Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.21
ML20206C071
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/21/1999
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NEL-99-0151, NEL-99-151, NUDOCS 9904300173
Download: ML20206C071 (3)


Text

. __ __ __ _ _ _ ____ _ __ _ _ --

Dave Morey Sruthern Nuclear SAFEGUARDS INFORMATION

'. . Vice President Operating Company,Inc.

)

Farley Project P (THIS PAGE IS DECONTROLLED Br g arn a\a a35201 IF DETACHED FROM SGI

, , Tel 205992 5131 PAGES IN A'ITACHMENT I)

April 21, 1999 SOUTHERN Energy to Serve %ur World" Docket Nos.: 50-348 NEL-99-0151 50-364 U. S. Nuclear Regulatory Commission A'ITN: Document Control Desk Washington, D. C. 20555-0001

~

Joseph M. Farley Nuclear Plant Enhion 1 to the FNP Security Plart FNP-0-M-99 Ladies and Gentlemen:

In accordance with 10 CFR 50.54(p), Southern Nuclear Operating Company (SNC) submits Revtsion I to the FNP Security Plan, FNP-0-M-99. In accordance with 10 CFR 50.4(b)(4), the signed original and three copies are being sent to the Document Control Desk, and two copies are being sent to the appropriate Regional Office.

These changes to the FNP Security Plan incorporate changes previously submitted for your review as Revision 28 by SNC letter dated March 25,1996. 'Ihe changes address the implementation of a hand geometry biometrics system for positive identification. 'Ihe NRC reviewed proposed Revision 28 on March 25,1996 and determined that the changes were consistent with the requirements of 10 CFR 50.54 (p). SNC was informed of the results of the NRC review by letter dated April 8,1996. During a security inspection performed in November of 1997, the inspector identified a concerr about controlling access at gate portals to the Protected Areas. IFI 97-13-01 was written to track the resolution of this concern. A conference call was held with the NRC on January 12,1998, to resolve the IFI. It was agreed on this call that SNC would use a portable hand reader to perform positive identification at all portals to the Protected Areas except the PAP and SAP. 'This revision to FNP-0-M-99 incorporates the use of the portable hand reader.

Revision 28 to the Security Plan was never issued at FNP due to problems with the implementation of the biometrics system. When the Security Plan was converted to a manual it was issued as Revision 0.

SNC has compared the enclosed Revision I changes to those submitted as proposed Revision 28 in the March 25,1996 letter. 'Ihe differences are identified in the comparison summary included in Attachment 1. Changes to FNP-0-M-99 resulting from the implementation of the biometrics system have been issued as Revision I and are described in the change summary descriptions included in Attaclunent I. Attachment I also contains the amended Security Plan pages.

Attachment 2 provides the page removal and insertion instructions to update the FNP Security Plan to j FNP-0-M-99, Revision 1.

9904300173 990421 o PDR ADOCK 05000348 4,1 F PDR j pI ,

i SAFEGUARDSINFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ATT. I)

~

SAFEGUARDS INFORMATION i (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ATTACHMENT 1)

U.S. Nuclear Regulatory Commission Page 2 Southern Nuclear has reviewed Revision I to the FNP Security Plan, FNP-0-M-99, and has determmed that the revision does not decrease the safeguards effectiveness of the FNP Security Plan.

{

Attachment I contains safeguards information, and should be withheld from public disclosure in accordance with 10 CFR 73.21.

'Ihis letter contains no NRC commitments. Ifyou have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY

.h 2 j

Dave Morey Sworn to andsubscribedbefore e thisa?lkdayof k 1999

" ~~

O b_

NotaryPublic ' (}

My Commission Erpires: l1-GJ+=YKul, 5 O$

v JGS/maf: SP REV Bio. doc Attachments SAFEGUARDS INFORMATION (THIS PAGE IS D6 CONTROLLED IF DETACHED FROM SGI PAGES IN ATT. I)

4 SAFEGUARDS INFORMATION t *

(THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN

, , ATTACHMENT I)

- cc: Southern Nuclear Ooeratina Comnany Mr. L. M. Stinson, General Manager - Farley U.S. Nuclear Reculatory Commission. Washington. D_C Mr. J. I. Zimmerman, Licensing Project Manager - Farley (w/0)

Document Control Desk (wl3) (NOTE: Contains Safeguards Information) i l

U S. Nuclear Reculatory Commission. Renion 11 Mr. L. A. Reyes, Regional Administrator (w/2) (NOTE: Contains Safeguards Information)

Mr. T. P. Jolmson, Senior Resident Inspector - Farley (w/0)

Attachments:  ;

1. Comparison to Revision 28, Change Summary Description, and Amended FNP Security Plan Pages (NOTE: ContainsSafeguardsInformation)
2. Page Removal and Insertion Instructions

{