Text
_
[p areg'o UNITED STATES
'!~
NUCLEAR REGULATORY COMMISSION
~
o h
7 C WASHING TON, D. C. 20555 1
%.....[
gg 21 1960 l
Docket Nos. 50-445/50-446 l
Ms. Billie Pirner Garde Director, Environmerdui Whistleblower Clinic Government Accountability Project IN RESPONSE REFER 1555 Connecticut Avenue, NW, Suite 202 TO F01A-85-59 Washington, DC 20036
Dear Ms. Garde:
This is in further response to your letter dated January 21, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), records related to the NRC Comanche Peak Task Force established in March 1984.
With the exception of one record (number one) which is undergoing further staff review and is identified by an asterisk on the enclosed Appendix J, we are now placing one additional box of records (box 9) in the QA/QC category, covering Appendix J records numbered 1 through 472, into the NRC Public Document Room (PDR) in file F0IA-85-59 under your name.
The Appendix J records identified 'at numbers 2, 3, 448, 450, 452, 455, 457, and 458 contain deletions without invocation of an F0IA exemption in accordance with the agreement reached between you and the NRC staff at a meeting held on May 8,1985, concerning your pending F0IA requests pertaining to the Comanche Peak Technical Review Team activities.
This agreement was summarized in a letter to you from J. M. Felton, dated May 15, 1985. The information deleted consists of personal infonnation and information that could reveal the identities of allegers.
A separate set of the oisclosed records is being made available for public inspection and copying at the Local Public Document Room (LPDR) located at the University of Texas Library, 701 South Cooper Street, Arlington, Texas.
Additional boxes of records in the QA/QC category are currently under review and will be placed in the PDR and LPDR in the coming weeks.
Sincerely, l
W /k A#
Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosure:
As stated hh60 3 860521 GARDE 85-59 PDR
I Re: F01A-85-59 APPENDIX J Box 9 QA/QC
_Date Description P_ age
- 1.
4-8-83 First page of a Report of Inquiry 1
- Q4-83-009 by Bullock, TRT 2.
7-84 Controlled Copy of list of Allegations 1
and/or Investigations Sumary 3.
8-24-83 G. L. Madsen, NRC, ltr to R. J. Gary, 19 TUGCO, Re: Inspection of March through July 1983 with NRC Inspection Report attached 4.
4-27-81 TUSI Procedure CP-EI-4.5-1, Rev. 1, 23
" General Program for As-Built Piping Verification" 5.
12-16-81 TUSI Procedure CP-EI-4.5-1, Rev 2, 12
" General Program for As-Built Piping verification" 6.
6-23-81 TUSI Procedure QI-QP-11.13-1 Rev 0 5
"As Built Piping Verification Instructions" 7.
9-17-81 TUSI Procedure QI-QP-11.13-1, Rev 1, As 8
Built Piping Verification Instructions 8.
1-20-82 TUSI Procedure QI-QP-11.13-1, Rev 2 "As 6
Built Piping Verfication Instructions
(
. 9.
1-28-82 TUSI Procedure CP-EI-4.5-1, Rev 3, 12
" General Program for As-Built Piping Verification" 10.
1-4-83 TUSI Procedure QI-QP-11.13-1, Rev 8 8
"As-Built Piping Verification Instructions" 11.
7-12-84 TUSI Procedure CP-EI-4.0-1, Rev 12 43
" Design & Design Verification Control for Pipe Support Engineering"
- 12. 7/30/84 TUSI Procedure,CP-EI-4.5-1, Rev. 10, 11
" General Program for As-Built Piping Verification
- 13. No Date Handwritten list of Hanger Numbers 1
- 14. No Date Handwritten Summary of 7914 Support 1
Inspections
- 15. No Date Handwritten - Changes in Allowable 1
Angular Error of QI-QAP-11-1-28
- 16. No Date Handwritten Calendar on Hanger Numbers 1
- 17. 4-17-79 Sketch - B&R - Mark #00-1-12-026-Y33R 2
- 18. 5-30-79 Hanger Package 00-1-012-026-Y33R 6
- 19. 4-3-81 Sketch, Dwg #BRHL-00-1-Y0-025 1
" Demineralized and Reactor Make-up Water"
. 3 As-Built Reverification Report Form #2851 20.
3-21-83 15 Documentation Check List
- 21. 4-9-83 2
B&R Procedure QI-QAP-11.1-28-pg 26 & 52
- 22. 4-12-83 3
As Built Re-verification Report Form #6272
- 23. 7-18-83 1
Support / Hanger Inspection Data Sheet 24.
