Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J3341999-10-19019 October 1999 Forwards Request for Addl Info Re Sale of Portion of Land Part of Oyster Creek Nuclear Generating Station Site Including Portion of Exclusion Area ML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20212J6721999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Oyster Creek Nuclear Generating Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20217B2531999-09-24024 September 1999 Informs That on 980903,Region I Field Ofc of NRC Ofc of Investigations Initiated Investigation to Determine Whether Crane Operator Qualification/Training Records Had Been Falsified at Oyster Creek Nuclear Generating Station ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A7921999-09-13013 September 1999 Forwards Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Issued on 950817 to Plant ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J9831999-09-0202 September 1999 Discusses 990804 Telcon Re Sale of Portion of Oyster Creek Nuclear Generating Station Land.Requests Info Re Location of All Areas within Property to Be Released Where Licensed Radioactive Matl Present & Disposition of Radioactive Matl ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211C0161999-08-19019 August 1999 Advises That Info Submitted by Ltr,Dtd 990618, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool, Holtec Rept HI-981983,rev 4,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20210U4341999-08-17017 August 1999 Responds to to Chairman Dicus of NRC on Behalf of Fm Massari Concern About Oyster Creek Nuclear Generating Station Not Yet Being Fully Y2K Compliant ML20210Q7331999-08-12012 August 1999 Responds to Re TS Change Request (TSCR)264 from Oyster Creek Nuclear Generating Station.Questions Re Proposed Sale of Property within Site Boundary & Exclusion Area ML20210L6311999-08-0606 August 1999 Discusses Licensee Response to GL 92-01,Rev1,Suppl 1, Rv Structural Integrity, for Plant.Staff Has Revised Info in Rv Integrity Database & Releasing as Rvid Version 2 ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20195G6541999-06-0707 June 1999 Discusses 981204 Initiation to Investigate Whether Contract Valve Technician,Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20195G6631999-06-0707 June 1999 Discusses 981204 Intiation to Investigate Whether Contract Valve Technician Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20209B0561999-06-0404 June 1999 Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195C5511999-05-25025 May 1999 Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal ML20206N7711999-05-11011 May 1999 Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 ML20206H9441999-04-28028 April 1999 Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 ML20206B6991999-04-26026 April 1999 Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis ML20206D3801999-04-26026 April 1999 Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) ML20206A9931999-04-22022 April 1999 Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 ML20205P8411999-04-15015 April 1999 Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl ML20205P5381999-04-14014 April 1999 Ack Receipt of Re Request for Exception to App J. Intended Correction Would Need to Be Submitted as Change to TS as Exceptions to RG 1.163 Must Be Listed in Ts,Per 10CFR50,App J ML20205P9401999-04-12012 April 1999 Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record ML20205P0651999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Results of PPR Used by NRC Mgt to Facilitate Planning & Allocation of Insp Resources 05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page1999-04-0505 April 1999 Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page ML20205J3281999-04-0101 April 1999 Discusses Arrangements Made on 990323 for NRC to Inspect Licensed Operator Requalification Program at Oyster Creek Nuclear Generating Station During Week of 990524 ML20205H1081999-03-31031 March 1999 Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC ML20205F0611999-03-25025 March 1999 Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20205E1171999-03-24024 March 1999 Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld ML20207F0331999-03-0404 March 1999 Forwards Insp Rept 50-219/98-12 During Periods 981214-18, 990106-07 & 20-22.Areas Examined During Insp Included Implementation of GL 89-10 & GL 96-05.No Violations Noted ML20207K2471999-02-25025 February 1999 Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195C5511999-05-25025 May 1999 Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal ML20206N7711999-05-11011 May 1999 Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 ML20206H9441999-04-28028 April 1999 Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 ML20206B6991999-04-26026 April 1999 Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis ML20206D3801999-04-26026 April 1999 Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 ML20206A9931999-04-22022 April 1999 Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation ML20205P8411999-04-15015 April 1999 Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl ML20205P9401999-04-12012 April 1999 Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record 05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page1999-04-0505 April 1999 Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page ML20205H1081999-03-31031 March 1999 Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC ML20205F0611999-03-25025 March 1999 Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20205E1171999-03-24024 March 1999 Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld ML20207K2471999-02-25025 February 1999 Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny ML20206S2541999-01-20020 January 1999 Confirms Resolution of Thermo-Lag Fire Barriers in Fire Zones OB-FZ-6A & OB-FZ-6B (480 Switchgear Rooms) IAW Previous Commitments Contained in Gpuns Ltrs to NRC & 971001 ML20199J2631999-01-18018 January 1999 Requests That Listed Changes Be Made to Correspondence Distribution List for Oyster Creek Generating Station ML20199D0271999-01-11011 January 1999 Requests Listed Addl Info in Order to Effectively Review TS Change Request 264 Re Ownership of Property within Exclusion Area ML20199A6521999-01-0707 January 1999 Notifies That Reactor Operators G Scienski,License SOP-11319 & D Mcmillan,License SOP-3919-4 Have Terminated Licenses at Oyster Creek Nuclear Generating Station, Effective 990101 ML20198T1061999-01-0606 January 1999 Forwards Rev 15 to Gpu Nuclear Corporate Emergency Plan for TMI & Oyster Creek Nuclear Station. with Summary of Changes Which Reflect Use of EALs Approved in NRC Ltr to Gpun on 980908 & Other Changes Not Related to Use of New EALs ML20198K0331998-12-23023 December 1998 Forwards Change Request 268 for Amend to License DPR-16. Amend Would Change TS to Specify Surveillance Frequency of Once Per Three Months ML20198H0181998-12-22022 December 1998 Forwards Attachment Addressing New Info & Modifying 980505 Submittal Re Request for Change to Licensing Bases for ECCS Overpressure,In Response to NRC Bulletin 96-03, Potential Plugging of ECCS by Debris in Bwrs ML20198H8521998-12-16016 December 1998 Dockets Completion of Physical Inventory Performed in July 1997,as Addl Info to Nuclear Matl Balance Rept Submitted on 980416 ML20196H4461998-12-0202 December 1998 Provides Final Response to NRC GL 96-01, Testing of Safety-Related Logic Circuits ML20196B4471998-11-23023 November 1998 Provides Required Response 2 to NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers in Bwrs. During Recently Completed 17R Refueling Outage,New Strainers Were Installed ML20195J8451998-11-12012 November 1998 Forwards Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan, as Change Previously Made Without Appropriate Notification to NRC ML20195C7201998-11-11011 November 1998 Forwards 120-day Required Response to GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment, ML20195E1221998-11-10010 November 1998 Notifies NRC of First Time Usage of Code Case N-504 & Inclusion Into OCNGS ISI Program,As Accepted by RG 1.147, Inservice Insp Code Case Acceptability ML20155J6851998-11-0505 November 1998 Forwards TS Change Request 266,to Modify Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & Verify Channel Operability ML20155H5641998-11-0202 November 1998 Informs That Bne Has No Comments on Proposed Change 259 to Ts,Correcting Required Water Level in Condensate Storage Tank So That Design Basis Is Correctly Implemented ML20155G3741998-10-29029 October 1998 Forwards Response to NRC 980619 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-30
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L2551990-09-14014 September 1990 Advises of Preparation for Final Refueling Outage to Complete Second 10-yr Interval for Inservice Insps ML20059F5121990-09-0505 September 1990 Requests Exemption from Filing Requirement of 10CFR55.45(b)(2)(iii) to Allow Submittal of NRC Form 474, Simulator Facility Certification, After 910326 Deadline & to Allow Administering of Simulator Portion of Test ML20059F7441990-08-31031 August 1990 Forwards Util Review of NRC Backfit Analysis for Hardened Wetwell Vent.Nrc Analysis Does Not Support Conclusion That Hardening Existing Vent Is cost-beneficial Mod for Plant ML20059E9061990-08-30030 August 1990 Forwards Response to 900808 Request for Addl Info Re NRC Bulletin 90-002, Loss of Thermal Margin Caused by Fuel Channel Box Bow ML20059G1841990-08-29029 August 1990 Ack NRC Request to Perform Type C Testing During Unscheduled Outage,As Plant Conditions Will Allow.Type C Exemptions Should Remain in Effect Until New Outage Start Date ML20059C8231990-08-27027 August 