Rev 7 to Instruction CP-EI-4.0-22, Design Document Control by Technical Svcs Mechanical Drafting Group
ML20205Q602
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/05/1984
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20205Q559 List:
References
FOIA-85-59 CP-EI-4.0-22, NUDOCS 8606020270
Download: ML20205Q602 (7)


Text

- _ - _

. L ,.

.A

. TUCCO ENGINEERING DIVI ~ UCI' ION REVISION ISSUE PAGE p, _ de \ DATE CONITOLLED CP-EI-4.0-22 7 7-5-84 1 of 7 DESIGN DOCUMENr // n //

REPARE s' //, , j CCNI70L BY TSMD APPf0VED By [,s# (2 [%% jrf O

1.0 REFERENCES

1-A CP-EP-4.0 Design Control 1-B CP-EI-4.5-1 General Prograal for As-Built Piping Verification 2.0 GENERAL 2.1 PURNSE To establish the method for control of drawings by Technical Services Mechanical Drafting in order to assure compliance with the provisions of Reference 1-A.

2.2 SCOPE This instruction shall apply to all controlled drawings issued by Technical Services Mechanical Drafting (TSMD).

2.3 RESPONSIBILITY The CP Project Pipe Supcott Engineer is responsible for providing technical direction and administrative guidance to the Pipe Support Engineering organization of which the Technical Services Group is a part.

The Technical Services Group Supervisor is responsible for the general i:rple:rentation of this instruction. The rrechanical drafting supervisor has been delegated the specific responsibility for ensuring drawings are controlled in accordance with this instruction. The supervisor shall be resconsible for assuring personnel within TSMD are qualified by education and/or for

. experience to perform assigned tasks.

Where specific individuals are designated oy title in this instruction, it shall be understood that designees may be delegated to act in that capacity.

2.4 DEFINITIONS TS - Technical Services Group TSMD - Technical Services Mechanical Drafting Group TSAS - Technical Services As-Built Group Br<P - - Piping Isometric Drawing 8606020270 860521 PDR FOIA CARDE85-59 PDR

+ -m

s

~

. TUGCO ENGINEERING DIVISION INSTRUCTION REVISION ISSUE PAGE DATE k CP-EI-4.0-22 7 7-5-84 2 of 7 BRH - Pipe Support Detail Drawing BRHL - Hanger Iccation Isometric DCC - Document Control Center MWV - Minimum Wall Violations i FMHS - Field Modified Hanger Sketch AB - As-Suilt BRH VCDI - Vendor Certification Drafting Instructions 3.0 INSTRUCTION 3.1 O NTROL GF INCOMING DESIGN DOCUMENTS i

i Incoming design documents from applicable vendors shall be logged and transmittal letters conpared to the actual documents received.

j All discrepancies shall be brought to the attention of the TSMD

! supervisor for resolution.

) TSMD shall establish and maintain logs / files adequate to provide i control and accountability of the internal activities within the 4 drafting organization.

3.2 GENERAL PREPARATICN AND ISSUE OF BRP'S 3.2.1 General Precaration and Issue For BRP's for dich no vendor drawing has been received, an isometric sketch shall be prepared from the piping composite. All information to be shown on the BRP shall be reviewed using appropriate drawings, specifications and/or lists. This information shall include i pipe location and configuration, dimensions, valve and equipment i data, vendor spool and weld information, etc. including notes i required by construction or engineering.

The drafter shall initial and forward the conpleted BRP to a checker for review. Upon completion of the review, the drawing shall te i subnitted to DCC for distribution. Discrepancies noted in the review process shall be resolved by the checker, draftsman, or group leader i as apyropriate.

3.3 REVISIONS TO BRP'S i BRP revisions shall normally be initiated by design changes issued in accordance with established procedares/ instructions. Drawing revisions are rot required immediately upon receipt of change documents.

All outstanding design changes against the BRP shall be identified using the appropriate file / log. All docunents that have been incorporated shall be referenced in the " Revision Description Block" l or otherwise noted on the drawings.

a

4 i 1 1

3

'IUGCO EN3INEERING DIVISION INSTRUCTION REVISION ISSUE PAGE p DATE CP-EI-4.0-22 7-5-84 7 3 of 7 i Ibcuments unclear in content or found to contain discrepancies shall be forwarded to the appropriate engineering group as necessary for elarification or resolution.

All changes to the drawing are to be " clouded" and indicated by the 1 new revision numoer in an adjacent small triangle. All " clouded" areas and triangles for the prior revision, if any, will be renoved.

Se new revision number shall be indicated in the title block and the drawing initialled appropriately. Se drawing package will be forwarded to a checker for review. Se checker shall review all incorporated information and refer corrections to the drafter. We l

checker shall initial the drawing in the appropriate area, and submit

the drawing to the approver. Upon final approval, 'ISMD shall submit the drawirg to DCC.