10-8-84 21 Sketches on Section A-A, As Built
- 25. 6-19-81
- RH-1-006-012-C42 R - Rev. 2 4
Sketches on Section A-A, As Built
- 26. 6-19-81
- RH-1-006-012-C42 R-Rev. 3 3
As Built Reverification Report Form #2012
- 27. 3-16-83 25
- 28. 8-3-83 Documentation Check List 1
29.
10-9-84 Support / Hanger Inspection Data Shee.
l 1
TUGCO, A. Vega to Hanger Package J
- 30. No Date 3
i B&R Sketch #RH-1-006-006-C42R, Rev 2
- 31. 9-26-79
[
and Component Support Checklist i
25 Material Record - Release # 3095 32.
10-21-79 8
33.
10-27-79 ASME Documentation Checklist 20 Material Verification Checklist
- 34. 8-13-82 2
As-Built Re-Verification Report Form
- 35. 3-21-83
- 2011
. 36. 6-29-83 B&R Procedure QI-QAP-11.1-28, Rev 21, 2
Pages 27 and 45, " Job 35-1195" 25
- 37. 8-3-83 Documentation Check List 1
38, 10-10-84 Support / Hanger Inspection Data Sheet 1
- 39. No Date A. Vega, TUGC0 office Memo to Hanger Package 34
- 40. 7-9-80 ASME Occumentation Checklist
- 41. 3-2-83 As Built Reverification Report Form #2044 2
- 42. 8-3-83 Documentation Check List 12
- 43. 8-12-83 B&R Sketch, BRHL-RH-1-RB-004, Rev 2 2
- 44. 9-16-83 B&R Sketch, BRHL-RH-1-SB-016, Rev 2, 1
45.
10-8-84 Support / Hanger Inspection Data Sheet 46.
7-24-79 ASMI Documentation Checklist 48
- 47. 9-12-80 B&R Receiving Inspection Report #15481 6
48.
11-8-80 B&R Sketch CS-1-085-003-A42K i
49.
12-5-8 B&R Sketch BRHL-CS-1-AB-001, Rev 4 1
Chemical & Volume Control
- 50. 2-18-83 Nonconformance Report, NCR #M5332-S 25
- 51. 3-15-83 As Built Reverification Report Form #2681 2
. m-2
- 52. 5-11-83 As Built Reverification Report Form 4350 2
- 53. 8-4-83 B&R Procedure QI-QAP-11.1-28, Rev 22, Pages 27 & 53 of 66, Job 35-1195 25 54.
10-24-83 Documentation Check List 1
- 55. 10-9-84 Support / Hanger Inspection Data Sheet 2
- 56. 4-30-79 Inspection Report #7156 2
57.
1-14-80 B&R Sketch FSE-00159 1
- 58. 2-25-80 Inspection Report #ME 1100 2
- 59. 3-7-80 Construction Operation Traveler 1
- 60. 5-30-80 Inspection Report #ME-3611 1
- 61. 6-17-80 Inspection Report #ME-3595 1
- 62. 6-19-80 Inspection Report ME-3790 1
- 63. 6-30-80 Inspection Report ME-3760 1i 1
I
- 64. 6-24-80 Inspection Report ME-3822 1
- 65. 8-18-81 Inspection Report ME-6168
. 66. 7-16-83 Design Change Authorization #5347, Rev 1 1
67.
11-17-83 Construction Operation Traveler 2
Continuation #5824 68.
12-11-83 Component Modification Card #11061, Rev 3 7
4 69.
1-3-84 Inspection Report #ME-1-006155
- 70. 1-11-84 Component Modification Card #93450 5
- 71. 1-20-84 Inspection Report ME-1-0016418 1
/2. 5/11/84 Design Change Authorization #3464 Rev. 23 31
- 73. 9-25-84 Design Change Authorization #17,838, Rev 9 7
1 74.
10-11-84 TRT Summary Sheet 75.
1-12-81 Construction Operation Traveler 2
- 76. 6-11-82 Inspection Report #109688 1
1
- 77. 7-8-82 Inspection Report #12566
- 78. 7-28-82 Component Modification Card #71294 3
- 79. 9-5-82 Sketch #FSE-00159 1
- 80. 7-6-83 Design Change Authorization 6
- 81. 1-10-84 Inspection Report #MH-1-0010402 1
- 82. 2-17-84 Design Change Authorization #3462, Rev 15 3
- 83. 2-17-84 Inspection Report #ME-1-0022582 1
i
7
- 84. 9-25-84 Design Change Authorization #17,838 7
- 85. No Date TRT Summary Sheet 1
86.
