Rev 1 to 840518 Design Change Authorization 12,212 Re Maintaining 8-inch Separation Requirements & Meeting Seismic Support Criteria Requirements.Voids & Supercedes Rev 0 to Design Change Authorization 12,212ML20205Q649 |
Person / Time |
---|
Site: |
Comanche Peak |
---|
Issue date: |
05/18/1984 |
---|
From: |
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
---|
To: |
|
---|
Shared Package |
---|
ML20205Q559 |
List: |
---|
References |
---|
FOIA-85-59 NUDOCS 8606020299 |
Download: ML20205Q649 (4) |
|
|
---|
Category:ARCHIVE RECORDS
MONTHYEARML20116A0341996-07-17017 July 1996 Rev 0 to Temp Vs Distance Profile for 10 RHR Line Containing Stagnant Water ML20058Q4061993-08-30030 August 1993 Package Consisting of Employee Concerns Programs ML20128G9491993-01-22022 January 1993 Calculation of Weights Due to Fire Protection Matl ML20128G9551992-12-29029 December 1992 Design Validation of Conduits W/Thermolag ML20128G9861992-10-0202 October 1992 Ampacity of Power Cable Wrapped W/330-660 Installed as Free Air Drop ML20105A7981992-08-14014 August 1992 Rev 0 to Calculation of Thermal Response for Sprinkler & Raceway Supports ML20101G0471992-06-17017 June 1992 Rev 3 to Calculation 2-FP-0085 Raceway & Firezone R Cable Supports Analysis ML20115B6851992-03-0202 March 1992 Rev 0 to 2-NP-GENX-544, Reconciliation of Local Stress Evaluation Using ME215 Analysis ML20104B4001992-02-13013 February 1992 Rev 1 to Calculation RXE-TA-CP1/0-027, Undervoltage/ Underfrequency Reactor Trip Setpoints ML20127H2091991-11-12012 November 1991 Calculation 2-NP-GENX-551, Evaluation of NUREG-0797 Suppl 1A (Sser 14) App a Sections 12.1 & 12.2 ML20082U5851991-05-0808 May 1991 Liner Attachment Welds Serviceability ML20055E2881990-03-12012 March 1990 Package Consisting of Event Notification Worksheet Re 900312 Inadvertent Safety Injection from Single Train.No Equipment Malfunction/Failure Noted ML20072A8471990-01-23023 January 1990 Rev 2 to Calculation 071, Review Statement for Safety Related Calculations ML20042D3711989-09-28028 September 1989 Audit Rept ATP-89-146S, Scaling Calculations, on 890821-0928 ML20247G4111989-03-31031 March 1989 Transit Time Flow Meter Calculations ML20151T3841988-08-0101 August 1988 Protocol Between OSP & NRR for Technical Review of Comanche Peak Fsar ML20151K5841988-04-18018 April 1988 Page from Draft Rept on Plant Safeteam Activity & Ofc of Investigations Review IR 05000445/19820141988-03-11011 March 1988 Draft of Insp Rept 50-445/82-14 Originally Withheld from FOIA-84-210 Response & Typing Cover Sheets or Transmittal Pages of Documents Withheld from FOIA-86-181 Response ML20148F8201988-01-21021 January 1988 Rev 0 to Investigation of SIF for Weld Shrinkage ML20148F8631988-01-21021 January 1988 Rev 1 to Parallel Snubbers ML20148F2151987-11-19019 November 1987 Rev 0 to Potential Binding of Lugs in Axial Supports ML20237K9771987-08-19019 August 1987 Press Release 87-115 Informing of NRC Release of Documents Re Investigation of NRC Actions Involving Plant Under Const. Portions of Documents Deleted for Personal Privacy Reasons or Prospective Personnel Matters ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20148F2521987-05-22022 May 1987 Rev 0 to Evaluation of Fluid Transient Cutoff Forces & Development of Screening Criteria for Piping Sys ML20237K0381987-05-14014 May 1987 Record of 870514 Telcon W/S&W & Util Re Insp Requirements for Pipe Supports (Ref Item 4,SWEC NA-1140 Rept) ML20237K0201987-05-13013 May 1987 Record of 870513 Telcon W/S&W & Util Re Insp Requirements for Pipe Supports for Plant.S&W Does Not Consider Insp of Designs to Be Warranted ML20236M4011987-04-17017 April 1987 Package Consisting of 870417 Request for Premium Cost