05000364/LER-1982-046, Forwards LER 82-046/03L-0

From kanterella
Revision as of 00:39, 24 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 82-046/03L-0
ML20070A575
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/01/1982
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20070A579 List:
References
NUDOCS 8212090295
Download: ML20070A575 (1)


LER-2082-046, Forwards LER 82-046/03L-0
Event date:
Report date:
3642082046R00 - NRC Website

text

_ _ _ _ _ _ ,

Malling Address Alabima Power Company '

600 North 18th streat Post Office Box 2641 , ,3 Birmingham, Alabama 35291 -

Telephone 205 783-6081 '

F. L. Clayton, Jr.

Serior Vice President FI;1tridge Building * ') [I ,f f { AlabamaPower g g the souttmrn electic sp!am December 1, 1982 Docket No. 364 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 2, Licensee Event Report No. LER 82-046/03L-0 is forwarded with three (3) copies in accordance with FNP ,

Technical Specification 6.9. This is a required thirty (30) day written notification which is being submitted three days late due to a personnel error.

If you have any questions, please advise.

Yours very truly,

, A

{fbf L d' F. L. Clayton, hr.

FLCJ r/KWM:nac Enclosures xc: Director, IE (30 copies)

Director, MIPC (3 copies)

@C;[>' ]/

// V 8212090295 821201 PDR ADOCK 05000364 S PDR

_