11-30-82 Construction Operation Traveler #90650 7
- 87. 3-15-83 Construction Operation Traveler 3
- MF-1-001244F
- 88. 3-15-83 Construction Operation Traveler 3
- ME-1-001244E
~
- 89. 4-11-83 Component Modification Card 90656 1
- 90. 5-24-83 Construction Operation Traveler #15552 3
- 91. 6-14-83 Design Change Authorization #15,552, Rev 4 6
- 92. 7-29-83 Inspection Report #IRME-36853 5
- 93. 8-3-83 Inspection Report #ME-235232 1
- 94. 8-3-83 Repair Process Sheet #NCR #M-83-01505 5
95.
10-22-83 Inspection Report #ME-39583 1
96.
1-11-84 Inspection Report #ME-1-001244 3
- 97. 3-21-84 Construction Operation Traveler 2
- 98. 5-16-84 Inspection Report #ME-1-001244 1
- 99. No Date TRT Summary Sheet 1
i
. 6 100. 2-4-83 Design Change Authorization #16,049, Rev 1 3
101. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-1 3
102. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-2 3
103. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-3 2
104. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-5 2
105. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-6 2
106. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-7 3
107. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-9 3
108. 2-8-83 Construction Operation Traveler
- EC-083-012021194-10 l
3 109. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-11 2
110. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-12 2
111. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-13
~,
)
2 112. 2-8-83 Construction Operation Traveler
- EC-083-C12021194-14 2
113. 2-8-83 Construction Operation Traveler
- EC-083-C12021'.94-15 3
114. 2-10-83 Construction Operation Traveler
- EC-083-C12021194-4 3
115. 2-10-83 Construction Operation Traveler
- EC-083-C12021194-8 a
3 116. 2-10-83 Construction Operation Traveler
)
- EC-083-C12021194-16 3
117, 2-10-83 Construction Operation Traveler
- EC-083-C12021194-17 3
q 118. 2-10-83 Construction Operation Traveler lh
- EC-083-C12021194-18 i)
- t i
Construction Operation Traveler 3
lr 119. 2-11-83
- EC-083-C12021194-20 f
Ji f
120. 2-11-83 Construction Operation Traveler 3
- EC-083-C12021194-21 121. 2-15-83 Construction Operation Traveler 3
- EC-083-C12021194-19 1
122. 3-11-83 Inspection Report #MH-107465 4
123. 3-11-83 Inspection Report ME-35322F
1 124. 3-28-83 Component Modification Card #88434 3
125. 5-16-83 Construction Operation Traveler
- EC-083-C12021194-22 3
126. 5-16-83 Sketch 2323-S-0910 127. 5-23-83 Component Modification ard #90851, Pev 2 2
1 128. 6-8-83 Inspection Report #MH-70874 5
129. 7-29-83 Inspection Report #ME-36853 r
1 130. 10-23-83 Inspection Report #ME-39906 1
131. 10-11-84 TRT Summary Sheet 3
132. 5-14-79 Construction Operation Traveler
- ELE-79-CTH-06742 3
133. 11-15-80 Construction Operation Traveler 2
ELE-81-CTH-06742 134. 10-24-83 Construction Operation Traveler #06742 2
5 135. 1-11-84 Component Modification Card #93450 1
1 136, 2-16-84 Inspection Report MEl-0024909 32 137. 5-23-84 Design Change Authorization #3464, Rev 23 1
138. 10-11-84 TRT Summary Sheet l
1 139. 11-15-78 TUSI Orawing 2323-M1-2104-07 140. 8-21-79 Seismic Tubing Support Package 2323-I-001 26
- ~ _
% 1 141. 3-7-80 Design Change Authorization #6905 1
142. 3-17-80 Component Modification Card #13659 1
143. 11-16-81 Component Modification Card #62456 1
144. 1-15-82 Inspection Report #1R-I-2779 6
145. 2-9-82 Construction Operation Traveler ME82-2213-5500 1
146. 2-18-82 Component Modification Card 62526 2
147. 2-22-82 Component Modification Card 58057 1
148. 3-29-82 Inspection Report #IR-I-3576 1
149. 10-31-82 Inspection Report #1R-I-6469 r
1 150. 12-30-82 Component Modification Card #42394, Rev 1 3
151. 12-30-82 Component Modification Card 66611 1
152. 3-2-83 Component Modification Card 72840 1