3.4 AS-BUILT BRP'S ,

A BRP will be revised to as-built conditions as necessary to support project priorities. As-built revisions shall be accomplished in the

} same manner described in Section 3.3 with the following exceptions.

I l te checker shall review the drawirg for possible thV's by reviewing the design c lange &cuments regarding thV welds prior to draf ting.

] It shall be the responsibility of the Technical Services Supervisor to forward these design change documents to the TSMD Supervisor. LV welds shall be denoted with the letters %V adjacent to the elliptical circle encompassing the weld number. We wrds "As-Built" shall be clearly indicated in the current revision block.

A BRP which has been "As-Built" by TSMD may be revised to incorporate mments resulting from the review and field verification process of 4

the as-built verification program in accordance with Reference 1-B.

TSAB is responsible for forwarding this information to TSMD. After i

. the drawing has been updated, the drafting approver and the TSAB '

j Coordinator shall jointly review the drawing to assure that all j i information has been incorporated, and initial the approval block.

3.5 CONTFOL OF BRH'S I

3.5.1 Precaration of BRH Using ENHS '

A EMHS may be received from the applicable engineering organization prior to drafting. We drafter shall assure all information on the  !

sketch is camplete. Dimensions which are necessary and can be calculated from information given on the sketch shall be included, and the drawing revised to incorporate all indicated changes. The draf ter shall add the Brown & Poot logo, revision block, etc. The word " Blue-Line" should be written across the top of the drawing for ease of identification. When vendor drawings do not exist, a new BR9 drawing any be prepared. We finished drawing shall be initialled by the drafter and forwarded to the checker.

i

- I

'IUGCO ENGINEERING DIVISION INSTRUCTION REVISION ISSUE PAGE DATE CP-EI-4.0-22 7 7-5-84 4 of 7

'Ihe checker shall assure all information on the sketch has been incorporated. When completed, the checker will sign one half of the check block, per Attacnment A, and forward the folder to the approver.

The approver shall also check the drawing to assure all required information has been incorporated, and initial the check block, per Attachment A.

The TSMD approved folder will be held in TSMD for approval by engineering. Approval by engineering shall be documented by initial in the approval column of the revision block - Attacnment A.

Approved drawings shall be submitted to DCC for distribution.

3.5.2 Preparation of BRH Without FMHS Blue-Line exempt drawings will be processed similarly to drawings controlled per 3.5.1. The exceptions are:

a) a blue-line will not be required before processing and; b) engineering approval will not be recuired (these drawings are original design).

3.6 REVISIONS 'IO BPM'S -

3.6.1 Revision by Vendor Drawings enanged by revised vendor documents shall te controlled in accordance with Section 3.1 and 3.5.1. Such revisions shall be initiated by the " Field Modified Hanger Sketches" or as needed by request of authorized engineering or craft personnel.

3.6.2 Field Initiated Chances Field design sanges shall be issued in accordance with established engineering procedures / instructions. Revisions to vendor certified drawings will be revised in accordance with Section 3.8.1 of this procedure.

3.7 AS-BUILT DEAWING PREPARATION 3.7.1 Initiation of As-Built BRH m n m ,, e. .-n r . -,n - - - - , , . < ~ s 7_

- r ec. - r~ --ee- 4 si i u :- _,,_ y u_ u__- ,.s,,,, r -__ a 4 - __m , , , _ - -

{

h ~a. -- - -- -'

_____ _,, . ,j Documental discrepancies shall be forwarded to the appropriate engineering group for resolution.

1 I

. l

'IUGCO ENGINEERING DIVISION INSTRUCTION REVISION ISSUE PAGE

. DATE CP-EI-4.0-22 7 7-5-84 5 of 7 3.7.2 Drawino Precaration All design change documents shall be incorporated into the ERH. 3 After revision, the checker will assure that the information on the 1 A-B correctly reflects the change documents in the package, and tne N drawings and dimensions depicted are satisfactory for design review :

by 'ISDRE. 'Ihe cnecker shall initial the " checked" column in the revision block, ard forward the drawing to an approver.

The approver shall check the drawing to assure all the required N information is properly incorporated and initial the appropriate column in the revision block. Upon approval the drawing shall be \y forwarded to the appropriate engineerina group for design verification.

X Upon completion of design review, performed in accordance with established engineering procedures / instructions, the revision block dated and the drawing submitted to DCC.

3.7.3 Revisions f A BRH wnich has been "as-built" by TSMD may te revised to incorporate further design change documents. In addition, upon completion of verification and certification activities, the BRH may be revised to incorporate TSAB cc:nnents which reflect the final as-built condition more clearly.

