MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
l t
MWP--
TEXAS UTILITIES GENERATING CO. NU . REVISION O E PAGE q CPSES , j QI-QP-11.13-1 2 1 of 6 l M 2 0 Igg l PREPARED BY: #7/ /8 / /52 AS-80ILT PIPING / 8 F:
VERIFICATION APPROVED BY. // [$
INSTRUCTIONS
/ -
/DA c' .
APPROVED BY . (_. M $L DATE &
1.0 REFERENCFJ 1-A CP-EI-4.5-1, "As-Built Piping Verification" 2.0 . GENERAL -
D f-2.1 PURPOSE AND SCOPE con u'a'-CRMATICM 0$*4 L l This instruction establishes the method utilized by the QA As-Built Coordinator to conduct verification of stress problem packages issued in the As-Built Piping Verification
( . Program (Reference 1-A).
2.2 DEFINITIONS -
Drawing Package - B RP and BRHL drawings having the same drawing number and associated BRH hanger sketches.
2.3 EQUIPMENT Transit
-qg* ,7 g q c.g ; q- 7
.4.- L.6 -
i j Surveyor's Level , * '- h *;
? .
,- . '. 4 .m a L .' , -As ;
l' Level Rod 50' Steel Measuring Tape Carpenter's Level F0lA-85-59 6" Engineer's Rule l
Chalk Box
,,,,,,g, itJGC0 OA 8606020218 860521
- -~
90%.F04A
- GARDE 85-59 PDR - - - .
(
,- . ( s. (
- l. -
! INSTRUCTION REVISION ISSUE
'* " N CATE PAGE TEXAS UTILITIES GENERATING CO. I CPSES QI-QP-11.13-1 2 JAN 2 u N 2 of 6 l
t 2.4 DOCUMENTATION All markings on drawings, specified in this " instruction,
. shall be in red ink. All drawings used for As-Built Verification shall have an open "As-Buil t" revision and
+
shall be controlled issue by Technical Services As-Built Coordinator.
Blueline drawings for each BRP and BRHL shall be issued to the QA As-Built Coordinator. The QA As-Built Coordinator will issue work copies of each for field verification.
After verification of drawings, all red marks will be neatly transferred to the record drawing for returning to the Technical Services As-Built Coordinator.
Field work drawings shall be retained by QA As-Built for final review and closure of the As-Built revision.
3.0 INSTRUCTION
( 3.1 AS-BUILT TAGS As-Built tags (Attachment 1) shall be attached to all l hangers and in highly visible locations on pipe prior to su rvey. All requi red infomation shall be shown on each tag. Location, however, will be listed as the applicable
, stress problem number.
Prior to perfomance of any work on a tagged line or its components, the QA As-Built Coordinator shall be consulted.
3.2 VERIFICATION OF BRP DRAWINGS 3.2.1 Dimensions At least one point en the pipe configuration on each stress problem will be verified for reference location to column ,
lines.
.s All dimensions verified shall be accurate within 22 inches.
Elevations veriff'ed, sh'al.1 be accurate within 1 inch.
If a dimension is a's- per drawing it shall be circled and checked. If a dimension is at variance with the drawing
, it shall be circled and the As-Buil t dimension written adjacent to the circle. j
.1
%g, TUGCO CA
~
+
_, ~) .w.,
l- ( t
\
(
l' - INSTRUCTION ISSUE REVISION PAGE
! TEXAS UT1UTIES GENERATING CO.
- j. ' CPSES QI-QP-11.13-1 2 JAN 2 0 382 3 of 6
- a. Elevations , for each BRP, shall be in reference to a single bench mark. . -
1 Whenever possible a surveyor's level and a level rod -
i shall be used to determine elevations. If necessary, a i steel tape may be used to measure vertical lengths.
- b. Horizontal dimensions shall be verified by measurement to and from defined points, i.e.; tangent intersection points, support centerline, etc.. Such measurements shall be taken using a steel tape and plumb bob (when necessary) to obtain a true horizontal length,
- c. If a vertical run of pipe can be detemined to be out-of-pl umb, the Technical Services As-Built Coordinator will be contacted to determine the degree of plumbness required.
3.2.2 Valves The valve location and mark (type) number shall be verified.
For all valves 2S inches nominal pip'e size and larger, as well as power actuated 2 inches nominal pipe size and smaller valves, the valve orientation shall be shown on the BRP and verified.
If the valve is oriented as per drawing it shall be circled and checked. If orientation is at variance with drawing then the valve will be circled and the actual orientation shall be written adjacent to the dircle.
3.2.3 Sleeves I
The following infomation shall be verified for all piping passing through structural walls and floors.
- a. Identification of pipe sleeve shall be shown on BRP and the Sleeve Take-Off (Reference 1-A). Numerical identification numbers shall be assigned for each BRP. !
