MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES TXX-9610, Monthly Operating Repts for March 1996 for CPSES1996-03-31031 March 1996 Monthly Operating Repts for March 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
= Log # TXX-94070 y9 File # 10010.2 Ref. # 10CFR50.36 r x TUELECTRIC March 15, 1994 Williare J. Cablil. Jr.
Group neil'rrsi.Irnt U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNITS 1 AND 2 DOCKET NOS. 50-445 AND 50-446 MONTHLY OPERATING REPORT FOR FEBRUARY 1994 Gentlemen:
Attached is the Monthly Operating Report for February 1994 prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2 Operating License Nos. NPF-87 and NPF-89, respectively.
Sincerely, William J. Cahill, Jr.
By:
D. R. Woodlan Docket Licensing. Manager JMK/jmk Attachment c - Mr. L. J. Callan. Region IV Mr. T. Reis, Region IV Resident inspectors, CPSES (2)
Mr. T. A. Bergman, NRR 9403100274 940228 PDR ADOCK 05000445
' l[' l C N. Obve Sirect L .1511 Dallas. Texa* 75201 R PDR
Attachment to TXX 94070 Page 1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT-DOCKET NO.: 50 445-UNIT: CPSES 1 DATE: 03/11/1994 COMPLETED BY: Janet Hughes ,
TELEPHONE: 817-897-5331 OPERATING STATUS
- 1. REPORTING PERIOD: FEBRUARY 1994 GROSS HOURS IN REPORTING PERIOD: 672
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND CAPACITY (MWe-Net): 1150
DESIGN ELECTRICAL RATING (MWe-Net): 1150
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE 4 REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 625 1,369 23,908
- 6. REACTOR RESERVE SHUTDOWN HOURS 47 47 2,401
- 7. HOURS GENERATOR ON LINE 621 1,365 23,458
- 8. UNIT RESERVE SHUTDOWN HOURS O O O
- 9. GROSS THERMAL ENERGY GENERATED (MWH) -2,062,130 4,598,220- 74,348,025
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 692,763 1,546,852 24,682,109
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 663,514 1,484,626 23,480,477
- 12. REACTOR SERVICE FACTOR 93.0 96.7 76.9 1 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 84.6
- 14. UNIT SERVICE FACTOR 92.4 96.4 75.4
- 15. UNIT AVAILABILITY FACTOR 92.4 96.4 75.4
- 16. UNIT CAPACITY FACTOR (USING MDC) 85.9 91.2 65.7
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 85.9 91.2 65.7
- 18. UNIT FORCED OUTAGE RATE 7.6 3.6 5.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) .
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 900813 ESTIM ATED -
4 1
n m--- -w a e - --
. . . . . . . . - _ ..___-m . ,_ . , . . . . . _ __ - - .
1 e e *
Attachment to TXX-97070 -
Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL l DOCKET NO.~: 50-445 UNIT: LTSES 1 4
DATE: 03/11/1994 COMPLETED BY: Janet Hughes -
TELEPHONE: 817-897 5331-
'1 1
MONTH : FEBRUARY 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL' (MWe-Net) (MWe-Net) 1 993 17 1106 2 0 18 1106- ,
i 3 0 19 1105 D
- 4 355 20 1107 5 983 21 1105 i 6- 1099 22. 1098 1
7' 1103 23' 1103 8 1105 24 1105 9 1103 25 1104 10 1103 26 1104 j i
l 11 1105 27 1105 12 1104 28 1105 13 1104 29 14 1104 30 15 1104 31 16 1106
.)
,_~ .. - - - . .,_ .. - , . , _ . . . , ..,e.-
e Attachment to TXX-94070 Pace 3 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH i
DOCKET NO.: 50-445-UNIT: CPSES 1 DATE: 03/11/1994, COMPLETED BY: Janet Hughes TELEPHONE: 817'-897-5331 MONTH : FEBRUARY 1994 DAY TIME REMARK / MODE 02/01 0000 Unit started month in MODE 1.
2138 Turbine / Reactor trip due to spurious indication of low main generator stator primary cooling water flow.
02/03 2000 Unit entered MODE 2.
I 2031 Reactor is . critical.
02/04 0005 Unit entered MODE 1.
0034 Synchronized to grid.
02/28 2400 Unit ended month in MODE 1.
t i
f i
e + , , -r - . -- + ., .
~
Attachment to TXX-94070 Page 4 of 8 ~ .
UNIT SHUTDOWNS AND POWER REDUCTIOtJS DOCKET NO.: 50-445 UNIT: CPSES 1.
DATE: 03/11/1994
-.?',
COMPLETED BY: Janet Hughes s
TELEPHONE: 817-897-5331 ,
REPORT MONTH : FEBRUARY 1994 4
, METHOD OF
,. TYPE SHUTTING DOWN ,
F: FORCED DURATION THE REACTOR OR ,
NO DATE REASON '
S: SCHEDULED (HOURS) REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 1 940201 F 50.93 A 3 Turbine / Reactor trip due to spurious indication of low main generator stator primary cool:ng water flow. LER 445/94-001 submitted.