1990 Advises That SPDS Enhancements Described in Completed,Per 900628 Request.Offline & Online Testing Completed & Enhancements Considered to Be Operational ML20059C8571990-08-24024 August 1990 Provides Results of Evaluation of Ability to Meet Acceptance Criteria for Eccs,In Response to 900804 Notice of Violation. Plant Meets Acceptance Criteria Contained in 10CFR50.46 W/ Valve Logic Design Deficiency in Containment Spray Sys ML20058N0781990-08-0909 August 1990 Submits Info Re pressure-temp Operating Limits for Facility, Per Generic Ltr 88-11.Util Recalculated Adjusted Ref Temp for Each Belt Line Matl as Result of New Displacement Per Atom Values ML20063P9521990-08-0909 August 1990 Advises That Response to NRC 900523 Request for Assessment of Hazardous Matl Shipment Will Be Sent by 910531 ML20058L9521990-08-0303 August 1990 Forwards Rev 2 to Security Contingency Plan.Rev Withheld (Ref 10CFR73.21) ML20058L9551990-08-0303 August 1990 Responds to SALP Rept 50-219/88-99.Although Minor,Several Factual Errors Noted.Dialogue Promotes & Identifies Areas Where Improvements Should Be Made ML20056A2071990-07-30030 July 1990 Forwards Response to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Record Review Performed & Sys Walkdowns Completed to Assemble Requisite List ML20055H7961990-07-20020 July 1990 Advises of Change to Preventive Maint Program for Electromatic Relief Valves.Rebuild Schedule Will Be Modified to Require Rebuilding Two or Three Valves During Refueling Outage & Remaining Valves During Next Refueling Outage ML20058N9911990-07-20020 July 1990 Partially Withheld Response to NRC Bulletin 90-002 Re Loss of Thermal Margin Caused by Box Bow (Ref 10CFR2.790(b)(1)) ML20055J0481990-07-19019 July 1990 Requests 2-wk Extension for Submittal of Response to Re Installation of Hardened Wetwell Vent W/ Appropriate Extension Period to Be Decided Pending Outcome of 900724 Meeting Discussion W/Bwr Owners Group ML20064A1221990-07-11011 July 1990 Discusses 900710 Telcon W/Nrc Re Util Corrective Actions in Response to NRC Finding That Operator Received Passing Grade on Administered Requalification Exam in 1989 Should Have Received Failing Grade.Corrective Actions Listed ML20055F8491990-07-10010 July 1990 Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 188,reducing Low Condenser Vacuum Scram Setpoint ML20043H7471990-06-21021 June 1990 Confirms Telcon W/A Dromerick Re Util Plans to Inspect CRD Hydraulic Control Units During Plant Walkdown to Address USI A-46, Seismic Qualification of Equipment in Operating Nuclear Power Plants. Walkdown Planned in Oct 1992 ML20043H2301990-06-14014 June 1990 Documents Licensee Commitment to Improve Seismic Restraints for Diesel Generator Switchgear Encls,Per 900613 Telcon W/ Nrc.Engineering Will Be Finalized & Mods Completed Prior to 900622 ML20043F7581990-06-0707 June 1990 Responds to Request for Info Re Util Compliance W/Generic Ltr 88-01 & Insp Plans for Upcoming 13R Outage.Frequency of Insp of Welds Classified as IGSCC Categories C,D & E Will Not Be Reduced During 13R Outage ML20043C5801990-05-25025 May 1990 Provides Descriptions & Conclusions of Three Remaining Issues of SEP Topic III-7B.Issues Include,Evaluation of Drywell Concrete Subj to High Temp & Thermal Transients ML20043C2461990-05-25025 May 1990 Forwards Rev 7 to EPIP 9473-IMP-1300.06 & Rev 4 to Radiological Controls Policy & Procedure Manual 9300-ADM-4010.03, Emergency Dose Calculation Manual. ML20043B2981990-05-21021 May 1990 Responds to NRC 900420 Ltr Re Violations Noted in Insp Rept 50-219/90-06.Corrective Actions:Incident Critique Rept Incorporated as Required Reading for Appropriate Operations Personnel & Change Made to Procedure 201.1 ML20043D0701990-05-17017 May 1990 Provides NRC W/Addl Info Re SPDS & Responds to Concerns Raised During 900117 & 18 SPDS Audit Documented in 900130 Ltr ML20043B3901990-05-0909 May 1990 Responds to NRC 900408 Ltr Re Violations Noted in Insp of License DPR-16.Corrective Actions:Two Narrow Range Drywell Pressure Monitoring Instruments to Be Provided During Cycle 14R Refueling Outage,Per Reg Guide 1.97,Category 1 ML20042G7071990-05-0808 May 1990 Forwards Summary of Initiatives & Accomplishments Re SALP, Per 891031 Commitment at mid-SALP Meeting.Plant Div Responsibilities Now Include Conduct of Maint Outages & Emergency Operating Procedure Training Conducted ML20042G2291990-05-0707 May 1990 Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 180,revising Tech Specs Re Fuel cycle-specific Parameters ML20042G2601990-05-0404 May 1990 Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 187,revising Tech Specs to Accommodate Implementation of 24-month Plant Refueling Cycle ML20042E9431990-04-20020 April 1990 Forwards Revised Epips,Consisting of Rev 7 to 9473-IMP-1300.01,Rev 4 to 9473-1300.11 & Rev 2 to 9473-ADM-1319.04.Deleted EPIPs Listed,Including Rev 3 