Text
__
'C M f 1..Cg f
.U y,',.'
g OPU Nuclear Corporation mBA One Upper Pond Road :
1 M%F Parsippany, New Jersey 07054.
~
7 201 316-7000
~
TELEX 134482
~b Wnter's Direct Dial Number; y
. August 9, 1990-500-90-1963-C320-90-729 4
W
_U..S.~ Nuclear Regulatory Commission
-Attentions, Document Control Desk Mail 1 Station Pl-137o Washingto1, DC. 20555
- Oontlemen t '
Subjects - Oyster Creek Nuclear Generating Station Docket No. 50-219 Pressure-Temperature Operating Limits
.for Oyster Creek Reactor Vessel In response to Generic: Letter 68-ll,1"NRC position on Radiation Embrittlement "of Reactor Vessel Materials and its: Impact on Plant Operations", GPU. Nuclear.
submitted on' July 26, 1989 results of our analysis concerning-the
- pressure-temperatures (P-T) operating limits using the calculational methods
-identified:in Revision 2 of Regulatory Guide 1.99.
Subsequently, a GPUN consultant discovered that the displacement per atom'-(dpa) values _used:in the. anal sis were possibly incorrect. The error was later i
. confirmed by the' supplier of the dpa values,.Battelle-Columbus Laboratory.
(BCL).1 BCL traced the error to-the treatment of the flux' ratios used in the
- dpa calculations..-They also emphasized that the neutron flux calculations,-
including the: basic material properties and dpa cross section used,'and the-results concerning the1 fast: flux andidosimetry,are all correct' and are not-7,
'affected'by thedpa error.
..As a result of the-new dpa values GPUN recalculatad an Adjusted Reference s
1 Temperature-(ART) for each belt-line material of the Oyster Creek reactor vessel using' Regulatory Guide 1.99 Rev. 2 guidelines. The results of the calculation indicated'a 16'F increase in ART over that reported on y
July.26,.1989.
Therefore, the new ART is estimated to be 145'F at 15 effective
~ full' power years'(EFPY). -It is projected that 15 EFPY will be reached during Lthe third quarter in 1994 (approximately in the middle of Cycle 14).
F 9008130201 900809 PDR ADOCK 05000219 p
P PDC
- 3
)g 0 0 012. 0GPU Nuclear Corporation is a subsidiary of General Public Utilities CorporatL.n
, 4- @, _,
r l
,, PRESSURE-TEMPERATURE OPERATING.LIMIST
^
'FOR' OYSTER' CREEK REACTOR VESSEL--
C C320-90-729
As_it wasl reported in our July 26, 1989 letter, another set of P-T operating curves;for the Oyster. Creek reactor vessel will be implemented by the end of:
13R'(May, 1991). This plan complies with the schedule set forth in Generic Letter 88-11 which required licensees to update and fully implement new P-T curves within two (2) plant outages (approximately 3. years) after.the effective
,date (May, 1988).of Revision 2 to Regulatory Guide 1.99, " Radiation Embrittlement of Reactor Vessel Materials."
Very truly yours, j
\\
J. C. DeVine, Jr.
l Vice President & Director l
Technical Functions i
JCD/YN/crb cc: Administrator" l
Region I U.
S. Nuclear Regulatory Commission j
475 Allendal=. Road 1
King of Prussia, PA 19406 NRC Resident Inspector oyster Creek Nuclear Generating Station-
. Forked River, NJ 08731 i-L:
Mr. Alex Dromerick,.Jr.
'q
- U. S. Nuclear Regulatory Commission Mail Station P1-137-Washington, DC. 20555 t
l-L f,<
o 1
iw l-i
,f C320727) y, i ~