Category:OPERATING LICENSES & AMENDMENTS
MONTHYEARML20210Q8661999-08-12012 August 1999 Amends 36 to License R-38 & 45 to License R-67,respectively Approving Decommissioning Plan for Ga Triga Mark 1 & Mark F Research Reactors & Authorizing Approved Decommissioning Plan to Be Included as Suppl to Sar,Per 10CFR50.52(b)(5) ML20154G9851998-10-0101 October 1998 Errata to Amend 44 to License R-67 Providing Signed Amend Replacing Criticality Safeguards Committee with Criticality Radiation Safety Committee & Decreases Frequency of Audits from Quarterly to Annually ML20154B4731998-10-0101 October 1998 Amend 44 to License R-67,replacing Criticality Safeguards Committee with Criticality & Radiation Safety Committee, Decreasing Frequency of Audits from Quarterly to Annually & Changing Administrative Requirements Section of TSs ML20212G4141997-10-29029 October 1997 Amend 35 to License R-38,removing Authority from License to Operate Reactor,Authorizing Possessing Only of Reactor & Changing TSs to Remove Operational Requirements Not Needed for Possession Only Status ML20211P3291997-10-0909 October 1997 Amend 34 to License R-38,changing Requirement for Calibration of Power Measuring Channels to Require Calibrations Only If Reactor Could Achieve Criticality ML20206J2791988-11-18018 November 1988 Amend 40 to License R-67,adding Requirements for Site Boundary Allowing Reactor Bldg Air Leakage & Verification Thereof & Installation,Availability & Surveillance of Operability of Reactor Room Activated Charcoal Filter Sys ML20238A6621987-08-28028 August 1987 Amend 39 to License R-67,adding Triga Fuel Containing Max U Content of 30 Weight Percent W/Enrichment of Less than 20% to Category of Std Triga Fuel ML20235E9811987-07-0606 July 1987 Amend 38 to License R-67,authorizing Increase in Irradiation Time for Fueled Incore Thermionic Direct Conversion Devices W/Irradiation Time Not to Exceed 40,000 H for Any One Incore Thermionic Direct Conversion Device ML20209C4501987-04-10010 April 1987 Amend 27 to License R-38,changing License & Tech Specs to Include Max Reactivity Insertion Allowed in Pulsing Mode ML20205A1791987-03-19019 March 1987 Amend 37 to License R-67,authorizing Increase in Number of Fueled in-core,thermionic,direct Conversion Devices Which May Be Irradiated Simultaneously from Two to Seven ML20137X6341986-03-0505 March 1986 Amend 35 to License R-67,changing Tech Specs to Increase Irradiation Time of Fueled in-core Thermionic Direct Conversion Devices to 20,000 H ML20140C3171986-03-0505 March 1986 Amend 36 to License R-67,revising Tech Spec Page 14 Re Irradiation Time Per Device ML20133K3241985-10-17017 October 1985 Amend 35 to License R-67,authorizing Substitution of Temporary Radiation Detectors & Temporary Bypass of Certain Radiation Detector Scram Functions During Calibr & Maint on Permanent Detectors ML20128L7881985-06-24024 June 1985 Amend 34 to License R-67,authorizing Performance of Calibr of Power Channels by Calorimetric or Heat Balance Methods Semiannually,But W/No Interval Greater than 7 1/2 Months 1999-08-12
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210Q8661999-08-12012 August 1999 Amends 36 to License R-38 & 45 to License R-67,respectively Approving Decommissioning Plan for Ga Triga Mark 1 & Mark F Research Reactors & Authorizing Approved Decommissioning Plan to Be Included as Suppl to Sar,Per 10CFR50.52(b)(5) ML20196C3491999-06-16016 June 1999 Application for Amend to License R-67,deleting License Conditions 3 & 4 Which Duplicate Requirements Now in Proposed TS ML20196D3791999-06-15015 June 1999 Application for Amends to Licenses R-38 & R-67,to Revise Proposed TS & Request Deletion of License Condition 2.B.(2). Mark-up of Previously Submitted strike-out Version of TS Showing Latest Changes Made ML20154G9851998-10-0101 October 1998 Errata to Amend 44 to License R-67 Providing Signed Amend Replacing Criticality Safeguards Committee with Criticality Radiation Safety Committee & Decreases Frequency of Audits from Quarterly to Annually ML20154B4731998-10-0101 October 1998 Amend 44 to License R-67,replacing Criticality Safeguards Committee with Criticality & Radiation Safety Committee, Decreasing Frequency of Audits from Quarterly to Annually & Changing Administrative Requirements Section of TSs ML20236Q5751998-07-16016 July 1998 Application for Amend to License R-67,revising Section 8.0 of Mark F Triga TS to Be Consistent W/Mark I Reactor TS ML20212G4141997-10-29029 October 1997 Amend 35 to License R-38,removing Authority from License to Operate Reactor,Authorizing Possessing Only of Reactor & Changing TSs to Remove Operational Requirements Not Needed for Possession Only Status ML20211P3291997-10-0909 October 1997 Amend 34 to License R-38,changing Requirement for Calibration of Power Measuring Channels to Require Calibrations Only If Reactor Could Achieve Criticality ML20198H4501997-09-15015 September 1997 Application for Amend to License R-38,changing TS 5.2.5 to Read as Listed ML20140D4921997-04-18018 April 1997 Application for Amends to Licenses R-38 & R-67,terminating Triga Reactor Operations at Main Site in San Diego,Ca & Requesting Possession Only License for Ga Mark I