ML19332F211

From kanterella
Jump to navigation Jump to search
Forwards Final Response to NRC 890803 Request for Addl Info Re Review of Updated Inservice Insp Program,Summarizing Results of Addl Reviews & Providing Exam Listing Info
ML19332F211
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/07/1989
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8912140047
Download: ML19332F211 (370)


Text

ps rc , 4 lE w' 1 i

Alabama Power Company -

40 inverness Center Parkway - l'

.f

Post Office Box 12951

[ W@,. Birmingham, Alabama 35201 -

f. Telephone 205 868-5581 I

[ . ,

W. G. Hairston, til '

Senior Vice President E .

7 Ns% Nerations Mah3gg gg-

- December 7, 1989 thesourhem electrc system 10CFR50.55a(g) 1 l

-l Docket No. 50-364

.1 l  !

j' ,

U. S. Nuclear Regulatory Commission Attention: Document Control Desk 1

)

Washington, D. C. 20555 Gentlemen:

Joseph H. Farley Nuclear Plant - Unit 2 ' ]

Response to the NRC Request for Additional Information for the Inservice Inspection Program By letter dated August 3, 1989, the NRC requested Alabama Power Company to provide additional information pertaining to the review of the Unit 2 updated Inservice Inspection (ISI) Program. Revision 0 of this program was  ;

submitted to the NRC by letter dated December 16, 1988. The NRC granted interim approval of certain reliefs by letter dated March 31,.1989. As

' discussed in letters-dated February 8 and March 23, 1989, approval of-the fremaining relief-requests vas deferred. Alabama Power Company proposed a

~

schedule for approval of the remaining reliefs by letter dated  !

June 8, 1989.

Alabama Power Company responded.to the NRC's Request for Additional E .Information, Enclosure 2 (for Unit 2) by letter dated October 5, 1989, s; In two instances, one involving the suitability of alternative calibration l E blocks and the other regarding hydrostatic testing of portions of the service water, component cooling water, chemical and volume control, spent j fuel pool cooling and reactor makeup systems, a substantial review effort was necessary to provide a suitable response. Also, the updated examination listings requested for Class 3 component examinations and for Class 1, 2 and 3 hydrostatic testing vere not complete. Enclosed for your review is Alabama Power Company's final response which summarizes the  ;

results of these additional reviews and provides the examination listing information requested.

L

"' AD'/7 8912140047 891207 ADOCK 05000364

.PDR 1 Q PDC [

yv. . -

1- .

_U. S. Nuclear Regulatory Commission Page 2

'If there are any questions or if additional information is needed, please

' advise.

Respectfully submitted, ALABAMA POWER COMPANY jg.l, . --f V. G. Hairston, III VGH/DEM/STBicht-nrc.8.5 Enclosure

-cc Mr. S. D. Ebneter v/1 Mr. E. A. Reeves v/1 Mr. G. F. Maxwell v/0 Mr. B. Brown v/1

v ENCLOSURE Joseph M. Farley Nuclear Plant - Unit 2 Response to the NRC's Request for Additional Information for the Inservice Inspection Program l

Alabama Power company's initial response to the NRC's Request for Additional Information (RAI) was provided on October 5, 1989. Additional information is herewith submitted which completes all items requested by the RAI. The following items correspond to Enclosure 2, Item 2 of the NRC's RAI.

A. General - Component Listings NRC Request:

Provide the staff with an itemized listing of the components subject to examination during the second 10-year interval. ,

APCo Reply:

In addition to the listings provided in Alabama Power Company's October 5, 1989 letter, the components subject to visual examination and pressure testing are provided in the referenced attachments as.follows:

Examination Type Code Section(s) Code Class (es) Attachment Visual IVD-2000 3 1 Pressure Test IVB, IWC & IVD- 1, 2, & 3 2 5000 Visual IVF-2000 3 1 The' listings provided in Attachments 1 and 2 vere excerpted from draft plant ISI Plans .*hids are currently under review. The listings, which are being' provided for information purposes only, are subject to change and the copies provided herewith vill not be maintained current.

J. Relief Requests RR-5 and RR-6 Provide the following information with regard to ISI calibration standards:

NRC Request:

For each of the subject relief requests, provide technical justification as to why obtaining the appropriate calibration block is impractical.

APCo Reply:

Relief Request RR-5 pertains to calibration block dimensions for piping and thin-valled vessel examinations. In general, dimensional design for these calibration blocks was based on the existing codes and standards in use at the time of fabrication. The existing calibration blocks were fabricated from materials representative of the specifications in use at that time.

