870519 & 20.Results of Exams Found Two Reactor Operator Candidates Meeting Min Qualification Requirements for Licensing.Personal Privacy Info Withheld (10CFR9.5(a)(6)) ML20215A3881987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.A Adams Designated as Facility Project Manager ML20209C4051987-04-14014 April 1987 Forwards Amend 27 to License R-38 & Safety Evaluation.Amend Changes License & Tech Specs to Include Max Reactivity Insertion Allowed in Pulsing Mode & Eliminates Inconsistency Between License Condition for Max Power Level 1999-08-12 |
Text
___ ._-
5
.-. 4
.f.
. g
" September 28, 1989 .
Docket No. 50-89 .
Dr. Keith Asmussen, Manager Licensing and Nuclear Material and Control G.. A. Technologies Inc. ,
P. O. Box 81608 San Diego, California 92138
Dear Dr. Asmussen:
Subject:
Reactor Operator and Senior Reactor Operator Licensing Examinations, Addendum In a telephone conversation on September 26, 1989, between Dr. Razvi of your staff and Mr. Lew Miller, Chief, Operations Section, arrangements were made for rescheduling the administration of licensing examinations at the G. A. Technologies Inc.. TRIGA facilities.
The written examinations are rescheduled for October 31, 1989. The operating examinations are rescheduled for November 1-3, 1989.
All other arrangements formalized by our original administrative letter (Dennis F. Kirsch, Chief, Reactor Safety Branch, dated July 24,1989) remain in effect.
Thank you for your consideration in this matter. If you have any questions regarding the examination procedures-and requirements, please contact Mr. Thomas Meadows at (415) 943-3867.
Sincerely,
/5/
Dennis F. Kirsch Reactor Safety Branch cc:
R. Cross,RV(2 copies)
T. Meadows, RV K. Asmussen, GA Technologies Inc.
J. Razvi, GA Technologies 11c.
A. Adams, NRR/PDSNP J, Martin, RV R. Zimmerman, RV A. Chaffee, RV l
D. Kirsch, RV I .L. Miller, RV l K. Perkins, NRR/LOLB L H. North, RV -
RV/jk $
Q[/YESE4pESTCOPY]REQpESTCOPYJREQU,ESTCOPY;i
/ NO ] DIS / fi0 1 GS' / N0 M
fB go gR 45w MEADOWS A L. E T RSCH /C 9/n/89 7/ 89 9/ /89
__ _- - _ - - - - -