Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20055E2841990-05-30030 May 1990 Final Response to FOIA Request.App C Record Encl & Available in PDR ML20246D8951989-08-18018 August 1989 Forwards Safety Evaluation Re Dispute Between Case & Util on Acceptability of Jul 1982 RCS Cold Hydrostatic Test ML20247Q4001989-07-27027 July 1989 Advises That Recipient 890713 Motion to Reopen Record Withdrawn,Per 890725 Request.W/Certificate of Svc.Served on 890729 ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245D0521989-06-16016 June 1989 Informs of Understanding of Dispute Between Case & Texas Utilities Electric Co,Including Issues Involved in Dispute & Update on NRR Plans for Resolution.Summary of Understanding of Dispute Encl ML20244B1211989-06-0909 June 1989 Partial Response to FOIA Request for Documents.Forwards App E & F Documents.App E Documents Also Available in Pdr.App F Documents Partially Withheld (Ref FOIA Exemptions 5,6 & 7). App G Totally Withheld (Ref FOIA Eexemption 7) ML20245J9461989-04-25025 April 1989 Partial Response to FOIA Request for Records.App B & C Records Available in Pdr.App D Documents Provided to Requestor But Not Publically Available Since Related to Oia Investigation Re Allegations by Client ML20247G6141989-03-28028 March 1989 Advises of Plans to Resolve Case Dispute W/Util Re RCS Cold Hydrostatic Test for Plant Conducted & Recorded in 1982,per Case 890313 & 17 Ltrs.Public Meeting Will Be Held in Arlington,Tx to Assure That NRC Understands All Info ML20235G1771989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) IA-88-524, Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6)1989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) ML20206H0921988-11-17017 November 1988 Partial Response to FOIA Request for Documents.Forwards App F Documents.App F Documents Also Available in PDR ML20206H5971988-11-14014 November 1988 Responds to Appeal of Partial Denial of FOIA Request for App F Documents.Request Approved in Part & Denied in Part. Portions of Documents 1,3,5,23,25 & Attachments to Document 20 Withheld (Ref FOIA Exemption 5) ML20206H4941988-11-10010 November 1988 Final Response to FOIA Request for Documents.Forwards Documents Listed in App a ML20206E7741988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App B.Documents Being Placed in Pdr.App a Documents Also Available in Pdr.Documents Listed in App C Totally Withheld (Ref FOIA Exemption 5) ML20195G1951988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents & Records Available in Pdr.App D Documents Also Available in PDR ML20206C1801988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl IA-88-152, Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl1988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl ML20205E9561988-10-0505 October 1988 Final Response to FOIA Request for Documents.Forwards App B Documents.Apps a & B Documents Also Available in PDR ML20151W5631988-08-16016 August 1988 Forwards Memo to Jg Partlow Re Mutually Agreed Upon Interpretation of Certain Provisions of Joint Stipulation in Proceeding.W/O Encl.Related Correspondence ML20196H0571988-06-23023 June 1988 Forwards Draft Pages from Ofc of Inspector & Auditor Rept 86-10, Allegations of Misconduct by Region IV Mgt Re Comanche Peak Steam Electric Station, Per Attached List.W/O Encls.Related Correspondence ML20195E8821988-06-15015 June 1988 Third Partial Response to FOIA Request for Documents.App C, E,F & G Documents Encl & Available in Pdr.App D Documents Available in Pdr.Portions of Records Subj to Request Withheld (Ref FOIA Exemptions 4,5,6 & 7) ML20155C3731988-05-25025 May 1988 Advises of Projected Schedule for Issuance of NRC Ssers Re Collective Significance & Evaluation Repts,Per . Next Rept on Cable Trays Should Be Issued on 880624 & Sser Re Environ Activities Anticipated on 880630 ML20155C3071988-05-24024 May 1988 Advises That NRC Counsel Will Not Be Executing Nondisclosure Statement,Per NRC Manual Chapter Governing Treatement of Protected Info by NRC Employees,Per Recipient ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20148J7801988-03-25025 March 1988 Final Response to FOIA Request for Documents Re Insp Repts 50-445/87-27 & 50-446/87-20.App B Documents Encl.App a Documents Available in PDR ML20150C7341988-03-15015 March 1988 Final Response to FOIA Request for Documents.App I Documents Encl & Available in Pdr.App J Records Totally Withheld (Ref FOIA Exemption 5) ML20150C1241988-03-14014 March 1988 Final Response to FOIA Request for Documents.Forwards App F Documents.Apps E & F Documents Available in PDR ML20147E4681988-03-0202 March 1988 Partial Response to FOIA Request.App C Documents Encl & Available in Pdr.App D Documents Re Insp Repts 50-445/85-07 & 50-446/85-05,Ofc of Inspector & Auditor Rept 86-10 & ASME Code Hydrostatic Test Encl & Available in PDR ML20147D7651988-03-0101 March 1988 Final Response to FOIA Request for Documents Re Insp Repts 50-445/87-23 & 50-446/87-17.Forwards App B Document.App a & B Documents Available in PDR ML20196B2161988-02-0505 February 1988 Responds to Appeal of Denial of FOIA Request for Documents Listed on App C,Per Dh Grimsley .Encl Documents Listed on App Also in Pdr.Documents Partially Withheld (Ref FOIA Exemptions 5 & 7) ML20147B3821988-01-13013 January 1988 Final Response to FOIA Request.App H Documents Re Correction to Ofc of Inspector & Auditor Rept Encl & Being Made Available in PDR ML20147C0281988-01-12012 January 1988 Final Response to FOIA Request for Documents Re Safeteam Program.Forwards App I & J Documents.App H & I Documents Available in Pdr.Other Records Available in Pdr.App J Documents Partially Withheld (Ref FOIA Exemption 6) IA-87-634, Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr Dtd 8712101988-01-11011 January 1988 Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr Dtd 871210 ML20147A8261988-01-11011 January 1988 Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr ML20237A5081987-12-10010 December 1987 Partial Response to FOIA Request.Forwards App G Documents. Documents Also Available in PDR ML20236X5841987-12-0808 December 1987 Final Response to 871106 Appeal of Dh Grimsley 871027 Denial of Documents for FOIA Request Re Keppler to Counsil on Facility.Listed Document Partially Released & Encl.Stated Documents Withheld (Ref FOIA Exemption 5) ML20236V6351987-12-0202 December 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Stello 871021 Memo Establishing Comanche Peak Rept Review Group & Notes of Stello Meeting W/Involved Individuals.Info Withheld (Ref FOIA Exemption 6) ML20236V7221987-12-0202 December 1987 Provides Details of How NRC Will Make Documents Available to Parties Once Sser Issued Re Project Status Rept.Procedure Should Obviate Necessity for Any Party to File for FOIA Request or Production of Documents.Related Correspondence ML20236S4271987-11-19019 November 1987 Further Response