Mail Svc & Unsigned & Undated Ltr to Util Forwarding Draft Insp Repts 50-445/87-02 & 50-446/87-02 & Notice of Deviation ML20128G9681987-02-24024 February 1987 Cable Ampacity Derating Factors for Conduits Boxed in W/ Thermolag (TSI Product) ML20236L9091987-02-19019 February 1987 Rev 1 to CT-1-137-701-S25R, Pipe Support Calculation ML20236N4981987-02-0202 February 1987 Package Consisting of Comanche Peak Steam Electric Station Design Change Authorizations & Evaluation Summaries ML20207D7231986-12-23023 December 1986 Pipe Support Calculation:General Calculation for Richmond Insert/Tube Steel Connections Design Mods ML20207D7481986-12-23023 December 1986 Generic Calculation:Evaluation of Npsi Rear Brackets, Dimension for Design Calculation IA-86-386, Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package1986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package ML20211P4701986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package IA-85-799, Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes1986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes ML20214R3351986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes ML20235S1101986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program IA-87-528, Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program1986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program ML20210E5991986-11-0707 November 1986 Rev 2 to Calculation 020-040-M19, Clip Stiffness Production Value ML20210E6811986-10-31031 October 1986 Rev 4 to Calculation M-03, Cable Tray Properties ML20236L8891986-10-31031 October 1986 Rev 1 to CT-1-137-702-S25R, Pipe Support Calculation. Supporting Documentation Encl ML20210E5221986-10-15015 October 1986 Rev 2 to Calculation M-10, Cable Tray - Clip Angle Stiffness ML20210E5751986-10-10010 October 1986 Rev 2 to Calculation M-12, Qualification Procedures for Cable Tray Support Evaluation ML20148F4591986-09-16016 September 1986 Rev 0 to Fatigue Cycle Determination for Pipe Supports ML20148F4921986-09-10010 September 1986 Rev 2 to Documentation of Use of Low Strength A563 Grade a Double Nuts on High Strength SA 193 Grade B-7th D Rod for Richmond Insert Bolt Connection ML20210E6261986-08-31031 August 1986 Rev 0 to Calculation M-28, Justification of Clip Modeling Procedure ML20148F3351986-08-28028 August 1986 Rev 2 to Development of Method for Evaluating Local Stress in Pipe Support Members ML20210E4611986-08-25025 August 1986 Rev 3 to Calculation M-25, Base Plate Prying Action Factors ML20236L9371986-07-31031 July 1986 Rev 1 to Calculation CT-1-032, Texas Util Generating Co Comanche Peak Steam Electric Station Containment Spray Sys 15454-NP(H) ML20211K2971986-06-11011 June 1986 Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak 1996-07-17
[Table view] Category:PACKAGE OF NONCODED MATERIAL
MONTHYEARML20058Q4061993-08-30030 August 1993 Package Consisting of Employee Concerns Programs ML20055E2881990-03-12012 March 1990 Package Consisting of Event Notification Worksheet Re 900312 Inadvertent Safety Injection from Single Train.No Equipment Malfunction/Failure Noted ML20151T3841988-08-0101 August 1988 Protocol Between OSP & NRR for Technical Review of Comanche Peak Fsar ML20151K5841988-04-18018 April 1988 Page from Draft Rept on Plant Safeteam Activity & Ofc of Investigations Review IR 05000445/19820141988-03-11011 March 1988 Draft of Insp Rept 50-445/82-14 Originally Withheld from FOIA-84-210 Response & Typing Cover Sheets or Transmittal Pages of Documents Withheld from FOIA-86-181 Response ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20236M4011987-04-17017 April 1987 Package Consisting of 870417 Request for Premium Cost Mail Svc & Unsigned & Undated Ltr to Util Forwarding Draft Insp Repts 50-445/87-02 & 50-446/87-02 & Notice of Deviation ML20236N4981987-02-0202 February 1987 Package Consisting of Comanche Peak Steam Electric Station Design Change Authorizations & Evaluation Summaries ML20211P4701986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package IA-86-386, Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package1986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package ML20214R3351986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes IA-85-799, Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes1986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes ML20235S1101986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program IA-87-528, Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program1986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program ML20211K2971986-06-11011 June 1986 Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak IA-85-299, Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak1986-06-11011 June 1986 Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak ML20212M6231986-05-23023 May 1986 Package of News Articles Re Case Opposition to U Removal from & Delivery to Plant ML20198H7221986-05-13013 May 1986 Partially Withheld & marked-up Package of B Caffell Comments on Miscellaneous Category Ssers ML20205D9251986-05-0707 May 1986 Morning Rept Re Five Cables Found Cut in Proximeter Reactor Coolant Pump Violation Monitor Box.Util Investigating ML20210P9251986-04-17017 April 1986 Partially Withheld Package of Documents Re Allegations Concerning Facility & Comanche Peak Task Force ML20205Q5171986-04-17017 April 1986 Partially Withheld Package of marked-up Documents Re Revs to Draft Qa/Qc Sser,Including marked-up Rev 3 to Sser AQ-50, Comanche Peak Sser 11,App O,Sser 11,App P & Sser 11 TC ML20198C6241986-04-11011 April 1986 Package of Records Re Potential Sabotage at Facility ML20203H4051986-04-0404 April 1986 Package of Documents Re Insp Repts 50-445/85-13 & 50-446/85-09 ML20202F9701986-02-28028 February 1986 Allegation Data Input Forms 86-A-023 & 86-A-047 & Allegation Reviews 4-86-A-023 & 4-86-A-047 Re Drug Sales Among Employees ML20154H6431985-12-16016 December 1985 Package of Insp Repts & Related Info Re Const of Plant IA-86-387, Package of Insp Repts & Related Info Re Const of Plant1985-12-16016 December 1985 Package of Insp Repts & Related Info Re Const of Plant ML20207G0461985-12-16016 December 1985 Partially Withheld Package of marked-up Documents Re Insp Repts 50-445/85-18 & 50-446/85-15 ML20205S7591985-12-0606 December 1985 Package Consisting of FSAR Change Request Forms & marked-up FSAR Pages Re Changing Commitment to Reg Guide 1.144,per NRC 850930 Request for Addl Info ML20215H8741985-11-22022 November 1985 Package of Documentation Including Vendor 851105-07 QA Audit,Cable Tray Design,Computer Program Errors & Vendor Audit Response Evaluation for Cable Tray Hanger & Conduit Supports Engineering QA Audit File for Plant ML20206M2351985-07-18018 July 1985 Package of Documents Re Insp Repts 50-445/85-16 & 50-446/85-13 ML20236C4041985-01-30030 January 1985 List of Open Cases & Inquires in Region IV Ofc of Investigations Through Dec 1984 Re Facility & Partially Withheld Investigation Record Re Allegations of Falsifying start-up Test Results IA-85-312, List of Open Cases & Inquires in Region IV Ofc of Investigations Through Dec 1984 Re Facility & Partially Withheld Investigation Record Re Allegations of Falsifying start-up Test Results1985-01-30030 January 1985 List of Open Cases & Inquires in Region IV Ofc of Investigations Through Dec 1984 Re Facility & Partially Withheld Investigation Record Re Allegations