- b. Sleeve eccentricity (if any) shall be detemined by measuring the clearance between the pipe and sleeve in 4 positions, two horizontal and two vertical. This infomation will be shown on the Sleeve Take-Off, and shall be verified to 11/8 inch.
s TUGCO CA
- i g. w g. ,W .. . ' ?.. *;. L. T.u a.'-. '-; - *
.- - s e - - *- - - - - - = - ~ ~ ~
~
~
' L. _
C-'
i .
l f,
, INSTRUCTION REVISION ISSUE PAGE
- f. TEXAS UTILITIES GENERATING CO.
CPSES QI-QP-11.13-1 2 JAh < u N 4 of 6
- c. If PDRF's are incorporated as part of the As Built package, then for that unique sleeve, inYomation on the PDRF shall be verifed as in "b" above. -
- d. Location of sleeve with respect to associated pipe shall be shown on BRP drawing, by dimension verification described in 3.2.1. _
3.2.4 Interconnecting Equipment All interconnecting equipment such as pumps, tanks ,
strainers, etc. shall be clearly identified on the BRP. This shall include as a minimum the equipment mark number. The orientation of any item that is totally supported by the interconnecting piping shall be clearly shown on the BRP.
If the above infomation is found to be as shown on drawing, the equipment item shall be circled and checked. If there i
exists some variance then the item shall be circled and the appropriate infomation shall be noted adjacent to the circle.
3.3 VERIFICATION OF BRHL DRAWINGS:
All BRHL drawings shall be verified to ascertain the following: _
- a. The number of installed hangers agrees with the number shown on the BRHL. This shall be shown on Section III of the As-Built Checklist (Reference 1-A).
- b. The actual mark numbers agree with 'the mark numbers shown on the BRHL. If this is the case, the number shall be circled and a check shall be made adjacent to the circle. If the numbers do not agree the number appearing on the drawing shall be circled and the actual mark number written adjacent to it or the BRH '
drawings will be referenced with mark numbers found.
- c. The dimensional location of each support shall be verified and recorded in manner delineated in 3.2.1.
- d. Hangers designated anchors that are cast in concrete
, shall be verified in place. This shall be shown on l Section III of the As-Built Checklist. l 3.4 VERIFICATION OF GHH-BRHL ORAWINGS:
All GHH-BRHL drawings shall be verified according to 3.3.
I j %g, TUGCO oA
'*- (
, fT b.
.. INSTRUCTION. ISSUE RWISION PAGE
!, TEXAS UTILITIES GENERATING CO. ^
CPSES i
QI-QP-11.13-1 2 JAN z u IW2 5 of 6 3.5 VERIFICATION OF BRH'S 3.5.1 Installed Hangers All BRH hanger sketches shall be verified to ascertain the following:
- a. The actual configuration of the hanger agrees with that shown on the BRH.
- b. The orientation of the hanger agrees with the orientation shown on the BRH. i'
- c. The ' total clearance between the hanger and the pipe is equal to that shown on the BRH.
All of the above shall be documented on Section III of the As-Built Checklist. Additionally, the Inspector will circle
(
and check the BRH number on the BRH if (a) and (b) are correct. If not, the number shall remain unmarked and the QA As-Built Coordinator shall be notified, so that he then may take the necessary steps to correct the drawing or the hanger.-
The As-Built Inspector will also mark the BRH for Item (c) in the manner delineated in paragraph 3.2.1.
3.5.2 Non-Installed Hangers *
, If a hanger is not installed, the clearance around the pipe will be checked to assure that the hanger can be installed per design drawing. If the support cannot be installed, it shall be so noted on the BRHL.
3.6 AS-BUILT CHECKLIST Upon completion of the As-Built verification in the field, the QA As-Built Inspector shall review the drawing package (see definitions) and complete Section III of the As-Built Checklist. The package is then reviewed by the QA As-Built Coordinator and combined with other drawing packages in the same stress problem. This combined package is then returned to the Technical Services As-Built Coordinator.
,, g , TUGCO OA .
S -,
!... c '
INSTRUCT ON REVISION I
PAGE
- - TEXAS UTILITIES GENERATING CO.
8-CPSES QI-QP-ll.13-1 2 JAN 2 0 192 6 of 6 i
l '
hTTACWENT1 I l
p TMbkkkk t=v g g .-
6m. a lElectric'che@eak.?.S't ion:
Ni s' t e 'Trgegs_(( fhj Dpeg Egg l]ll
. g.tTAG wnm @y L HOUTRM l !
i DWNf- g
=a= d?f %
. N ;
?&&
j
. i a,, lul ' m t QERIFICATION.
UNE! 0.1 0 W G. N O .h "
l 'M.W ~ */mrf:v ,9' CA 10N N "
MYY SWAY IS UNE IS BEING IN S*-BUILTifURPOSES N+m s CONTACTe kk[.,.,( N N '"" * * $'
RIOR.TO: PERFORMING $Y?WORY OThlE ~
HAM I o
,,,,,%., m co cA
\
. _ _ _ _ _ _ _ . _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ , _