MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
MWE.
( t TEXAS UTluTIES GEi4ERATING CO. NU REVISICN O E PAGE CPSES i
QI-QP-11.13-1 0 JUN 2 3 1981 1 of 5 PREPARED BY: 4 ., ,
/#
~
b2 O/
DATE AS-BUILT PIPING VERIFICATION { g INSTRUCTIONS '
> z ,_
APPROVED c d2h
! OATE
1.0 REFERENCES
1-A CP-EI-4.5-1, "As-8uilt Piping Veri fication" 2.0 GENERAL 2.1 PURPOSE AND SCOPE F O R plhi' L/ dn .17t n . ,
i Ws t ig '
This instruction e.itablishes the method utiliz b'n y .thn y'gA As-Built Coordina tor to conduct ve ri fica ti on of draw ng packages issued in the As-Built Piping Verification Progran
[ (Reference 1-A).
2.2 DEFINITIONS -
Point of Ent ry - A point at which fluid flow enters the subject pipe c onfigu ra tion, as depicted on i sone tric drawi ngs.
Point of Exi t - A point at which fluid fl ow exits the subject pipe c onfigu ra tion, as depicted on i s one tric d rawings . =
I i ,
2.3 EQUIPMENT l
Transi t '
l Surveyor's Level Level Rod * '
C ~ " " ""* F01A-85-59 i Ca rpenter's Level I
6' Engineer's Rule i i Chalk Box l
,,,,,,%. TUGCC 0A 60 7 060021 CARDE85-59 PDR
. _ . _ - -=
(. ( .
( INSTRUCTICN IIOUI AEVISION PAGE l
^
TEXAS UTIUTIES GENERATING CO. l
, QI-QP-11.13-1 0 JUN 2 31981 2 of 5 3
1 3.0 INSTRUCTION t 3.1 VERIFICATION OF BRP ORAWINGS i
3.1.1 Dimensions All dimensions and elevations shall be verified beginning at point of entr/ (see definitions) and proceeding in the dintetion of flow to the point of exit. All measurements shall be taken to the nearest inch. When this cannot be achieved, the Technical Services As-Built Coon 11nator will be contacted to detennine what accuracy is required. .
f If a dimension is as per drawing it shall be circled and t
checked. If a dimension is at variance with the drawing J
t it shall be ci rcled and the As-Built dimension written
- l adjacent to the circle. ,
l
, a) Elevations shall be taken fran a defined point, i.e.;
top of pipe. Elevations, for each BRP, shall be in
, reference to the elevation monument.
1
. Whenever possible a surveyor's level and a level rod
! shall be used to detennine elevations. If necessary, a i
steel tape may be used to measure vertical lengths, t
- b) Horizontal dimensions shall be verified by measurement * '
to and fran defined points, i.e.; connections, hangers, !
etc.. Such measurements shall be taken using a steel '
tape and plumb bob (when necessary) to obtain a tnae l horizontal length.
c) If a ve rtical run of pipe can be detennined to be
- out-of-plumb, visually, the Technical Services As-Built j
~
Coonfinator will be contacted to detennine the degree I of plu1bness required.
3.1.2 Valves I The valve 1ocation and mark (type) number shalI be verifled.
j For all valves 21s inches nominal pipe size and' larger, as i well as power actuated 2 inches noninal pipe size and i smaller valves, the valve orientation shall be shown on the i BRP and verified.
% ,, TtJGCC CA
( q I
, INSTRUCTION REVIS10N ISSUE PAGE I
( NUMBER OATE TEXAS UTILITIES GENERATING CO. l QI-QP-11.13-1 0 JUN 2 3 1981 3 of 9 If the valve is oriented as per drawing it shall be cimled and checked. If orientation is at variance with drawing then the valve will be circled and an estimate of actual l orientation shall be written adjacent to the circle.