Reactor License.Decommissioning Plan Encl ML20132F1971996-12-17017 December 1996 Application for Amend to License R-38,withdrawing Authorization to Operate Triga Mark I non-power Reactor ML20059G2891994-01-0707 January 1994 Application for Amend to License R-38,revising Paragraph (a) of Section 9.4 of TS to Reflect Elimination of Position of Associate Physicist-in-Charge,as Result of Reduced Funding/ Utilization of Triga Reactors ML20206J2791988-11-18018 November 1988 Amend 40 to License R-67,adding Requirements for Site Boundary Allowing Reactor Bldg Air Leakage & Verification Thereof & Installation,Availability & Surveillance of Operability of Reactor Room Activated Charcoal Filter Sys ML20148H9901988-03-25025 March 1988 Application for Amends to Licenses R-38 & R-67,changing Name of Licensee.Fee Paid ML20237D8251987-12-22022 December 1987 Application for Amend to License R-67,revising Tech Specs to Add Activated Charcoal Filter When Testing Thermionic Devices in Core Whenever Distance to Nearest Site Boundary Is Less than 350 Meters.Safety Analysis Encl.Fee Paid ML20238A6621987-08-28028 August 1987 Amend 39 to License R-67,adding Triga Fuel Containing Max U Content of 30 Weight Percent W/Enrichment of Less than 20% to Category of Std Triga Fuel ML20235E9811987-07-0606 July 1987 Amend 38 to License R-67,authorizing Increase in Irradiation Time for Fueled Incore Thermionic Direct Conversion Devices W/Irradiation Time Not to Exceed 40,000 H for Any One Incore Thermionic Direct Conversion Device ML20210A3131987-04-30030 April 1987 Application for Amend to License R-67,revising Tech Specs to Extend Irradiation Time for Direct Conversion Devices to Beyond 20,000 H for Uninterrupted Continuation of DOE Research Program on Thermonic Devices.Safety Analysis Encl ML20209C4501987-04-10010 April 1987 Amend 27 to License R-38,changing License & Tech Specs to Include Max Reactivity Insertion Allowed in Pulsing Mode ML20205A1791987-03-19019 March 1987 Amend 37 to License R-67,authorizing Increase in Number of Fueled in-core,thermionic,direct Conversion Devices Which May Be Irradiated Simultaneously from Two to Seven ML20212D3481987-02-26026 February 1987 Application for Amends to Licenses R-38 & R-67,eliminating Inconsistency Between Max Licensed Power & Testing of Power Scrams at 110% of Licensed Power ML20213G6981986-11-14014 November 1986 Application for Amend to License R-67,revising Tech Spec Section 10.2.6 to Permit Simultaneous Irradiation of Up to Four Thermionic Devices.Fee Paid ML20205Q1751986-05-20020 May 1986 Application for Amend to License R-67,defining Triga Low Enriched U Fuels as Std Fuel & Permitting Continued Tests Under Special Fuel Provisions for Fuel W/U Loadings in Range from 30% to 45% Weight ML20140C3171986-03-0505 March 1986 Amend 36 to License R-67,revising Tech Spec Page 14 Re Irradiation Time Per Device ML20137X6341986-03-0505 March 1986 Amend 35 to License R-67,changing Tech Specs to Increase Irradiation Time of Fueled in-core Thermionic Direct Conversion Devices to 20,000 H ML20205J2511986-01-28028 January 1986 Resubmits Application for Amend to License R-67,changing Tech Spec Section 10.2.6 (D) to Allow Uninterrupted Continuation of Thermionic Experiment Now in Progress & to Extend Irradiation Time to 20,000 H ML20137K4061985-11-26026 November 1985 Application for Amend to License R-67,changing Tech Specs to Allow Uninterrupted Continuation of Thermionic (Direct Conversion Device) Experiment in Progress.Fee Paid ML20133K3241985-10-17017 October 1985 Amend 35 to License R-67,authorizing Substitution of Temporary Radiation Detectors & Temporary Bypass of Certain Radiation Detector Scram Functions During Calibr & Maint on Permanent Detectors ML20132G8141985-09-24024 September 1985 Revised Application for Amend to License R-67,amending Tech Spec 10.2.6(f)(2) to Clarify Justification & Discussion in 850826 Application,Authorizing Routine Calibr or Maint of Radiation Monitors During Extended Operations ML20134M4771985-08-26026 August 1985 Application for Amend to License R-67,changing Tech Specs Re Performance of Routine Calibr or Maint on Radiation Monitors,Including Continuous Air Monitor,During Extended Operations.Fee Paid ML20134C5531985-08-12012 August 1985 Application for Amend to License R-67,revising Tech Specs to Authorize Performance of Routine Calibr or Maint on Radiation Monitors During Extended Operations.Fee Paid ML20128L7881985-06-24024 June 1985 Amend 34 to License R-67,authorizing Performance of Calibr of Power Channels by Calorimetric or Heat Balance Methods Semiannually,But W/No Interval Greater than 7 1/2 Months ML20129J4151985-06-0404 June 1985 Application to Amend License R-67,revising Tech Spec Section 6.2.5 to Perform Calibr of Power Channels by Calorimetric or Heat Balance Methods Semiannually.Fee Paid ML20054L9171982-06-23023 June 1982 Application for Amend of Licenses R-38 & R-67 to Reflect Change of Ownership from Ga Co to Ga Technologies,Inc. One Oversize Preliminary Parcel Map Encl.Aperture Card Is Available in PDR 1999-08-12
[Table view] |
Text
, __ _ . _
it; ; '
p & ac u j{ ,' ; NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
,.7p .
