ML20206B563

From kanterella
Revision as of 17:03, 11 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Special Rept 88-007:on 881022,following Inservice Insp, Completed on 881022,one Tube in Steam Generator 1 Plugged
ML20206B563
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/07/1988
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
88-007, 88-7, NON-00409, NON-409, NUDOCS 8811150487
Download: ML20206B563 (1)


Text

'O Geotg a PCr*M Ccepay

$33 P edmcot Averve

  • 4 ')

ANm Gem 3W;6 Te'epnore 424 526 0526 e (

a UsMg Mws

$

  • lut Of' ce Don $45 ,

F Ar$rta. Gecep 30302 I i

$ .*f? $ ','? % , "m""n "m s n#  :

n w w % 3t m ) NON-00409 l 1  !

i November 7,1988 j U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Pl. ANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 TECHNICAL SPECIFICATION SPECIAL REPORT 88-007 STEAM GENERATOR TUBE PLUGGED Gentlemen:

Following the completion of inservice inspection of steam generator tubes.

Georgia Power Company is submitting this report of the number of tubes plugged per the Plant Yogtle - Unit 1 Technical Specification, sections 4.4.5.5a and 6.8.2.

After inservice inspection completion on October 22,1988, one (1) tube in Steam Generator #1 was plugged. Complete results will be submitted within 12 months per the Technical Specification requirement 4.4.5.5b.

Sincerely, k), .Y W. G. Hairston, III TEW:ca c: Georgia Power Company Mr. P. D. Rice Mr. G. Bockhold, Jr.

Mr. M. Sheibani Mr. J. P. Kane G

Yogtle-NORMS U. S. Nuclear Regulatory Commission Dr. J. N. Grace Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge Senior Resident Inspector-Operations, Vogtle [g,v

! M "Re m m m ,, h PNU