3.1.3 Sleeves The following infonnation shall be verified for all piping passing through structural walls and floors.
a) Identification of pipe sleeve shall be shown on BRP and
] As-Built Checklist.
b) Sleeve eccentricity (if any) shall be detennined by measuring the clearance between the pipe and sleeve in 4 positions, each 90* fran the other. This infonnation will be'sh mn on As-Built Checklist.
l( c) Inside diameter of sleeve shall be shown on As-Built Checklist. -
d) Loca tion of sleeve wi th respect to building column lines shall be shown on BRP d rawing, by dimensi on ve rification desc ribed in 3.1.1.
e) Type of sealing material used between pipe and sleeve shall be shown on As-Built Checklist.
4 3.1.4 Interconnecting Equipment All interconnecting equipment such as pumps, tanks, i
strainers, etc. shall be clearly identified on the BRP. This shall include as a minimum the equipment mark number. The orientation of any item that is totally supported by the j interconnecting piping shall be clearly shown on the BRP.
t If the above infonnaticn is found to be as shown on draw'ing, the equipment iten shall be circled and checked. If there exists some variance then the item shall be circled and the appropriate infonnation shall be noted adjacent to the circle.
2 i l i
Tuoco c4 l
, ( I
( INSTRUCTION REVISION ISSUE PAGE TEXAS UTILITIES GENERATING CO.
" ^
CPSES }
QI-QP-11.13-1 0 4 of 5 ;
GUN 2 3 1981 t,
3.2 VERIFICATION OF BRHL ORAWINGS:
All BRHL drawings shall be veri fied to ascertain the following:
a) The number of installed hangers agrees with the number j shown on the BRHL. This shall be shown on the As-Built i Checklist. -
b) The actual mark nisnbers ag ree wi th the mark nurabers shown on the BRHL. If this is the case, the number shall be circled and a check shall be made adjacent -
to the circle. If the numbers do not agree the number appea ring on the drawing shall be ci rcled and the As-Built number written adjacent to it.
c) The dimensi onal loca tion of each support shall be
(- veri fied and recorded in manner delineated in 3.1.1.
d) Hange rs designated anchors that are cast in concrete shall be verified in place. This shall be shown on the As-Built Checklist.
e) The orientation of the hangers agree with that shown i
on the BRHL. If this is the case the hanger shall be ci rcled and checked on the d rawing. If the orientation is at variance, with that shown on the BRHL, the hange r will be ci rcled and the As-Built orientation shall be shown adjacent to the ci rcle.
i j 3.3 VERIFICATION OF GHH-BRHL DRAWINGS:
l All GHH-BRHL drawings shall be verified according to 3.2.
For piping designated pa rt of Class 1. Stress P robleia,
' the GHH-BRHL shall also be verified that a stiffness or "K" value is shown for each suppo rt. If value is as pe r d rawing, the value will be ci rcled and checked. If value di f fe rs fran As-Bui l t value, then value will be circled and the As-Built value shall be written ad- '
jacent to the circle.
i 3.4 VERIFICATION OF BRH'S !
Dimensions shown on the BRH hanger sketch shall be verified if hange rs appear misaligned or incorrectly installed.
Determination as to the need of verification shall be the
. ,,,,,,,,,,, TUGCC CA
__ _ _ _______ __-____ J _ _ _ _ - - __ -
h.i. (::
i I
INSTRUCTION REVISION ISSUE I
( NUMBER DATE PAGE TEXAS UTluTIES GENERATING CO. I i CPSES QI-QP-11.13-1 0 JUN 2 3 1981 5 of 5 i
! i i
responsibility of the Quali ty Assu rance As-Built i l Coo rdina tor. The method used in verification of BRH's shall l also be determined by the Quality Assu rance As-Bui l t Coordinator on a case-by-case basis.
3.5 AS-BUILT CHECKLIST Upon canpletion of the As-Built verification in the field, the QA As-Built Coordinator shall review the drawing package
]- and conplete the As-Built Checklist. The package is then i j distributed in the manner outlined in Reference 1-A. ;