Rev 0 to Maint & Insp Procedure Mi 3, Procedure for Confirming Full Thread Engagement Via Eye Rod Measurement for Rigid Sway Struts. Related Documentation EnclML20205Q668 |
Person / Time |
---|
Site: |
Comanche Peak ![Luminant icon.png](/w/images/d/d7/Luminant_icon.png) |
---|
Issue date: |
09/26/1980 |
---|
From: |
NPS INDUSTRIES, INC. |
---|
To: |
|
---|
Shared Package |
---|
ML20205Q559 |
List: |
---|
References |
---|
FOIA-85-59 MI-3, NUDOCS 8606020322 |
Download: ML20205Q668 (4) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
-
.g npsindustries,ino c~~ h
~
Maintenance & Inspection hg g. 7 os / .
Dated Revision No.
MI No. 0 3 9/26/80 PROCEDURE FOR CONFIRMING FULL THREAD TITLE: ENGAGEMENT VIA EYE ROD MEASUREMENT FOR RIGID SWAY STRUTS ,
SCOPE OF: ,
E0RMATLON COPY i
?P3V m
~
APPROVAL SIGNATURES Original Issue Rev.1 Rev.2 Rev.3 Prepared By: ,
7)2 $O Checked By: M 9[80((6 Approved By: , 7 v i t 60 2 060521 GARDE 85-59 PDR
. .m - -
ops Industn,es,,Inc.- yetp; .999, t nps j 4 , , g,f Maint.enance & s
(. Inspectic.
~
l Revision No.
Title:
3 '
O PROCEDURE FOR CONFIRMING FULL THREAD . #3
- ENGAGEMENT VIA EYE ROD MEASUREMENT FOR RIGID SWAY STRUTS Page_ 1 or g I Date: '
9/26/80 ,
I i
A. Forged Eye Rods: l I
- 1. Determine sway strut size by measurement of rod diameter or checking size code forged into the eye' rod.
- 2. Verify design C-C equals or exceeds the minimum value listed in -
l Table 1 or Measure L and determine if it equals or exceeds the ;
minimum value listed in Table 1. ;
3A. If C-C or L equals or exceeds minimum value, verify DL and DR do not exceed maximum values listed.
3B. If C-C or L is less than the minimum value, unpin one end of
- strut and verify by unscrewing rod ends that the ends are upset and/or are ibily engaged.
l TABLE 1 l ROD SIZE STRUT SIZE C-C MIN. L MIN. DL MAX. DR MAX.
3/4 06 19-3/8 9-1/2 5 .13/16 6-9/16 1 08 21-1/2 10 6 ,1/2 7-1/2 1-1/4 .10 24-3/4 10-1/2 7-3/4 9 .
1-1/2 12 23-1/4 11 6-5/8 8-1/8 1-3/4 14 -
28-1/4 11-1/2 8-3/4 10-1/2 DL DR
( xxx.)
~
( NA X. /
L C . . . , n m ,1. , , m , , m . __.g
- t. c ,,,m _ .nm M s QW
- . m. _ _ = ;L_ , .
- Hqiun- .,
y C-C .
~
??@
4e
. . . . - . - . . . . . ~ - . - . - . - . - . . - - - - - . - - ._--
g
- w npS InC}OStn,es,,inC.
Ad//ng,D&v w
l nps . Q // dJ3' ,
t
] Maint &~
~
Revision No.
Title:
0 PROCEDURE FOR CONFIRMING FULL THREAD MIY3 I
, ENGAGEMENT VIA EYE ROD MEASUREMENT FOR ,
RIGID SWAY STRUTS Page l or p [
9/26/80 5 t
. i B. Fabricated Eye Rods: i i
- 1. Determine sway strut size by measurement of rod diameter. .
- 2. If strut is Size 20, detemine if it. is long pattern or short i pattern by measuring E.
}
- 3. Verify design C-C equals or exceeds the minimum value listed in Table 2 or measure L and determine if it equals or exceeds the minimum value listed in Table 2.
4A. If C-C or L equals or exceeds minimum value, verify FL and FR do not exceed maximum values listed.
4B. If C-C or L is less than the minimum value, unpir strut and verify by unscrewing rod ends that the en!s are 0eEMTION s
upset and/or are fbily engaged. S 7
/{ "J y['f3a w;;j]T{f
[ TABLE 2 {
ROD SIZE D. D.Dl./s E STRUT SIZE C-C MIN. L MIN. rt mA . rn m.
3/4 -
06 ' 19-5/8 9-i/2 5-7/16 6-3/16 1 - 08 21-1/8 10 5-13/16 6-13/16 1-1/4 - 10 24-1/8 10-1/2 6-15/16 8-3/16 1-3/4 - 14 31 11-1/2 9-5/8 11-3/8 2-1/2 5-3/8 20 (short) 31-1/2 13 8-3/4 11-1/4 2-1/2 8-5/8 20 (long). 38 13 12 14-1/2 3 -
24 41-1/4 14 12-7/8 15-7/8 : I 4-1/2 - 36 54-1/2 17 17-1/4 21-3/4 FL FR
~
' ~
( NA X. )
( M A X.)
_ L .
+
E "
n, -
/',.s , ,,,n,.,nnnn,.nm _ __4,J _
A_ m.. _ ,. , _.m.; a gn >c ' -
- 1) _
.7 -
--e ;.3.--
,, , , . n o 14 1
gt w
a C-C -
~l
.s . . _-.
.,- y . - ,
- __ _ . - - . . _ ,_.-a -#
\L '
l/[ f g',jyQ ,._
$ n n -
nps industnes.ninc.
~ -
4 ~
one herrnonpfozo
$ a o/#
Qp$-
- secoucus.newJerseg07094 201863 6550 telex 14-1435 October 23, 1980 HPSI-12-1052 Texas Utilities Services, Inc. Yh.
p P.O. Box 1002 g O- f Cg#p Glen Rose, Texas 76043 9 y Pg Attention: J.T. Merritt, Jr./R.T. Wolantejus 8g
Subject:
Texas Utilities Gen. Co. 64 Comanche Peak Stm. Elec. Sta. , , _ , ,
Units 1 and 2 Purchase Order No. CP0046 A.1
Subject:
(PMI No. 3.1.2) Thread Upsetting on Welded Sway Struts Ref. : NPSI-12-1016, TUX-12,489 Gentlemen:
NPS Industries is-transmitting to TUSI (PMI No. 3.1.2, Rev. 0)
Thread Upsetting on Welded Sway Struts procedure for your use.
If I can be of.any further assistance,. please do not hesitate -
to contact me.
Very truly yours, NPS INDUSTRIES, INC.
MA Herman W. D'Errico Project Manager ,
IrdD :rc: ;
Attachments: (1) 2 pages cc: H.R. Rock, G&H 2L .
D.C. Frankum, B&R 1L J.T. Merritt, TUSI OL, 1L, 1A R.E. Holloway, G&H 1L ,
J. Oliver, NPSI G TUSI 1L 4