ML20127G302

From kanterella
Revision as of 08:22, 10 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Confirms Telcon Re Initiating Arrangements for NRC Contingency Telecommunications at Emergency Operations Facility.Util Estimate for Labor & Matls to Accomplish Listed Tasks Requested
ML20127G302
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/20/1985
From: Wenslawski F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8506250410
Download: ML20127G302 (2)


Text

_

So-9((

,. 110 - 5 2 'l r

2 0 JUN 1985 Pacific Cas and Electric Company 77 Beale Street, Room 1445 San Francisco, CA 94016 Attention: Mr. James D. Shiffer, Vice President Nuclear Power Generation Gentlemen:

Subject:

Request for a PG&E Cost Estimate to' Install an Additional Circuit in.Diablo Canyon's EOF and PG&E Permission to Use Site Property for Contingency Telecommunications This letter will confirm a telephone conversation held a month ago between Ms. Teri Mack, Senior Nuclear Generating Engineer, and Mr. Arnold Wieder of this office about initiating arrangements for NRC contingency telecommunications at Diablo Canyon.

These arrangements, the details of which Ms. Mack is familiar, consist of obtaining PG&E's cost estimate to install additional telephone circuits in the Emergency Operations Facility for NRC use and formalizing permission to place .

l temporary repeater stations on top of Davis Peak and Black Butte for NRC emergency telecommunications equipment when it might be needed at Diablo Canyon. The circuits and the temporary repeater sites are essential

. elements of our emergency telecommunications plan for Diablo Canyon.

~

We are seeking PG&E's estimate for labor and materials to accomplish the following tasks:

1. Establish three two-wire telephone circuits from the NRC room in the Emergency Operations Facility to the Communications Room on top of the Emergency Operations Facility.

, 2. Terminate both circuit ends with WE-742 connectors which NRC Region V will supply, and

3. Tag or mark these circuits "For NRC Use Only."

75 PDR l[j ?)f

c

c. 2 0 JUN 1985 Pacific Gas and Electric .

We will issue a purchase order for this work upon receipt of your estimate.

There is no work associated with the repeater sites.

Should you wish to discuss any of this further, please ' contact Arnold Wieder at 415/943-3783. .We appreciate your cooperation on this matter.

Sincerely, Frank A. Wenslawski, Chief Emergency Preparedness and Radiological Protection Branch cc: S. Cohen, TB D. Astley, Boise Interagency Fire Center K. Perkins, NRC, IE bec: -RSB/ Document Control Desk (RIDS)

State Resident Inspector RV Wied r:rc Fish M

Wenslawski 4

Frigilliana 06/fd/85 06/J#/85 06/J0/85 06/p/85