153. 3-12-83 Design Change Authorization #16,614 154. 5-1-84 TUGC0 Orawing 2323-M1-2603-01, Rev CP-1 1
2 155. 5-18-84 Design Change Authorization 12,212 R.1 156. 7-24-84 TUGC0 Procedure QI-QP-11.8-2, Rev 14 4
" Instrumentation Supports & Rack Assemblies" 1
. 157. 9-17-84 Orawing, TUGC0 #2323-MI-2503-03 1
Instrument Tabulation Sheet 158. 10-18-84 Support / Hanger Inspection Data Sheet 1
1 159. No Date TRT Checklist 160. 8-15-79 TUSI Orawing 2323-M1-2104-07 1
1 161. 1-15-82 Inspection Report IR-I-2778 1
162. 1-13-82 Component Modification Card #62533 163. 1-13-82 Component Modification Card 62534 1
164. 1-18-82 Component Modification Card 62541 1
165. 2-9-82 Construction Operation Traveler 6
- ME82-2213-3500 1
166. 3-29-82 Inspection Report IR-I-3575 1
167. 8-13-82 Component Modification Card #72742 2
l 168. 9-16-82 Nonconformance Report #I-82-01433S 2
e I
169. 10-4-82 Inspection Report IR-I-5741 1
i 170. 10-25-82 Inspection Report IR-I-6305 1
c 171. 5-1-84 TUGC0 Orawing 2323-MI-2603-01, Rev CP-1 1
l Instrument Locations Containment i
Plan EL-808-0 Quadrant No. 2 t
t i
- - - - - - - - - - - - - ~ ~ -
2 172. 5-18-84 Design Change Authorizatfor. #12,212 R.1 1
173. 9-17-84 TUGC0 Orawing 2323-MI-2503-03 Instrument Tabulation Sheet 1
174. 10-17-84 Support / Hanger Inspection Data Sheet 1
175. No Date B&R Drawing #FSI-1-378 Instrument Tubing 1
176. No Date TRT CMC Listing 1
i 177. No Date TRT Checklist 1
178. 11-15-78 TUSI Drawing #2323-M1-2104-07 1
179. 10-29-79 TUSI Drawing #FSI-00069, Seismic Tube Support Span Lengths 1
180. 3-7-80 Design Change Authorization #6905 1
181. 3-17-80 Component Modification Card 13659 l
1 182. 6-17-80 Component Modification Card #32343 l
m 1
I Component Modification Card 42387 f
183. 11-19-80 L
1 184. 5-29-81 Inspection Report IR-1-1755 6
i 185. 2-9-82 Construction Operation Traveler ME82-2213-5500 2
186. 2-22-82 Component Modification Card #58057
_ ~,.
i 1 187. 4-5-82 Inspection Report IR-I-3747 1
188. 4-22-82 Inspection Report IR-I-3902 1
189. 12-30-82 Component Modification Card #42394 1
190. 12-30-82 Component Modification Card 66611 3
191. 1-28-83 Component Modification Card 72906-1 192. 3-2-83 Component Modification Card 72840 1
193. 13-21-83 Design Change Authorization #16,614 1
194. 7-27-83 Component Modification Card 73103 1
195. 5-18-84 Design Change Authorization 12,212 196. 6-1-84 Component Modification Card 96241<
1 197. 6-1-84 TUGC0 Drawing #2323-M1-2603-01 1
Instrument Locations 198. 9-17-84 TUGC0 Orawing #2323-M1-2503-03 1
Instrument Tabulation Sheet 199. 10-18-84 Support / Hanger Inspection Data Sheet 2
200. No Date TRT Checklist 1
201. No Date CMC Listing 1
e
_.. _ _ _ _ _ _ _ 202. 11-6-80 Nonconformance Report M-2507 2
f 203. 1-12-82 B&R Drawings BRHL-CC-1-FB-002, Rev 5 4
Component Cooling Water 204. 1-17-83 Nonconformance Report #M-5002S 2
205. 1-17-83 Nonconformance Report M-5003S 2
206. 4-14-83 Nonconformance Report M-5873S 2
207. 4-14-83 Nonconformance Report M-5874S 2
208. 4-14-83 Nonconformance Report M-5872S 2
209. 8-24-84 TRT listing of Hanger / Supports to be 1
Stripped 210. 10-1-84 TRT System Summary Sheet 4
211. No Date TRT System Summary List 1
l 212. 7-2-79 ASME Documentation Checklist 12 213. 8-31-79 Construction Operation Traveler 4
i 214. 7-1-82 B&R Sketch I
l 215. 1-17-83 Nonconformance Report M5004S 3
T 216. 4-12-83 B&R Procedure QI-QAP-11.1-28, Rev 19 1
Pg 9 of 64 Job 35-1195 217. 4-20-83 Documentation Checklist 17
16 -
1 218. 9-20-84 Support / Hanger Ir.spection Data Sheet 1
R. G. Tolson, TUGCO, office Memo to 219. No Date Hanger Package 1
220. No Date PPRV on Hanger Number 12 221. 7-7-79 QA Vault Documentation Package 14 Construction Operation Traveler 1
222. 8-31-79 l
18 223. 7-8-82 Vendor Certification l
l l
2 224. 1-17-83 Nonconformance Report M5002S
.)