of Falsifying start-up Test Results ML20212C5291984-11-13013 November 1984 Partially Withheld Allegation Review of Case 4-85-A-18 Re Drug Investigation ML20205Q6491984-05-18018 May 1984 Rev 1 to 840518 Design Change Authorization 12,212 Re Maintaining 8-inch Separation Requirements & Meeting Seismic Support Criteria Requirements.Voids & Supercedes Rev 0 to Design Change Authorization 12,212 ML20205Q6271984-02-0707 February 1984 Documents Re Facility,Including List & Calendar of Hanger Numbers,Summary of 7,914 Support Insps,Changes in Allowable Angular Error of QI-QAP-11-1-28 & Hanger Package DD-1-012-026-733R.W/one Oversize Drawing ML20210T7431983-12-0909 December 1983 Partially Withheld Documents Re Terminated Employee in Millwright/Boilermaker Dept,Vendor Mgt Investigation in Response to 820806 Complaints & Related Info Encl ML20213A7001983-08-0202 August 1983 Partially Deleted Package of Plant QA Instructors Qualifications,Qa Insps Certifications & QC Recertifications Info,Including Test Questions,Answers & Scores & Training Outlines ML20205Q6351983-07-0606 July 1983 Documents Re Facility,Including 830706 Design Change Authorization,Rev 15 to 840217 Design Change Authorization 3462,Insp Repts MH-1-0010402 & ME-1-0022582,TRT Summary Sheet & 821130 Const Operation Traveler 90650 ML20203H2151982-05-0505 May 1982 Package of Documents,Including Design Change Authorizations, Comanche Peak Review Team Checklists,Comanche Peak Response Team ERC Deviation Repts & Records of Other Insps ML20085M6091981-09-30030 September 1981 Response to NUMARC Questions Re Final Environ Statements from June 1984 & Sept 1981 ML20205Q6571980-03-0707 March 1980 Documents Re Facility,Including Rev 5 to 800307 Design Change Authorization 6905,830321 Rev 6 to 830321 Design Change Authorization 16,614 & 810529 Final Rept IR-I-1755. W/One Oversize Drawing ML20205Q6431979-08-21021 August 1979 Documents Re Facility,Including 790821 Seismic Tubing Support Package 2323-I-001,800307 Design Change authorization,800317 & 811116 Component Mod Cards & 820115 Insp Rept IR-I-2779 1993-08-30
[Table view] |
Text
_ - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ . __
.. U.
C$8s & HIIt., INC. TUGC0(2) m mggn" E7-PAGE 1 0F 2 O
9 WAY 14084
( COMANCHE PEAK STEAM ELECTRIC STATION ilj
--- a. ". a--"Lilt /~TI'"
OESIGN CHANGE AUTHORIZATION OCA N0. 12,212 R.1 (WILL) MDLU)0OCf) BE INCORPORATED IN DESIGN 00CUMENT OEI NO.
' . . SAFETY RELATED DOCUMENT: X X' YES NO
- 2. ORIGINATOR: CPPE XX ORIGINAL DESIGNER
- 3. DESCRIPTION:
A. APPLICABLE X5MU/0HG/00CGtEtMX See sheet 2 of this DCA REV.
B. DETAILS THIS REVISION VOIDS AND SUPERCEDES DCA-12,212 R.0 See Sheet 2 of this DCA.
F010FF CE MiU __
nUEEING USE ONd W I'W CNGINFC9TNG Jt!STTFTCATTON- In order to maintain 18" seoaration recuirements and' meet seismic succort criteria reauirements.
35-1195 RECEIVED 4 SUPPORTING DOCUMENTATION:
MNY 231984 i
CMC-63099 DOCUMENT CON i KUL
- 5. APPROVAL SIGNATURES: /ls May 8, 1984 A. ORIGINATOR: O h _ _ .. ) O_ A A OATE 5lti!cw B. DESIGN REPRESEN IVE: hud DATE 3-dy'//'/
C. DESIGN REVIEW PRIOR TO ISSUE: / A' - DATE f M 8 'r 3
m
- 6. STANDARD DISTRIBUTION:
fy o- o- ARPS (ORIGINAL) (1) V My OUALITY ENGINEERING (1) con DCTG FOR ORIG. DESIGN (1) 7@ WESTINr-HOUSE (1) ;
4 o CPPI!:C (1) 35% Mark Welch (0A) (1)
DCA Fo=P 3-81 S!We 06 I)
.. s> .
s- . .
DCA-12,212 R.1 Page 2 of 2
(
APPLICABLE DRAWINGS: 2323-M1-2503-03 R.7 2323-M1-2503-04 R'. 7 h3_-M1_-2iS03]~ R 2323-M1-2603-01 Ri5 2323-M1-2603-02 R.5 ,
2323-M1-2603-03 R'. 5 DETAILS:
., On 2600 drawings change instrument numbers to coincide with root valve
'7 numbers and on 2500 drawings change root valves to coincide with instru-ment numbers per the below list.