to Appeals of FOIA Request for Records Re Evaluation of issue-specific Action Plan Re Plant.Documents I.2.b & I.10 Addressed in Responses to FOIA 86-A-203 & 86-A-204 & Contained in Other Documents Available in PDR ML20236Q5511987-11-17017 November 1987 Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR IA-87-684, Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR1987-11-17017 November 1987 Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR DD-87-17, Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 8711171987-11-17017 November 1987 Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 871117 ML20236P2581987-11-13013 November 1987 Advises of Tentatively Scheduled 871209 Public Meeting in Dallas,Tx to Discuss NRC Review of Corrective Actions Described in Util 870625,0820,28,0908 & 23 Ltrs.Comments Requested by 871201 for Inclusion in Agenda ML20236L7401987-11-0909 November 1987 Partial Response to FOIA Request for Documents Re Implementation of Piping Generic Technical Issue Resolution.Forwards Documents Listed in App A.App a Documents Available in PDR ML20236K0871987-11-0404 November 1987 Response to Appeal of Denial of FOIA Request for Documents Re Insp Rept 50-455/87-07 & 50-446/87-06.Documents Listed in Encl App Will Continue to Be Withheld (Ref FOIA Exemption 5) ML20245D0621987-11-0303 November 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Ofc of Investigations Investigation 4-84-050.Forwards Portions of Transmittal Memo Listed on App.Remaining Documents Continue to Be Withheld (Ref FOIA Exemptions 5) ML20236G6301987-10-30030 October 1987 Final Response to FOIA Request for Documents,Including V Stello 870414 Memo Re Comanche Peak Rept Review Group.Encl App B Documents Also in Pdr.App B & C Documents Partially & Completely Withheld (Ref FOIA Exemption 5) ML20236J9541987-10-29029 October 1987 Final Response to FOIA Request.App a Documents Re Mgt of Allegations Already Available in Pdr.App B Document Encl & Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) ML20245C4291987-10-29029 October 1987 Partial Response to FOIA Request Re Plant.App a Records Available in Pdr.App B Records Encl & in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5).App D Documents Partially Withheld (Ref FOIA Eexemption 6) ML20236D8821987-10-27027 October 1987 Partial Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Documents Encl & Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) 1990-05-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised ML20207D7111999-05-28028 May 1999 Advises That Info Contained in Licensee 990514 Submittal Re License Amend Request 98-01-0 Will Be Withheld from Public Disclosure,Per 10CFR2.790. 10CFR2.790 ML20207D7011999-05-27027 May 1999 Advises That Info Contained in TU Electric 990514 Submittal (TXX-99115) Re License Amend Request 98-010 Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 990511 Application & Affidavit ML20207B7241999-05-25025 May 1999 Advises That Info Contained in Application & Affidavit 990507 (CAW-99-1333),submitting WCAP-15004,dtd Dec 1997,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 ML20206P5961999-05-12012 May 1999 Forwards Insp Repts 50-445/99-09 & 50-446/99-09 on 990419- 23.No Violations Noted.Nrc Determined That Releases of Radioactive Waste Effluents Controlled,Monitored & Quantified Well ML20206N7061999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206S5841999-05-11011 May 1999 Forwards Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint & Acceptable Radiological Controls ML20206K0311999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info,Without Encl ML20206H1701999-05-0606 May 1999 Forwards Copy of Exemption & Safety Evaluation Supporting Requirement in App K to 10CFR50.Proposal Will Use New Feedwater Flow Measurement Sys to Allow More Accurate Measurement to Thermal Power ML20206K3931999-05-0505 May 1999 Ltr Contract,Task Order 41, Comanche Peak Safety System Engineering Insp, Under Contract NRC-03-98-021 ML20206G1221999-05-0303 May 1999 Discusses 981215 Request That Document, Responses & Further Clarifications to NRC Questions from 980929 Meeting, Be Withheld from Public Disclosure.Determined Information to Be Proprietary & Will Be Withheld from Public Disclosure ML20206F5711999-04-30030 April 1999 Forwards Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Insp Re Focus on Radiation Protection Program Activities During Unit 2 Refueling Outage ML20206E5211999-04-27027 April 1999 Discusses GL 96-01 Issued on 960110 & TU Responses, ,970102 & 980502 for Cpses,Units 1 & 2.Determined That Submittals Provided Both Info Requested & Responses Required by GL 96-01 ML20206B3831999-04-23023 April 1999 Forwards FEMA Final Rept for 990311,Comanche Peak Steam Electric Station Medical Drill.No Deficiencies or Areas Requiring Corrective Actions Identified ML20206B5321999-04-22022 April 1999 Ack Receipt of Ltrs Dtd 970407,09 & 0204,which Transmitted Revs 6 & 7 to Safeguards Continency Plan,Rev 10 to Security Training & Qualification Plan & Rev 29 to Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20206A2301999-04-14014 April 1999 Refers to Public Meeting Conducted on 990329 in Glen Rose, Tx Re Results of Plant Performance Review Completed on 990211 & Transmitted to Licensee on 990319.List of Attendees Encl ML20205L8711999-04-0707 April 1999 Forwards Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Were Identified.Review of Operability Evaluation Re MOVs Disclosed That Licensee Failed to Include Info About Degraded ECCS Performance ML20205L1051999-04-0606 April 1999 Informs of Completion of Review of Tuec 980312 Submittal Re GL 97-05, SG Tube Insp Techniques. No Concerns Identified with SG Insp Techniques Employed at Cpses,Units 1 & 2,that Would Indicate Noncompliance with Current Licensing Basis ML20205F9141999-04-0101 April 1999 Informs That as of 990329 Dh Jaffe Has Been Assigned as Senior Project Manager for Plant IR 05000446/19920491999-03-24024 March 1999 Discusses Concern That Postulated Fire in CR Could Create Single Hot Short in Control Circuitry of MOVs Resulting in Spurious Operation.Required Hardware Mods Implemented to Control Circuits of Affected Mov,Per Insp Rept 50-446/92-49 ML20204F3311999-03-23023 March 1999 Forwards Discussion Items for 990323 Telcon 1999-09-07
[Table view] |
Text
_ _ _ _ -
[p areg'o ~ UNITED STATES
'!~ o NUCLEAR REGULATORY COMMISSION h 7C WASHING TON, D. C. 20555 1 %.....[ gg 21 1960 l
Docket Nos. 50-445/50-446 l
Ms. Billie Pirner Garde Director, Environmerdui Whistleblower Clinic Government Accountability Project IN RESPONSE REFER 1555 Connecticut Avenue, NW, Suite 202 TO F01A-85-59 Washington, DC 20036
Dear Ms. Garde:
This is in further response to your letter dated January 21, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), records related to the NRC Comanche Peak Task Force established in March 1984.
