Text
,
eX9 l
~
TEXAS UrILITIES SERVICES DJC.
INSTRUCTIQJ REVISIGI ISSUE PAGE DATE CP-EI-4.5-1 2
12-16-81 1 of 12 PREPARED BY AS-BdILT PIPIIC VERIFICATIGI f,
g f a&, L M
APPROVED BY
1.0 REFERENCES
1-A CP-EP-4.5 Design Verification 1-B IE Bulletin No. 79-14 dated 7-2-7) 1-C IE Bulletin No. 79-14, Revision 1 dated 7-18-79 l-D IE Bulletin No. 79-14, Supplement 1 dated 8-15-79 l-E IE Bulletin No. 79-14, Supplement 2 dated 9-7-79 l-F CP-EI-16.1-1 Control of Piping Deviation Record Form 1-G MS-100 Piping Installation
- 2. 0 GENERAL l
{
2.1 IURPOSE B B %F E 47 UJ Ebb
=
To establish the neans by which the general intent specified in Reference 1-A thru l-E are acccuplished. Measures shall be inplemented to define the as-built configurations of @plicable systems and to evaluate damage study consequences of high energy lines, if postulated treak locations are altered ie to as-built support locations.
2.2 SCOPE
'Ihis instruction shall @ ply to the following piping:
Safety Class Size i
l' All sizes 2,3 Large Bore 2,3,5 Designated Small Bore (up to and including the first anchcr cr terminal connection) that interacts with i
safety related Large Bore pipe.
Additional piping may be as-built verified upon written request to and @ proval by the TSABC. 'Ihese additional lines are not I
specifically within the scope of this instruction and may be processed only as necessary to satisfy particular requirenents.
2.3 GENERAL PROGRAM DESCRIPTIGI j
A package consisting of cbcuments required to cbscribe the as-built configuration of the pipirg arri support system shall be assembled by problem cr other defined cbcument and transmitted to the i
%hk 8606020201 860521 PDR FOIA
- GARDE 85-59 PDR
'IEXAS 17?ILITIES SERVICES INC.
DISTRUCTIOT REVISIO1 ISSlJE PAGE DAT CP-EI-4.5-1 2
12-16-81 2 of 12 responsible analysis organization for review and verification. Upon capletion of analysist verification, the suppat & signs will be reviewed to assure acceptability. Darage study interface will be initiated when @plicable.
2.4 DEFINITIGE AfD ABBREVIATIGE CAABC - Oaality Assurance As-Built Coordinator TSABC - Technical Services As-Built Coordinatcr BRP
- Piping Iscxnetric Drawing BFH
- Pipe Support Detail Drawing BRHL - Pipe Suppat Incation Drawing GE
- Small Bore Pipe and Support Iocation Drawing Small Bore - piping less than 21/2 inches in diameter Large Bore - piping 21/2 inches in diameter and larger PDRF - Piping Deviation Record Form - See Reference 1-F 2.5 RESPOEIBILITY t
The CPP Mechanical Engineer is.re.sponsible for providing technical direction and administrative. guidance to the CPP Mechanical Engineering organization of which the Technical Services Group is a part.
The Technical Services Group Supervisor is responsible fcr ensuring activities within the purpose and scope of this instruction are ccmpleted in accordance with the neasures described herein.
'Ihe TSABC is responsible for inplementing this instruction. The TSABC shall coordinate the assembly and transmittal of as-built verificaticn packages, interface activities, and establish and maintain adequate tracking mechanisms a logs to assure positive control of all activities described within this instruction.
1 When pecific individuals are chsignated by title in this instruction, it shall be assumed a designee may act in that capacity.
Documentation of such designation shall be maintained within the Technical Services Group.
3.0 DISTRUCTIO1 3.1 INITIATIQi 3.1.1 General The TSABC shall assemble a package for as-built verification. The verificaticn process may be initiated pria to the installation of all ocmponents and supports cn a given stress problem. Such exceptions shall be trac'ced and as-built verified pricr to final certification of the stress problem.
b YY.h${ ff
.I
TEXAS [7tILITIES SERVICES INC.
INSTRUCTIO1 REVISIGI ISSUE PAGE DATE CP-EI-4.5-1 2
12-16-81 3 of 12 3.1.2 As-Built Verification Packace me as-built wrification package shall consist of the following documents as required:
a.
BRP's b.
BRHL's c.
GE and associated support &awings d.
BRH's e.
As-Built Checklist (Figure 1) f.