4 Y
i
- 1) REASON 2) METHOD
, A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM '
C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMAT C SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
- ( ,
6- ;
Attachrnent to TXX-94070 Page 5 of 8 q COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 -
NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 03/11/1994 COMPLETED BY: Janet Hughes.
TELEPHONE: 817 897 5331 OPERATING STATUS
- 1. REPORTING PERIOD: FEdRUARY 1994 GROSS HOURS IN REPORTING PERIOD: 672 '
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACIT'! #AWo-Net): 1150
- DESIGN ELECTRICAL RATING (MWe-Net): 1150
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE 4, REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS LUTICAL 672 1,416 4,705
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 327
- 7. HOURS GENERATOR ON LINE 672 1,416 4,661
- 8. UNIT RESERVE SHUTDOWN HOUFW 0 0 0
- 9. GROSS THERMAL ENERGY GEf ERATED (:AWH) 1,545,139. 4,010,522 14,634,480-
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 509,180 1,349,590. -4,936,817
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 481,799 1,290,287 4,722,093
- 12. REACTOR SERVICE FACTOR -100.0 100.0 93.5
- 13. REACTOR AVAILABILifY FACTOR 100.0 100.0 100.0 14 UNIT SERVICE FACTOR 100.0 1 )0.0 92.6.
- 15. UNIT AVAILABILITY FACTOR . '100.0 100.0 92.6
- 16. UNIT CAPACITY FACTOR (USING MDC) 62.3 79.2' 81.6
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) -62.3 79.2 81.6'
- 18. UNIT FORCED OUTAGE RATE . 0.0 . 0.0 1.2.
- 19. - SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYFE, DATE, AND DURATION OF EACH) :
Mid Cycle Outage to conserve fuel and perform equipment maintenance to begin April 17,1994, with an estimated duration of 47 days,
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21, UNITS IN TEST STATUS (PRIOR.TO COMMERCIAL OPERATION): ' ACHIEVED COMMERCIAL OPERATION -930803 ESTIMATED
, , . ,_.-,.~.__.-...u, _..u_. _ _ _ _ , _ . . . . . . . _
- .. . .. .... ..~ . . - ..-. . ... .
. . - ..~ . -. . .,
4
. [
ji Attachrhent to TXX-94070 ' !
Page 6 of 8 AVERAGE DA'LY UNIT POWER LEVEL 1
DOCKET NO.: 50-446 UNIT: CPSES 2 i DATE: 03/11/1994 COMPLETED BY: Janet Hughts TELEPHONE: 817-897-5331 MONTH t FEBRUARY 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL' (MWe Net) (MWe-Net) 1 867 17 572- .
890 570 2 18 3 850 19 571 4 859 20 571 5 596 21 575 6 572 22 567 ,-
7 579 23 572~
8 575 24 598 9 757 25 629
-l 10 1117 26 775 l
11 1111 27 766 j 12 881 28 764 ?l l
+
' 13 , 873' 29 14 864 30 15 578 31 16 576 A - - ,t e- m y V g *
. _ .. _ _ _ . ~ . . -_ .- . . _
. i Attachthent to TXX-94070 Page 7 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 03/11/1994 COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331 MONTH ; FEBRUARY 1994 DAY TIME REMARK / MODE 02/01 0000 Unit started month in MODE 1. Unit at 80% power, operating at reduced power for cycle optimitation purposes.
02/04 2045 Reduced power to 55% for fuel cycle optimization purposes.
02/10 0055 Increased power to 100% to support TU Electric system demand.
02/11 2130 Reduce power to 80% for fuel cycle optimization purposes.
f 02/13 1145 MSRs were taken out of service for miscellaneous Balance of Plant maintenance.
02/14 2107 Reduced power to 55% for fuel cycle optimization purposes.
4 02/25 1755 increased power to 73% for fuel optimization purposes.
02/27 0337 -Feedwater Heater was taken out of service for preventive maintenance inspections and the associated Heater Drain Valves were repaired dunn0 this inspection.
02/28 2400 Unit ended month in MODE 1 with reactor power at 75%.
l 1
-i
Attachment to TXX-94070 !
Page 8 cf 8 . .-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 03/11/1994 COMPLETED BY: Janet Hughes !
TELEPHONE: 817-897-5331 ,
REPORT MONTH - FEBRUARY 1994 .
METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS! COMMENTS 2 940201 S H 4 Reduced power operation for fuel cycle optimization purposes throughout the month. Major load changes indicated on previous page.
l
- 1) REASON 2) MF,400 A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION %NUAL B: MAINT OR TEST F: ADMINISTRATIVE . 'dANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3- AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: THER (EX~~.AIN)
_ .. . -. .