ML20069B303

From kanterella
Revision as of 07:35, 27 August 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Final Deficiency Rept Re Radiographic Film for Reactor Vessel Control Rod Drive Mechanism Housing Welds,Initially Reported 810603.Radiographic Technique Found Sufficiently Sensitive to Detect Rejectable Flaws
ML20069B303
Person / Time
Site: Mcguire
Issue date: 12/15/1981
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8112240168
Download: ML20069B303 (2)


Text

- .- _ _ - ... ._ . _ _ - _ _

,. l <

Duxu Powen Co31Pm I'ow en 13citnixo 400 SocTri Citrucit STuner, CllARLOTTic, N. C. 20242

(

WILLI AM O. PA R M E R, .J R. ~

V,c r Pot s. c r ee t ME" 7N s.t. p oo o o December 15, 1981 U'C'"]4 3 7 3-4 cia 3 g ,

> .z N HO Mr. James P. O'Reilly, Director -

U. S. Nuclear Regulatory Commission <c f_l' Region II ** ;

101 Marietta Street, Suite 3100 o Atlanta, Georgia 30303 Cn Re: McGuire Nuclear Station Unit 2 Docket No. 50-370

Dear Mr. O'Reilly:

Pursuant to 10 CFR 50.55e, please find attached Significant Deficiency Report SD 370/81-06 (final) concerning radiographic film for reactor vessel CRDM welds supplied by Westinghouse not meeting the requirements of ASME Section III Appendix IX. An interim report was submitted by my letter dated July 2, 1981.

et Very truly yours, o ,(S; ty 'Q j -

\(.g

~

. , G4 m.

_ (0 , , O D E,C 2,3 'lC'M I'" T William O. Parker, Jr. b . \'

PBN:Is ,

Attachment ,

l cc: Director Mr. P. R. Bemis Office of Inspection & Enforcement NRC Resident Inspector U. S. Nuclear Regulatocy Commission McGuire Nuclear Station Washington, D. C. 20355 l l

i 1

f', ,

8112240168 811215 "e " 'h gDRADOCK 05000370 M ,' > '

PDR

. DUKE POWER COMPANY MCGUIRE NUCLEAR STATION SIGNIFICANT DEFICIEhTY Report Number: SD-370/81-06 (final)

Report Date: December 15, 1981 Facility: McGui e Nuclear Station Unit #2 Identification of Deficiency: Radiographic film for reactor vessel CRDM housing welds supplied by Uestinghouse does not meet the requirements of ASME Section III, Appendix IX.

Description of Deficiency: On June 3,1981, Messrs. W. O. Henry, J. K. Berry and J. E. Cavender advised Mr. J. Bryant of NRC, Region II, of this deficiency.

Dr. June 24, 1981, Westinghouse determined that eleven (11) RT films at McGuire exceeded the film density requirement, and also one film for a CRDM housing weld could not be located in the records.

Evaluation of Deficiency: Westinghouse fabricated a mock-up of the CRDM housing welds and radiographed the mock-up using the same RT technique that was used originally. Artificial discontinuities were introduced in the mock-up which consisted of a 1/32 inch (0.032 inch) groove and a 1/16 inch (0.063 inch) diameter hole.

The essential features of the IQ1 (penetrameter) and the artificial flaws were clearly discernable in the radiographs of the mock-up.

Westinghouse radiographed the eleven (11) CRDM housing welds at McGuire and also radiographed the one weld for which no radiograph could be located.

No rejectable indications were detected by this examination.

Indications of porosity of approximately 1/65 inches (0.016 inches) were discernable in some instances on some of the film. This information verified that the radiographic technique is sufficiently sensitive to detect discon-l tinuities which would be considered rejectable for these welds even though all the essential parameters of radio?raphy may not have been met.

In addition, Westinghouse performed a fracture mechanics evaluation of the welds which indicates that a very large flaw would be necessary to cause failure of the weld. (The Westinghouse report " Rotterdam Drydock Reactor Vessel CRDM Weld Radiography" was submitted to the NRC via letter NS-EPR-2523, E. P. Rahe to R. C. DeYoung, dated November 25, 1981.) Therefore, we t conclude that these welds would not have failed.

l .

Corrective Action: These radiographs were produced approximately 8 to 10 years ago. We do not r.aticipate receiving any other radiographs produced by this organization (RDM). All other radiographs, which were produced by RDM on these two vessels, were reviewed and no other discrepancies were detected. No other action is planned.

I L

-- - _ - _ _ _ _ _