Submits Suppl 1 to 860312 Startup Rept,Per Tech Spec 6.9.1.3.No Test Results Available Due to 851031 Plant Shutdown.Supplemental Rept Will Be Submitted by 860920
ML20199E863
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/13/1986
From: Agosti F
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
VP-860070, NUDOCS 8606240131
Download: ML20199E863 (1)


Text

_ _ _ _ -

.6 7n A V P e's ert )

Nxlear Opercons '

Fermi 2 Edison BIAERF* W m:.

June 13, 1986 VP-860070 PRIORITY ROUTING Mr. James G. Keppler , [

Regional Administrator /2 f/L MJP :s Region III S U. S. Nuclear Regulatory Commission 799 Roosevelt Road h -

Glen Ellyn, Illinois 60137 f~1c>

Dear Mr. Keppler:

Reference:

(1) Fermi 2 NRC Docket No. 50-341 Facility Operating License No. NPF-43 (2) Detroit Edison Letter to NRC "Startup Report" VP-86-0014, Dated March 12, 1986

Subject:

Startuo Reoort - Supolement 1 This is Supplement 1 of the Startup Report for Fermi 2. As required by Fermi 2 Technical Specification 6.9.1.3, this supplement is being submitted within 3 months of the initial Startup Report (Reference No. 2) . Because the plant has been shut down since October 1985, there are no test results to report at this time. A supplemental report will be submitted by September 20, 1986.

If you have any questions regarding this report, please contact Mr. Lewis Bregni, Compliance Engineer at (313) 586-5313.

Sincerely,

[

cc: M. D. Lynch W. G. Rogers G. C. Wright i USNRC Document Control Desk l Washington, D. C. 20555 (36 Copies) 8606240131 860613 B 1 9 I*$