With the exception of one record (number one) which is undergoing further staff review and is identified by an asterisk on the enclosed Appendix J, we are now placing one additional box of records (box 9) in the QA/QC category, covering Appendix J records numbered 1 through 472, into the NRC Public Document Room (PDR) in file F0IA-85-59 under your name.
The Appendix J records identified 'at numbers 2, 3, 448, 450, 452, 455, 457, and 458 contain deletions without invocation of an F0IA exemption in accordance with the agreement reached between you and the NRC staff at a meeting held on May 8,1985, concerning your pending F0IA requests pertaining to the Comanche Peak Technical Review Team activities. This agreement was
! summarized in a letter to you from J. M. Felton, dated May 15, 1985. The information deleted consists of personal infonnation and information that could reveal the identities of allegers.
A separate set of the oisclosed records is being made available for public inspection and copying at the Local Public Document Room (LPDR) located at the University of Texas Library, 701 South Cooper Street, Arlington, Texas.
Additional boxes of records in the QA/QC category are currently under review and will be placed in the PDR and LPDR in the coming weeks.
Sincerely, l W /k A#
Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosure:
As stated hh60 3 860521 GARDE 85-59 PDR
I Re: F01A-85-59 APPENDIX J Box 9 QA/QC
_Date Description P_ age
- 1. 4-8-83 First page of a Report of Inquiry 1
- Q4-83-009 by Bullock, TRT
- 2. 7-84 Controlled Copy of list of Allegations 1 and/or Investigations Sumary
- 3. 8-24-83 G. L. Madsen, NRC, ltr to R. J. Gary, 19 TUGCO, Re: Inspection of March through July 1983 with NRC Inspection Report attached
- 4. 4-27-81 TUSI Procedure CP-EI-4.5-1, Rev. 1, 23
" General Program for As-Built Piping Verification"
- 5. 12-16-81 TUSI Procedure CP-EI-4.5-1, Rev 2, 12
" General Program for As-Built Piping verification"
- 6. 6-23-81 TUSI Procedure QI-QP-11.13-1 Rev 0 5 "As Built Piping Verification Instructions"
- 7. 9-17-81 TUSI Procedure QI-QP-11.13-1, Rev 1, As 8 Built Piping Verification Instructions
- 8. 1-20-82 TUSI Procedure QI-QP-11.13-1, Rev 2 "As 6 Built Piping Verfication Instructions
(
- 9. 1-28-82 TUSI Procedure CP-EI-4.5-1, Rev 3, 12
" General Program for As-Built Piping Verification"
- 10. 1-4-83 TUSI Procedure QI-QP-11.13-1, Rev 8 8 "As-Built Piping Verification Instructions"
- 11. 7-12-84 TUSI Procedure CP-EI-4.0-1, Rev 12 43
" Design & Design Verification Control for Pipe Support Engineering"
- 12. 7/30/84 TUSI Procedure,CP-EI-4.5-1, Rev. 10, 11
" General Program for As-Built Piping Verification
- 13. No Date Handwritten list of Hanger Numbers 1
- 14. No Date Handwritten Summary of 7914 Support 1 Inspections
- 15. No Date Handwritten - Changes in Allowable 1 Angular Error of QI-QAP-11-1-28
- 16. No Date Handwritten Calendar on Hanger Numbers 1
- 17. 4-17-79 Sketch - B&R - Mark #00-1-12-026-Y33R 2
- 18. 5-30-79 Hanger Package 00-1-012-026-Y33R 6
- 19. 4-3-81 Sketch, Dwg #BRHL-00-1-Y0-025 1
" Demineralized and Reactor Make-up I Water" l l
I
3 As-Built Reverification Report Form #2851
- 20. 3-21-83 15
- 21. 4-9-83 Documentation Check List 2
B&R Procedure QI-QAP-11.1-28-pg 26 & 52
- 22. 4-12-83 3
As Built Re-verification Report Form #6272
- 23. 7-18-83 1
- 24. 10-8-84 Support / Hanger Inspection Data Sheet 21 Sketches on Section A-A, As Built
- 25. 6-19-81
- RH-1-006-012-C42 R - Rev. 2 4
Sketches on Section A-A, As Built
- 26. 6-19-81
- RH-1-006-012-C42 R-Rev. 3 3
As Built Reverification Report Form #2012
- 27. 3-16-83 25
- 28. 8-3-83 Documentation Check List .