8 VENDOR CERTIFIED AS-BUILT CRAWING PREPAPATION 3.8.1 Precaration of Vendor Certified BRH's Usino VCDI A T.DI shall be received from the applicable engineering orgarji::ation prior to drafting. te drafter shall revise the BEH to incorporate changes delineated on the VCDI. All changes made to the BRH are to be " clouded" and indicated by the new revision number in an adjacent small triangle. All " clouded" areas and triangles for the prior revision, if any, shall be removed. %e finished drawing shall be initialed by the drafter and forwarded to the checker. De checker shallassureallinformationontheVCDIhasbeencorrectlyinporp-orated and shall initial the drawing and forward the BRH to the approver. Re approver shall also check the drawing to assurd all required information has been incorporated ard initial the a; proval block.

The TSMD approved BRH shall be forwarded to the applicable 6% ineering organization for vendor certification and aoproval. Approy'edvendor certified BRH's shall be sikmitted to DCC for distributiop.

O

'RXXD ENGINEERING DIVISION INSTRUCTION REVISION ISSUE PAGE

, DATE

(

CP-EI-4.0-22 7 7-5-84 6 of 7 3.9 CONrPOL OF BRHL'S 3.9.1 General Preparation For information purposes, a piping isometric may be prepared showing the location, orientation, and identification of pipe supports subject to as-built verification per Reference 1-B. The BRHL shall reflect the sane piping configuration as the corresponding BRP, and should show only that information necessary for verification and analysis purposes.

3.9.2 Revisions to BRHL's A BRHL may be revised to incorporate comments rer the 'ISAB coordinator, or as necessary to reflect as-built conditions. After the drawing has been updated, the drafting approver and the TSAB Coordinator shall jointly review the drawing to ass' Ire that all information has been incorporated, and initial the approval block.

. 'IUGCO DIGINEERING DIVISICN INSTRUCTION REVISION ISSUE PAGE

- DATE 7-5-84 CP-EI-4.0-22 7 7g7 ATTACHMENT A (TYPICAL) ctscntpricM REvl car cwslcxxlAro{ _

J .

il si i ll d ll L

l l l 1

- Field engineer's appreycl. ( Eluelines cnly.)

Crcfting cpprcver fer ncn-bluelines.

- Orcfting apprever fer bluelines.

- Crcftin g checker.

- Orcftspersen.-

  • %/D f

- Apprcycl date.

b 6

- rievision level.

ATTACHMENT A g

- *r

, ~

. c, .

E REVISION PAGE

-s TEXASUTILITIESSERVICESIj(NPf0CEDURE

.. 1 surnMI iTWd , t I m u tunu ~ ---

4 TUK CP-EP-4.5 1 2-18-80 1 of 3 PREPARED BY /f:.

DESIGN VERIFICATION APPROVED BY ' . /

f '.

///w ~ ~

IN '"f //

(/

/

1.0 REFERENCES

1-A TUGC0/TUSI CPSES QA Plan 2.0 GENERAL 2.1 PURPOSE The purpose of this procedure is to specify the require-ments for design verification for Comanche Peak Project Engineering (CPPE) designed projects to ensure that a new or revised design adequately satisfies its intended function.

2.2 DEFINITIONS - - - - .

2.2.1 Desian Verification - The process of reviewing, confinning or substantiating the design by one or more methods to provide assurance that the design meets the specified in-puts. Acceptable verification methods include but are not limited to Design Review, Alternate Calculations, and Qualification Testing.

2.2.3 Alternate Calculations Design verification method that employs comparison with alternate calculation or analysis. The alternate method may be a more simplified or less rigorous approach.

2.2.4 Qualification Testing Verification achieved by suitable testing of a prototype or initial production unit.

2.3 RESPONSIBILITIES The Original Designer shall authorize their personnel -

at the site or in the CPSES Project Engineering Group to perfonn design reviews / verifications.

3.0 PROCEDURE 8 *$

- - - - - -1YT he-

4 I s' E

TEXAS UTILITIES SERVICES INC. REVISION PAGE CP-EP-4.5 1 2-18-80 2 of 3 3.1 GENERAL Design verification shall be done in accordance with sub-ordinate instructions that outline the requirements and/

or the method (s) to be used.

Design verification shall be performed by other than the one who performed the original calculation.

When verifying changes to a previously verified design, verification shall include an evaluation of the effects of these changes on the overall design.

Design verifications will be verified by the original designer when applicable.

Deficiencies identified during design verification shall be identified, documented and resolved as per the require-ments of Reference 1-A.

Acceptable methods for design verification include Alter-nate Calculations and Qualification Testing.

3.2 ALTERNATE CALCULATIONS When using alternate calculations for design verifciation,

a. Appropriateness of assumptions, input da;a and .the code requirements used during the original calculations shall be reviewed; (e.g. hand calculations vs. computer)
b. Even if the simplified alternate calcuiations do not exactly check the original calculaticas, they must be consistent with the original cairJlations.