to 9473-1300.19,Rev 2 to 9473-1300.21 & Rev 5 to 9473.1300.24 ML20042E6371990-04-16016 April 1990 Informs of Plans to Install Safety Grade Check Valve in Supply Line Inside Emergency Diesel Generator Fuel Tank Room Coincident W/Replacement or Repair of Emergency Diesel Generator Fuel Oil Tank ML20042E5001990-04-13013 April 1990 Forwards Rev 1 to Topical Rept 028, Oyster Creek Response to NRC Reg Guide 1.97. ML20012E8711990-03-28028 March 1990 Lists Property Insurance Coverage,Effective 900401,per 10CFR50.54(w)(2) ML20012D4391990-03-19019 March 1990 Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 186,allowing Idle Recirculation Loop to Be Isolated During Power Operation by Closing Suction,Discharge & Bypass Valves ML20012B6781990-03-0202 March 1990 Requests Exemption of Specified Local Leak Rate Test Intervals to Include Next Plant Refueling Outage Scheduled for Jan 1991,per 10CFR50,App J ML20012A1501990-02-23023 February 1990 Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 184,removing 3.25 Limit on Extending Surveillance Intervals,Per Generic Ltr 89-14 ML20011F2571990-02-21021 February 1990 Advises That 891003 Request for Appropriate Tech Specs for Chlorine Detection Re Control Room Habitability,Not Warranted ML20006G0101990-02-21021 February 1990 Discusses 900110 Meeting W/Nrr Re 13R Insp Criteria for RWCU Welds Outboard of Second Containment Isolation Valve. All Welds Required 100% Radiography Based on Review of Piping Spec.Response to Generic Ltr 88-01 Will Be Revised ML20006F5931990-02-20020 February 1990 Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 177.Amend Changes Tech Spec 4.7.B to Include Battery Svc Test Every Refueling Outage & Mod of Frequency of Existing Battery Performance Test ML20011F6641990-02-20020 February 1990 Responds to NRC 900122 Notice of Violation & Forwards Payment of Civil Penalty in Amount of $25,000.Corrective Actions:Change Made to Sys Component Lineup Sheets in 125- Volt Dc Operating Procedure to Include Selector Switches ML20006F9181990-02-15015 February 1990 Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 183,permitting No Limitation on Number of Inoperable Position Indicators for 16 ASME Code Safety Valves During Power Operation ML20006D2551990-01-30030 January 1990 Forwards Response to Generic Ltr 89-13 Re Plant Svc Water Sys.Insp Program for Intake Structure at Plant Implemented During Past Two Refueling Outages & Emergency Svc Water Currently Chlorinated to Prevent Biofouling ML19354E8571990-01-24024 January 1990 Forwards Omitted Pages of 900116 Ltr Re State of Nj DEP Comments on Draft full-term OL SER & Clarification of Page 10,fourth Paragraph on New Seismic Floor Response Spectra ML20006B2171990-01-23023 January 1990 Responds to Unresolved Items & Weaknesses Identified in Insp Rept 50-219/89-80.Corrective Actions:Procedure Re Containment Spray sys-diagnostic & Restoration Actions Revised to Stand Alone Re Installation of Jumpers ML19354E3891990-01-19019 January 1990 Responds to Violations Noted in Insp Rept 50-219/89-27. Corrective Actions:Procedure 108 Revised to Allow Temporarily Lifting of Temporary Variation ML19354E8441990-01-19019 January 1990 Forwards Revised Tech Spec Table 4.13-1, Accident Monitoring Instrumentation Surveillance Requirements, in Support of Licensee 890630 Tech Spec Change Request 179,per NRC Project Manager Request ML20006B2881990-01-18018 January 1990 Forwards Results from Feedwater Nozzle Exam,In Accordance w/NUREG-0619 Insp Format ML20005G8161990-01-16016 January 1990 Provides Assessment of State of Nj Concerns Re full-term OL Plant,Per NRC 891222 Request.Comments Did Not Raise Any Concerns That Refute Conclusions Reached by NRC That Facility Will Continue to Operate W/O Endangering Safety ML19354D8281990-01-15015 January 1990 Responds to Violation Noted in Insp Rept 50-219/89-21. Corrective Action:Procedure A000-WMS-1220.08, Mcf Job Order Revised to Provide Detailed Guidance for Performance of Immediate Maint ML20042D4891989-12-28028 December 1989 Forwards Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance, Fulfilling 6-month Reporting Requirement ML20005E1401989-12-22022 December 1989 Forwards Integrated Schedule Semiannual Update for Dec 1989 1990-09-05
[Table view] |
Text
_. . .-_.-- _ -. . - .
! E'! CLOS'JRE 2 i
, l GPU Nuclear Corporation
'..h j U Mf 100 intercace Parkway Patsccany New Jersey 07c54114 (201)263 6500
- TEl.EX 136 482 Writer s Direct Dral Numter.
{
, September 3,1985 (201) 263-6797 f 0980k
(
. i
{
i i
! l Nunzio J. Palladino, Chairman. !
United States Nuclear Regulatory Commission I
- 1717 H Street, NW ,
k'ashington, DC 20555
Dear Chaiman Palladino:
l I am aware from press inquiries and reports that Congressman Markey has- 'l 4 inquired of you regarding certain materials used during a training course '
presented at Oyster Creek in the Fall of 1983.