1
- 29. 10-9-84 Support / Hanger Inspection Data Shee.
l 1
J TUGCO, A. Vega to Hanger Package
' 30. No Date i 3 B&R Sketch #RH-1-006-006-C42R, Rev 2
- 31. 9-26-79
[ and Component Support Checklist i
25
- 32. 10-21-79 Material Record - Release # 3095 8
- 33. 10-27-79 ASME Documentation Checklist 20
- 34. 8-13-82 Material Verification Checklist 2
As-Built Re-Verification Report Form
- 35. 3-21-83
- 2011
B&R Procedure QI-QAP-11.1-28, Rev 21, 2
- 36. 6-29-83 Pages 27 and 45, " Job 35-1195" 25
- 37. 8-3-83 Documentation Check List 1
38, 10-10-84 Support / Hanger Inspection Data Sheet 1
- 39. No Date A. Vega, TUGC0 office Memo to Hanger Package 34
- 40. 7-9-80 ASME Occumentation Checklist As Built Reverification Report Form #2044 2
- 41. 3-2-83 12
- 42. 8-3-83 Documentation Check List B&R Sketch, BRHL-RH-1-RB-004, Rev 2 2
- 43. 8-12-83
' " Residual Heat Removal" ,
- 44. 9-16-83 B&R Sketch, BRHL-RH-1-SB-016, Rev 2, 1
" Residual Heat Removal" 1
- 45. 10-8-84 Support / Hanger Inspection Data Sheet 48
- 46. 7-24-79 ASMI Documentation Checklist B&R Receiving Inspection Report #15481 6
- 47. 9-12-80 i
- 48. 11-8-80 B&R Sketch CS-1-085-003-A42K
- 49. 12-5-8 B&R Sketch BRHL-CS-1-AB-001, Rev 4 1 Chemical & Volume Control Nonconformance Report, NCR #M5332-S 25
- 50. 2-18-83 As Built Reverification Report Form #2681 2
- 51. 3-15-83
. m- - - - - - - - - - - - - - . - - - - - - -
2
- 52. 5-11-83 As Built Reverification Report Form 4350 2
B&R Procedure QI-QAP-11.1-28, Rev 22,
- 53. 8-4-83 Pages 27 & 53 of 66, Job 35-1195 25
- 54. 10-24-83 Documentation Check List
. 1
- 55. 10-9-84 Support / Hanger Inspection Data Sheet 2
- 56. 4-30-79 Inspection Report #7156 2
- 57. 1-14-80 B&R Sketch FSE-00159 1
- 58. 2-25-80 Inspection Report #ME 1100 2
- 59. 3-7-80 Construction Operation Traveler 1
- 60. 5-30-80 Inspection Report #ME-3611 1
- 61. 6-17-80 Inspection Report #ME-3595 1
- 62. 6-19-80 Inspection Report ME-3790 1
, 63. 6-30-80 Inspection Report ME-3760 1
i 1 I 64. 6-24-80 Inspection Report ME-3822 1
- 65. 8-18-81 Inspection Report ME-6168 l
l l
- 66. 7-16-83 Design Change Authorization #5347, Rev 1 1 Construction Operation Traveler 2
- 67. 11-17-83 Continuation #5824 7
- 68. 12-11-83 Component Modification Card #11061, Rev 3 Inspection Report #ME-1-006155 4
- 69. 1-3-84 5
- 70. 1-11-84 Component Modification Card #93450 1
- 71. 1-20-84 Inspection Report ME-1-0016418 Design Change Authorization #3464 Rev. 23 31
/2. 5/11/84 Design Change Authorization #17,838, Rev 9 7
- 73. 9-25-84 TRT Summary Sheet 1
- 74. 10-11-84 Construction Operation Traveler 2
- 75. 1-12-81 1
- 76. 6-11-82 Inspection Report #109688 1
- 77. 7-8-82 Inspection Report #12566 Component Modification Card #71294 3
- 78. 7-28-82 1
- 79. 9-5-82 Sketch #FSE-00159 Design Change Authorization 6
- 80. 7-6-83 l
Inspection Report #MH-1-0010402 1
- 81. 1-10-84 Design Change Authorization #3462, Rev 15 3
- 82. 2-17-84 1
1 i
- 83. 2-17-84 Inspection Report #ME-1-0022582
7 Design Change Authorization #17,838 7
- 84. 9-25-84
- 85. No Date TRT Summary Sheet 1
- 86. 11-30-82 Construction Operation Traveler #90650 7
- 87. 3-15-83 Construction Operation Traveler 3
- MF-1-001244F
- 88. 3-15-83 Construction Operation Traveler 3
~
- ME-1-001244E
- 89. 4-11-83 Component Modification Card 90656 1
- 90. 5-24-83 Construction Operation Traveler #15552 3
- 91. 6-14-83 Design Change Authorization #15,552, Rev 4 6
- 92. 7-29-83 Inspection Report #IRME-36853 5
- 93. 8-3-83 Inspection Report #ME-235232 1
- 94. 8-3-83 Repair Process Sheet #NCR #M-83-01505 5
- 95. 10-22-83 Inspection Report #ME-39583 1
- 96. 1-11-84 Inspection Report #ME-1-001244 3
- 97. 3-21-84 Construction Operation Traveler 2
- 98. 5-16-84 Inspection Report #ME-1-001244 1
- 99. No Date TRT Summary Sheet 1
i .
