Text
f s
'IEXAS UTILITIES SERVICES INC.
INSTRUCTICN REVISICN ISSUE PAGE DATE 1
CONTROLLED COPY NO.
4-5-82 1 of 7 DESIGN DOL % MENT PREPARED BY 4)
CCNTROL BY 'ISMD APPROVED BY
,,wd V/'
/
1.0 REFERENCES
1-A CP-EP-4.0 Design Control 1-B CP-EI-4.5-1 General Program for As-Built Piping Verification l
2.0 GENERE 2.1 RJRPOSE To establish the me trol of drawings by Technical Services Mechanical Draftira ssure compliance with the provisicns l of Reference 1-A.
2.2 SCOPE
'Ihis instruction shall apply to all t
awings 'ssued by Technical Services Mechanical Drafting 2.3 RESPCNSIBILITY
'Ihe CP Project Mechanical Engineer is responsible for pro 31ng technical direction and administrative guidance to the Mec..anical Engineering organization of which the '1bchnical Services Group is a part.
'Ihe Technical Services Group Supervisor is responsible for the ceneral implementation of this instruction. 'Ibe rrechanical draf ting 1
supervisor has teen delegated the specific responsibility for ensuring drawings are controlled in accordance with this instruction. 'Ihe supervisor shall te responsible for assuring personnel within 'ISMD are cualified by educaticn ard/or for experience to perform assigned tasks.
hhere specific individuals are desionated by title in th instruction, it shall be understocd that desionees may b 3elegated to act in that capacity.
1 2.4 DEFINITIONS TS
- Technical Services Gtbup TSMD -TechnicalServicesMechanicalD(af@q ru-
%F %# %9 TSAB - Technical Services As-Built Group l
- Piping Isometric Drawing 8606020344 860521 PDR FOIA GARDE 85-59 PDR
'IEXAS UTILITIES SERVICES INC.
IE TRUCTICN RD/ISICN ISSUE PAGE DATE CP-EI-4.0-22 1
4 5-82 2 of 7 BRI
- Pipe Support Detail Drawing BRHL - Hanger Iocation Isometric DCC
- Document Control Center MW
- Minimum Wall Violations FMHS - Field Modified Banger Sketch AB
- As-Built BRH 3.0 INSTRUCTICN 3.1 CDNIBOL CF INCCMIM EESIGi ICCUMENTS Incomino desian documents shall be Icnced and transmittal letters compared to the actual documents received. All discrepancies shall be brought to the attenticn of the TSMD supervisor for resolution.
TSMD shall establish and maintain logs / files adequate to provide control arri accountability of the internal activitits within the drafting organization.
3.2 GENERAL PREPARATICN AND ISSUE CF BRP'S l
3.2.1 General Preparation aM Issue For BRP's for which no vendor drawir has been received, an isometric sketch shall be prepared frcm the piping cenposite. All information to be shown on the BRP shall be reviewed using appropriate drawings, specifications and/or lists. %is in'ormaticn shall include pipe location and configuration, dimt ions, valve and equipnent data, vendce spool ard weld informati
, etc. including notes required by construction or engineerirg.
%e drafter shall initial and forward the ccepleted BRP to a checker for review. Upon conpletion of the review, the drawing shall be submitted to DCC for distribution.
Discrepancies noted in the review process shall be resolved by the checker, draf tsran, or group leader as appropriate.
3.3 REVISICNS 'IO BRP'S BRP revisions shall normally be init *ated by design changes issued in accordance with established procedu
/ instructions. Drawing We drawing shall be obtained from DCC for revision purp3ses. All outstandirn design chances against the BRP shall be identified using the appropriate file / log. We BRP is revised by incorporating all outstandirn applicable changes. All accuments that haw been incorporated shall be referenced in the " Revision Description Block" or otherwise roted cn the drawing.
J
~
w
~
EXAS UTILITIES SERVICES INC.
