Responds to 850909 Ltr Urging NRC to Take Necessary Steps to Improve Safety & Reliability at Plant,Based on 850609 Loss of Feedwater Event.Nrc Reviewing Util Submittal & Will Issue SER
ML20133G126
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/08/1985
From: Palladino N
NRC COMMISSION (OCM)
To: Celeste R, Cleste R
OHIO, STATE OF
Shared Package
ML20133G129 List:
References
NUDOCS 8510150198
Download: ML20133G126 (6)


Text

-

Distribution:

Docket Files s/ ,%o*t NRC PDR UNITED STATES f '

, NUCLEAR REGULATORY COMMISSION Local PDR 3

,i W ASHINGTON, D. C. 20555 WJDircks JRoe k ***** / October 8, 1985 TRehm VStello CHAIRMAN JKeppler JTaylor GCunningham HDenton/Eisenhut HThompson Glainas The Honorable Richard F. Celeste JStolz Governor of Ohio JThoma Columbus, Ohio 43215 LMulley ED0 998

Dear Governor Celeste:

ORB #4 416 Old Phil.

I am responding to your September 9,1985 letter where you urged the Commission to take whatever steps are necessary to improve the safety and reliability at the Davis-Besse plant. The principal event of concern is an event which occurred June 9, 1985. Briefly, the plant experienced a loss of feedwater which was followed by an operator error and a number of systems and equipment failures before the plant was brought to a stable shutdown condition some 30 minutes later.

The plant status at this time has the facility in cold shutdown, troubleshooting is nearly complete, and corrective actions and system modifications by the Toledo Edison Company are in progress. Toledo Edison must receive NRC per-mission prior to restarting Davis-Besse.

Toledo Edison has recently responded to Harold R. Denton's letter of August 14, 1985 regarding the design, operational and management inadequacies that contributed to the event, and has met separately with the staff and the Commission to present its corrective action plan. The staff is now reviewing the licensee's submittal and will issue its findings in a safety evaluation report. Among the modifications that will be completed before restart are the installation of a third electric-powered auxiliary feedwater pump and changes to the auxiliary feedwater system to resolve the likelihood of inadvertent isolation of auxiliary feedwater to both steam generators.

During the June 9 event, there was an emergency preparedness deficiency in not reporting the incident to the State. In accordance wid:'the then established procedure, the licensee notified the County Sheriff who was to, in turn, notify the State. But the State notification was not made promptly. Toledo Edison has revised their emergency notification procedures so that they will now notify the State directly.

Based on the NRC staff's inspection of the emergency notification systems and contact with the Ohio Disaster Service Agency, we conclude that the concern identified has been rectified. On July 16, 1985, a site drill was conducted at Davis-Besse in which the State participated and in which the emergency organization was tested. The sirens were not tested during this drill but they are periodically tested in accordance with procedures reviewed by FEMA.

8510150198 85100H PDR COP 998 NRCC Originated: NRR:Thoma CDRRESPONDENCE PDR

% : J The Honorable Richard F. Celeste , Although some discrepancies requiring corrective actions are indicated in the drill critique, no major discrepancies were noted. Since January 1985, we have conducted four inspections of emergency preparedness at Davis-Besse, and we intend to monitor them more closely in this area.

Before the NRC grants permission for restart, we must be satisfied that there is reasonable assurance that operation of the plant will not adversely affect public health and safety. I assure you that the Commission is taking whatever steps that are necessary to improve safety and reliability at the Davis-Besse plant.

Sincerely, f / W ff ""

Nunzio J. lladino, 1

t

, ..m .,r.-, , , ~ - , . . , - . . . . . , s -- , , ...,-v--,

The Honorabl Richard F. Celeste Although some dis repancies requiring corrective actions arp indicated in the drill critique, no major discrepancies were noted. S Ace January 1985, we have conducted f r inspections of emergency prepared ss at Davis-Besse, and we intend to mon r them more closely in this area Before the NRC grants pgrmission for restart, we mus be satisfied that there is reasonable assurance hat operation of the plant ill not adversely affect public health and safety. I assure you that the C ission is taking whatever steps that are necessary t improve safety and te iability at the Davis-Besse plant.

Since ely,

'unzio J. Palladino Chairman Distribution (Docket No. 50-346)

Docket Files (w/ incoming) bec: Co issioner Roberts NRC PDR Co ssioner Asselstine Local PDR Comm1 sioner Bernthal i

WJDircks Commis ioner Zech JRoe SECY TRehm OGC VStelle OPE JKeppler JTaylor GCunningham HDenton/DEisenhut 4

HThompson Glainas JStolz JThoma LMulley l ED0 Rdg File

i. MBridgers (ED 000998)

ORB #4 Green icket File 416 Old Phil.

1

  • SEE PRE OUS CONCURRENCES AND COMMENTS FROM OTHER OFFICES t ORB-4 ORB-4 AD/0R DL 0 EDO l
  • JThor :mcs *JStolz *Glainas *HLThompson D. ut H . n WJDircks 9/2 85 9/25/85 9/25/85 9/26/85 9p85 9985 9/3*/85 MM aliadino 9/ /85 l

Governor Celeste Although some discrepancies requiring corrective actions are indicated in the drill critique, no major discrepancies were noted. Since January 1985, we have conducted four inspections of emergency preparedness at Davis-Besse, and we intend to monitor them more closely f: tM n=t j r t in this area.

Before the NRC grants permission for restart, we must be satisfied that there is reasonable assurance that operation of the plant will not adversely affect public health and safety. I assure you that the Commission is taking whatever steps that are necess,ary to improve safety and reliability at the Davis-Besse plant.

\ f

\ /

Chairman Palladino

/

cc: Commissioner Roberts CommissionerAsselstine/

Commissioner Bernthal'

  • Commissioner Zech /

SECY /

OGC /

OPE f

/

Distribution:

WJDircks /

JRoe TRehm VStello /

['

1 JKeppler JTaylor GCunningham HDenton/DEisenhut ,

HThompson My Glainas '

c# '

JStolz JThoma 5

($ g '

t E k ei d' PPAS pbg, h}#%s LMulley M8ridgers (EDO 000998) p p -f9 p trS {e g,ey

[ rad 4lt 0 0RB- \ B4 rW/AR DL ONRR ONRR EDO COMM Q,em:mcs JS. GLa'i f.a's HLThompsonj\ DGEisenhut HDenton WJCircks NPalledino W3g' 85 9/g(J85 9/ /85 9/ /85/'9/ /85 9/ /85 9/ /85 9/ /85 il

. w aseg **

/' jo, ,

UNITED STATES y s, ss ( ( ,g NUCLEAR REGULATORY COMMISSION 5 . /; WASHINGTON, D. C. 20555 S .

%, p

..... s I

EDO PRINCIPAL CORRESPONDENr:F CONTROL FROM: DtlE: (N gg4 EDO CONTROL: 000998 DOC DT: 09/09/85 RICHARD F. CELESTE OOVERNOR OF OHIO k/ FINAL REPLY:

TO:

CHAIRMAN PALLADINO

~

>FOR SIGNATURE OF: ** PRIORITY ** SECY NO: 85-784 CHAIRMAN PALLADINO DESC: ROUTING: -

CONCERNS RE EVENTS AT DAVIS-BESSE ON 6/9/85 DIRCKS WHICH RESULTED IN LOSS OF FEEDWATER ROE REHM DATE: 09/17/85 STELLO ASSIGNED TO: NRR CONTACT: DENTON KEPPLER

~ ~ ~~~~ - ~~

TAYLOR GCUNNINGHAM SPECIAL INSTRUCTIONS OR REMARKS:

l N

h 3L(7 M Ar) NJ a}yy

.q---(' y e'} yllyg ,'M

~

[clvAL(Kdel}l7g l/

1)>~u- 1>Gy .

A) 4 l

Gov Richard Celeste CORRESPONDENCE CONTROL TfCKET 1

SECY NUMBER: 85-784 LOGGING DATE 9/16/85 i .. OFFICE OF THE SECRETARY l ACTION OFFICE: ED0 AUTHOR: Gov Richard Celeste AFFILIATION: State of Ohio LETTER DATE: 9/9/85 FILE CODE ADDRESSEE: Palladino

SUBJECT:

Expresses concerns re the events at the Davis Besse Nuc Plant on 6/9/85 resulting in the loss of all feedwater ACTION: Chairman's Signature and Com Review...Date due Com: Sept 30 DISTRIBUTION: Chm,Cmrs,RF ,

SPECIAL HANDLING: (If response will be delayed for more than 10 working days, please ack by phone or in writing)

SIGNATURE DATE: FOR THE COPMISSION Champ lt-8 r 0%:

m.':::%:..:AE"".".

.