3.3 QUALIFICATION TESTING When verifying design by qualification testing:

a. Qualification testing shall be designed to demonstrate adequacy even under the most adverse conditions.
b. If qualification testing is designed to verify a spe-cific design feature then the other features shall be verified by other means.
c. It shall be performed in accordance with procedures which make provisions for insuring that the pre-requisites have been met, adequate instrumentation is available and that necessary monitoring is performed.

e, -

PROCEDURE E - --

' ~~

TEXAS UTILITIES SERVICES INC. REVISION .. PAGE

- CP-EP-4.5 1 2-18-80 3 of 3

' ~

, 3.4 DOCUMENTATION The design verification method, results and the verifier's approval shall be documented as described in subordinate ins tructions.

4 0

O e

w

4 ILUCO ENGINEERING DIVISION PFOCEDURE REVISICN ISSUE PAGE DATE hh I CP-EP-4.6 10 4-16-84 1 of 15 FIELD DESIGN GANGE CNIFOL PREPARED BY APPPOVED BY Y 44 /

v

1.0 REFERENCES

1-A 'ILGT CA Plan 1-B INE Procedures Manual 1-C CP-EP-4.7 Control of Engineering / Design Review of Field Design Changes 1-D CP-EP-4.0 Design Control General Requirements 1-E CP-EP-4.5 Lesign Verification 2.0 GENERAL 2.1 WRPOSE Ib describe the general mthod of documenting changes or deviations to specified design / construction requirements by autnorized field personnel #ollowing release of engineering cbcuments approved for fabrication or construction. These previsions are established to assure compliance with the requirements of Reference 1-A. Note, supplemental engineering procedures / instructions may te used to describe and iglement alternate methods of design change control.

2.2 SCOPE Design change / deviations shall be approved den complete and validated y designated authorities as described in this instruction.

2.3 PES KNSIBILITIES The Assistant Project General Manager has overall responsibility for the design of the CPSES project. Authority for the iglementation of this procedure has been delegated to the Manager of Engineering and subordinate engineering organi::ations. Further delegation of authority may be acccmplisned through formi engineering instructions supplementing this procedure.

i 2.4 DEFINITICNS 2.4.1 Engineerino Documents As used in this procedure, documents approved for fabrication cr construction which specify design, engineering, and/or construction requirements (such as specifications and drawings).

A SY7WYh I Wee-

. .. s-

~

'IUGCO ENGINEERING DIVISION PIOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-84 2 of 15 2.4.2 Desian Change A revision to engineering documents which affects the form, fit, or furction of the affected structure, system or cmponent.

2.4.3 Deviation A departure from a specified engineering requirement that cbes not affect the form, fit, or function of affected structure, system, ,

or c:enponent. l

/ 2.4.4 Engineering Chance Recuests i A document used to forward engineering, design, or technical informa-tion between engineering organizations for the purposes of initiating l

revisions to engineering cbcuments. The ECR is a comunication/ '

i interface document which does not authorize fabrication or

  • I construction activities.  !

2.5 DOCUMENTATIN l

Design danges/ deviations to specified engineering documents .

shall be documented by revision initiated by an Engineering I Change Request (ECR), a Design Change Authorization (DCA), or l' j a Congonent Modification Card (CMC). 'Ihe respective forms and 1 the application of each are further described below.

i  !

3.0 PPOCEWRE ,

j 3.1 ENGINEERIIG CHANGE REQUESTS ,

t I

3.1.1 General ECR's shall be used by CPPE to initiate design danges to be  ;

documented by document revision. In addition, design change

proposals forwarded by other organizations such as Westinghouse Field  !

Change Notices (ECN's), 'IUGCD Design Change Requests ('IDCR's) ard I l! Gibbs & Hill Design / Engineering Change /teviations (DE/CD's) may l l be processed by ECR's. l 1  !

l Upon completion by the originator,the ECR shall be forwarded as i

specified herein for engineerim document incorporation, approval,  !

I and design verification as required.  :

f i 3.1.2 Soecific Scoce of ECR's l i 'Ihe specific scope of citanges (i.e., systems, subsystems, areas, i j engineering documents, etc.) to be processed by ECR's shall be administrative 1y defined by the CPP Engineering Manager. ,

i l LOTE: Changes critical to construction in terms of an imediate

! need for implementation may be exempted from the scope of ,

ECR's on a case by case basis. Changes processed in this
manner shall be cbcumented by CCA/ CMC; however, the change  ;

j shall be authorized by specified engineerirg management 2 personnel. i

~ ~

! n__________

O

~

I .

\.

' PIOCEDURE R" VISION ISSUE PAGE TUGCO ENGINEERING DIVISION i DATE i

CP-EP-4.6 10 4-16-84 3 of 15 P

1 I 3.1.3 Form Completion k

l Detailed instructions for cxxcpletion of the ECR form are specified j per Attachment 1.