Our review of the matter has developed the following information:
l o The course was developed and presented by a contractor rather than by '
I
- GPU Nuclear. j i o ' The title of the course was " Containment System Leakage Testing". The [
! material apparently referred to by Mr. Markey was incidental to the !
! course purpose and not part of what 6PU Nuclear expected to be ;
l covered. The material was not reviewed by GPU Nuclear prier to !
- presentation. The entire section of the course material on this ,
aspect is enclosed (Enclosure 1). i
! t 3
o The contractor advises that the material was revised in 1983 af ter [
- presentation at Oyster Creek based, in part, on the critical coments ;
from GPU Nuclear attendees, i 1 :
, o The course was given once at Oyster Creek. It was never given at - !
TMI. Seventeen people attended. This did not include anyone assigned l
. to TMI. However, one person in our Technical Functions Division who i l supports TM1 as,well as Oyster Creek did attena.
l o The material is contrary to well established GPU Nuclear policy. The
- GPU Nuclear policy on, " Employee Contact with Regulatory Agencies" .;
- concludes
- l 1
i
}
m "f g E E8'PDR CORRESI r
j GPu uuciear Corocrationis a sutsiciary of GeneraiPuthe Utut.es Corcerat.on "
l
-, l
I i 2-
.i "Again, the interests of the Company, its employees, and i the public are best served by an open and cooperative attitude and honesty in our interactions with the
! governmental agencies responsible for regulating our various activities. We expect your active support in .
fulfilling these aspects of our public and corporate '
responsibilities."
o During General Employee Training, GPU Nuclear employees and 1 contractors working at our plants are given instruction that company policy is to be fully open and candid with the NRC and otherf j regulators. This instruction is repeated each year, o in addition, this policy is covered in other widely disseminated
, documents including:
o Corporate Objectives which state, " Continue to provide full and accurate information in a timely manner on GPUN activities and operations to the various publics of GPU; i.e., NRC, public .
officials, the media, the general public, employees, shareholders, and governmental agencies, so as to continue to deserve their trust".
o Letters to employees from corporate management, such as Enclosure 2.
- We are also taking the following action
o Contacting each of the course attendees presently employed by GPU Nuclear to reinforce their understanding of our policy on this matter.
l o Reviewing other course material provided by the contractor to '
determine whether any similar problems exist. We will take any q needed action.
4
- . o Asking the contractor to provide formally his assessment of this l situation and steps he has taken to prevent future similar situations.
o Reviewing internal controls over contractor provided training and training material, t
i Much of this information was provided on August 31, 1905 to media representatives but, regretfully, was largely not reflected in published accounts the next day.
, _ _ - . _ _ _ _ _ _ . . _ - _ , . _ - . . _ . _ _ _ _ . _ _ _ . _ _ _ , . _ , , _ . . _ , _ _ _ . _ . ~ _ _ _
9 3-I wili be glad to furnish additional infonnation on this matter.
Sincerely, f b. .
P. R. Clark President ,
pfk J
Enclosures .
cc: Thomas M. Roberts, Commissioner James X. Asselstine, Commissioner Frederick M. Bernthal, Commissioner Lando W. Zech, Jr., Commissioner
, 0 4
- Enclosure 1 I
t i i
, ~ m u n a- -. _ - - m os_-- ---m _--
x- _. m , mw. , yu ,m_ , , _
Y i
T i
. f L
i I
i
- f I
t I
i LECTURE //3 i ,
INTERACTIONS WITH THE NRC l i
i l
1 -
\ i I
t i.
l I i
i l
I i
I l
l o
\
I l
1 l
4 1
3-0 J
. - _ _ _ - _ __ _ _ _ . _ _ - _ .=-.-- _ __ . _ . - . = _ _ _ , -
_ . _ . ,m INTERACTIONS WITH THE NRC KEY PHASES 9 CONSTRUCTION PERMIT - PSAR COMMITMENTS ,
e OPER ATING LICENSE FSAR COMMITMENTS & TECH SPECS i l
e PREOPERATIONAL TEST - LOTS OF ATTENTION
. I e COMMERCI AL OPERATIONS -UPDATES AND PERIODIC TESTS e OPERATING LICENSE RENEWALS -UPDATES AND PLANT MODIFICATIONS
- SUBMITTALS AND UPDATES I
i e SARs (PS AR, FS AR)- CONT AINMENT AND SYSTEMS
- e TECHNIC AL SPECIFICATIONS - 9JBMIT AT LEAST 6 MONTHS-PRIOR TO USE (10CFR50.55c(g)(5)(ii))
i e EXEMPTIONS TO 10CFR50 APPENDIX J e RELIEF REOJESTS FOR ASME SECTION XI VALVE TESTING 4
PREOP AND PERIODIC ILRT SJMMARY REPORTS (INCLUDES LLRT TESTING SJMMARY SINCE LAST ILRT) e SECONDARY CONTAINMENT TESTING REPORT (PER TECH SPECS) e LIAISON EVENT REPORTS (REPORT ABLE OCCURRENCES) t e ASME SECTION XI REPAIR / REPLACEMENTS, AS APPLICABLE (NIS-2 FORM AVAILABLE PER W82A & LATER) 4 u . _ - - - _ . . _ - - . . . .. - - .. . - .... .... a 3-I
I
,=,-_-- -- -.=,-,..., ,.. .._--, ~ -- n a
=a=,u__,..- . _ , . f INTERACTIONS WITH THE NRC l i
i INSPECTION AND ENFORCEMENT AUDITS !