PDRF's 9
Additional information as required including the identification of stiffness values for supports en Class 1 Stress problems and mininum wall (Ref.1-G, tr_A-5551) violation data.
3.1.3 As-Bailt Packaoe Preparation he TSABC shall coordinate the updating of required &awings with the apprcpriate engineering drafting group.
3.1.4 tpon receipt of updated &awings the TSABC shall review the package fcr clarity and mark the drawings "For As-Built Verification Only".
The &afting group and TSABC shall fill cut the @prcpriate portions of the As-Built Checklist.
3.2 AS-BUILT VERIFICATIOi 3.2.1 OAABC Interface and Activities he TSABC rAall forward the package to the QAABC to shall coordinate the necessary effort fcr verifying (and obtaining if necessary) the required as-built information. 2e QAABC shall cmplete the appropriate porticn of the As-Built Checklist.
3.2.2 As-Built Verification (ABV) Tag During the verification process, ABV tags (Figure 2) shall be attached to the line - at strategic locatic,ns - by verification personnel.
3.2.3
'Iblerances Applicable tolerances for wrification are shown in parenthesis in paragraph 3. 2. 4 and 3. 2. 5.
FOR NFORMhil0k gyl.y
TEXAS tRILITIES SERVICES IllC.
DISTRUCTIQ1 REVISIQ1 ISSUE PAGE DA2 CP-EI-4.5-1 2
12-16-81 4 of 12 3.2.4 Verification of BRP's and GHH's Verification shall include:
a.
Dimensions (+ 2").
b.
Elevations (+ 1").
c.
Valves. %e valve location and mark (type) numbers of all valves shall te verified.
In addition, the orientation of valves 2 1/2 inches and larger, and power actuated valves shall be verified.
d.
Sleeve clearances including applicable PDRF's (+ 1/8"),
e.
Equipment. Equipment shall be identified bf mark runber, and the orientaticn of equipment supported by the pipirg shall alsa be shown.
3.2.5 Verification of BRHL's and GE's Verificaticn shall include:
a.
Support mark runbers.
b.
Dimensional location of supports (+ 2").
3.2.6 Verification of Supports Verification shall be limited to:
a.
Type of supp a t b.
Orientaticn of support
- 3. 2
'7 Supoorts flot Installed When a design location is chsignated cn the support location drawing, the fol3cwing shall be determined by TSABC.
a.
%e support can be installed.
b.
The prcper location has been reserved for the suppcrt.
If the support can not be installed, the @propriate location crawing shall be so noted.
3.2.8 ccroletion of Verification The OAABC shall review and transmit the package to the TSABC noting appropriate connents.
3.3 AS-BUILT [EAWDIG UPDATE 3.3.1 Initiation ne TSABC shall review the package and forward the @plicable drawings to the responsible engineering draf ting group. Additional comments bf the TSABC shall be specifically noted.
F 1 Tngr# #"trut Wu il Unidi lun..+,T.
b TEXAS UTILITIES SERVICESf EC..
E STRUCTIGI
.REVISIQ1 ISSUE PAGE mTE I
T CP-EI-4.5-1 2
12-16-81 5 of 12
,g.
~
1 3.3.2 tbdate i.5E L on cx:stpleting update _ activities, drafting personnel shall forward the updated drawings' fog. review by the TSABC.
3.4 NIALYSIS T W E AS-BdlLY COIDITIGI 3.4.1 Transmittal and Analysis he TSABC shall review for cortpleteness and f6rward the updated package to the responsible analysis ceganizaticn which shall update analyses in accordance ki.th established procedures / instructions.
Discrepant or missing information shall be resolved /obtained through the TSABC.
3.4.2 Resolution of thacceptable Analysis Se TSABC shall coordinate the resoluticn of unacceptable analyses withtheresponsibleenijineeringceganization' including re-verificaticn as applicable.
3.4.3 Ibcumentation If analysis review is performed prior to all conponents and supports being installed cr if ariy uwnt cr support is nodified during analysis review, the TSABC will determine if_ function ce location is changed. Se TSABC shall coordinat:a verificaticn of supports with originally issued fcr an)alysis review, the infcrmaticn will be the QAABC as required.
f there is no inpacti on the documents furnished in writing to the responsible analysis crganization for information.
If there 18 inpact, the information shall be furnished for review and acceptance by the responsible analysis organization.
De TSABC will be responsible fcr identifying and rectifying any affected documents in all cases.