These blocks were utilized for preservice and inservice examination and provide an important reference from which to evaluate future examination results. Further review has indicated that while under the present Code, dimensional deviations exist between the component and calibration block, these differences are inconsequential to the examination results and 4

F i

Enclosure - Unit 2 Page 2 vould in most cases result in conservative examination results. ,

Fabrication of new calibration blocks, solely for the purpose of achieving dimensional congruity with the component vill not in Alabama Power Company's judgment improve examination quality. The consistent use of '*

calibration standards between the preservice and inservice examinations

. performed to date and future examinations would be lost if new calibration blocks were utilized.  ;

Calibration block ALA/APR-33 is used for the examination of cast austenitic stainless steel reactor coolant loop piping materials in the hot, cold and the crossover legs which have different diameters and thicknesses. The  !

calibration block is the same nominal diameter as the hot leg, but is of smaller diameter than the crossover leg piping and larger diameter than the cold leg piping. Use of the calibration block for examination of the larger crossover leg piping is conservative since calibrating on a smaller diameter calibration block and examining a larger diameter component vould tend to decrease ultrasonic attenuation. The calibration block thickness differs from that of all three legs; however, it is considered representative since its thickness is close to the average thickness for all three legs. Code Case N-461 allows the use of calibration blocks which are within plus or minus 25% of the pipe vall thickness which would envelope the loop piping thickness differences. The ASME has approved this Code Case and the NRC is considering incorporation of N-461 into a future revision of' Regulatory Guide 1.147. Regardless of the differences in e

diameter and thickness, the NRC has revieved and accepted the special examination techniques which Alabama Power Company utilizes for reactor coolant loop examination as permitted by Section XI, Paragraph IVA-2240.

This review included an attenuation comparison of the calibration block and the coolant loop piping. It was concluded that the calibration block was '

representative of the installed piping and would therefore provide a I

conservative examination.

Calibration block ALA-24 has a nominal thickness greater than the examined piping. Use of a thicker calibration block is conservative since examination of a thinner component would tend to decrease ultrasonic attenuation. As discussed above, NRC approval of Code Case N-461 vill permit the use of this calibration block since the calibration block thickness is within plus or minas 25% of the component thickness. .

Calibration block ALA-25 differs in both thickness and diameter from the 16 inch diameter reducer which connects the 14 inch diameter feedvater piping l

to the steam generator nozzle. The reducer is schedule 100 vith a nominal thickness of 1.031 inches; however, in the area of interest it is machined to a nominal thickness of 0.758 inch to match the steam generator nozzle thickness. Therefore, use of the .750 inch thick calibration block vill provide a representative examination of the nozzle to reducer veld.

Again, application of Code Case N-461, once NRC approval is obtained, vould l permit the use of this calibration block. The calibration block is 14 inches in diameter and is used for examining the 16 inch diameter reducer I

to steam generator nozzle veld. As discussed above, use of this t calibration block is considered conservative since calibration on a smaller L diameter calibration block and examination of a larger diameter component would tend to reduce ultrasonic attenuation.

x ,

f:-

b '

t y

Enclosure - Unit 2 Page 3 Calibration block ALA-5 vas fabricated from 8 inch diameter stainless steel pipe and is utilized for examination of a 9.5 inch diameter component.

Calibration on a smaller diameter calibration block for examination of a ,

larger diameter component is considered conservative since-it would tend to-  ?

decrease' ultrasonic attenuation. Regardless, APCo utilizes enhanced  :

ultrasonic examination techniques on all stainless steel components. This technique includes requirements that the refracted angle be recorded for each examined component. In addition to the required 45* examination, a J 60' examination is also utilized and both are performed at increased sensitivity by adjusting the gain to an average noise-level of 10 percent 1 of full screen height. This enhanced examination technique more than adequately compensates for any mismatch between the calibration block and the examined component, ,

Calibration blocks ALA-31 and.ALA-32 are fabricated from stainless steel plate and are used to examine thin-valled vessels ranging from 22 to 84 inches in nominal diameter. Use of the flat calibration block is considered acceptable based on guidance from the ASME Code,Section V, Articles 4 and 5, which state that for diameters greater than 20 inches, a olock of essentially the same curvature or alternately a flat basic calibration block shall be used. Given the large diameter of the components being examined, the flat calibration block is considered to be acceptable. As discussed above, use of the enhanced ultrasonic examination technique more than adequately compensates for any mismatch between the calibration block and the curvature of the examined component.

Calibration block ALA-23 is fabricated from carbon steel plate and it is used to examine 34.5 inch diameter piping. Given the guidance from Section V for the use of flat basic calibration blocks where the component diameter exceeds 20 inches, the flat calibration block is considered acceptable.

Relief Request RR-6 pertains to calibration block materials for piping and thin-valled vessel examinations. After a substantial comparison of the calibration block and component materials and a review of the examination requirements of Section XI; Appendix III, Paragraph III-3411 as clarified by ASME Code Interpretation XI-1-86-61, it was found that all calibration block materials are in compliance, therefore, relief request RR-6 is not required and vill be deleted from the ISI Program with the next revision.

1 NRC Request: l l

Relief Request RR-5: Identify the celibration blocks for which relief is I requested and provide information with regard to the actual vall thickness I and curvature differences between the calibration blocks and the components to be examined.

