ML20073S954

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Incorrect Matl Supply Discovered on Unshipped Order.Pump Div Will Notify Enertech W/ Recommendation That Items Supplied W/Incorrect Matl Be Removed & Destroyed
ML20073S954
Person / Time
Site: Beaver Valley, Mcguire, Byron, Braidwood, McGuire
Issue date: 06/27/1994
From: Gibson D
BW/IP INTERNATIONAL, INC. (FORMERLY BYRON JACKSON
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-94 NUDOCS 9407070259
Download: ML20073S954 (4)


Text

.

@ 13W'IP International, Inc.

$[c$on. Io '

C ," *, " -

['3h.d n Pumps vi te .t n i ra.

United 2'3 N v centorugan' Pumps 27 June,1994 U.S. Nuclear Regadatory Commission Attn: Doctunent Control Desk Washington, D.C. 20555 Referenre: NRC M27135 Gentlemen:

7his letter transmits Noncortfonnance Revision A to in accordance svith thethe Notification o of10 Clfand requirements Defects R, Part 21. The attached Notification, CFRN 9102(Rev A), clarlfics irlfonnation provided in the original transmittal. All changes and additions have been marked svith under limng and by a: asterisk in the margin.

7 bis :::'istnitial ciinpletes the notification requirements on this issue.

Very truly yours,

\ m

).A. Gibson Afanager, Nuclear Products Operations I

Attach.

cc: Afr. F.J. Costanzo, Afanager of Engineering Air, k.D. Ham, Afanager cf Quality Afr. K.A. Huber, Chainnan, Part 21 Evaluation Board Afr. W.A. Klenner, Product Afanager Afr. K.B. Lemmon, Afanager, Field Service Operations l

s

. 's I

C 94070702",9 940627 i PDR ADOCK 05000734 S PDr; l -__

NOTIFICATION NO. CFRN 94 02(Rev A)

NOTIFICATION OF A REPORTABLE DATE: 27 June 1994 ISSUE PURSUANT TO 10 CFR 21 TO: U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20$55 ,

NAh1E AND ADDRESS OF INDIVIDUAL INFORh11NO Tile Cohlh11SSION:

hit. David Gibson --

BW/IP International, Inc. _

Pump Division 2300 East Vernon Avenue Vernon, CA 90058 (213) 587-617i Foi Technical Information

Contact:

Dr. Kent lluber BWIIP Evaluation No. CFR 94-003 IDENTIFICATION OF Tile FACILITY, Tile ACTIVITY, OR Tile BASIC COh1PONENT SUPPLIED FOR SUCil FACILITY OR ACTIVITY WITil!N Tile UNITED STATES WillCII FAILS TO CohtPLY OR CONTAINS A DEFECT:

liasic Component: Replacement seals for valve hydraulic operator accumulators and cylinders. Part numbers 90433-011, 90433-015, 90433-017, 90433 025, 90433-027, 90433-013.

  • 90433 014. 90433-018.
  • Part number 90433-041 is not aff fsissla IDENTIFICATION OF Tile FIRht SUPPLYlNO Tile BASIC COh1PONENT WillCil FAILS TO COh1 PLY OR CONTAINS A DEFECT:

BW/IP International, Inc.

Pump Division Successor tc.:

BW/IP International, Inc.

Fluid Controls Division

, Successor to:

Dorg Warner Nuclear Valve Division 7500 Tyrone Avenue Van Nuys, CA 91409 Page 1 i wi,

4 NOTIFICATION NO. CFRN-94 02 (Rev A)

NATURE OF TIIE DEFECT OR FAILURE TO COM r LY AND Tile SAFETY llAZARD WillCil IS CREATED -

OR COULD DE CREATED BY SUCil O'cFECT OR FAIL'JRE TO COMPLY:

Seals supplied were Lubr, thane (Polyurethane) with a Nitrile spring. Correct material is a i fluorocarbon (Viton) seal web a nuorocarton (Viton) upring. ]

l The polyurethane and Nitrile mateOls have not been qualified for use with Fyrquel 220 MLT or Brayco 853 hydraulic fluids. Both muerials are known to degrade when in contact with Fyrquel 220 MLT hydraulic fluid. Acceptability of the Brayco 853 fluid is unknown.

The polyurethane and Nitrile materials have not been qualified for use in harsh temperature or radiation environments and may degrade and jeopardize operator function.

t Tile DATE ON WillCil Tile INFORM ATION CF SUCil DEFi.*T OR FAILURE TO COMPLY WAS OITI AINED:

Fluid Controls informed Pump Division on 6 June 1994 that incorrect material supply had been discovered on an unshipped order. Subsequent investigation located three earlier incidents in which incorrect material had been supplied and delivered to customer (Enertech). Details were provided to Pump Division by FAX on 14 June 1994.

IN TIIE CASE OF A BASIC COMPONENT WillCil CONTAINS A DEFECT OR FAILS TO COMPLY, Tile NUMBER AND LOCATION OF ALL SUCil COMPONENTS IN USE AT, SUPPLIED FOR, OR BEINO SUPPLIED FOR ONE OR MORE FACILITICS OR- ACTIVITIES SUBJECT TO TliE REGULATIONS:

All components effected by this Notification were supplied to IInertech Company 2950 E. Birch St.  ;

Brea, CA 92621 Sixty-eight (68) of the items have subsuquently been delivered to the following utilities:

Utility Site Site and Number Duke Power Mcguire 90433-027 (12 nes). 90433-025 (6 ne<1 Commmonwealth Edieon Byron 90433-013 (2nes). 90433 015 (3 nes). 90433-18 (2nes) *

- Braidwood 0 pieces

  • Duquesne Power & Light. Beaver Valley 90433-013 (43 nn)

Page 2 7 ,

-, - ., . . . . - - . --. . -- . . . - - - - . . . . . . - . . . . - , , , _ - - ~ - - . - ._._,--,,m.-.. . _ . . . , , - - -

. l l

NOTIFICATION NO. CFRN-94-02 (Rev A) i

  • )

Tile CORRECTIVE ACTION WillCll llAS, IS BEING, OR WILL BE TAKEN: Tile NAh1E OF Tile INDIVIDUAL OR ORGANIZATION RESPONSIBLE FOR TIIE ACTION: AND THE LENGT 1 OF TlhtE  :

TilAT llAS BEEN OR WILL BE TAKEN TO COMPLETE Tile ACTION:

Fluids Controls Division notified Enr.eeh of the deviation on 8 Juns 1994.

The Pump Division will notify Enertech witu the reconunendation that all items supplied with incorrect material be removed and destroyed. .

ANY ADVICE RELATED TO Tile DEFECT OF FAILURE TO COhtPLY ABOUT Tile FACILITY, ACTIVITY, OR BASIC COh1PONENT TilAT llAS BEEN,15 DEiNO, OR WILL BE GIVEN TO PURCl!ASERS:

Discrepant parts should be removed and destroyed.

Page 3

.-. . - - . , ~ . , - - - , . - . - _ . . - - . _ _ - - , . . - , -. .