1 l 3.1.4 Request Approval and Distribution f cCR's shall be approved by individuals designated by the CPP j Engineering Manager. . Upon approval, the ECR shall be forwarded j as follows for disposition:

f Scope of ECR Responsibility a) Non-ASME, BRP Related CPP Mechanical Engineering

  • b) Non-ASME, Non-BRP Related TNE i c) ASME Related: Stamping Complete 'INE

! d) ASME Iblated: Stamping Incomplete CPP Mechanical or I&C

Engineering i

I j 3.1.5 Disposition i 3.1.5.1 Non-ASME, BRP Related I

t (

! The ECR shall be used by CPP Technical Services as a basis for BRP ,

! revision and re-analysis (as required). If the ECR also affects '

[ design documents other than BRP's, CPP Technical Services will 4 forward copies of the ECR to the responsible organizations. These l activities shall be acconplished in accordance with the engineering j procedures / instructions established to control the design and

! design ctlange program. Revised design documents shall be entered

]

into the document control program.

3.1.5.2 Non-ASME, Non-BRP Related i

i

. The ECR shall be used by TNE to connence design control activities  !

as defined per Reference 1-B. Upon completion of an engineerirg  ;

' review to identify design considerations (such as interdiscipline ,

l review, calculations, damage study, etc., impact), the ECR shall  !

4 be incorporated into affected documents for formal approval of  !

the design change and design verification (if required). During l the disposition process, the ECR may be nodified with the i involvement of the originator.  ;

b Affected documents shall be entered into the cbcument control i

program for distribution. j I l J y b

\ ,

1 j -

7

. - i IUGCO DiGINEERING DIVISION PROCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-84 4 of 15 3.1.5.3 ASME Related: Stamping Complete TNE shall complete design control activities as specified in Reference 1-B. CPPE shall participate in the analysis and pipe support effort as defined in the' TNE-defined interface documents.

All CPPE activities shall be controlled in accordance with j established engineering procedures / instructions. During the i disposition process, the ECR may be nodified with the involvement of the originator.

3.1.5.4 ASME Pelated: Stamping Incomplete The ECR shall be used by CPP Mechanical or I&C Engineering as a basis for revising the engineering document used in the certification

! process. The revised &cument shall be reviewed to determine if '

)i stress re-analysis is required. If stress re-analysis is required, the reviewing organization shall coordinate the analysis and i initiate pipe support design activities as required. After 1

re-analysis, or if no re-analysis is required, the revised document shall be forwarded to TNE for the cctnpletion of design control activities and return. The above activities shall be accomplished in accordance with the engineerirs procedure / instructions established to control the design and design change program.

j Revised engineering documents shall be entered into the dcanent i control program.

3.1.6 Closure IIR disposition shall be cbcumented per Figure 1. Distribution of the dispositioned ECR shall include the originator and DCIG. Where required, the responsible disposition organization shall retain a copy of the ECR for design control documentation.

3.2 DESIGN GANGE AUIHORIZATIONS & COMPONENT EDIFICATION CARDS 3.2.1 Form Ccm:oletion i

Detailed instructions for completion of the DCA/ CMC forms are specified per Attachment 2 & 3.

,--y,- , 7.-,- _ --.e - - _ , . , _ , _ _ ,, _ - - - , , , - - , , , , - , , ,,.--,,,,.-.,.,-,.--4---,.-g.,. g p.,,,,. ,.,-e,e,- ,-m,-34,

'ItXXD 12KIINEERING DIVISION PPOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-84 5 of 15 ,

i 3.2.2 Review and Aporoval

~ - ~

___L..-.... .e

_. -. - n ,. , .

. __.,..m. . __ __ ____ .c_.._.- -

_. . . . .m .u s e l

^ '

,I............; _ . . . ~  ;

queusmulust. 'Ihe Engineering Manager shall maintain written authorization of personnel designated as a "G&H Design Representative" l or design representative of any other vendor. Clarifications or design changes properly approved and issued by the original design organization require only the signature of the originating engineer / l technician. Such clarifications or design changes shall be referenced l or attached. Design changes / deviations documented as described I herein are approved for fabrication and construction only. In i addition, these measures may be used to cnicunicate or identify . f to censtruction ctianges/ deviations originated / approved by the  ;

original design organization. ,

i subsequent review and approval by the original design organization l shall te accomplished per the provisions of Reference 1 C or 'INE.

3.2.3 Distribution l m_' _. ,g

.--_ . : a - c..,c:,,

] __- l

- , 4 - c, . u, u __ - 4 _e ,_,,.c,,,,_. _ _ _ _

1___3_

~ . :. , _ a e ~ -.. a __ -

s,_____ -

-~ ] _.5.....$ __.---~. Ton.

3.2.4 Revisions Pevisions to DCA/ CMC Forms shall be accomplished as described in Attachments 1 and 2 and shall be reviewed ard approved as prescribed )

in Section 3.2.2. i l

i 9

. . . . - - _ _ . _ _ _ _ _ , . _ . . _ _ . _ _ _ _ , , _ , , _ , . _ _ . _ _ . . , ,, , _ , , , _ _ . . . _ _ , ,_,,.___,______.,.,___._,,,-,,_.,____-,_-._._,.,_r

O i

TUZO EN3INEERING DIVISION PEOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-34 6 of 15 3.2.5 Desicn Verification

~

This verification shall normally be accomplished by the original design organization in accordance with established procedures although the provisions of Peferences 1-B or 1-2 may be utilized at the discretion of the Assistant Project General Manager.

