IR 05000400/1986013

From kanterella
Revision as of 10:06, 1 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Preoperational Insp Rept 50-400/86-13 on 860310-13.No Violation or Deviation Noted.Major Areas Inspected:Security Program & Organization,Security Audit & Physical Barriers. Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML20202J368
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/04/1986
From: Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20202J367 List:
References
50-400-86-13-01, 50-400-86-13-1, NUDOCS 8604160011
Download: ML20202J368 (1)


Text

y AFEGUARDS INFORMhTION UNITED STATES

[em af Cgo,^

? \

NUCLEAR REGULATORY COMMISSION f/ R EGION 11 h (I .M

r

,

e 101 MARIETTA STREET. ATL ANTA. GEORGt A 30323 y/*"**

APR 09 986'

Report No. 50-400/86-13 Licensee: Carelina Power and Light Company 411 Lafayette Street Raleigh, NC 27602 Docket No. 50-400 License No. CPPR-158 Facility Name: Shearon Harris Nuclear Power Plant Inspection Date: March 10-13, 1986 Inspector: 1tf)CAbl tfn

.hW.Tobid, '/b b nior Securitp Inspector Date Signed Approved by: h v _ _4o -

// 86 D. R. McGuire, Chief, Physical Security Section ~

Ddte ' Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This announced pre-operational inspection involved 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inspecting the following areas: Plan / Procedures, Security Program and Organization, Security Audit, Maintenance, Physical Barriers, Compensatory Measures, Communications, and Contingency Pla Results:

The licensee continues to meet its schedule for the final installation and implementation of its security program.

8604160011 860409 1 PDR ADOCK 05000400 G PDR ENCLOSURE CONTAINS I UPON 5F.PARATION THIS PAGE IS DECONTROLLED.