INSTRLCTICN REVISICN ISSUE PME DATE CP-EI-4.0-22 1
4-5-82 3 of 7 Documents unclear in content or found to contain discrepancies shall be forwarded to the ewwiate engineering group as necessary for clarificaticn or resolution.
All changes to the drawing are to be " clouded" and irdicated by the new revision ntuber in an adjacent small triangle. All " clouded" areas and triangles for the prict revision, if any, will be remwed.
he new revisicn number shall be indicated in the title blode ard the drawing initialled appropriately. We drawing packaoe will be forwarded to a checker for review. We checker shall review all incorporated information and refer corrections to the drafter. The checker shall initial the drawirs in the appropriate area, ard subnit the drawing to the draf ting supervisor. Upon final approval, TSMD shall sutruit the drawirg to DCC.
3.4 AS-BUILT BRP'S A BRP will be revised to as-buixt conditions as necessary to supprt project priorities. As-built revisions shall te acccuplished in the l
same manner described in Section 3.3 with the following exceptions.
I
%e checker shall review the drawing for possible EV's by reviewing the design change cbcuments regarding MW welds prior to draf ting.
It shall be the 2sponsibility of the 'Ibchnical Services Supervisor to forward these design change documents to the TSMD Supervisor. %V welds shall te denoted with the letters mV adjacent to the elliptical circle mcocpassing the weld nu:ter. The words "As-Built" shall be clearly dicated in the current revisicn block.
A BRP which has bien "As-Built" by TSMD may be revised to incorporate coments resulting frcrn the review ard field verification process of the as-built verification program in accordance with Reference 1-B.
TSAB is responsible for forwarding this informaticn to TSMD. After the drawing has been updated, the drafting supervisor ard the TSAS Coordinator shall jointly review the drawirn to assure that all
)
information has been incorporated, ard initial the approval block.
l 3.5 CCNIPOL CF BRH'S ORMAT,ON ONly 3.5.1 Preparation of f '9 Using FMHS A FMHS may be r zived from the applicable engineering organization prior to draftirn. The drafter shall assure all informatico cn the sketch is cortplete. Dimensions which are necessary ard can be l
calculated frcxn informaticn given cn the sketch shall be includei, aM the drawing revised to incorporate all iMicated changes. %e drafter shall add the Brown t. Foot logo, revisicn block, etc. We wrd " Blue-Line" should be written across the top of the drawing for ease of identification. When vendor drawinos cb rot exist, a new PRH drawing may te prepared. We finished drawing shall be initialled by I
the drafter ard forwarded to the checker.
l l
'IEXAS UTILITIES SERVICES INC.
INSTRUCTICN REVISICN ISSUE PAGE DA'IT CP-EI-4.0-22 1
4 5-82 4 of 7
'Ihe checker shall assure all informaticn cn the sketch has been incorporated. 'Ibe review shall be documented per Attachment A.
men cxmpleted, the checker will sign one half of the check block, per Attachrmnt B, and forward the folder to an approver.
'Ibe approver shall alsa chedc the drawing to assure all required information has been incorporated, and initial the check block, per 3.
'Ihe TSMD aporoved folder will be held in TSMD for groval by engineering. Approval by engineering shall te cbcumented by initial in the approval column of the revision block - Attachment B.
Approved drawings shall be submitted to DC fcr distribution.
3.5.2 Preparation of BRH Without ENHS Blue-Line exempt drawings will be processed similarly to drawings controlled per 3.5.1.
'Ihe exceptions are:
a) a blue-line will not be required before processing ard; b) engineering approval will not be required (these drawims are original design).
3.6.1 Revision by Verdor Drawings chanced by revised vendor documents shall be controlled in accordance with Section 3.1 and 3.5.1.
Such revisions shall be initiated by the " Field Madified Hanger Sketches" or as needed by request of authorized engineering or craft personnel.
3.6.2 Field Initiated Changes Field design changes shall be issued in accordance with established engineerim procedures / instructions, y
. mem m.%,.y.)
