ML20202J365
| ML20202J365 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/09/1986 |
| From: | Panciera V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20202J367 | List: |
| References | |
| NUDOCS 8604160010 | |
| Download: ML20202J365 (2) | |
See also: IR 05000400/1986013
Text
_ ._ _ _ _
\\
-
'
SAFEc'"% u,qRMATION
APR 091986'
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engi1eering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT :
REPORT N0. 50-400/86-13
On March 10-13, 1986, NRC inspected activities authorized by NRC License
No. CPPR-158 for your Shearon Harris Nuclear Plant facility. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures to
this letter, with the exception of the report cover page which presents a non-
exempt summary, will s be placed in NRC'i Public Document Room.
Should you have any luestions concerning this letter, please contact us.
Sincerely,
Vincent W. Panciera, Chief
Reactor Projects Branch 2
Division of R3 actor Projects
Enclosure:
Inspection Report No. 50-400/86-13
(Safeguards I,1tormation)
cc w/ encl: (See page 2)
8604160010 060409
ADOCK 05000400
G
ENCLO5URE COMTAINS
SAT *.; GUARDS tlWC*MATION
SAFEGUARDS IMFCP,MATION
" "$ m a^" " = 8
PAGE IS DECONTROLLED.
s\\ 3 04
SAFEGUARDS INFORMATION
.
Carolina Power and Light Company
2
APR 0 91986
cc w/ enc 1:
R. A. Watson, Vice President
Harris Nuclear Project
R. M. Parsons, Project General Manager
J. L. Willis, Plant General Manager
bec w/ encl:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
Document Control Desk, 016
NRC Resident Inspector
State of North Carolina
.
RII
I
RII
,
RII
PFredricksos fgg"[auag e
{WT
- hlm
McGuire
K arr
J
hr
e
4/((/86
4/ /86
86
4/3/86
RDT
4/ /86
r;poy 3
- .oyy,
N E8 Dkoafnn
US
'
SAFEGUARDS INFORMATION'
'