ML20133F655

From kanterella
Revision as of 08:10, 4 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1996 for Vogtle Electric Generating Plant,Unit 1 & 2
ML20133F655
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/31/1996
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0757-L, LCV-757-L, NUDOCS 9701140312
Download: ML20133F655 (12)


Text

. _m . _ _ . - __ __m . .m _ _ _ _ . _ ___ . _ _ _ _ - . _ . . ~ .

Grorgia Power Company I 40 Irivemess Center Parkway Post Office Box 1295 Birmingham. Alabama 35201 Telephone 205 992-7122 Georgia Power C.K.McCoy the soutton abctre system Vice President, Nuclear vogtle Project g g ggg7 LCV-0757-L Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the December 1996, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.  !

1 l

Sincerely, l C. K. McCoy CKM/HWM Enclosures cc: Georgia Power Comoany Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator j .

Mr. L. L Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle [j ,9 9701140312 961231 PDR ADOCK 05000424 R PDR

i 3

g 9 l

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT-UNIT 1 MONTHLY OPERATING REPORT FOR DECEMBER 1996 2

TABLE OF_CGNTENTS  !

NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 i

)

l l

)

i

NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE: January 2,1997 COMPLETED BY: G. L. Hooper TELEPHONE: (706) 826-4104 DECEMBER 01 00:00 UNIT AT 100% POWER WITH NO OPERATING PROBLEMS.

DECEMBER 31 23:59 UNIT AT 100% POWER WITH NO OPERATING PROBLEMS.

I I

V1-1

, r OPERATING DATA REPORT DOCKET NO. 50-424 DATE: January 2,1997 COMPLETED BY: G. L. Hooper ,

TELEPHONE: _(706) 826-4104 OPERATING STATUS

1. UNIT NAME: VEGP UNIT 1
2. REPORT PERIOD: Dec-96
3. LICENSED THERMAL POWER (MWt): 3565
4. NAMEPLATE RATING (GROSS MWe): 1215
5. DESIGN ELECTRICAL RATING (NET MWe): 1169
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1216
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1162
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NA
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION,IF ANY: NA i THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744 8784 84049 l
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 7248.6 73714.8
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE: 744.0 7163.0 72505.5
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH): 2648271 25022574 246424308 ,
17. GROSS ELEC. ENERGY GENERATED (MWH): 918620 8552598 83225125
18. NET ELEC. ENERGY GENERATED (MWH): 879590 8149798 79192205
19. REACTOR SERVICE FACTOR 100.0 % 82.5 % 87.7 % l
20. REACTOR AVAILABILITY FACTOR 100.0 % 82.5% 87.7 % i
21. UNIT SERVICE FACTOR: 100.0 % 81.5 % 86.3 % r
22. UNIT AVAILABILITY FACTOR: 100.0 % 81.5 % 86.3 %
23. UNIT CAPACITY FACTOR (USING MDC NET): 101.7 % 79.8 % 84.3 %
24. UNIT CAPACITY FACTOR (USING DER NET): 101.1 % 79.4 % 83.7 %
25. UNIT FORCED OUTAGE RATE: 0.0% 5.8% 4.5%
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: i NA l

l l

\

l V1-2 l

l j

UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE: January 2,1997 COMPLETED BY: G. L Hooper TELEPHONE: (706) 826-4104 DAY Net MW

1. .. 1171 *
2. 1183 *
3. 1183
  • 4 .. . . . 1184
  • 5.. . 1183
  • 6.. 1183 *
7. . 1174
  • 8 .. . 1185 *
9. 1187 *
10. . 1184 *
11. 1179 *
12. 1175 *
13. 1181 *
14. 1185 *
15. . 1185 *
16. 1186
  • 17 . . 1182 *
18. 1186 *
19. . 1187 *
20. 1188
  • 21 . . . .. . 1187 *
22. . 1186 *
23. 1183 *
24. 1180 *
25. 1187 *
26. 1188
  • 27 . 1186
  • 28 . . 1179
  • 29 , 1175
  • 30 1175
  • 31 1172 *
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS l

1 V1-3

  • i l

I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE: January 2,1997 UNIT NAME: VEGP UNIT 1 COMPLETED BY: G. L. Hooper TELEPHONE: (706) 826-4104 REPORT MONTH Dec-96 l

R M S E E Y T A T LICENSEE SC l

Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE I

I NA NA NA NA NA NA NA NA NA NA l F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2-MANUAL SCRAM REDUCTION IN AVERAGE  !

C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4-CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) a i

V1-4

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT-UNIT 2 MONTHLY OPERATING REPORT FOR DECEMBER 1996 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL ' Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4 I

l l

1

. ..__. _.. ~ ...- .. _ -~ - - - . ..- ~. ~ -. - -_. .. .~ . . _ - - . . - - . . . _ . . . . . . . . - . . . . ~ . - . .

NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:. January 2,1997 COMPLETED BY: G. L. Hooper TELEPHONE: (706) 826-4104 I

DECEMBER 01 00:00 UNIT AT 100% POWER WITH NO OPERATING PROBLEMS.

DECEMBER 31 23:59 UNIT AT 100% POWER WITH NO OPERATING PROBLEMS.

l t

l i

t

! l 3 I 4

i V2-1 i

. . , . . .. . - - _ _ . . . - . . . - . . . . - . _ , . ~ , - ..

j .

OPERATING DATA REPORT DOCKET NO. 50-425 DATE: January 2,1997 COMPLETED BY: G. L. Hooper TELEPHONE: (706) 826-4104 l OPERATING STATUS i 1. UNIT NAME: VEGP UNIT 2 l 2. REPORT PERIOD: Dec-96 l 3. LICENSED THERMAL POWER (MWt): 3565 l 4. NAMEPLATE RATING (GROSS MWe): 1215

5. DESIGN ELECTRICAL RATING (NET MWe): 1169
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1216
7. MAXIMUM DEPENDABLE CAPAClW (NET MWe)
1162 l
8. IF CHANGES OCCUR IN CAPACITY RATINGS I (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NA
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTirM IF ANY: NA THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744 8784 66793
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 7947.3 60063.8
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE: 744.0 7899.7 59399.2
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH): 2650604 27514928 200969043 l 17. GROSS ELEC. ENERGY GENERATED (MWH): 923679 9465396 68488698 l 18. NET ELEC. ENERGY GENERATED (MWH): 885879 9037636 65275898
19. REACTOR SERVICE FACTOR 100.0 % 90.5 % 89.9 %
20. REACTOR AVAILABILITY FACTOR 100.0 % 90.5 % 89.9 %
21. UNIT SERVICE FACTOR: 100.0% 89.9 % 88.9 %
22. UNIT AVAILABILIW FACTOR: 100.0 % 89.9% 88.9 %
23. UNIT CAPACITY FACTOR (USING MDC NET): 102.5 % 88.5% 86.4 %
24. UNIT CAPACITY FACTOR (USING DER NET): 101.9 % 88.0 % 86.3 %
25. UNIT FORCED OUTAGE RATE: 0.0% 0.6% 1.8%
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):

None

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA l

V2-2 l

l l

p a UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 ,

POWER LEVEL DATE: January 2,1997 COMPLETED BY: G. L. Hooper TELEPHONE: (706) 826-4104 DAY Net MW 1.... . . . 1183

  • 2 ... . . . 1192
  • 3 ... . .. 1193
  • l
4. . . . . . , 1193
  • f
5. .. . . 1191 * '

6 . .. . . . . . . 1190 * '

7. . . 1184
  • i 8....... 1194
  • 9... 1196 *  !

10.. . . . 1193 * ,

11. .. 1186
  • 12 . . . . . 1183
  • 13 . . . . 1189 * .
14. . 1193
  • l 15 . . . . . . 1194 * ,
16. . ... 1194 * ,

17 . . . . . . . 1190

  • j 18.. .. . 1195 * '

19 . .. . . . . . 1197 *  ;

20. . . . . 1196 * ,

21 . . . . 1198 * '

22 . 1196 *

23. .. 1192 * }

24 . . . .. . . 1188 * .

25 . . . 1195

  • 26 .. . 1195 *
27. . 1193 *
28. 1187
  • 29 . 1181
  • 30 . . . . . 1183
  • 31 . 1179 *
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS i

1 l

)

V2-3

4 .

1 4

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE: January 2,1997 "

UNIT NAME: VEGP UNIT 2 COMPLETED BY: G. L. Hooper

TELEPHONE
(706) 826-4104 REPORT MONTH Dec-96 l

j R M S '

f E E Y T A T LICENSEE SC l Y H EVENT TO S COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO ,

NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE 1 L r

NA NA NA NA NA NA NA NA NA NA F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2. MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4-CONTINUATIONS THE PRECEDING 24 HOURS. ,

E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H.OTHER (EXPLAIN)

~

l ENCLOSURE 3

]

VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CHALLENGES TO PORY OR SAFETY VALVES l l

DOCKET NOS. 50-424.50-425 j DATE: January 2,1997  ;

COMPLETED BY: G. L. HOOPER .

TELEPHONE: (706)826-4104 i

j i

l EVENT DATE TAG NO. TYPE DESCRIPTION ,

i NA NA NA NA l

1 i

i l

l l

j