3.5 ISSUNIG T NIALYSES s
3.5.1 Reanalysis !bt Required If an analysis is verified to be acceptable based on the as-built configuration, the appropriate docurentation shall be ccepleted by the responsible analysis crganization and transmitted to~ the TSABC.
1 3.5.2 Peanalysis Reauired - tbn-High Eneroy Lines ;*
When reanalysis is required for acceptance of a non-high energy line, the problem shall be issued per 3.5.1 with the following additions:
a.
Revised loads shall be transmitted to the TSABC.
b.
The TSABC shall coordinate verification of individual hangers in accordance with 3.6.
N0h {}kl.f
TEXAS UTILITIES SERVICES INC.
i i
~
3.5.3 Reanalysis Recuired - Higt u.
. e, When reanalysis 1 ; requires
- : e. :e " 2.
n
~
responsible analysis cegan:
r_..
addition, the TSABC shall i.
.i m er crx. +
r.w activities.
3.5.4 Certification Certification of each analysi analysis organization. The T.^-
statements of verification by 1,ystem er other.vu t e
3.6 VERIFICATIGi AND CERTIFICATIGi OF PIPS CLTPIC ".'..a 3.6.1 Supoort Desian verification Support design shall be verifl d to, e : "i e r.
.<eh-
.a by the responsible engineerin. crqanir m.cr..
shall be coordinated by the TWK' 'hw ev,. '
3.6.2 Certification Support drawings verified to i r. o.;;. -
.s 2.-
authorized representative of i:e, e.%. n..
7 Certified ckawings shall be cFngr.:.uj d-
.m.:-
TSABC shall document support
- Y.
4.
e apprcpriate portion of the As-A.ic. ":..t nt.
3.7 CCNPIZIIOi OF AS-BUILT VERIFIP\\TIQi ACTIVITIF.3 Proper documentation shall be -1ssetibicd ern t~c.ww..ex.
Permanent Plant Records Vault iPPRV'.
am SP: 44 t.
acknowledgement by the PPRV.
TUGCO will be notified tpon o activities.
A l
FOR lhFORMATON DNLY l
ISSUE 3
T.
INSTRUCTION REVISION PAG; DATE CP-EI-4.5-1l 2
12-16-Al 7 of l' Figure 1
.a t, : i
,acxx.: c:>rors T PW D Ct.Ais L C 4C 70 C
....:.w, aerwrr 4.auns
- a. r... u v.. w i t, m u m imsi l
l en m. m.
enn. m. e.
eee m. e.
_i.
$g[.5 Es!
.;u -
5 s
s j $y I5e]
$5 Es Gl f j ji te]
i
=*u I
miji a
a
...[2 ut 3
st L...
i l
i l
l I
II i
l l
l I
I I
II I
i i
! i_
l i
II I
l l
iI I
I I
l L e l J.1, il I
II I
l_
i lt IIT Flf-A i_
I ii l
i 1
. i _i i
il I
i i
? '
I I
i lI i
l I
Il l
1 1
I!
l l
l 1i I
i i
lI l
l i
ll I
I I
II I
i l
i I
I i
i ll_I I
l I 'I I
I I
I I
I l
1I i
i i
i l
I i
ii i
i i
I I I I
I I
l l
l 6
II i
i i
r.
... v ss - (in.rno.cr ti a.u a
- unas O'u (su oca usru so)
Ou.
78.._.
OCA f OCA f M8 OCA f s L23 (C124 1 ONLf) CNQ OiAmt Ct(Y!st3 A5 Ustt3 BD Q q.A.
E' I
..c 3 Swu FOR INFORMATION ONLY.
I TEXAS UTILITIES SERVICES IllC.
INSTRUCTION REVISION PAGE CP-EI-4.5-1 2
12-16-81 8 of 12 Figure 1 As-4'Jtt' vftretast!M 5"Itt13 7tC8LE4 pacta 2 ~29'Tvf3 4GC PACIAGE
- afTACHpet (*
ALTEAAA*t #G.
5HET OF 4tyf 3 Das lla0;f*tyat !=rces't g l
$LiPPORT 5
=
si in q q is 1,
is I
i i
I i
I l
I i
I I
i I
i l
I I
I I
l I
l i
I i
l i
I I
I i 1 i
l l
l 1
l l
i i
l i
l i
f I
I I
I i
l i TY F ICA L '
I 1
x
}
I I
I
~
l I
i i
i I
l l
I l
I l
l 1
i I
e i
j i
I i
i i
i l
I i
i i
I I
l i
I I
l I
I I
I I
l l
t i
i t
i i
l i
I e
4 i
l I
I I
l 6
l l
l 1
i' I
i l
l I
I I
l i
i l
I c
f I
I I
I i
I i
I i!
