Requests Exemption of Specified Local Leak Rate Test Intervals to Include Next Plant Refueling Outage Scheduled for Jan 1991,per 10CFR50,App J
ML20012B678
Person / Time
Site: Oyster Creek
Issue date: 03/02/1990
From: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003160098
Download: ML20012B678 (6)


Text

1 r :

3; D8 Ki-

)

)

i x

OPU Nuclear Corporation -

Ng r.

Post Ofhce Box 388 Route 9 South Forked River, New Jersey 08731-0388 :

n" 609 971-4DMK Writer's Direct Dial Nurnber:

March 2,1990 U.S.' Nuclear Regulatory Commission

' Document-Control Desk Washington, DC 20555 0

Dear Sirs subjects oyster Creek Nucisar Generating Station Docket No. 50-219 10CFR50 Appendix J, Type B and C Testing Test Interval Exemption Request l

This letter is being' written in accordance with 10 CFR 50.12(a)(2)(ii) to request an-exemption of the specified Local Leak Rate Test intervals to include the next oyster Creek Nuclear Generating Station refueling outage.

10CFR50 Appendix J, Sections III.D.2 and III.D.3 require periodic Type B L

(penetration) Land Type C (valve) testing, respectively. Both criteria require

~

j.

testing during reactor shutdowns:for refueling but in no case at intervals greater than-two years. Attachments I.and II list.the penetrations'and valves presently within.the scope of.the oyster. Creek Nuclear Generating Station Local Leak Rate Test (LLRT). Program and. the date of the most recent successful completion of each LLRT.

'The'next, refueling. outage-(13R) is presently. scheduled for January 1991. Meeting the two-year inspection interval for LLRT implementation would necessitate a' reactor shutdown prior to the:13R refueling outage schedule date. This would result in an

~1 additional thermal cycle for the plant, as well'as the potential environmental-~

.]

' impacts of-a winter shutdown in order to meet this criteria.

)

'Similar Technical Specification surveillances, performed on similar p'lant components such as valves, are allowed by the Technical Specifications to extend up to 1.25 times the prescribed interval. This is allowed to minimize the impact.of testing on safe. plant operations.

Although the Type B and C tests as described in.10CFR50 i

C Appendix J do not specify an acceptable extension interval, utilizing the same.

f:

logical: processes would result in an allowable extension of the LLRT performance by 6 months. The extension request to 10CFR50 requirements contained in this letter is

,significantly shorter than the calculated'6-month extension which would be allowed if this testing were performed to meet Technical Specification requirements.

l 9003160098 900302 O PDR ADOCK 05000219)

P ppnj y yl 0

j t

GPU Nuclear Corporation is a subsidiary of the General Public Utikties Corporation

1 Additionally, by allowing the extension of the interval to include the 13R outage, planning and resources can be maximized to more efficiently and effectively complete the maintenance previously docketed in the oyster Creek Integrated Schedule.

+

Therefore, pursuant to 10 CFR.50.12(a)(2)(ii) it is requested that the next performance of the Oyster Creek LLRT program be er. tended to the 13R refueling outage.

If any further information is required, please contact Mr. John Rogers at (609) 971-4893.

t t

very truly yours, Fitzpatrick c President & Director er Creek EEF/JR/dmd JR-LTRS/22 Attachments cc Mr. William-T. Russell, Administrator Region'I U.S. Nuclear Regulatory Commission 475 Allendale Road t

King of Prussia, PA 19406 Mr. Alexander W. Dromerick i

U.S. Nuclear Regulatory Commission Washington, DC 20555 t

NRC Resident Inspector Oyster Creek Nuclear Generating Station l

r

'y j

5:

3-4

. ATTACHMENT'I

-==============

Ponetration'No.

Dato'Last Tested BS 01 10/14/88 s

- BS 02-10/14/88 BS 03 10/14/88 BS 04 10/14/88 BS 05 10/14/88 BS 06 '

10/14/88 BS 07 10/14/88

.BS 08 10/14/88 DA 01 04/16/89.

[

DC 01 02/28/89 DD 01 10/17/88-DE 01 02/04/89 DH 01 02/28/89 EL 01 02/26/89 o

EL 02 02/26/89 EL 03 02/26/89 EL 04 02/26/89 EL 05-02/26/89 EL'06 02/26/89 EL'07 02/26/89.