i e PROGRAM COMMITMENTS (FSAR & TECH f'ECS) , j i
e RECORDS OF REOJIRED TESTS /lNSPECTIONS !
i e PROCEDURES / ;
l i
e REPAIR AND REPLACEMENT ACTIONS l 9 lNSTRUMENTATION/C ALIBRATION PROGRAM i
'*e i
ANTICIPATING NRC ACTION / RESPONSES j
I e LOCAL / REGIONAL (SJRVEILLANCE AND ENFORCEMENT) [
PERSONAL INTERESTS AND KNOWLEDGE AFFECT AREAS SCRUTINIZED I AND EMPHASIS I INSPECTOR'S PREJJDICE WILL VARY ON , ,
INTERPRETATION / APPLICATION OF REOJIREMENTS
, NRC POSITION C AN BE "OJESSED" BASED ON EXPERIENCE !
i
. l
. EXPERIENCE AT OTHER PLANTS I l
! . PREVIOJS INSPECTIONS l l
j -
REGIONAL PREFERENCES MUST BE CONSIDERED f
i I e CENTR AL OFFICE - PREPARES / REVISES REOJL ATIONS, REG. OJIDES; IS9JES I POSITIONS
! 3-2 I
., _ m _ ~ m - - _ .
. - - ._ y--
m=m _1 - m,m . .
s= ~ m m. o_ ,
l F
INTERACTIONS WITH THE NRC 1 -
i DAY TO DAY COMMUNICATIONS (INDJSTRY EXPERIE 1
e SHOJLD THE UTILITY INFORM THE NRC O CHANCES'! THIS ($ DEBATABLE.
ALERTING NRC OPENS UP UTILITY FOR C THOJ GHTS.
SPRINGING CHANCES ON NRC HAS BENEFIT O .
NOTE:
IT SEEMS BETTER TO KEEP NRC INFOR TO COMMUNICATE WITH THE INSPECTOR.
COMMUNICATIONS.
BENEFITS:
[ UTILITY C AN LEARN OF NRC FOSITION A
- REVIEW IS PERFORMED, UTILITY CAN DEFEND ACTIC ,
f "THE NRC HAD SJFFICIENT TIME TO COMME ... THIS
- WAS ASSUMED TO CONSITUTE TACIT APPROVAL " .
m L _ _
39
, .,_,~r.-- _ _ . = - - - - - - . - - - - - - - - - + - - - - - - - - _ ~ - - - . ~ .
INTERACTIONS WITH THE NRC DAY-TO-DAY COMMUNIC AT'ONS (CONTD)
O INFORMING THE LOCAL INSPECTOR IT'S IMPORTANT TO KEEP LOC AL INSPECTOR INFORMED OF CURRENT DEVELOPMENTS -
ENCOJRAGE INSPECTOR TO WITNESS A TYPE C TEST, BJT . . . DON'T BE FOOLISH:
NOTE: PERFORM DEMO ON AN " EASY" VALVE WHICH HAS TRADITIONALLY NOT BEEN A " PROBLEM LEAKER" 9 NRC-WILL WANT TO CONCENTRATE ON EAST PROBLEM AREAS AND PET PEEVES PLANT STAFF SHOJLD REVIEW ALL NRC COMMENTS / PROB' EMS WITH PAST ILRTs AND ENSJRE PROPER RESOLUTION EXAMPLE: VALVE LINEUP (BEFORE AND AFTER TESTISG; CHECK PLANT HISTORY) e 3-4
w .= , - ... _ -- ~ -. - - ..--w n m a w w ,== -
i INTER ACTIONS WITH THE NRC DAY 10 - DAv COMMUNICATIONS (CONTD) 9 TRADITIONAL INDUSTRY APPROACH TO ILRT TESTING PROBLEMS HAS BEEN PREDICATED ON NOT STATING TO NRC: -
1 WHEN THE TEST BEGAN (THJS ALLOWING FOR REPA!RS AFTER PRES 9)RIZATION COMMENCED)
THE " TYPE A" TEST FAILED (SINCE SOME SMOOTH TALKERS HAVE MANAGED TO GET OJT OF FAILURES) . .
