Responds to 860127 Request That Commission Convene Hearing Re Disposal of Low Level Radwaste at Facility.Intervention in Hearing May Be Requested by Further Filings Per Forthcoming Notice.Commission 860220 Order EnclML20154L858 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
02/26/1986 |
---|
From: |
Palladino N NRC COMMISSION (OCM) |
---|
To: |
Celeste R OHIO, STATE OF |
---|
Shared Package |
---|
ML20154L864 |
List: |
---|
References |
---|
NUDOCS 8603130143 |
Download: ML20154L858 (1) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999 Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML20210H0491999-07-28028 July 1999 Forwards Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, to Allow Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G5521999-07-28028 July 1999 Provides Addl Response to 980923 OL Licensing Exam Rept 50-346/98-301 Re OL Exam Administered in Aug 1998.Results of Root Cause Investigation & Corrective Actions,Discussed ML20210G3831999-07-27027 July 1999 Forwards Application for Amend to NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20211P3071999-07-26026 July 1999 Forwards Final Rept for 990504 Biennial Radiological Emergency Preparedness Exercise for David-Besse Power Station.No Deficiencies Identified for Any Jurisdiction During Exercise ML20210G4391999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumentation, & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20210G7151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrument - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G3211999-07-26026 July 1999 Forwards Written OL Exam & Supporting Matl for Exam to Be Administered at DBNPS During Week of 990913.Listed Encls Withheld from Public Disclosure Until After Exam Complete ML20210C4381999-07-20020 July 1999 Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs ML20209G3681999-07-15015 July 1999 Advises That Info Submitted in & 990519 Affidavit Re Design & Licensing Rept,Davis-Besse,Unit 1 Cask Pit Rack Installation Project,Holtec Intl, HI-981933,marked Proprietary,Will Be Withheld from Public Disclosure ML20207H6401999-07-0909 July 1999 Discusses Closure of TAC MA0540 Re Util Responses to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Staff Has Revised Info in Rvid & Releasing It as Rvid Version 2 ML20209D1341999-07-0808 July 1999 Forwards Notice of Withdrawal of Application for Amend to Operating License.Proposed Change Would Have Modified Facility TSs Pertaining to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves 05000346/LER-1998-012, Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached1999-07-0707 July 1999 Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached ML20209C3981999-07-0101 July 1999 Responds to NRC Re Violations Noted in Insp Rept 50-346/98-21.Corrective Actions:Developed Rev to Boric Acid Control Program & Work Process Guideline on Plant Leakage ML20209B5821999-06-24024 June 1999 Provides Justification for Rev to Completion Date for One of Insp follow-up Items Cited in Insp Rept 50-346/98-03, Designated as Inspector follow-up Item 50-346/97-201-10 ML20196G1251999-06-23023 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196E5321999-06-17017 June 1999 Forwards Addl Info Re Relief Request RR-A16 to Support NRC Approval of Relief Request ML20195K2751999-06-16016 June 1999 Forwards Safety Evaluation Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195F9071999-06-10010 June 1999 Forwards Application for Amend to NPF-3,changing Tech Specs 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20195F8851999-06-0707 June 1999 Withdraws 950929 License Amend Application,Proposing Mod to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20207G0751999-06-0707 June 1999 Forwards Insp Rept 50-346/99-04 on 990323-0513.Violations Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-09
[Table view] Category:NRC TO STATE/LOCAL GOVERNMENT
MONTHYEARML20236V7341987-12-0101 December 1987 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App C DD-86-17, Advises That Time for Commission to Review Director'S Decision DD-86-17 Expired.Commission Declined Review. Decision Became Final Agency Action on 861215.Served on 8612221986-12-19019 December 1986 Advises That Time for Commission to Review Director'S Decision DD-86-17 Expired.Commission Declined Review. Decision Became Final Agency Action on 861215.Served on 861222 ML20209E3901986-09-0202 September 1986 Responds to 860815 Request That Perry Not Be Licensed for Full Power & Davis-Besse Not Be Permitted to Achieve Full Power Operation Until State of Oh Review of Emergency Evaluation Plans Completed ML20215B2851986-09-0202 September 1986 Requests Addl Info Clarifying State of Oh Position Re Participation in Perry Evacuation Plan Prior to 860905 Meeting to Consider Issuance of Full Power License ML20207H7351986-07-22022 July 1986 Notification of 860805-07 Hearings in Sandusky,Oh.Limited Appearance Statements Scheduled on 860806 & 07 During Listed Hours.Copy of 860710 Order Encl.W/O Encl.Served on 860724 ML20206P6891986-06-27027 June 1986 Notifies That Testimony Will Be Welcomed at Davis-Besse Low Level Radwaste Informal Proceedings.Served on 860630 ML20195B8411986-05-22022 May 1986 Informs That 860502 Request to Revoke 861015 Authorization to Dispose of Low Level Radwaste Will Be Considered by Administrative Judge Conducting Adjudicatory Proceeding. Commission Will Review Decision.Served on 860527 ML20197F8181986-04-15015 April 1986 Forwards Population Density Map for Emergency Planning Zone. Map Developed by ORNL by Projecting from 1982 Census Data & Must Be Taken as Estimate.W/O Encl ML20197F0501986-04-15015 April 1986 Forwards Population Density Map for Emergency Planning Zone. Map Developed by ORNL by Projecting from 1982 Census Data & Must Be Taken as Estimate.W/O Encl ML20140C7111986-03-20020 March 1986 Responds to & City Council Resolution Opposing Burial of Low Level Radwaste on Site.Order Issued on 860220 Referring Hearing Requests to Administrative Judge.Fr Notice of Opportunity for Hearing Published on 860314.Notice Encl ML20140C1511986-03-20020 March 1986 Informs of Action Taken in Response to Expressions of Public Concern Received Re Approval to Bury Potentially Radioactively Contaminated Sludge at Plant.Order Issued on 860220 Referring Hearing Requests to Administrative Judge ML20154L8581986-02-26026 February 1986 Responds to 860127 Request That Commission Convene Hearing Re Disposal of Low Level Radwaste at Facility.Intervention in Hearing May Be Requested by Further Filings Per Forthcoming Notice.Commission 860220 Order Encl ML20133G1261985-10-0808 October 1985 Responds to Urging NRC to Take Necessary Steps to Improve Safety & Reliability at Plant,Based on 850609 Loss of Feedwater Event.Nrc Reviewing Util Submittal & Will Issue SER ML20127H2161985-04-12012 April 1985 Responds to FOIA Request for 50-mile Ingestion Pathway Map for Plant.Map Will Be Mailed Under Separate Cover IA-85-201, Responds to FOIA Request for 50-mile Ingestion Pathway Map for Plant.Map Will Be Mailed Under Separate Cover1985-04-12012 April 1985 Responds to FOIA Request for 50-mile Ingestion Pathway Map for Plant.Map Will Be Mailed Under Separate Cover ML20203E8571983-06-0707 June 1983 Requests Attendance at 830624 Meeting W/Util FEMA & Region III to Discuss Lucas County Concerns Re Offsite Emergency Preparedness.Related Info Encl 1987-12-01
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217P2061999-10-26026 October 1999 Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML20210C4381999-07-20020 July 1999 Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs ML20209G3681999-07-15015 July 1999 Advises That Info Submitted in & 990519 Affidavit Re Design & Licensing Rept,Davis-Besse,Unit 1 Cask Pit Rack Installation Project,Holtec Intl, HI-981933,marked Proprietary,Will Be Withheld from Public Disclosure ML20207H6401999-07-0909 July 1999 Discusses Closure of TAC MA0540 Re Util Responses to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Staff Has Revised Info in Rvid & Releasing It as Rvid Version 2 ML20209D1341999-07-0808 July 1999 Forwards Notice of Withdrawal of Application for Amend to Operating License.Proposed Change Would Have Modified Facility TSs Pertaining to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20195K2751999-06-16016 June 1999 Forwards Safety Evaluation Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20207G0751999-06-0707 June 1999 Forwards Insp Rept 50-346/99-04 on 990323-0513.Violations Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207G0621999-06-0404 June 1999 Forwards Insp Rept 50-346/98-21 on 980901-1201 & 990425-0513.Violations Identified & Licensee Being Provided Opportunity to Either Respond to Violations within 30 Days or Inform NRC That LER Rept Already Contain Info Requested ML20207B8161999-05-25025 May 1999 Confirms Discussion Between Members of Staffs to Have Mgt Meeting on 990608 in Oak Harbor,Oh to Discuss Recent Performance at Davis-Besse as Described in Plant Performance Review ML20207B3141999-05-24024 May 1999 Informs That in September 1998,Region III Received Revision 20 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Rev Submitted Under Provisions of 10CFR50.54(q) ML20206T0881999-05-18018 May 1999 Confirms 990517 Telcon Between Lindsey & M Bielby Re Arrangements Made for Administration of Licensing Exam at Facility for Week of 990913 ML20206N5311999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Aj Mendiola Will Be Section Chief for Davis-Besse Npp.Organization Chart Encl ML20206H2291999-05-0707 May 1999 Forwards Proposed Change to Plant,Unit 1,TS Bases Section 2.2.1, Limiting Safety Sys Settings - Reactor Protection Sys Instrumentation Setpoints - Rc Pressure - Low,High & Pressure Temp ML20206B8171999-04-27027 April 1999 Forwards Insp Rept 50-346/99-05 on 990405-09.No Violations Noted.Purpose of Insp Was to Examine on-line Maint Risk Assessment Program Recently Implemented in Response to Maint Work Control Weaknesses ML20205G5681999-03-26026 March 1999 Advises of Completion of Plant Performance Review on 990202 to Develop Integrated Understanding of Safety Performance. Overall Performance of Plant Acceptable.Plant Issues Matrix & Insp Plan Encl ML20207G1701999-03-0505 March 1999 Forwards Insp Rept 50-346/99-01 on 990102-0212.No Violations Noted ML20207D4351999-02-25025 February 1999 Forwards Insp Rept 50-346/99-02 on 990202-05.No Violations Noted.Examples of Deficiencies with Station Procedures, Similar to Those Identified Through Staff self-assessments & in Previous NRC Insps,Were Noted IR 05000346/19960141999-02-17017 February 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-346/96-14 on 970225.Ack That Due to Plant Events,There Has Been Delay in Completion of C/As for Violation 50-346/96-14c ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20206S0811999-01-22022 January 1999 Forwards Insp Rept 50-346/98-18 on 981110-990102.No Violations Identified.Conduct of Activities at Davis-Besse Generally Characterized by Conservative Plant Operations, & Effective Engineering Involvement in Plant Issues ML20199H5821999-01-20020 January 1999 Forwards SE Re Ampacity Derating Issues Due to Application of Thermo-Lag Fire Barrier Matl at Plant ML20198E6821998-12-17017 December 1998 Forwards Insp Rept 50-346/98-20 on 981116-20.No Violations Noted.Implementation of Licensed Operator Requalification Program Was Generally Characterized by Safety Conscious Operations & Sound Evaluation of Operator Performance ML20198C9881998-12-15015 December 1998 Informs That as Part of NRC PRA Implementation Plan, Commission Assigned Two SRAs to Each Regional Ofc.Sras Will Routinely Assess Licensee Event Repts,Plant Event,Insp Findings & EAs from Risk Perspective ML20198B5391998-12-0909 December 1998 Forwards Insp Rept 50-346/98-17 on 980918-1109 & NOV Re Inadequate Maint Work Order Used by Electrician During Removal of Primary Water Storage Tank Temp Indicator ML20196G1621998-12-0303 December 1998 Submits Response to Request for TS Interpretation Re Surveillance Interval Extension Allowances ML20196H4411998-12-0303 December 1998 Confirms Plans to Hold Meeting on 981216 in Lisle,Il,To Discuss Recent Performance at Davis-Besse & Actions Being Implemented by Licensee ML20198B1511998-12-0202 December 1998 Forwards Insp Activity Plan for Next 6 Months & Plant Issues Matrix.Infor Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite ML20196J5111998-12-0101 December 1998 Fowards Year 2000 Readiness Audit Rept,Which Documents Results of NRR Audit Conducted at Facility from 981027-29 ML20196D4371998-11-25025 November 1998 Discusses Concerns Re Announced Asset Transfer Between Firstenergy Corp & Duquesne Light Co ML20196C6491998-11-20020 November 1998 Forwards Insp Rept 50-346/98-19 on 981014-23.No Violations Noted.Inspectors Reviewed Circumstances Surrounding Events Leading Up to & Following Reactor Trip IR 05000346/19983011998-11-0909 November 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-346/98-301OL Issued on 980923.Effectiveness of C/A Will Be Reviewed Following Submittal of Root Cause Investigation Results ML20155J1471998-11-0303 November 1998 Informs That on 981007,NRC Administered GFE Section of Written Operator Licensing Exam to Employees of Facility. Exam Answer Key for Forms a & B,Grading Results & Individual Answer Sheets Encl.Without Encl ML20155B6641998-10-28028 October 1998 Forwards Safety Evaluation Re Request for Reduction in Commitment Changes in QA Program Matl Receipt Insp Process ML20154Q6711998-10-16016 October 1998 Forwards Insp Rept 50-346/98-15 on 980914-18.No Violations Noted.Emergency Preparedness Program Effectively Implemented During 980624 Tornado Event & Station Personnel Responded Well to Event ML20154Q5891998-10-14014 October 1998 Forwards Insp Rept 50-346/98-14 on 980808-0918.No Violations Noted.Online Safety Equipment Outages Were Performed Well & IAW Established Procedures ML20154H0241998-10-0606 October 1998 Discusses Arrangements Made During 980924 Telcon for Insp of Licensed Operator Requalification Program at Davis Besse Nuclear Power Station During Wk of 981116 ML20154D1801998-09-30030 September 1998 Forwards Insp Rept 50-346/98-16 on 980831-0904.No Violations Noted 1999-09-07
[Table view] |
Text
_----______ ______ __ ______ _____ ____. _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
,w PDR-
- o,,
UNITED STATES
-2 8" n NUCLEAR REGULATORY COMMISSION f ,E W ASHINOTON, D. C. 20555 ,
\*****/
CHAIRMAN February 24, 1986 The Honorable Richard F. Celeste Governor, State of Ohio Columbus, Ohio 43266-0601
Dear Governor Celeste:
Your letter of January 27, 1986 requested that the Commission convene a hearing regarding the disposal of low-level radioative waste at the Davis-Besse nuclear power station. On February 20, 1986, the Commission issued an order that addresses the concerns expressed in your letter. That order refers various hearing requests concerning low-level waste disposal at Davis-Besse to an Administrative Judge for consideration in an informal adjudicatory proceeding. The order, a copy of which is attached, also directs that a notice be issued inviting interested persons desiring to intervene in the proceeding to file a petition with the NRC. Thereafter, the Administrative Judge is to consider the conce rns of those persons found to have standing and to have presented issues appropriate for litigation in the proceeding.
In the event that the State of Ohio wishes to prorticipate in this hearing, it can do so by making further filings in accordance with the forthcoming notice regarding intervention in the proceeding.
Sincerely, y ,
- ]p ,, q ,. j)cu % r Nunzio J. Palladino
Attachment:
As stated ,
w.
i B603130147 B60224 PDR COMMS NRCC CORRESPOPOENCE PDR
00(.ME IEO USNPC UNITED STATES OF AMERICA W FH 20 P4 52 NUCLEAR REGULATORY COPEISSION
~
hiihu .. N'ENi' COMMISSIONERS: BRANO!
Nunzio J. Palladino, Chairman Thomas M. Roberts SEWtb f t.:i ~ ; w,,,
James K. Asselstine Frederick M. Bernthal Lando W. Zech, Jr.
)
In the Matter of )
)
TOLED0 EDISON COMPANY, _et _al_. ) Docket No. 50-346
)
(Davis-Besse Nuclear Power )
Station, Unit No. 1) )
)
ORDER . .
By letter dated July 14, 1983, as supplemented on July 30, 1984, and January 29, 1985, Toledo Edison Company (Toledo Edison) requested authorization under 10 CFR $ 20.302(a) to dispose of byproduct material on the site of its Davis-Besse Nuclear Power Station, Unit 1. The materials in question are radioactively contaminated resins from the plant's secondary system demineralizer. On October 9, 1985, the NRC staff published in the Federal Register an " Environmental Assessment and Finding of No Significant Impact" relating to Toledo Edison's request (50 Fed. Reg. 41265), and by letter dated October 15, 1985, approved the licensee's request for disposal authorization. Thereaf ter, in November 1985, various groups and individuals, including Save Our State From j%D ?
C,oF
2 Radioactive Waste (SOS), Toledo Coalition for Safe Energy (TCSE) and Susan A. Carter, the Western Reserve Alliance (WRA), and the Consuners League of Ohio (CLO), filed petitions for a hearing regarding the Toledo Edison disposal authorization request. Also, in early December 1985, the Corraission received petitions from City of Mentor, Ohio, and the Ohio Citizens for Responsible Energy (0CRE) asking that the agency recind its October 15, 1985 approval of Toledo Edison's disposal authorization request.
We have decided that, in the circumstances of this case, interested persons should be afforded a hearing under section 189a of the Atomic Energy Act, 42 U.S.C. 5 2239(a). In making an initial disposition of the pending hearing requests, we note that in our decision in Kerr-McGee <
Corp. (West Chicago Rare Earths Facility), CLI-82-2, 15 NRC 232 (1982),
aff'd, City of West Chicago v. NRC, 701 F.2d 632 (7th Cir. 1983), the Cormiission indicated that there was no entitlement to a formal, trial-type hearing under either the Atomic Energy Act or NRC regulations with regard to materials licensing actions. Further, neither these particular hearing requests nor any other infomation now available to us, give us cause to exercise our discretion and grant a formal hearing under the "public interest" standard of 10 CFR 5% 2.104(a) and 2.105(a)(7) or to find due process concerns require that a formal hearing must be convened. Therefore, only an informal hearing will be instituted.
With regard to the conduct of the informal proceeding, we direct the Chairman of the Atomic Safety and Licensing Board Panel to designate a single member of that Panel to act as the presiding officer. In order to ensure that all interested persons are identified and heard on a
i 3
timely basis, the presiding officer should arrange for publication in the Federal Register of a notice of opportunity for hearing that notes i
the pendency of the hearing requests regarding the Toledo Edison authorization application and invites all interested persons desiring to intervene in any hearing proceeding to be conducted to file a petition
' to intervene with the Docketing and Service Branch of the Office of the Secretary within thirty days of the publication of the notice. The 7 ,
intervention statement must set forth with particularity (1) the
- -interest of that person in the proceeding; (2) how that interest may be 5'
affected by the results of the proceeding, including a delineation of the reasons why that person should be permitted to intervene that makes particular reference to (a) the niture of the person's right under the Atcmic Energy Act to be made a party, (b) the nature and extent of the i person's property, financial, or other interest in the proceeding, and
, (c) the possible effect of any order that may be entered in the proceeding on the person's interest; and (3) the specific aspect or f
i aspects of the subject matter of the proceeding that the person seeks to have litigated. Statements by those seeking to intervene as parties will be deemed filed when personally delivered to the Office of the i Secretary or when deposited in the United States mail, properly j addressed and first-class postage prepaid.
The parties to the informal adjudication shall be applicant Toledo 4
j Edison; SOS, TCSE, Susan A. Carter, WRA, CLD, OCRE, and the City of 1
Mentor, if their petitions are found to be adequate; and any other l
person found to have filed a proper intervention statement. The NRC
- staff also can appear as a party if it so desires.
i I
i i
L
. - . _ _ _ . _ _ . . . . . _ . _ . . _ . . . , _ . -,-,_,..__,.._,,,-.,___m._ . _ . - _ , - _ , . , - . _ - , - - . , ~ .
4 Determinations by the presiding officer on the standing of persons seeking to intervene is parties to the proceedirg will be governed by existing agency precedents regarding 10 CFR Q 2.714(d). See Rockwell-International Corp. (Energy Systems Group Special Nuclear Materials License No. SNM-21), ASLPB No. 83-488-01 ML, at 4-5 (Admin. Judge Oct.
7,1983). If the presiding officer. finds that the hearing petitions or any intervention petition should be denied _i_n, n toto on the basis of lack of standing or any other reason, such determination, which must be in writing, will become final agency action within thirty days unless the Commission, on its own, undertakes a review of that decision. No petition for review will be entertained by the Commission regarding the presiding officer's decision on such matters.
In carrying out his responsibility under this delegation, the presiding official also will have the authority to request and receive whatever written submissions and documents he deems necessary from any party en any schedule he deems proper. Such requests can include requirements that petitioners or intervening parties provide additional
'4 information relative to their standing to participate or further particularize the aspects of the subject matter of the proceeding they wish to litigate or that the parties answer specific questions, with supporting materials, that the presiding officer poses to them. In addition, at such time as niy be specified by the presiding officer, persons who do not desire to become parties or cannot fulfill the requirements for party status can file a statement indicating they wish to make a limited appearance regarding any issue in the proceedirg. The presiding officer will have the authority to fix such limitations and l
5 conditions as appropriate on the participation of those making limited appearances and they are not otherwise to participite in the proceeding.
In his discretion the presiding office also can entertain oral presentations from the parties or those making a Ifmited appearance.
Any oral comunications between the presiding officer and any party or any person making a limited appearance concerning any matter at issue in the proceeding will be conducted in the presence of the parties or memorialized in a written memorandum that is served on all parties and made a part of the docket file on the proceeding.
If, on the basis of the parties' presentations and other information that the adjudicator is entitled to rely upon as discussed below, the presiding officer believes that additional procedures are necessary to ensure the full development of the agency record or to resolve any material factuil issues that could not be resolved through the procedures set forth in this order, he should seek authority from the Commission to implement any additional procedures.
The presiding officer's decision, which is to be in writing, should be made on the basis of the written submissions of the parties, any oral presentations by the parties, and other technical or f actual information that is publicly available in the docket file. The presiding officer's decision will become final agency action thirty days after the dite of issuance unless the Comission, on its own motion, undertakes a review
7 6
of the decision. No petition for review will be entertained by the Comission regarding the presiding officer's decision.
It is so ORDERED.
,. m
,cf# "CD(, ,,
For the Comission
,,N
% . , ./ ,.
L L SAMUEL J.THILK Secretary of thelComission w , . , , . -../
Dated at Washington, D.C.
~ $
this % ' day of February,1986.