EL 08 02/26/89 EL 09 02/26/89 EL 10 02/26/89 EL.11 02/26/89 EL 12 02/26/89 I

EL'13 02/26/89 l

EL 14 02/26/89 EL 15 02/26/89L EL 16 02/26/89 K

EL 17 02/26/89' i

EL 18 02/26/89 f

EL 19 02/26/89 EL 20 02/26/89 2

EL 21 02/26/89

-l EL 22 02/26/89 i

L EL 23 02/26/89 l

L EL 24 02/26/89 EL 25 02/26/89 l

EL 26 02/26/89 EL 27' 02/26/89 l,

EL 28 02/26/89 EL 29 02/26/89 L

EL 30 02/26/89 l

EL 31 02/26/89 n

EL 32 02/26/89 l

EL 33 02/26/89 L

I

. -.+,

v.

e{,.

- o

-i ;

' Penetration No.

Date Last-Tested EL 34 02/26/89.

EL 35 02/26/89

-EL 36 02/26/89 EL 37 02/26/89 EL 38 02/26/89 EL 39 02/26/89 EL 40 02/26/89 MD 01 03/04/89 SD 01 10/07/88 SD 02 10/07/88 SD 03 10/07/88 SD 04 10/07/88

~SD 05 10/07/88 SD 06-10/07/88 SD 07

--10/07/88 SD 08 10/07/88 SD 09-10/07/88 SD 10 10/07/88 r

SD 11 10/07/88 SD 12 10/07/88 SD 13.

10/07/88 1

SD 14 10/07/88 SD 15 10/07/88 SD 16 10/07/88 I

SP 01~

'10/07/88 y

TC N1 03/17/89 TC S1 03/05/89

-TP 01 10/13/88-

.TP 02 10/13/88 TP 03 10/13/88 L

TP 04 10/13/88 X-18 10/07/88 X-23 02/19/89 X-74 10/09/88

'l 1

EX

+

h'Q 4

3 J ATTACHMENT II

===

Valve No.

Date Last Tested 01-007 03/15/89 01-008 10/05/88 01-009 01/29/89 01-010 10/04/88 01-FL1/2 03/04/89 01-FL3/4 03/04/89 02-71 01/22/89 02-72

.09/14/89-02-73 11/14/88 02-74 11/13/88 05-147

^10/10/88 05-165 10/10/88 05-166 10/11/88 05-167 10/11/88 06-393 10/16/88 06-395 10/16/88 15-27' 10/05/88 15-28 10/05/88 16-1 10/14/88 16-2/14 01/31/89 16-30 10/09/88 16-61 1G/08/88-16-62 10/08/88 19-16 10/01/88 19-20 10/13/88 22-1/2 10/17/88'

'22-28/29 12/15/88

.23-13/14 10/07/88 23-15/16 10/06/88-23-17/18 10/07/88 23-19/20 10/06/88 l

23-21/22

'10/06/88 23-70 10/11/88 24-29 02/26/89 24-30

'10/16/88 26-15/16 10/05/88 26-15/16 10/05/88 26-15/16 10/05/88 26-15/16 10/05/88 26-17/18 11/28/88 26-17/18 11/28/88 26-17/18 11/28/88 26-17/18 11/28/88 27-1/2 02/27/89 NOTE:

01-FL1/2 are spectacle flanges used to isolate valves V-01-106 and V-01-107.

NOTE:

01-FL3/4-are spectacle flanges used to isolate valves

)

l V-01-110 and V-01-111.

f

i;.

)

7.ldf,

e.

l'

.,4 t

Valve No.-

Date-Last Tested.

I 27-3/4 10/07/88

' 17/18 03/03/89

.28-47 03/03/89

/

31-2

'10/07/88.

31-5 10/17/88 38-09 02/18/89 38-10 02/18/89 38-16 02/18/89 38-17 02/18/89 38-22 10/13/88 38-23 10/13/88 I

38-37 06/29/89 38-38 06/29/89 38-39 06/29/89 38-40 06/29/89' 38 10/13/88 38-43 10/13/88-i 38 10/13/88 38-46

.10/13/88 40-06 02/22/89 40-08 02/26/89 40-12 02/25/89 40-24 02/23/89' TBV-1 10/12/88 TBV-2 10/12/88 TBV-3 110/12/88 TBV-4 10/12/88 1