In the event the design verification activities indicate the change / deviation is unacceptable, the reviewing agency shall

  • notify the originating organization who may, on the area in question, place a " Hold" or rescind and reissue the diange/

deviation. Any d1ysical corrective action required in problem areas shall be evaluated and formulated on a case by case basis.

3.2.6 Interface Control Significant changes / deviations to engineered items involving A/E and vendor interfaces for equipment foundation details shall be reviewed with toth the A/E and the vendor for compliance with design requirements, prior to approval for fabrication or construction.

Formal documentation where vendor or A/E approval is required shall be accomplished in accordance with Reference 1-C.

i

y_ ,, __ _ __ _ . _ _ . __ _ _ _ . _ m.. . _ _ _ _ . _ . _ ._ ___

.i

} ,

7 ,.

a t .

l i 'IUGCO ENGINEERING DIVISION PIOCEDURE ILcVISICN ISSUE P/GE DATE 3

- CP-EP-4.6 10 4-16-84 7 of 15 i

ATTACINENT I

!~

ECR EDIN COMPLETION  ;

f te Engineering Change Request Form (Figure 1) shall be cornpleted as follows:

}

a. ECR No. - assigned by the responsible site organization, j I b. Safety Related Document - Check appropriate block.

) c. Discipline - Designate appropriate Engineering organization.  :

/

d. Applicable Spec / Dwg / Document - Cross out cbcuments that  ;

j do not apply. Specify all known affected or interfacing l i engineering documents. .  :

i

e. Details - Provide information on the change under mnsideration ,

I using adequate descriptions or references to other documents  !

I which clearly illustrate the problem and resolution. Attach l l the design documents marked to adequately show the change. i j l

] f. Supporting Documentation - References supporting documents such as  ;

. telephone conversations, telexes, telecopies, sketches, FCis,  ;

i DCAs, 'IDCRs, 'IDRs other ECRs, etc. l

! {

. Handwritten forms will be accepted in isolated cases; however, typing  !

l is preferred. {

~

t The originator and date shall be provid M . Amroval shall be provided, l

disposition responsibility assigned, arxl the EER forwarded for j disposition as indicated in Section 3.1.4. j I

$ Itdifications required to the ECR in the disposition process shall

! be indicated by mting the change on the ECR. %e change shall be initialed or otherwise validated and dated. All involved parties

should be identified in the validation. l 1

I s

I  !

i  :

i l i i l I I i

i 1

a

'IUGCO ENGINEERING DIVISION PROCEDURE BEVISION ISSUE Pb3E DATE CP-EP-4.6 10 4-16-84 8 of 15 i

A'ITACHMmr 2 DCA EDIN OiPLETICH he Design Change Authorization form (Figure 2) shall be completed as follows: '

a.

Authorization No. - Assigned by the responsible site organization,

b. (WIIL) (WILL for) Be Incorporated in Design Documents - Cross out the one that does not apply.

As a general rule, design changes to a specification which are generic in a nature and will affect future work on a continuing basis shall be designated drawings that can be delineated on the drawing. Clarifications

  • and/or interpretations involving design documents will normally not be incorporated into the design docunents. It is to km recognized that specific guidelines covering every situation cannot te delineated in this procedure; as such, it will be the responsibility of the Originating Engineer / Technician to exercise judgement and designate whether or ret a change should be incorporated. Note designation of incorporaticn is for preliminary use only.

c.

Safety Belated Document - Check the appropriate block.

d. Originator - Check the appropriate block. (Rc " Originator" of a t DCA resulting frca a DE/CD should be noted as the " Original Designer").

e.

Applicable Spec /Cwg/ Document - Cross out the documents that cS rot apply Specify all known affected or interfacing engineering cbcuments, f.

Details - Provide information on the change under consideration using adequate descriptions or references to other cbcumen to reflect the "as-built" configuration.

9 Supporting Documentation - Faference supportirrJ documents such as telephone TDCPs, conversations, TDRs, etc. telexes, telecopies, DE/CD's, sketches, EUs, word " Modified" shall te placed adjacent to the DE/CD number.If th I

l l

i . I

. l

'IUGCO ENGINEERING DIVISION PPOCEDURE REVISION ISSUE PAGE DATE i

CP-EP-4.6 10 4-16-34 9 of 15 l

f Handwritten forms will be accepted in isolated cases, however, typing is perferred.

l

.j The DCA is then reviewed for technical acceptance by the designated personnel.

Approval is obtained by signature and dating the appropriate blanks as

', indicated in Section 3.2.2.

In the event formal approval and design verification is required prior to issue, the IG shall be forwarded to the responsible organization.