l 3
B&R Procedure QI-QAP-11.1-28, Rev 19 225. 4-12-83 Pg 7, 8, & 26 of 64. Job 35-1195 23 226. 4-28-83 QA Vault Documentation Package 3
227. 9-15-84 Support / Hanger Inspection Data Sheet
\\
1 R. G. Tolson office Memo to Hanger Package 228. No Date se 1
229. No Date PPRV to Hanger number I
12 230. 7-7-79 QA Record Documentation Package 13 231. 5-12-82 Documentation Checklist 4
232. 4-14-83 Nonconformance Report #M58745 17 233. 4-29-83 Documentation Checklist 1
i m
e--
e-se.
--i.
<es
-e m_
m--_
-7m.
.-.m
-y
, 1 234. 9-10-84 Support / Hanger Inspection Data Sheet 235. 9-24-84 Work Package Index WASP #P-84-0086-CC 9
1 236. No Date R. G. Tolson, office Memo to Hanger Package 1
237. No Date PPRV on Hanger Number 2
238. 12-21-80 Weld Filler Material Log. #07879 l
4 239. 12-30-80 Component Modification Card #10081 1
240. 1-9-81 Material Identification Log 241. 5-13-82 Material Verification Checklist 2
1 1
242. 10-21-82 B&R Sketch 1
243. 4-13-83 QC Component Support Checklist 244. 4-16-83 Occumentation Checklist 1
1 245. 7-5-83 B&R Sketch 3
246. 9-1-83 QC Component Support Checklist 4
247. 9-11-84 Support / Hanger Inspection Data Sheet 248. No Date R. G. Tolson, office memo to Hanger Pkg.
14 12 249. 7-7-79 QA Vault Documentation 1
250. 8-11-79 Construction Operation Traveler 1
i 7
251. 5-11-82 Documentation Checklist 4
4 252. 3-3-83 Procedure Pages TUGC0-CP-QP-11.2 3
253. 4-14-83 Nonconformance Report M5872S 25 254. 9-15-83 Documentation Checklist 1
255. 9-11-84 Support / Hanger Inspection Data Sheet 1
256. No Date R. G. Tolson office Memo to Hanger Pkg.
1 1
257. No Date PPRV to Hanger Number 258. 2-17-81 Weld Filler Material Log #42058 11
\\
20 259. 8-8-81 Hanger Package 260. 3-31-83 Procedure.QI-QAP-11.1-28, Rev 18 6
261. 4-16-83 Documentation Checklist 14 1
262. 9-11-84 Support / Hanger Inspection Data Sheet 263. No Date R. G. Tolson office Memo to Hanger Pkg 1
1 264. No Date PPRV to Hanger Number 4
265. No Date TRT System Summary Sheet 13 266. 7-7-79 QC Vault Documentation Procedure 2
267. 10-10-79 CMC #10333 268. 1-7-82 Material Verification Checklist 13
,, - -. -.,, --- -. g- - - - - -
y-
,-m,-,
e~
- ~. -
-.,w-<---,-
2 269. 1-17-83 NCR #M5001S 1
270. 2-11-83 Weld Inspection Checklist 3
271. 2-12-83 QC Hanger Inspection Report 2
272. 4-12-83 B&R Procedure QI-QAP-11.1-28 24 273. 7-25-83 Documentation Checklist 1
274. 9-21-34 Support / Hanger Inspection-Data Sheet 9
275. 6-8-79 Hanger Package 4
276. 7-8-79 Hanger Package 277. 10-16-80 NPS Industries Procedure 2
29 i
278. 11-6-80 NCR #M2507 R.2 29 279. 1-6-82 Material Package r
280. 7-21-82 B&R Procedure QA-QAP-11.1-28 Rev 11 3
Pgs 15, 16, & 17 of 50, Job 35-1195 i,
281. 3-3-83 Multiple Weld Data Card #07887 1
i 25 282. 4-26-83 QA Vault Documentation i
6 283. 9-13-84 Support / Hanger Inspection Data Sheet l
11 284. 7-7-79 QA Vault Documentation Procedure 1
285. 10-22-79 Multiple Weld Data Card i
f
' 286. 12-13-79 Construction Operation Traveler 3
287. 3-5-80 Construction Operation Traveler 2
288. 3-16-82 NCR #M-32555 1
289. 5-4-82 Documentation Checklist 1
290. 4-12-83 B&R Procedure QI-QAP-11.1-28 2
291. 4-15-83 NCR #M-5871S 2
1 292. 4-15-83 NCR #M-5871S 3
293. 4-15-83 NCR #M-58715 2
294. 4-26-83 QA Vault Documentation Checklist 19 295. 9-10-84 Support / Hanger Inspection Data Sheet 3
j 296. No Date R. G. Tolson office Memo to Hanger Pkg 1
297. No Date PPRV to Hanger Number 1