FOR FORMATLON 0M g Initiation of As-Built BPR
'ISMD shall support proiect priorities in the pregg,qtion ofas-builg drawinos. 'Ibe R$-Mn-ercr;mmT@mnibecirFwithTritvf*4f-N6h irfl
'a d co e
b tue/tolder to assure the identification of design change (bcu:mnts. TSMD shall retrieve original desian change documents as needed. Ebcumntal discrepancies shall be forwarded to the appropriate engineerina grouo for resolution.
I
- s
'IEXAS UrILITIES SERVICES INC.
INFIRUCTICN REVISICN ISSUE PAGE DATE CP-EI-4.0-22 1
4 5-82 5 of 7 3.7.2 Drawirn Preparation cn the A-B correctly reflects the dange documents in the package, ard the drawings ard dimensions depicted are satisfactory for design review by TSDRE. 'Ihe checker shall initial the " checked" colum in the revisicn block, cmplete the checklist (Attachment A) ard forward the drawing to an approver.
'Ihe approver shall check the drawing to assure all the required information is properly incorporated ard initial the appropriate colum in the revision block. Upon @ proval the drawing shall te forwarded to the appropriate enoineerirn group for design verification.
Upon cxxpletion of design review, performed in accordance with established engineering procedures / instructions, the revision block dated and the package sutrnf.tted to DCC.
3.7.3 Revisions 6 has
^ -~ % - _G'WPPNCT '_2Mid m aodition, up ccmoleticn of_
veri on cert icat cn activities, the BRH may be revised to incorporate TSAB coments which reflect the final as-built condition nore clearly.
3.8 CCNrRCL CF BRHL'S 3.8.1 General Preparation For information purposes, a piping isometric may be prepared showing the location, orientation, ard identification of pipe supports subject to as-built verification per Reference 1-B.
The BRHL shall reflect the same piping configuration as the corresponding BRP, and should show cnly that informtion necessary for verifi and Q
gg i
j g a
ysis prposes.
3.8.2 Revisions to BRHL's i
A BRHL may be revised to incorporate comments pr the TSAB j
coordinator, or as necessary to reflect as-built corditions.
w 3
--,--.m
e
'a E
TEXAS UTIt.ITIES SERVICES INC.
INSTRUCTION REVISION PAGE CP-EI-4.0-22 1
4-5-E2 6 of 7 BRH CHECKLIST for CHECKERS
( APPROVERS l-
- 1. B&R logo and rev. block. 000
- 2. Verify mark number. 00 O
- 3. Verify mark number vs. line number. O O O
- 4. Vendor revision incorporated. 00O
- 5. GH.l. Iso. information. O O O
- 6. Design loads. O O O
- 7. Item numbers vs. bill of material. 00 0
- 8. Field change documents incorporated. 00 O 4
- 9. A.H.D., D.C.A. ( other notes. O O O
- 10. Revision clouds ( A's. O O O i 1. Third party inspection & code class. O O O
- 12. Turnover number. OO O
- 13. Revision block filled out properly. O O O
- 14. Blueline reference-top left corner. O O O
- 15. As-Built reference-top left cerner. 0 0 O SPECIAL NOTES i
'Y'CL 1
-uriceutrNORMAT10N ONLY i
i Note Finct corrections are Oroftpersons signature Date i
to be made before opprotr Checkers signature Cote
!.corov er's signature Cote
. '. 4.
E TEXAS UTILITIES SERVICES INC. INSTRUCTION REVISION PAGE i
4-5-82 7 of 7 l
MV OATE OWN CHK APP DESCRIPTION
,f I l i l i l i l H
i Field engineer's approval. ( Bluelines only.)
i Drafting approver for ~*non-bluelines.
Drafting opprover for bluelines.
2
- Draf ting checker.
- Draftsperson..
6/2
- Approval date.
w b
Revision level, I
y -
-,n
, --- - -. - - - - -,