Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2
ML20204H637
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/28/1999
From: Reible B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20204H641 List:
References
NUDOCS 9903290119
Download: ML20204H637 (8)


Text

.-. . . - - . . - - - . . .- -._._.-.- .-.-..-.. -.--.-.-.- -.

c Attachment to TXX-99066 Page 1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NRC MONTHLY OPERATING REPORT

. .. DOCKET NO.: 50-445 UNIT: CPSES 1  ;

DATE: 2/ 8/99  !

COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 i

OPERATING STATUS j

1. REPORTING PERIOD: FEBRUARY 1999 GROSS HOURS IN REPORTING PERIOD: 672
2. CURRENTLY AUTHOR! ZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
  • DESIGN ELECTRICAL RATING (MWe-Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE i

5 NUMBER OF HOURS REACTOR WAS CRITICAL 672 1,416 64,051 6 REACTOR RESERVE SHUTDOWN HOURS 0 0 2,632 7 HOURS GENERATOR ON LINE 672 1,416 63,375 '

8- UNIT RESERVE SHUTDOWN HOURS 0 0 0 ,

4 9 GROSS THERMAL ENERGY GENERATED (MWH) 2,287,025 4,818,792 208,059,236 5

-10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 772,583 1,627,835 69,578,312 11 NET ELECTRICAL ENERGY GENERATED (MWH) 743,700 1,566,764 66,475,039 12 REACTOR SERVICE FACTOR 100.0 100.0 85.5 13 REACTOR AVAILABILITY FACTOR 100.0 100.0 89.0

-94 UNIT SERVICE FACTOR 100.0 100.0 84.6 15 UNIT AVAILABILITY FACTOR 100.0 100.0 84.6 16 UNIT CAPACITY FACTOR (USING MDC) 96.2 96.2 77.2 17 ' UNIT CAPACITY FACTOR (USING DESIGN MWe) 96.2 96.2 77.2 18 UNIT FORCED OUTAGE RATE 0.0 0.0 3.6

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

20.' IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 900813.

ESTIMATED 9903290119 990315 7 PDR ADOCK 05000445)

R PDR j

l Attachment to TXX-99066 l Page 2 of.8

, AVERAGE DAILY UNIT POWER LEVEL l DOCKET NO.: 50445 UNIT: CPSES 1 DATE: 2/8/99 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 l-MONTH: FEBRUARY 1999 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) j l

1 1109 17 1108 2 1109 18 1108 3 1109 19 1108 4 1109 20 1108 4 1

5 1110 21 1108 6 1110 22 1108 7 1110 23 1108 l 8 1109 24 1108 9 1109 25 1108 10 1109 26 1091 l

l 11 1109 27 1075 12 1109 28 1108 13 1108 29 14 1108 30 15 1108 31 l

l- 16 1108

, ' Attachment to TXX-99066

[ Page 3 of 8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50-445 l UNIT: CPSES 1 i DATE: 2/8/99 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449

l

)

MONTH: FEBRUARY 1999 DAY TIME REMARK / MODE

02/01 0000 Unit began the month at 100% power.

02/28 2400 Unit ended the month at 100% power.

l I

l l

l l

f i

7 Y

Attachment to TXX-99066

. Page 4 of 8 t

UNIT SHUTDOWNS AND POWER REDUCTIONS .

4 DOCKET NO.: S)-445 UNIT: CPSES 1 '

DATE: '

2/8/99

. COMPLETED BY: ' ' Bob Reible TELEPHONE: 254-897-0449 i

I METHOD OF

-TYPE SHUTTING DOWN F: FORCED' DURATION

  • THE REACTOR OR - l NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTION / COMMENTS NONE LONE l

t i

i

1) REASON 2) METHOD te EQUIPMENT FAILURE (EXPLAIN) E OPERATOR TRAINING AND LICENSE EX/;5 NATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM  ;

D: REGULATORY RESTRICTION H: OTHER(EXPLAIN) 4: OTHER(EXPLAIN)

  • INDICATES SHUTDOWN HOURS /OTHERWISE "NA" FOR NOT APPLICABLE

. _ . _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ - _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .____ __ ___ _ ______ _.___ _ _ ~

Attichment to TXX-99066 Piga 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NRC MONTHLY OPERATING REPORT

. .- DOCKET NO.: 50-445 UNIT: CPSES 2 DATE: 2/8/99 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 OPERATING STATUS

1. REPORTING PERIOD: JANUARY 1999 GROSS HOURS IN REPORTING PERIOD: 672
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
  • DESIGN ELECTRICAL RATING (MWe-Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 672 1,376 42,225
6. REACTOR RESERVE SHUTDOWN HOURS 0 40 2,366
7. HOURS GENERATOR ON LINE 672 1,376 41,893
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,285,275 4,597,310 136,464,323
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 778,725 1,564,305 46,099,038
11. NET ELECTRICAL ENERGY GENERATED (MWH) 749,277 1,502,517 44,138,594
12. REACTOR SERVICE FACTOR 100.0 97.2 86.4
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 91.3
14. UNIT SERVICE FACTOR 100.0 96.3 85.7
15. UNIT AVAILABILITY FACTOR 100.0 96.3 85.7
16. UNIT CAPACITY FACTOR (USING MDC) 97.0 92.3 78.6
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 97.0 92.3 78.6
18. UNIT FORCED OUTAGE RATE 0.0 3.7 4.6
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATED

Attachment to TXX-99066 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-446 l s .. UNIT: CPSES 2 l DATE: 2/ 8/99 COMPLETED BY: Bob Reible i TELEPHONE: 254-897-0449 i

MONTH: FEBRUARY 1999 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL

DAY . (MWe-Net) DAY (MWe-Net) 1 1119 17 1118 2 1118 18 1118 3 1118 19 1117 4 1119 20 1118 5 1119 21 1118 6 1119 22 1118 7 1118 23 1117 8 1118 24 1118 9 .1118 25 1115 10 1118 26 1117 11 1118 27 1118 12 1118 28 1118 13 1112 29 14 1045 30 15 1118 31 16 1118 f-l I

+

(

Attachment to TXX-99066

. Pags 7 of 8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50-446

, .- UNIT: CPSES 2 DATE: 2/8/99 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 MONTH: FEBRUARY 1999 DAY TIME REMARK / MODE 02/01 0000 Unit began the month at 100% power.

02/28 2400 Unit ended the month at 100% power.

l l

., - , - _ . . m ' ' ' " '

Attachment to TXX-99066 Page 8 of 8 ',

UNIT SHUTDOWNS AND POWER REDUCTIONS ,

DOCKET NO.: e 50 6 UNIT:' CPSES 2 DATE: .

2/8/99 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 i METHOD OF I

TYPE SHUTTING DOWN F: FORCED DURATION

  • THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTION / COMMENTS NONE NONE
1) REASON 2) METHOD A EQUIPMENT FAILURE (EXPLAIN) E: OPERATORTRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM '

D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

  • INDICATES SHUTDOWN HOURS /OTHERWISE *NA" FOR NOT APPLICABLE

_ _ _ _ _ _ - - _ _ _ _ - _ - _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ - _ - _ - _ - _ - _ _ _ _ _ _ _ - _ _ _ _ - .