Completion of those activities by the responsible organization shall be indicated by signature ard date in the "DESIG4 REVIEW PRIOR 'IO ISSUE"

blank.

t I

1 If formal approval and design verification is not required prior to issue, .

mark "NA" in the "DESIG4 REVIDi PRIOR 'IO ISSUE" blank. Note "NA" does not indicate approval and design verification is not subsequently required.

]

  • Revisions to a DCA will use Figure 2 and are filled out as described with the following exceptions:

l I a. Se same authorization number shall be used.

i i b. te appropriate revision number shall be placed after the j authorization number.

4 4

c. Subsection 3.B, Details, shall contain the following:

) "21s revision voids and supersedes Design Change Authorization No. , Bevision .

d. If it is necessary to void or rescind a Design Change Authorization, i

it should te done by a revision to the existing DCA. Subsecticn

' 3-B (Details) of Figure 2 should contain the following statement "Wis revision voids Design Change Authorization No. and all revisions thereto".

I e

i i

l j

i . _ - _ _ _ _ _ _ _ _ _ _ _ - -

'IUGCO DJGINEERING DIVISION PIOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-84 10 of 15 ATTACHMENT 3 CMC FOFM COMPLETION The Conponent M3dification Form (Figure 3) is completed as follows unless otherwise stated in engineering instructions supplementing this procedure.

The card should be filled out using a black ink pen or " dark" pencil.

a. Serial No. - Prenumbered, or as established through detailed application instructions supplementing this procedure.
b. Section 1, Application - State generic category of work (e.g. mechanical equipnent, electrical equipment, pipe, pipe supports, etc).

Weld Mod., Q, Non-Q - Check appropriate block.

Design Change Deviation - Cross out the one that cbes not apply.

Enter N/A or leave blank if not a change or deviation to design.

c. Section 2, DW. Ib. - Enter the complete number and revision of the affected design basis and/or construction drawings as follows:
1. Electrical - Enter desiga b-eis drawing nwters.
2. Pipirg and Instrumentation - Enter the design ard construction drawing numb ~ - 'or all design change / deviations; and construction drawing nurters for construction changes.
3. Pipe Supports - Enter the construction drawing nwbers.
d. Section 3, Line No./Conponent Ib. - Enter the specific identification nwber of the component to be nodified; spool nwber, equipment number, etc. It is not required to enter the pipe support nwter in block 3. If a nwber of items are affected, enter "see sketch", and
show all changes in block 5.
e. Section 4, Peason for Change - State briefly but concisely the reason for the change. If to implement a change properly approved by the Original Design, clearly state this fact (e.g., 'Ib implement DE/CD 8600).
f. Section 5, Instructions - Inscribe completely and accurately the change to be made.
1. Where there are no welds or material removed or added, enter "N/A" in the a@ropriate blocks.
2. For removal and/or addition of welds and/or nuterial, check the awropriate block and enter all weld numbers and/or Bill of Material item nurrbers removed and/or added. It is tot nundatory to disposition the future use and/or storage requirements for deleted material. .

^

. 'IUGCO ENGINEERING DIVISION PEOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-84 11 of 15

3. EOR PIPIN3 ONLY AND INTEGRAL HANGER A'I'rACHMENTS - If, after the original issue of BRP drawing, a weld has to be recoved and rewelded, the weld number will be changed to indicate same by adding an "A" for the first renoval, "B" for the second remval, etc. to the weld numbers, e.g., for the weld 6, the first removal / reweld is 6A, ard if 6A requires rework, the second renoval/ reweld is 6B.
4. FOR PIPING OILY - hten stainless steel materials are re-used and the heat affected zone not renoved, the new weld number will include the next sequential letter of the item with the highest numerical weld number.

For exaxple, if the pipe between welds 7A and 8C is deleted, and the remaining parts welded together, the new weld nu:ter will be 8D, not

78. In the situaticn where weld 6A is cut and a pup installed between the two pieces, the new welds will te numbered 6B and 6A-1.
5. PIPIN3 ONLY - If, after the original issue of the BRP drawing, an added weld is required which is not a reweld of an existing weld; the new weld will be keyed to the 1cwcr of the tw numbered welds ard suffixed by "-1" for the first weld, "-2" for the second weld, etc., if a weld is added between weld "3" and "4", the new weld will te "3-1".
g. Section 6- Provide a sketch indicating the new arrangement when necessary for clarification. hten nere than one CFC affects a drawing, care shall be taken to avoid conflicts tetween the C4C's. This block should include specifications of items added that are not listed on the affected drawing.

It should also show new weld locations, and all required working reint dimensions (cut lengths for pipig and hangers are not required).

h. Section 7 - Originator - Enter the name of the individual preparing the modification (for pipirg changes, foreman requestire the change should be entered).
i. Section 8 - Approvad By - Approval shall be obtained in accordance with Section 3.2.2.
j. Section 9 - Distribution - If not predesignated, the Engineer / Technician preparire the CSC shall enter the name of each agency requiring an

" Engineering nd Office Use Only" copy and shall indicate the number of required copies for each.