- ~. j -} ;
o
,; l&..vf/ ..+
.I E N_(
s 4
ff
- GA TECHNOLOGIES, INC.
. DOCKET NO. 50-89 AMENDMENT TO FACILITY OPERATING LICENSE f x 4 -Amendment No.'27 License.No. R-38 l
- 1. The Nuclear Regulatory Comission (the Comission) has found that:
A. The application for amendment to Facility Operating License No. R-38, -,
filed by GA Technologies, Inc. (the licensee), dated February 26, !
1987, complies with the standards and re Energy Act of 1954,~ as amended (the ,Act)quirements of the Atomic and the Comission's i
, g regulations as set forth in 10 CFR Chapter I; i B. The facility will operate in conformity with the amended license, the provisions of the Act, and the' rules ~ and regulations of the Comission; C. There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D. The issuance of this amendu.ent will not be inimical,to the common defense and security or to the health.and safety of.-the p'ublic; .
i E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied; and F. Publication of' notice of this amendm'ent is not required since it does not involve a significant hazards consideration nor amendment of a !
license of the type described in 10 CFR Section 2.106(a)(2).
i 8704280683 870414 PDR- ADOCK 05000089 P PDR l
.i 3 ,
- 2. Accordingly, paragraph 2.C.(1) of License No. R-38 is hereby amended to read as follows:
(1) Maximum Power Level The licensee may operate the reactor at power levels.not in excess of 250 kilowatts (thermal) and, in the pulsing mode, with reactivity insertions not to exceed $3.00.
- 3. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of License No. R-38 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 27, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the
. Technical Specifications.
- 3. -This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION i
Herbert N. Berkow, Director Standardization and Non-Power .
Reactor Project Directorate !
Division of Reactor Projects .III, IV,
~
Y and Special Projects .
Office of Nuclear Reactor Regulation
Attachment:
- Appendix A Technical Specifications Changes Date of Issuance: April 10, 1987 l
l l
l i
-.g k
ATTACHMENT TO LICENSE AMENDMENT NO. 27 -
FACILITY OPERATING LICENSE NO. R-38 DOCKET NO. 50-89 Revised Appendix A Technical Specifications are as follows:
Remove Page Add Page 7 7 The change on the revised page is id e ntified by a marginal line.
i
(
l
e.
3:
} 7.0 REACTOR OPERATIONS 7.1- The operating power level shall not be intentionally raised above 250 kW except for pulsing operation.
- 7. 2 The maximum available excess reactivity (cold with expc -
me nt s, if any, in place) shall be:
- a. $5. 00 during steady- state operations, or
- b. $3. 25 during transient operations.
- 7. 3 The maximum reactivity insertion during transient operations shall be $3. 00.
- 7. 4 Maximum fuel tempe rature:
- a. The maximum fuel temperature as measured by a standard thermocouple shall be 800*C for standard high hydride fuel elements.
- b. The maximum allowable fuel temperature shall be 530'C for standard low hydride fuel elements or aluminum-clad clements.
- 7. 5 The maximum reactivity worth of any transient control rod shall be $3. 00.
- 8. 0 EX PER IM E NT S 8.1 Experiment Approval Procedures i 8.1.1 Routinc experiments may be performed at the discre-tion of the Physicist-in-Charge or his designated alternate, without the necessity of any further review or approval.
S.1.2 Prior to performing any reactor experiment which is not a routine experiment, the proposed experiment shall be evaluated by a person or persons appointed by the Physicist-in-Charge to be re sponsible for reactor safety. He shall consider the experiment in terms of its effect on reactor operation and the possibility and consequence s of its f ailure s, including, where significant, consideration of chemical reac-tions, physical integrity, design life, proper cooling, inter-action with core components, and reactivity effects.
8.1. 3 Modified routine experiments may be performed at the !
discretion of the Physicist-in-Charge without the necessity of )
any further review or approval provided that the evaluation j performed in accordance with Section 8.1.2 results in a deter- i mination that the hazards associated with the modified routine experiment are neither greater norsignificantly different than those involved with the corresponding routine experiment which shall be referenced.
I Amendment ilo . 27 I