6 100. 2-4-83 Design Change Authorization #16,049, Rev 1 3
101. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-1 3
102. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-2 3
103. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-3 2
104. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-5 2
105. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-6 2
106. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-7 %
3 107. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-9 Construction Operation Traveler 3
.. 108. 2-8-83
- EC-083-012021194-10 l
Construction Operation Traveler 3 109. 2-8-83
- EC-083-C12021194-11 2
110. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-12 Construction Operation Traveler 2 111. 2-8-83
- EC-083-C12021194-13
~,
)
2 112. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-14 2
113. 2-8-83 Construction Operation Traveler
- EC-083-C12021'.94-15 3
114. 2-10-83 Construction Operation Traveler
- EC-083-C12021194-4 3
115. 2-10-83 Construction Operation Traveler
- EC-083-C12021194-8 a ,
Construction Operation Traveler 3 116. 2-10-83
) #EC-083-C12021194-16 Construction Operation Traveler 3 117, 2-10-83
- EC-083-C12021194-17 q Construction Operation Traveler 3 118. 2-10-83 lh
- EC-083-C12021194-18 i)
- t i Construction Operation Traveler 3 lr 119. 2-11-83
- EC-083-C12021194-20 f
Ji 3 120. 2-11-83 Construction Operation Traveler f
- EC-083-C12021194-21 Construction Operation Traveler 3 121. 2-15-83
- EC-083-C12021194-19 1
122. 3-11-83 Inspection Report #MH-107465 4
123. 3-11-83 Inspection Report ME-35322F
1 124. 3-28-83 Component Modification Card #88434 3
125. 5-16-83 Construction Operation Traveler
- EC-083-C12021194-22 3
126. 5-16-83 Sketch 2323-S-0910 2
127. 5-23-83 Component Modification ard #90851, Pev 2 1
128. 6-8-83 Inspection Report #MH-70874 5
129. 7-29-83 Inspection Report #ME-36853 r
1 130. 10-23-83 Inspection Report #ME-39906 1
131. 10-11-84 TRT Summary Sheet 3
132. 5-14-79 Construction Operation Traveler
- ELE-79-CTH-06742 Construction Operation Traveler 3 133. 11-15-80 2
ELE-81-CTH-06742 Construction Operation Traveler #06742 2 134. 10-24-83
' 5 135. 1-11-84 Component Modification Card #93450 1 1
136, 2-16-84 Inspection Report MEl-0024909 32 137. 5-23-84 Design Change Authorization #3464, Rev 23 l
1 138. 10-11-84 TRT Summary Sheet l l
1 139. 11-15-78 TUSI Orawing 2323-M1-2104-07 Seismic Tubing Support Package 2323-I-001 26 140. 8-21-79
- ~ _ . _ ,
1 141. 3-7-80 Design Change Authorization #6905 1
142. 3-17-80 Component Modification Card #13659 1
143. 11-16-81 Component Modification Card #62456 1
144. 1-15-82 Inspection Report #1R-I-2779 6
145. 2-9-82 Construction Operation Traveler ME82-2213-5500 1
146. 2-18-82 Component Modification Card 62526 2
147. 2-22-82 Component Modification Card 58057 1
148. 3-29-82 Inspection Report #IR-I-3576 1
149. 10-31-82 Inspection Report #1R-I-6469 r 1
150. 12-30-82 Component Modification Card #42394, Rev 1 3
151. 12-30-82 Component Modification Card 66611 1
152. 3-2-83 Component Modification Card 72840 1
153. 3-12-83 Design Change Authorization #16,614 1
154. 5-1-84 TUGC0 Orawing 2323-M1-2603-01, Rev CP-1 2
155. 5-18-84 Design Change Authorization 12,212 R.1 TUGC0 Procedure QI-QP-11.8-2, Rev 14 4 156. 7-24-84
" Instrumentation Supports & Rack Assemblies" 1
1 157. 9-17-84 Orawing, TUGC0 #2323-MI-2503-03 Instrument Tabulation Sheet 1
158. 10-18-84 Support / Hanger Inspection Data Sheet 1
159. No Date TRT Checklist 1
160. 8-15-79 TUSI Orawing 2323-M1-2104-07 1
161. 1-15-82 Inspection Report IR-I-2778 1
162. 1-13-82 Component Modification Card #62533 ,
163. 1-13-82 Component Modification Card 62534 1 ;
1 164. 1-18-82 Component Modification Card 62541 Construction Operation Traveler 6 165. 2-9-82
- ME82-2213-3500 1 166. 3-29-82 Inspection Report IR-I-3575 1 Component Modification Card #72742 2 l 167. 8-13-82 Nonconformance Report #I-82-01433S 2 168. 9-16-82 e I.
1 169. 10-4-82 Inspection Report IR-I-5741 ;
i 170. 10-25-82 Inspection Report IR-I-6305 1 c
171. 5-1-84 TUGC0 Orawing 2323-MI-2603-01, Rev CP-1 1 , l Instrument Locations Containment i
Plan EL-808-0 Quadrant No. 2 t t
i
2 172. 5-18-84 Design Change Authorizatfor. #12,212 R.1 1
TUGC0 Orawing 2323-MI-2503-03 173. 9-17-84 Instrument Tabulation Sheet 1
174. 10-17-84 Support / Hanger Inspection Data Sheet 1
175. No Date B&R Drawing #FSI-1-378 Instrument Tubing 1
176. No Date TRT CMC Listing 1
i 177. No Date TRT Checklist 1
178. 11-15-78 TUSI Drawing #2323-M1-2104-07 1
179. 10-29-79 TUSI Drawing #FSI-00069, Seismic
! Tube Support Span Lengths 1
180. 3-7-80 Design Change Authorization #6905 1
181. 3-17-80 Component Modification Card 13659 l
1 182. 6-17-80 Component Modification Card #32343 l
m I Component Modification Card 42387 1
f 183. 11-19-80 L
1 184. 5-29-81 Inspection Report IR-1-1755 i
6 185. 2-9-82 Construction Operation Traveler ME82-2213-5500 2
186. 2-22-82 Component Modification Card #58057
_~,. - _ _ - - - . _ _ - .
i 1
1 187. 4-5-82 Inspection Report IR-I-3747 1 188. 4-22-82 Inspection Report IR-I-3902 1 189. 12-30-82 Component Modification Card #42394 1 Component Modification Card 66611 3 190. 12-30-82 191. 1-28-83 Component Modification Card 72906- 1 192. 3-2-83 Component Modification Card 72840 1 193. 13-21-83 Design Change Authorization #16,614 1 194. 7-27-83 Component Modification Card 73103 1 195. 5-18-84 Design Change Authorization 12,212 196. 6-1-84 Component Modification Card 96241< 1 197. 6-1-84 TUGC0 Drawing #2323-M1-2603-01 1 Instrument Locations 198. 9-17-84 TUGC0 Orawing #2323-M1-2503-03 1 Instrument Tabulation Sheet 199. 10-18-84 Support / Hanger Inspection Data Sheet 2 200. No Date TRT Checklist 1 201. No Date CMC Listing 1 e