298. 7-13-79 QA Vault Documentation Procedure 14 i
299. 5-4-81 Sketch B&R 1
300. 4-12-83 B&R Procedure QI-QAP-11.1-28 Rev 19 3
301.4-14-83 NCR #M5873S 2
302. 4-26-83 QA Vault Documentation Procedure 16 303. 9-18-84 Support / Hanger Inspection Data Sheet ~
1
i,
2 R. G. Tolson office Memo to Hanger Pkg i
304. No Date 12 305. 7-7-79 QA Vault Documentation Procedure 4
306. 10-9-82 Documentatlin Checklist 2
B&R Procedure QI-QAP-11.1-28, Rev 19 307. 4-12-83 23 308. 7-25-83 Documentation Checklist 1
309. 9-19-84 Support / Hanger Inspection Data Sheet 1
i 310. 6-13-83 TUSI Drawing GHH-CH-1-SB-008 f
4 Chilled Water i
1.
311. No Date TRT - Details / Discrepancy 1
312. No Date TRT - List of Hangers 17 l
313. 9-18-79 QC Component Support Checklist i
1 314. 1-10-80 B&R Orawing Mark #MS-1-416-001-S33R 36 315. 4-29-82 ASME Documentation Checklist b
1 316. 6-18-82 Hanger Inspection Report i
1 317. 7-9-82 Hanger Inspection Report 20 318. 4-15-83 NCR #M-50335 R-1 3
319. 8-4-83 B&R Procedure QI-QAP-11.1-28 i
~
__ t 1
320. 9-26-83 Inspection Report IR-M-01451 1
321. 9-28-83 Inspection Report #AM-02469 1
322. 9-28-83 Inspection Report AM-02531
\\
1 323. 10-10-83 Inspection Report IR-M-01468 i
1 324. 10-11-83 Request for Hanger or Parts
+
i 1
325. 10-12-83 Hanger Inspection Report 4
3 326. 10-14-83 Documentition Checklist 1
327. 9-14-84 Support / Hanger Inspection Data Sheet 1
328. No Date A. Vega, office Memo to Hanger Package 2
329. 8-10-79 ITT Grinnell Drawing 9
330. 11-16-79 QA Vault Documentation Package 24 331. 11-16-79 Material Record 22 332. 11-7-82 Inspected Item Removal Notice #H005811 17 333. 8-31-83 Documentation Checklist l
i 4
334. 8-4-83 B&R Procedure QI-QAP-11.1-28 Rev 22 3
335. 10-7-83 B&R Orawing BRHL-MS-1-SB-048, Rev 3 1
I 1
336. 9-14-84 Support / Hanger Inspection Data Sheet 2
337. 9-20-84 Support / Hanger Inspection Data Sheet
. 6 338. 5-19-81 Component Modification Card #52101 3
339. 8-4-83 B&R Procedure QI-QAP-11.1-28, Rev 22 10 340. 9-16-83 Documentation Checklist 1
341. 9-15-84 Support / Hanger Inspection Data Sheet i
2 342. No Date A. Vega office Memo to Hanger Package 1
343. 2-13-84 B&R Drawing BRHL-RC-1-RB-046, Rev 2 2
344. 6-19-84 NCR #M-13453N R1 1
345. No Date TRT System Summary Sheet 1
346. No Date TRT System Support List 12 347. 4-29-82 Material Description 1
348. 6-8-82 Inspected Item Removal Notice H001199 1
l 349. 6-14-82 Request Hanger or Parts 1
"}
350. 7-5-82 Documentation Checklist i
4 351. 8-17-82 Manufacturer's Transmittal Form for 1
Component Supports 2
352. 8-20-82 Modification Record #67095 I
1 353. 10-8-82 Request Hanger or Parts 1
7 1
1 1 354. 10-11-82 Modification Record 69818 r
i 4
355. 10-11-82 Material Modification Log 1
e 4:
1 Modification Maaufacturer's Transmittal 3
356. 10-13-82 Form for Ccyponent Supports
~
Documentatidn Cfjecklist 1\\
e 357. 10-13-82 3'
358. 12-28-82 CMC #74079,
1 359, 12-28-82 Inspected Removal Notice H008043 4
1 360. 2-5-83 Reques'. Hanger or Parts s
2 B&R Procedure QI-QAP-11.1-28 Rev 20 361. 5-16-83 1
362. 6-8-83 Request danger or Parts f
/
27 363. 7-23-83 Documentation Checklist
',s
,(
1 364. 9-10-84 Support / Hanger Inspection Data Sheet g
/
,4 1
Documentation Checklist 7
365. No Date i
6 i
366. No Date Material Requisition i
1 A. Vega office Memo to Hang'er Phckage s
367. No Date
\\
+
i
\\
n l
f i
i i
r
/
l i
j
-~ _,,,
368. 7-2-82 Material Requisition #221772 & 260300 2