  • TUGCO ENGINEERING DIVISION PFOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-84 12 of 15
k. General - Extra sheets may be used where necessary to adequately cover the subject. .\1l sheets nust be marked with the C4C serial number and numbered page of .
1. Revisions to a CT may be accomplished by changing the original form or by utilizing a new form (nonserialized) and filling it out as outlined above. Se following additions shall be noted on the revised CMC, as applicable.
1. Se same serial number shall be used.
2. Se appropriate revision number shall be placed adjacent to the serial number.
3. If the reason for the revision is different from the original, ,

enter the additional circumstances in Block 4.

4. We CMC shall contain the following statement: i l'

"This revision voids ard supersedes document Serial Number , Bevision .

l

, i

m. When an occasion arises where a CMC has been issued arxl for some I reason that card is rot needed, it must be wided.
1. Tb void a CK, the original card must be revised ard clearly marked

" Voided - Not Superseded".

2. A void C E shall not be reactivated.

i e

4 _ 2*

'IUGCO DUINEERING DIVISION P90CEDURE REVISION ISSUE PAGE

- DATE CP-EP-4.6 10 4-16-34 13 of 15 FIGURE 1 (TYPICAL)

REV. PAGE 1 OF COMANCHE PEAK STEAM ELECTRIC STATION ENGINEERING CHA!EE REQUEST ECR NO.

1. SAETTY REIATED CFRGE: YES 10
2. DISCIPLINE: CPPE 'INE
3. DESCRIPTION:

A. APPLICABLE SPEC /DWG/ DOCUMENT B. DETAIIS C. REASON EUR QiANGE

4. SUPPORTING DOCI.: MENTATION:
5. APPPOVAL SIGNA'IURES:

A. ORIGINA'IOR DATE B. APPEOVED BY DATE C. DISPOSITION BY 'INE CPPME CPPI&C

6. DISPOSITICN:

A. APPIOVED APPPOVED AS tDIED REJECTED B. DRAWING & REVISIO3 AFFECTED BY ECR II;CORPOPATIQi OR JUSTIFICATION EOR REJECTION:

BY: DATE ECR ECPM 10-83

.4,.. , . ,-

s -, .-

v . .

TUGOO E9GINEERING DIVISION PPCCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-84 14 of 15 e

~

PAGE 1 OF COMANCHE PEAK STEAM ELECTRIC STATIN DESIGN GANGE AUIBORIZATION I

(WIIL) (WIII Nor) BE IFCORPORATED IN DESIGi DOCUMENT DCA NO.

1. SAFETI REIATED DOCUMENT: YES NO
2. ORIGINATOR: ..CPPE ORIGI!ML DESIGNER
b. DESCRIPTION:

i A. APPLICABI2 SPD /DWG/DOCUMEBTT REV.

B. DETAIIS ,

i

.s i

(,.

1 4 SUPPORTING DOCLHENTATION:

A f -

5. APPROVAL SIGNATURES:

A. ORIGINATOR: DATE B. DESIGI REPRESENTATIVE: DATE C. DESIGN REVIEW PRIQR TO ISSUE: DATE

6. STANDARD DISTRIBUTION: ,

~~

- ARMS (ORIGINAL) (1)

L CUALITY ENGINEERI?G (1)

DC'IG EOR ORIG. DESIGN (1)  ;

DCA FORM 3-84 l

\

+

9

, y - -e--eg-J"--o , ,,.,ean.-- - ,n , - +w,,o,- - , , , - -n ---- n- qn,---w,m w-,.,e-.,,-----e-w ,--m. ,m,7, - em,--

t E)GCO ENGINEERING DIVISION PEOCEDURE REVISIN ISSUE PAGE DATE CP-EF-4.6 10 4-16-34 15 of 15 CMC EO m (TYPICAL) e

  • w w w w w ud

=

7 o

7 o

7 o

7 a

2 e

2 a 'uz dzC ,

a 2

I a .

.,. . e 3 -

3 e, g *

. 2* 0o z C s s o e _r _ii_.e ,

e .

u o .

. _. m .. .

m -

,~ ,.c _

.i E -

M _ _ . . . . . _ . ,

4  % s. f- .

O g . . .

z Y-9 n

5 ,- i.

. ~s ' %..

3 _ 4 ". . _.

1

_ w

. . , - f

. N --

m a g .- -

c 1 g g e s

- e ., ._.

m s, g . _ - _ _ .

j c - --

t c o: .,. . .

h C . . .

, e' < -

. e _ _.

e, a _ __ ..

c, h - __ _ . . . . . . _ .

9 2.- e a

<a z W& Q l

  • U a. I W" g l

.. , , d. _ _

9 u G a _<3

~

cs N Q

2 e -

vu c . -

=i se. 3 z a 5

!! 5e ,4 5i  ! I m

.p,