202. 11-6-80 Nonconformance Report M-2507 2 f
203. 1-12-82 B&R Drawings BRHL-CC-1-FB-002, Rev 5 4 Component Cooling Water Nonconformance Report #M-5002S 2 204. 1-17-83 Nonconformance Report M-5003S 2 205. 1-17-83 Nonconformance Report M-5873S 2 206. 4-14-83 Nonconformance Report M-5874S 2 207. 4-14-83 208. 4-14-83 Nonconformance Report M-5872S 2 209. 8-24-84 TRT listing of Hanger / Supports to be 1 :
Stripped , ,
210. 10-1-84 TRT System Summary Sheet 4 211. No Date TRT System Summary List 1 -
l 212. 7-2-79 ASME Documentation Checklist 12 213. 8-31-79 Construction Operation Traveler 4 i
214. 7-1-82 B&R Sketch I l 215. 1-17-83 Nonconformance Report M5004S 3 T
216. 4-12-83 B&R Procedure QI-QAP-11.1-28, Rev 19 1 Pg 9 of 64 Job 35-1195 217. 4-20-83 Documentation Checklist 17
1 218. 9-20-84 Support / Hanger Ir.spection Data Sheet 1
R. G. Tolson, TUGCO, office Memo to 219. No Date Hanger Package
- 1 PPRV on Hanger Number 220. No Date 12 221. 7-7-79 QA Vault Documentation Package 14 Construction Operation Traveler 1 222. 8-31-79 l 18 Vendor Certification l
l 223. 7-8-82 l
.) 2 Nonconformance Report M5002S 224. 1-17-83 l
3 B&R Procedure QI-QAP-11.1-28, Rev 19 225. 4-12-83 Pg 7, 8, & 26 of 64. Job 35-1195 23
' 226. 4-28-83 QA Vault Documentation Package ,
3
! 227. 9-15-84 Support / Hanger Inspection Data Sheet
\ 1 R. G. Tolson office Memo to Hanger Package 228. No Date
- se 1
229. No Date PPRV to Hanger number I 12 230. 7-7-79 QA Record Documentation Package 13 231. 5-12-82 Documentation Checklist 4
Nonconformance Report #M58745 232. 4-14-83 17 233. 4-29-83 Documentation Checklist 1
i m - - - - e-- e-se. - - ,- --i. <es -e - m_ m--_ -7m. .-.m --
- -y
1 234. 9-10-84 Support / Hanger Inspection Data Sheet Work Package Index WASP #P-84-0086-CC 9 235. 9-24-84 236. No Date R. G. Tolson, office Memo to Hanger 1 Package 1
237. No Date PPRV on Hanger Number Weld Filler Material Log. #07879 2 238. 12-21-80 l
4 239. 12-30-80 Component Modification Card #10081 240. 1-9-81 Material Identification Log 1 2
241. 5-13-82 Material Verification Checklist 1
1 242. 10-21-82 B&R Sketch 1
243. 4-13-83 QC Component Support Checklist 1
244. 4-16-83 Occumentation Checklist 1
245. 7-5-83 B&R Sketch 3
246. 9-1-83 QC Component Support Checklist 4
247. 9-11-84 Support / Hanger Inspection Data Sheet R. G. Tolson, office memo to Hanger Pkg. 14 248. No Date 12 249. 7-7-79 QA Vault Documentation 1
250. 8-11-79 Construction Operation Traveler 1
i 7
251. 5-11-82 Documentation Checklist 4
Procedure Pages TUGC0-CP-QP-11.2 4 252. 3-3-83 Nonconformance Report M5872S 3 253. 4-14-83 25 254. 9-15-83 Documentation Checklist 1
255. 9-11-84 Support / Hanger Inspection Data Sheet 1
1 256. No Date R. G. Tolson office Memo to Hanger Pkg.
1 257. No Date PPRV to Hanger Number Weld Filler Material Log #42058 11 258. 2-17-81
\
20 259. 8-8-81 Hanger Package Procedure.QI-QAP-11.1-28, Rev 18 6 260. 3-31-83 14 261. 4-16-83 Documentation Checklist 1
262. 9-11-84 Support / Hanger Inspection Data Sheet 263. No Date R. G. Tolson office Memo to Hanger Pkg 1 1
264. No Date PPRV to Hanger Number 4
265. No Date TRT System Summary Sheet 13 266. 7-7-79 QC Vault Documentation Procedure 2
267. 10-10-79 CMC #10333 13 268. 1-7-82 Material Verification Checklist
. , . - , - , - - - , , - - . - ., , --- -. g- - - - - -
y- , --.-- --- , ,-m,-, - - .- - e~ - ~ . - % -.,w-<---,- , , - . . - - - -
2 269. 1-17-83 NCR #M5001S 1
270. 2-11-83 Weld Inspection Checklist 3
271. 2-12-83 QC Hanger Inspection Report 2
272. 4-12-83 B&R Procedure QI-QAP-11.1-28 24 273. 7-25-83 Documentation Checklist 1
274. 9-21-34 Support / Hanger Inspection-Data Sheet 9
275. 6-8-79 Hanger Package 4
276. 7-8-79 Hanger Package 2
277. 10-16-80 NPS Industries Procedure i
29 278. 11-6-80 NCR #M2507 R.2 Material Package 29 279. 1-6-82 r
3 280. 7-21-82 B&R Procedure QA-QAP-11.1-28 Rev 11 Pgs 15, 16, & 17 of 50, Job 35-1195 i,
1 281. 3-3-83 Multiple Weld Data Card #07887 i
25 i 282. 4-26-83 QA Vault Documentation 6
283. 9-13-84 Support / Hanger Inspection Data Sheet l
11 284. 7-7-79 QA Vault Documentation Procedure Multiple Weld Data Card 1 l 285. 10-22-79 i
f 286. 12-13-79 Construction Operation Traveler 3 287. 3-5-80 Construction Operation Traveler 2 288. 3-16-82 NCR #M-32555 1 289. 5-4-82 Documentation Checklist 1 290. 4-12-83 B&R Procedure QI-QAP-11.1-28 2 291. 4-15-83 NCR #M-5871S 2 1
292. 4-15-83 NCR #M-5871S 3 293. 4-15-83 NCR #M-58715 2 294. 4-26-83 QA Vault Documentation Checklist 19 295. 9-10-84 Support / Hanger Inspection Data Sheet 3 j
296. No Date R. G. Tolson office Memo to Hanger Pkg 1 297. No Date PPRV to Hanger Number 1
- 298. 7-13-79 QA Vault Documentation Procedure 14 i 299. 5-4-81 Sketch B&R 1 300. 4-12-83 B&R Procedure QI-QAP-11.1-28 Rev 19 3 301.4-14-83 NCR #M5873S 2 302. 4-26-83 QA Vault Documentation Procedure 16
- 303. 9-18-84 Support / Hanger Inspection Data Sheet ~ 1
i 2
i R. G. Tolson office Memo to Hanger Pkg 304. No Date 12 305. 7-7-79 QA Vault Documentation Procedure 4 .
306. 10-9-82 Documentatlin Checklist 2
B&R Procedure QI-QAP-11.1-28, Rev 19 307. 4-12-83 23 308. 7-25-83 Documentation Checklist .