2 369. 1-21-83 Orawing, Small Bore Pipe 370. 6-29-83 B&R Procedure QI-QAP-11.1-28 Rev 21 6
1 371. 9-10-84 Support / Hanger Inspection Data Sheet 11 372. No Date NPSI Component Certified Design Report Summary 373. No Date ASME III Subsection NF 4700 5
374. No Date TUGC0 office Memo on N-5 Status 11 1
375. 4-29-82 Orawing - Small Bore Pipe 376. 4-29-82 TUSI Drawing - Small Bore Pipe 2
377. 6-12-8E CMC #74078 1
378. 6-22-82 Material Identification Log 2
2 379. 6-25-82 Request Hanger or Parts l
380. 6-17-82 Request Hanger or Parts 1
4 381. 7-5-82 Documentation Checklist 1
382. 7-21-83 Documentation Checklist 9
383. 8-9-84 Support / Hanger Inspection Data Sheet 1
q 384. No Date TUSI Orawing Small Bore Pipe 1
385. No Date TUGC0 office Memo to Hanger Pkg 1
1 12 386. 11-9-81 CMC #52385 7
9 387. 4-15-83 B&R Drawings i
42 388. 6-22-83 NCR #M79815 389. 8-4-83 8&R Procedure QI-QAP-11.1-28 Rev 22 9
J 1
390. 8-17-83 MT/PT Report #17665 r
1 391. 9-9-83 Repair Process Sheet #705459 2
392. 9-9-83 Repair Process Sheet S-004 1
393. 9-12-83 Hanger Inspection Report 394. 9-12-83 UT Thickness Report A-6017 1
2 l
395. 9-13-83 Component Support Checklist t
396. 9-13-83 Weld Filler Material Log 705459 1
l l
397. 9-22-83 Documentation Checklist 28 l
398. 9-30-83 Multiple Weld Data Card 87217 3
399. 9-30-83 Multiple Weld Data Card 87446 5
l l
1 400, 9-30-83 Multiple Weld Data Card 44129 2
401. 9-12-84 Support / Hanger Inspection Data Sheet 1
402. 9-24-83 WASP #P-84-0087-AF 7
i 403. 10-2-84 Support / Hanger Inspection Data Sheet 5
, 404. 6-4-81 Weld Filler Material Log #44881 1
405. 2-14-83 B&R Orawing 1
406. 8-4-83 QI-QAP-11.1-28 Rev 22 2
407. 8-17-83 Documentation Checklist 27 408. 9-13-84 Support / Hanger Inspection Data Sheet 1
409. No Date TUGC0 office Memo to Hanger Package 7
i 410. 1-2-81 B&R Drawing 4
411. 1-23-81 B&R Drawing 4
412. 2-17-81 CMC #48607 2
413. 3-27-81 Inspected Item Removal 118286 4
414. 4-12-82 Inspected Item Removal 131601 1
415. 7-2-81 Manufacturers Transmittal Form 1
416. 2-17-82 Inspected Item Removal Notice 140483 1
417. 4-18-82 Documentation Checklist 15 418, 2-16-84 Inspected Item Removal Notice H3176 1
419. 2-20-84 Documentation Checklist 24 420. 6-11-84 QI-QAP-11.1-28, Rev 25 2
421. 8-9-84 B&R Drawing 2
2 422, 8-9-84 B&R Orawing 1
423. 9-13-84 Support / Hanger Inspection Data Sheet 424. No Date TUGC0 office Memo to Hanger Package 2
425. 9-9-83 Documentation Checklist 10 3
426. 8-9-84 B&R Orawing 1
427. 9-12-84 Support / Hanger Inspection-Data Sheet 428. No Date TUGC0 office Memo to Hanger Pkg 21 429. 6-2-80 Weld Filler Material Log 05362 1
430. 1-5-83 NCR #M4707S 32 431. 7-11-83 B&R Orawing - Auxiliary Feedwater 1
4 432. 8-4-83 QI-QAP-11.1-28, Rev 22 433. 1-19-83 QA Vault Documentation Package 21 8
i 434. 4-6-79 QC Checklist 435. 6-20-80 Manufacturer's Transmittal Form for 9
Component Supports 436. 3-9-81
-B&R Procedure OCP-3, Rev 11 6
437. 4-5-82 TUSI Design Document CP-EI-4.0-22 7
s 17 438. 6-4-82 Hanger Inspection Report 439. 7-15-84 Support / Hanger Inspection Data Sheet 8
l
. 440. No Date TUGC0 office Memo to Hanger Pkg 2
441. 10-24-83 QI-QAP-11.1-28, Rev 23 4
442. 12-15-83 QA Vault Documentation Package 36 443. 1-12-84 Handwritten list of Hanger Numbers 1
444. 1-16-84 B&R rsrawing 3
445. 1-25-84 Documentation Checklist 17 446. 9-15-84 Support / Hanger Inspection Data Sheet 1
447. No Date TUGC0 office Memo to Hanger Package 6
448. 1-4-78 Performance Qualification Test 2
