ML20128L760

From kanterella
Jump to navigation Jump to search
Forwards Amend 34 to License R-67 & Safety Evaluation. Amend Authorizes Performance of Calibr of Power Channels by Calorimetric or Heat Balance Methods Semiannually,But W/No Interval Greater than 7 1/2 Months
ML20128L760
Person / Time
Site: General Atomics
Issue date: 06/24/1985
From: Thomas C
Office of Nuclear Reactor Regulation
To: Mowry W
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
Shared Package
ML20128L767 List:
References
NUDOCS 8507110453
Download: ML20128L760 (3)


Text

'

June 24o 1985 Docket No.: 50-163 Fr. William R. Mowry Licensing Administrator GA Technologies, Inc.

Post Office Box 85608 San Diece, California 92138

Dear Mr. Mowry:

SUBJECT:

CHANGE IN POWER CHANNEL CALIBRATION TIMING The Commission has issued Amendment No. 34 to facility Operating License No.

R-67 for the GA Technologies, Inc. reactor. The amendnent censists of changes to the technical specifications in response to your submittal dated June 4, 198s.

The amendment authorizes perfornance of the calibration of the power channels by calorimetric or heat balance metheds semiannually, but with no interval greater than seven and one-half months, which is consistent with ANSI /ANS 15.1 " Development of Technical Specifications for Research Peactors" (1982).

This will elininete the need to interrupt the experimental program's extended runs for the sole purpose of power channel calibration in relation to the thermal power of the reactor.

Copies of Amendment No. 34 and the related Safety Evaluation are enclosed.

Sincerely,

,' 4 Original signed by Cecil 0. Thomas, Chief

's Standardizatien 8 Special Projects Branch Division of Licensing

Enclosure:

Pl 1. Arendment No. 34 L 2. Safety Evaluation t cc w/ enclosures: 8507110453 850624 i

See next page PDR ADOCK 05000163 P PDR DISTRIBUTION DocRet. File i ' EJordan RDiggs NRC PDP BGrines RBallard L PDR JPartlow SSPB R/F TBarnhart (4)

PAnderson WJones RCarter MVirgilio 0 ELD ACRS (10)

LHarmon Miles, OPA S! ) :D. PB : ,_ P- 0E l RCarter:dk . PA  ! _ 'o H8erkow as ewer W s i w 8s s w i8s sini8s oss 0 op8s yrg i

j#  %

UNITED STATES 8

.i o NUCLEAR REGULATORY COMMISSION

. ... $ VVASHINGTON, D. C. 20555 e

"%g / June 24, 1985 Cocket No.: 50-163 Mr. William R. Mowry Licensino Administrator GA Technologies, Toc.

Post Office Box 85608 San Diego, Califerria 97!38

Dear Pr. i'owry:

St'BJECT: CHANGE IN POWER CHANNEL. CALIPRATION TIMING The Connission has issued Arerdrent No. 34 to Facility Operating License No.

P-67 for the GA Technologies, Inc. reactor. The amendment consists o# changes to the technical specifications in respnnse to your submittal dated June 4, 1985.

The amendment authorizes performance of the calibration of the power channels by calorimetric or heat balance methods semiannually, but with no interval greater than seven and one-half months, which is consistent with ANSI /ANS 1.5.1 " Development of Technical Specifications for Research Peactors" (1082).

This will eliminate the need to interrupt the experinental progran's extended runs for the sole purpose of power channel calibration in relation to the thermal power of the reactor.

Copies of Amendment No. 34 and the related Safety Evaluation are enclosed.

Sincerely, lA 0. ^;;; ; V-Cecil 0. Thomas, Chief Standardization & Special

- Proiects Branch Divisicn of Licensing

Enclosure:

1. Amendment No. 34
2. Safety Evaluation cc w/ enclosures:

See next page i

l GA Technologies, Inc. Decket No. 50-163 cc: Attorney General '

555 Capitol Mall I

Sacramente, Ct'ifornia 95814 California nacartrent of Health ATTr'- Chief, Environmental Radiation Control Unit Radiologic Health Section 714 P Street, Fnom anP 7

Sacranento, Cali#ornia 95814 Director Energy Facilities Sitinc Pivision Energy Rescurces Corservation A Development Commissinr.

1516 - 9th Stree' Sacranento, California 95814 1

4 i

2 s

h I

4

- , - - - . .w_, -

, , , - - , ., - .,n,--..- .. - - -.- -- ..,, -,. ,_, --,.,-,,----,_----,----,-,,w-, . . , - , - ,-