- ,.ce e=
E0RIFOsMMUWUiii.Y l
e
~
\\
E TEXAS UTILITIES SERVICES IMC.
INSTRUCTION REVISION PAGE 12-16-81 CP-EI-4,5-1 2
9 of 12 f
Stres #cos.
4ame Ptg.
Alta Ptg.
A3 8utLT OttCKLI5?
!!. P4f.vt2!FICAft:N CAAm!4 uPCAft REV
=Q 4.
tap's (73PC)
(f3ASC) 8 instets for all valves samat All sinteum unles thent All outstanding Changes tacarporatee?
9'8 All eeuteuset Cannectient then?
(Distess of eeutsumet art f.)
Amoreduction eueltty accostacle.
S.
M *l all suseerts located per cunt rev.
All outstaneing revittens incorperated?
04 All proeles te6%sr9es SAcunt All Soutsment Connectient SAmet (Nintes of stutsument aset f.)
. _ 1.n e
,,t, et.e,e.
C.
ORM's All outstanting oanges tacorporateef 9/4 All Mt't AS. Guilt!
- 3. Castes of all aselicaele eremings 4tta@ed.
8 C3eOT5 453,VQ
(.
fetettee to f5AAC UM) sisAli F.
Pacaege leview ($f t f5AAC)
, t.en 11
.ev.
e mt,an,,.
.evte e FOR FORMATl0N ONJ.Y
E TEXAS UTIt.ITIES SERVICES INC. INSTRUCTION REVISION PAGE CP-EI-4.5-1l 2
12-16-81 10 of 12 f
Figure 1 n...
s.ni.,
x,e,.
9,,
A.
ess. 5%'.
All.utst f.T O..go. tocarper.tes, egg g gg g ~,
r,g<g,n,g..
s o. - i.
- i. i n e4.,.
An
- c. ca.
na.. m....ua e
c= ors
. ram l
L n
p n.
IT F I O_ _
am 9.
fr...et tt
- t. f1ASC; 3A'T l
l 3
1 e
ISSUE TEXAS UTILITIES SERVICES It!C.
INSTRUCTION REVISION NE CATE CP-EI-4.5-1!
2 12-16-81 11 of 12 ser. e,..
I c:n.cM esa stua arm:: inr::=
meme P.S.
Altra g.
I' sacrian ::: as.=tti intr:ar::a l r.
r j
i w r..c i
e-i.
i c..i i.,,,.c..
i a i.sv r am i
i se v.,mac.
l l
. n..i
. i... c.
I i
i.
... n.
a u..i.,.
..n n I
I 4.
n.
l.i -.,,u.u n n I
i 4.
ne i.. i...
4.
l $8 1 M % 1 RT1ff.G.
l
. c.i
.n.u.u.u a fi s.
a u.' N h.at.4 8P f Mat.
9 tu
.... n n 89P 1f C'*.*C..
l.
i i..r.AC.. F.P.ii.i.. 4 8.a.un
.$+'tute...
- i...i - u..
t.
e
,m,,.c.
i i
i.
n..,n.
w MpAi 4.
.Sissert 1.c.tions ven f t g
n.y ww- -
P tef 9 I
3.
411.as. orts 1netalt.e.
[
e 0
l v.M ettatt.n.f e.e-eeg.'s g
i.
s n.
n cm.
l l
4.
5=
rt i.e.tt.as.en fi.e Se am.H l
l 3.
l All.u.a.rts f a.talt.c.
l l
t ) $w ort ventf utt.n l
l
- i. j or.uc..,
en n n.
i l ryse.f.u rt Mn.d.
l l
l conators l
e l
l I
I i
e.f.
u.i uri it-ouri i A..wH t ins.en.,;
C7.( f.4, $.1 S t.09 11,1 ).1 a.
E TEXAS UTILITIES SERVICES D:C.
INSTRUCTION REVISION pggg l12-16-81126f12 CP-EI-4.5-1 2
Figure 2 FIGUR(
2 A$.8UILI V(RIFICATION TAG (iYPICAL)
CP5[$
NO.
'45 80!LT'vtRIFICAT!0N TAG Line No.:
i\\.
,a ora.ing No.:
a f!#
Location:
This line is being '
ed for as. built purposes.
Contact' at est.
Prior to performing any wort other than inspection and telttag on this line.
O e
FOR
! FORMATION Deli
- -