449. 11-30-78 TUSI ltr tb MPS Industries, Re: Base 1
Plate Approval 450. 3-8-79 Performance Qualification Test 2
451. 3-12-79 Hanger Package 3
452. 6-8-81 Performance Qualification Test 2
453. 3-15-82 QA Vault Documentation Package 43
. 454, 3-16-82 NCR #M-3255S 29 455. 7-23-82 Certification Record 3
1 456. 11-29-82 B&R Orawing 457. 3-21-83 Certification Record 4
458. 8-26-83 Certification Record 4
f 459. 9-27-83 B&R ltr to TUSI, Re: Approval of 7
Welding Procedure Specification 460. 9-12-84 Support / Hanger Inspection Data Sheet 22
[
t f
461. 9-20-84 Welder Qualification Matrix 1
462. 9-22-84 Request Hanger or Parts 3
463. 9-22-84 B&R Orawing - Auxiliary Feedwater 1
464. 9-24-84 NIS-2 Owner's Report for Repairs or 2
Replacements 465. 9-24-84 NIS-2 Owner's Report for Repairs or 5
Replacements 466. 9-24-84 WASP #P-84-0085AF 1
467. No Date Partial of Subsystem AF-1 12 468. No Date TUGC0 office Memo to Hanger Package 2
469. 3-16-82 NCR #M-3255S 5
. - - -, ~.. -
. 7 470. 4-27-83 NCR #M-5805 R-1 1
471. 7-19-83 B&R Drawing, Auxiliary Feedwater 1
472. 9-22-83 B&R Orawing, Auxiliary Feedwater 4
i i
GOVERNMENT ACCOUNTADILITY PROJECT 1555 Connecticut Awnue, N.W., Suite 202 Woshington. D.C. 20036 (202)232-8550 G:85:104 January 21, 1985 FREEDOM OF INFORMATION ACT REQUEST FREEDOM OF INFORMATION ACI REQUESI F0EA 67 d 4 h / - d f "'- M Director Office of Administration Nuclear Regulatory Commission Washington, D.C.
20555 To Whom It May Concern:
Pursuant to the Freedom of Information Act ("FOI A"), 5 U.S.C. 5 552, the Government Accountability Project (" GAP") requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview re-ports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, computer runoffs, any other data compilations, interim and/or final reports, status re-ports, and any and all other records relevant to and/or generated in connection with the overview, ragulation and investigation of the Comanche Peak Nuclear Plant by any person, branch, or department of the NRC since January 18, 1985.
This request includes all agency records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8,1980) whether they currently exist in the NRC official, " working," investigative or other files, or at any other location, including private residences.
If any records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s).
GAP requests that fees be waived, because " finding the information can be con-sidered as primarily benefitting the general public," 5 U.S.C. 5 552(a)(4)(a).
GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through public outreach, the Project promotes whistleblowers as agents of government accountability. Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Citizens Clinic is currently assisting several citizens groups, local governments and intervenors in the central Texas area concerning the construction of the Comanche Peak nuclear power plant.
~
g
~
.Director Office of Administration Page Two We are requesting the above information as part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of The index should provide a detailed jusitfication of your documents withheld.
grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document. withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S.
977 (1974).
We look forward to your response to this request within ten days.
Sincerely, ih Billie Pirner Garde Citizens Clinic Director e
e
$