1 309. 9-19-84 Support / Hanger Inspection Data Sheet 1 i 310. 6-13-83 TUSI Drawing GHH-CH-1-SB-008 4
Chilled Water f i
1.
311. No Date TRT - Details / Discrepancy ,
1
' 312. No Date TRT - List of Hangers ,
17 l 313. 9-18-79 QC Component Support Checklist i
1 B&R Orawing Mark #MS-1-416-001-S33R 314. 1-10-80 ,
36 315. 4-29-82 ASME Documentation Checklist b 1
' 316. 6-18-82 Hanger Inspection Report i
1 317. 7-9-82 Hanger Inspection Report 20 318. 4-15-83 NCR #M-50335 R-1 3
319. 8-4-83 B&R Procedure QI-QAP-11.1-28 i
~ __ __
t 1
320. 9-26-83 Inspection Report IR-M-01451 1
321. 9-28-83 Inspection Report #AM-02469 1
322. 9-28-83 Inspection Report AM-02531
\
1 323. 10-10-83 Inspection Report IR-M-01468 i 1
+ 324. 10-11-83 Request for Hanger or Parts i
1 325. 10-12-83 Hanger Inspection Report 4 _
3 326. 10-14-83 Documentition Checklist 1
327. 9-14-84 Support / Hanger Inspection Data Sheet 1
328. No Date A. Vega, office Memo to Hanger Package ITT Grinnell Drawing 2 329. 8-10-79 9
330. 11-16-79 QA Vault Documentation Package 24 331. 11-16-79 Material Record Inspected Item Removal Notice #H005811 22 332. 11-7-82 17 333. 8-31-83 Documentation Checklist l i 4
3 334. 8-4-83 B&R Procedure QI-QAP-11.1-28 Rev 22 1
335. 10-7-83 B&R Orawing BRHL-MS-1-SB-048, Rev 3 I
1 336. 9-14-84 Support / Hanger Inspection Data Sheet 2
337. 9-20-84 Support / Hanger Inspection Data Sheet
6 338. 5-19-81 Component Modification Card #52101 3
339. 8-4-83 B&R Procedure QI-QAP-11.1-28, Rev 22 10 340. 9-16-83 Documentation Checklist 1
341. 9-15-84 Support / Hanger Inspection Data Sheet i
2 342. No Date A. Vega office Memo to Hanger Package 1
343. 2-13-84 B&R Drawing BRHL-RC-1-RB-046, Rev 2 2
344. 6-19-84 NCR #M-13453N R1 1
345. No Date TRT System Summary Sheet 1
346. No Date TRT System Support List Material Description 12 347. 4-29-82 1
348. 6-8-82 Inspected Item Removal Notice H001199 1
l 349. 6-14-82 Request Hanger or Parts 1
"} 350. 7-5-82 Documentation Checklist 4 : i 1
351. 8-17-82 Manufacturer's Transmittal Form for Component Supports 2
352. 8-20-82 Modification Record #67095 ,
I 1
353. 10-8-82 Request Hanger or Parts 1
, 7 1
1 r
1 354. 10-11-82 Modification Record 69818 i
' 4 Material Modification Log 355. 10-11-82 1 e
4:
1 356. 10-13-82 Modification Maaufacturer's Transmittal 3 Form for Ccyponent Supports
~
1\
Documentatidn Cfjecklist e 357. 10-13-82 3'
358. 12-28-82 CMC #74079 ,
4 1 359, 12-28-82 Inspected Removal Notice H008043 1 ,
360. 2-5-83 Reques'. Hanger or Parts s
, 2 361. 5-16-83 B&R Procedure QI-QAP-11.1-28 Rev 20 1
362. 6-8-83 Request danger or Parts f
/ 27 363. 7-23-83 Documentation Checklist '
,s ,(
> 1 364. 9-10-84 Support / Hanger Inspection Data Sheet g
- / ,4 1
365. No Date Documentation Checklist 7 i ' 6 366. No Date Material Requisition i
i 1
A. Vega office Memo to Hang'er Phckage s 367. No Date
\ \
+
i n
f l
i i i
$. r
/
i l j
- -~ _ , ,,
Material Requisition #221772 & 260300 2 368. 7-2-82 Orawing, Small Bore Pipe 2 369. 1-21-83 6
370. 6-29-83 B&R Procedure QI-QAP-11.1-28 Rev 21 1
371. 9-10-84 Support / Hanger Inspection Data Sheet NPSI Component Certified Design 11 372. No Date Report Summary 5
373. No Date ASME III Subsection NF 4700 11 374. No Date TUGC0 office Memo on N-5 Status 375. 4-29-82 Orawing - Small Bore Pipe 1 TUSI Drawing - Small Bore Pipe 2 376. 4-29-82 1
377. 6-12-8E CMC #74078 Material Identification Log 2 378. 6-22-82 Request Hanger or Parts 2 379. 6-25-82 l
Request Hanger or Parts 1 4 380. 6-17-82 1
381. 7-5-82 Documentation Checklist Documentation Checklist 9 382. 7-21-83 Support / Hanger Inspection Data Sheet 1 383. 8-9-84 q 384. No Date TUSI Orawing Small Bore Pipe 1 385. No Date TUGC0 office Memo to Hanger Pkg 1
1 12 386. 11-9-81 CMC #52385 7
9 387. 4-15-83 B&R Drawings i
42
! 388. 6-22-83 NCR #M79815 9
389. 8-4-83 8&R Procedure QI-QAP-11.1-28 Rev 22 J 1
390. 8-17-83 MT/PT Report #17665 r
1 391. 9-9-83 Repair Process Sheet #705459 ;
2 392. 9-9-83 Repair Process Sheet S-004 1
393. 9-12-83 Hanger Inspection Report 394. 9-12-83 UT Thickness Report A-6017 1 Component Support Checklist 2 l 395. 9-13-83 t
396. 9-13-83 Weld Filler Material Log 705459 1 ;
l l
28 397. 9-22-83 Documentation Checklist
, l Multiple Weld Data Card 87217 3
, 398. 9-30-83 Multiple Weld Data Card 87446 5 l 399. 9-30-83 l
1 Multiple Weld Data Card 44129 2 400, 9-30-83 1
401. 9-12-84 Support / Hanger Inspection Data Sheet ,
7 402. 9-24-83 WASP #P-84-0087-AF i
Support / Hanger Inspection Data Sheet 5 !
403. 10-2-84
404. 6-4-81 Weld Filler Material Log #44881 1 405. 2-14-83 B&R Orawing 1 406. 8-4-83 QI-QAP-11.1-28 Rev 22 2 407. 8-17-83 Documentation Checklist 27 408. 9-13-84 Support / Hanger Inspection Data Sheet 1 409. No Date TUGC0 office Memo to Hanger Package 7 i
410. 1-2-81 B&R Drawing 4 411. 1-23-81 B&R Drawing 4 412. 2-17-81 CMC #48607 2 413. 3-27-81 Inspected Item Removal 118286 4 414. 4-12-82 Inspected Item Removal 131601 1 415. 7-2-81 Manufacturers Transmittal Form 1 416. 2-17-82 Inspected Item Removal Notice 140483 1 417. 4-18-82 Documentation Checklist 15 418, 2-16-84 Inspected Item Removal Notice H3176 1 419. 2-20-84 Documentation Checklist 24 420. 6-11-84 QI-QAP-11.1-28, Rev 25 2 421. 8-9-84 B&R Drawing 2
l I
2 422, 8-9-84 B&R Orawing 1
423. 9-13-84 Support / Hanger Inspection Data Sheet TUGC0 office Memo to Hanger Package 2 424. No Date 10 425. 9-9-83 Documentation Checklist 3
426. 8-9-84 B&R Orawing 1
427. 9-12-84 Support / Hanger Inspection-Data Sheet _,
TUGC0 office Memo to Hanger Pkg 21 428. No Date 429. 6-2-80 Weld Filler Material Log 05362 1 32 430. 1-5-83 NCR #M4707S 431. 7-11-83 B&R Orawing - Auxiliary Feedwater 1 QI-QAP-11.1-28, Rev 22 4 432. 8-4-83 QA Vault Documentation Package 21 433. 1-19-83 8
i 434. 4-6-79 QC Checklist 9
435. 6-20-80 Manufacturer's Transmittal Form for Component Supports
-B&R Procedure OCP-3, Rev 11 6 436. 3-9-81 TUSI Design Document CP-EI-4.0-22 7 437. 4-5-82 s Hanger Inspection Report 17 438. 6-4-82 Support / Hanger Inspection Data Sheet 8 439. 7-15-84 l
440. No Date TUGC0 office Memo to Hanger Pkg 2 441. 10-24-83 QI-QAP-11.1-28, Rev 23 4 442. 12-15-83 QA Vault Documentation Package 36 <
443. 1-12-84 Handwritten list of Hanger Numbers 1 444. 1-16-84 B&R rsrawing 3 445. 1-25-84 Documentation Checklist 17 446. 9-15-84 Support / Hanger Inspection Data Sheet 1 447. No Date TUGC0 office Memo to Hanger Package 6 448. 1-4-78 Performance Qualification Test 2 449. 11-30-78 TUSI ltr tb MPS Industries, Re: Base 1 Plate Approval 450. 3-8-79 Performance Qualification Test 2 451. 3-12-79 Hanger Package 3 452. 6-8-81 Performance Qualification Test 2 453. 3-15-82 QA Vault Documentation Package 43 -
454, 3-16-82 NCR #M-3255S 29 Certification Record 3 455. 7-23-82 1
456. 11-29-82 B&R Orawing 4
457. 3-21-83 Certification Record 4
458. 8-26-83 Certification Record 459. 9-27-83 B&R ltr to TUSI, Re: Approval of 7 f
Welding Procedure Specification Support / Hanger Inspection Data Sheet 22 460. 9-12-84 [
t 461. 9-20-84 Welder Qualification Matrix 1 f Request Hanger or Parts 3 462. 9-22-84 463. 9-22-84 B&R Orawing - Auxiliary Feedwater 1 464. 9-24-84 NIS-2 Owner's Report for Repairs or 2 ;
Replacements 465. 9-24-84 NIS-2 Owner's Report for Repairs or 5 Replacements 1
466. 9-24-84 WASP #P-84-0085AF 467. No Date Partial of Subsystem AF-1 12 TUGC0 office Memo to Hanger Package 2 468. No Date 5
469. 3-16-82 NCR #M-3255S
-, . - - - , ~ . . - , _ , . -
7 470. 4-27-83 NCR #M-5805 R-1 1
471. 7-19-83 B&R Drawing, Auxiliary Feedwater 1
472. 9-22-83 B&R Orawing, Auxiliary Feedwater 4
i i
GOVERNMENT ACCOUNTADILITY PROJECT 1555 Connecticut Awnue, N.W., Suite 202 Woshington. D.C. 20036 (202)232-8550 G:85:104 January 21, 1985 FREEDOM OF INFORMATION ACT REQUEST FREEDOM OF INFORMATION ACI REQUESI F0EA 67 Director Office of Administration
, d 4 h / - d f "'- M Nuclear Regulatory Commission Washington, D.C. 20555 To Whom It May Concern:
Pursuant to the Freedom of Information Act ("FOI A"), 5 U.S.C. 5 552, the Government Accountability Project (" GAP") requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview re-ports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, computer runoffs, any other data compilations, interim and/or final reports, status re-ports, and any and all other records relevant to and/or generated in connection with the overview, ragulation and investigation of the Comanche Peak Nuclear Plant by any person, branch, or department of the NRC since January 18, 1985.
This request includes all agency records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8,1980) whether they currently exist in the NRC official, " working," investigative or other files, or at any other location, including private residences.
If any records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s).
GAP requests that fees be waived, because " finding the information can be con-sidered as primarily benefitting the general public," 5 U.S.C. 5 552(a)(4)(a).
GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through public outreach, the Project promotes whistleblowers as agents of government accountability. Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Citizens ,
Clinic is currently assisting several citizens groups, local governments and intervenors in the central Texas area concerning the construction of the Comanche Peak nuclear power plant. .
~
~
g
Director .
Office of Administration Page Two We are requesting the above information as part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed jusitfication of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document. withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S.
977 (1974).
We look forward to your response to this request within ten days.
Sincerely, ih Billie Pirner Garde Citizens Clinic Director e
e
$