1-FT-414 (LP) 1RC-8060A 1-FT-434 (LP) 1RC-8060C t 1-FT-415(LP) 1RC-8059A 1-FT-435(LP), IRC-8059C 1-FT-416(LP) 1RC-8061A 1-FT-436(LP) 1RC-8061C
( 1-FT-424(LP) 1RC-8059B 1-FT 443 (LP) 1RC-80590 1-FT-425(LP) 1RC-80618 1-FT-445(LP) 1RC-8061D 1-FT-426 (LP) 1RC-80608 1-FT-446(LP) 1RC-8060D REV. 1: To correct applicable drawing number and to clarify design change.
~ '
M Gb8S & HII.t INC. TUGC0(2) .-
? "
E fiDi'P_.[T' 1 2.
PAGE 1 0F 2
'q 'g 14 pg4
( COMANCHE PEAK STEAM ELECTRIC STATION lll 3 , ". a u T D T DESIGN CHANGE AUTHORIZATION OCA NO. 12,212 R.1 (WILL) MDDtX)(X)GX) BE INCORPORATED IN DESIGN DOCUMENT OEI NO.
- 1. SAFETY RELATED COCUMENT: XX YES NO
- 2. ORIGINATOR: CPPE XX ORIGINAL DESIGNER
- 3. DESCRIPTION:
A. APPLICABLE )GOEC90WG/OOCtXMX See sheet 2 of this DCA REV.
B. OETAILS THIS REVISION VOIDS AND SUPERCEDES DCA-12,212 R.0
!. See Sheet 2 of this DCA.
CNGINFCOTNG JUSTTFTCATTON- In order to maintain 18" seoaration recuirements k and' meet seismic succort criteria reouirements.
FOR FlCE AfD 1195 Eh Glhl'FRlN.1 I.IR.F_ O.NI_Y.R E C E I V E D MAy 23 l984 4 SUPPORTING DOCUMENTATION:
CMC-63099 DOCUMENT GON I KUL
- 5. APPROVAL SIGNATURES: /ls May 8, 1984 A. ORIGINATOR: O _.)O AD DATE sltilgy B. DESIGN REPRESEN IVE: I/wd DATE S/p/!/M C. DESIGN REVIEW PRIOR TO ISSUE: / - - DATE f/ 8/8'r
- 6. STANDARD DISTRIBUTION:
==
ARMS (ORIGINAL) (1) )
00ALITY ENGINEERING (1) i DCTG FOR ORIG. DESIGN (1) l WESTINGHOUSE (1) l CPPIEC (1) 1 Mark Helch (0A) (1) l Sr'Y e M6 f) DCA F0cM 3-81
,.I T { ,
I i
DCA-12,212 R.1 i Page 2 of 2 '
(
APPLICABLE DRAWINGS: 2323-M1-2503-03 R.7 2323-M1-2503-04 R.7 h23_-M1-2603 ' R}5 2323-M1-2603-01 R.5 2323-M1-2603-02 R.5 2323-M1-2603-03 R.5 DETAILS:
i
. On 2600 drawings change instrument numbers to coincide with root valve jf numbers and on 2500 drawings change root valves to coincide with instru-l ment numbers per the below list.
l 1-FT-414(LP) 1RC-8060A 1-FT-434(LP) 1RC-8060C 1-FT-415 (LP) 1RC-8059A 1-FT-435(LP) 1RC-8059C 1-FT-416(LP) 1RC-8061A 1-FT-436(LP) 1RC-8061C
! ( 1-FT-424 (LP) 1RC-8059B 1-FT34a(LD) 1RC-80590 1
1-FT-425 (LP) 1RC-8061B 1-FT-445(LP) 1RC-8061D 1-FT-426(LP) 1RC-80608 1-FT-446(LP) 1RC-80600
. REV. 1: To correct applicable drawing number and to clarify design change.