WE'LL DO IT OVER (SINCE IT HAS BEEN POSSIBLE TO OBTAIN NRC AGREEMENT WITH SJCH STATEMENTS AS,"YOJ SAW THE TEST BEFORE AND DIDN'T COMMENT; WHY THIS TIME WHEN WE'VE DONE IT EVEN BETTER?")
NOTE: DISCUSSION OF THE ABOVE EXPERIENCE SHOJLD IN fna WAY INDIC ATE ENDORSEMENT OF ANY OF THESE OBSERVED APPROACHES.
I I
1 l
3-S l
,=~..---=-x.w----,-------wc--=--
_= _ -
INTERACTIONS WITH THE NRC KEY CONSIDERATIONS IN PEPARING PROGR AM e REVIEW PL ANT DESIGN FOR INSPECTABILITY/ TESTABILITY
/
e DETERMINE AREAS OF NONCOMPLIANCE WITH REOJLATIONS, CODES, STANDARDS, ETC.
4 PREPARE EXEMPTION REOJESTS FOR APPENDIX J PROGRAM (TYPE A, B & F TESTS) e- PREPARE RELIEF REOJESTS FOR ASME SECTION XI, C ATEGORY A VALVE TESTING
( e DISCUSS MAJOR PROGRA A CONCEPTS / CHANGES WITH NRC.EARLY IN DEVELOPMENT 4
PERFORM DEVELOPMENTAL AND IMPLEMENTATION TASKS AS EARLY AS POSSIBLE e
{
REDJCE EXCEPTIONS TO TESTING - COMPLETE PLANT MODIFIC ATIONS e
r I
L. W
.w _ _ _ _ __ _ _ _ -
i 3-6
, __ .--_ --_ - = = - - - - . ---=----=~v=-=w -
INTERACTIONS WITH THE NRC ;
i SOME NRC POSITIONS ,
A i
e ANSI 56.8 - 198i VS ANSI N45.4 -1972 $(l
/
l
- ANSI 56.8 IS NOT REOJIRED BY NRC FOR PLAN' 4; ' l-151t o..s
- DEPENDING ON YOJR REGION, NRC STAFF MA . _. .c COMPLI ANCE WITH PORTIONS OF ANSI 56.8 NOTE: NRC PLANS TO ACCEPT ANSI S6.8 BY REG. OJIDE !
4 BECHTEL TOPICAL REPORT BN-TOP-l' l
NRC DOES NOT LIKE SHORT DJR ATiON TESTING BJT . . . ,
l NRC HAS (AND IS EXPECTED TO) ACCEPT THE SHORTENED ILRT ON A CASE EASIS 6 ILRT - ILRT SEOJENCE CONSIDER ATION [
i NRC RECOGNIZES THAT ILRT FAILURE "HAS TEETH" t
PJBLIC WILL BE PROTECTED IF INTEGRATED LEAK ACE IS "lN SPEC" CONSIDERiNG ILRT BEFORE LLRT TO DETERMINE "AS FOJND" CONTAINMENT LEAKAGE CONDITION REVISION TO 10CFRSO APPENDlX J CONTINJES I 3-7
ee 9e-e e
s _ - Q"y'A rt_ .
pmu-13 w t_ nw s M 'M"2 K r ' "' ' J A '
%M YA- LM - ' 'M %u , -' n e e_ -Tw w g- g-_=Q m
C.
. .Ce% *e
.- ga , .g s-t Or =4 --
y*g 3:
r4 -
. s c.-s ==
=
1,3 .a c
Er - .
E33*
e .ao v e C
,.3 . .
Yg <. s
""* l..:s * *
.'- er
E es e- ** a g.
==
E ;
3-h =e [ $, [e { .= I. x- V-
YY o re '
g h'
$,r *<*
r l. ,' c.* -zK . Ep i s$ -
- t. - - 6 re g< : =:
<. e
! c.0 C
>g- >2 E*..r c
- < cr * <-
.. c:
E.
erc 'C e.
-e 5.- >- =w >- * "
~ c 1. e. -=. - c.
a cg >-
. ;* e"
. =w a' =
e' r**
- =
- t s.;Ir I I >c -e eg. 5 r ese r
i v e cf r e 5*- r*
3
{j((e.
ass I I I E C 2 t T :T"
. .c .a I _
-= si /
-* 1e E -
g vo .
5 *
,2 .
c E
s.:
s ey
=
h
EE E ',
I:*
w*<
E)
E=. K{:
< E.we <<* ry.
r- ge.
Z C
2,5
=
r .,>
.r br "I
.sc c.
2 ;
re
.c cu
.e.
c .
.a2.
rs==
>.6 53-=
M =
. 13
. . E, . 5 E
E g[I e $
s .ii.
.sd ,w l l T l 2 2Y c c
C : =g O er :
U
> El
= . i 8 K e C = . ,
6 -r i
< g:
, -s
==e c .I cc .1 c- .e c>> g-r E..
. .; r ! ,.
3 p
.U 3
.I'ii-r . e. ,. .E-SE- ,
[ lI '{* E r,s. d. .' '.
,- e, .. r e
w .d - - k
- E.: .,
>- > ,r g<
>=
I .: .
z z -
I l.a.'i < >
= < 0 c..
E E
s- at a s:c 5;;
5 :r C s a -
f 0
- ,5 -
I 9" u n .
l 3 U 5 i t.
z - -i.:l Ec, r,. --e w
.I
-n- e e e x s2 ,r Eer -
C-r E< - * -
.e
!" - I 8' c# h. >
ITr h-r h*: E:
r E!'E E v f' 2
.a s. . - s e r-
>r El r, y e
.:= I > E
> ,;- t t. r. .a.
7 -
1*3 E* E I- E,I E% ~ 51*
. .E i ,C - E:=
3 =
EE E c *.
l l ' I rkr 3 *- a c
5 Eit I
~ . ,..g >
r
= 20. 3, .E z c . *.u . c. ..*
c- .I w .n -- . ; .c. w c
r e.
. g c-3 [a
-s [v.
Er O
- e --= .s .e rg r. re a k- - ->. >r-
-8 e C ,.
C *- g ->3
.= 3 c:e I=
E
.e E3" ec E r c, a e 2e
=4 V
g I *
=l:
g - i i l gg l l
=-
.nt i o s e s GPU Nuclear
' U s e a v. ew e s y 07C54 201 263-6500 TELEX 136462 wnter s Deect Dial Numter December 8, 1983 (201) 253-5797 TO: /
GPU SYSTEM EMPLC F ASSIGNED TO NUCLEAR ACTIVITIES and the Office of the President of GPU Nuclear Corporation.Last w I know all of you share with me deep appreciation for '
Bob sinceArnold's the accidentunstinting efforts and leadership during the nearly five years at TMI-2. That period has seen the establishment and staffing of GPU Nuclear Corporation and placed us in a sound position to push forward to reach the ma3cr goals we have set.
steps taken The changes during the lastMr. Kuhns announced, when added to other ma yor four years, are intended to strengthen our ability to perform in a professional manner and to provide to the Nuclear Regulatory Commission a sound basis for authorizing the Restart of TMI 1 -
without awaiting
.Cemniss:en Staff. resolution of the "open issues" identified by the Act:on responsibil ty of the NRC. We on authorizing Restart of Unit 1 :s the Mcwever, as :
wil) begin my assignment as president of GPU Nuclear Corporatio I want to reerphasize the importance of meeting egr responsibilitfes .
GPU Nuclear Corporation must meeting all of our responsibilities. continue to be fully committed to ofour of ouremployees.
activities so as to protect the health and safety of the pub 1:e andP Under our license, and our agreement wit.) the owners of GP*T s nuclear plants GPU Nuclear Corporation and the Metropolitan Edison and Jersey sobering Central employees assigned to our nuclear sites have that very responsibility.
or herself to meeting that Each of us must fully accept and devote himself responsibility.
that we have chosen to engage in nuclear power generation with :ts inhIt comes d erent potential for serious consequences to public health and safety. Our Job :s to assure that risk is kept acceptably low.
o The ownersthey overriding importance andplace our Board of Directors on fulfilling have made clear the that responsibility.
Mission states:
Our
" Manage and direct the nuclear activities of the GPU System to provide the -required high level of protec-tion for.the health and safety of the public and the employees. ,
Consistent with the above, generate electricity from the CPU nuclear stations in a reliable and efficient manner in conformance with all applicable laws, regu- '
lations, licenses and other requirements and the /
directions and interests of the owners."
However. Many things are involved in carrying out this Mission.
I want to draw your attention today to three which are vital.
They have all been the subject of prior guidance but they deserve reemphasis.
' The first ones in keeping with the responsibility we bear.is that we must set our own sta
exceed the regulatory requirements. They must encompass and We must actively seek excellence.
both The second is the need to have ,fuJ,1 and open communications-- ']
withinconcerns, the company and between us and our regulators.
! problems, In particular, !
t openly. and uncertainties need to be identified and addressed [
believe is.not being adequately addressed.I stand ready to' discuss) with any
/
The third 'is rigorous and f aithful adher'ence to all of our
, requirements and standards as a minimum.
responsibilities. Cur success depends on everyone faithfully fulfilling their In accepting election to the position of president. GPU '
Nuclear do so. ICorporation.
ask eacn of Iyou have to committed do likewise.myself to the Board of Directors to have promised their full support.The members of the GPU and GPU Nuclear Boa joins me in pledging to you our very best efforts.Mr. Kintner, Executive Vi,ce President, Very truly yours, R . -
P. R. Clark President 1
. ._ , , , - - , . .,. , , ,----