APCo Reply:

Attachment 3 is a list of the calibration blocks for which relief from l dimensional requirements is requested. This list includes the calibration block thickness and diameter, as appropriate, and the examined component thickness and diameter. .

l l

l

m_

7 . ,

i L'

4 t ~ (

t~_

Enclosure - Unit 2 g; Page 4 NRC Request:

I Relief Request RR-6:

~

Identify the calibration blocks for which relisf is requested and provide additional information with regard to the materials of fabrication and acoustic compatibility with the component to be examined.

APCo Reply:

For the reasons cited above, Relief Request RR-6 vill be deleted from the ISI Program with the next revision. +

P. Relief Request RR-33 NRC Request:

Provide detailed technical justifications demonstrating impracticality and discuss the following concerns with regard to most of the systems involved ,

(i.e., service water, component cooling water, chemical and volume control, t reactor makeup): Are these systems required by the Technical Specification to be operable in all modes (e.g., during vessel examinations when fuel is removed from the reactor)? Do any of these systems have multiple trains of-which one could receive the Code-required examination? Do these systems have portionc which can be " valved out" to accommodate the Code-required hydrostatic test?

APCo Reply:

Those portions of the service water, component cooling water, chemical and volume control and cpent fuel pool cooling systems which can be isolated without loss of redundant trains within the system vill be hydrostatically tested to the extent practical as required by the Code. 'A detailed review was conducted to identify those portions of these systems which cannot be hydrostatically tested as required by the Code. A listing of these is provided in Attachment 4. The piping and components listed either lie beyond the Code boundary valve used te isolate the system for performance of the hydrostatic test or interconnect the redundant system trains such that removal from service for testing would render the entire system inoperable. RR-33 vill be revised accordingly to incorporate this table and the revised relief request vill be resubmitted with the next ISI Program revision.

cht-nrc.8.4

L

.Ei.

' ATTACHMENT 1 L

Class 3 Component Listing i

{

! o 4 FNP 2-M-069

. [ ') -

p Class 3 System Pressure Testina

1. RE0VIREMENTS ASME Code Class 3 pressure-retaining components are provided to have the following three types of system pressure tests to be performed on a regular basis, ,

A. System Functional and Inservice Tests (Ref. Basis 11 B and C)

E 1. The system boundary extends up to and including the first normally closed valve or valve capable of automatic closure as required to perform _the safety related function.

2. The nominal operating or inservice pressure of the system test or.

system operation shall be acceptable as the test pressure for the system functional or system inservice test, respectively.

B. System Hydrostatic Test (Ref. Basis, 11 D) i

,m 1. Hydrostatic testing will be performed to the appropriate procedure j

' ,)

q listed in Basis - Table 1.

2. The_ system hydrostatic test pressure and temperature shall be as detailed in Basis - Table I which reflects the requirements.of IWD-5323(a) and IWD-5230.
3. In the case of atmospheric storage. tanks, the hydrostatic head, developed with the tank filled to its design capacity, shall be >

acceptable as the test pressure. For 0-15 psi storage tanks, the test pressure shall be 1.1 PG Design Pressure of vapor or gas space above liquid level for which overpressure protection is provided by the relief valve.

4. For the purpose of the test, open ended portions of suction or drain lines from a storage tank extending to the first shutoff valve shall  !

be considered as an extension of the storage tank.

5. For open endedl portions of discharge lines beyond the last shutoff valve in nonclosed systems (e.g., service water systems),

confirmation of adequate flow during system operation shall be acceptable in lieu of system hydrostatic test.

6. Open endedl vent and drain lines from components extending beyond

" the last shutoff valve and open endedl safety or relief valve discharge lines shall be exempt from hydrostatic test.

o O

P3-1 Rev. 0 w

m

  • L_

p ,

p-i (~X-FNP 2 M 069

-l '

7. Where adjoining pipe sections have different test pressure, the-sections should be separated whenever practicable and each section tested at its specified test pressure. Where it is. impracticable to separate adjoining sections of piping for hydro testing, the sections may be tested together at- the lower specified test pressures.

L i! 8. - Where closed valves are used to establish the hydrostatic test boundaries, precautions must be taken to assure that components on ',

the low pressure side of the boundary valve are not over-pressuirzed.

./ 9. Since check valves cannot isolate in the direction of flow, the  !

upstream test pressure shall be used up to the first valve 4> downstream of the check valve.

10. Lines connected to process piping or equipment must be. tested to the l process piping test pressure out to the last valve. Downstream of 1 the Tast vent or drain valve vents to the atmosphere, or drains to

,7' atmospheric tanks or sumps, may be left untested, j i

- - h ,,$ II. TEST MEDIUM l A;

M) The contained fluid in the system shall serve as the pressurizing medium.

III. TEST FRE0VENCIES Test frequencies are established in accordance with Section XI as detailed-in the following schedule. System inservice or system functional testing must be performed each inspection period except for the period during which the system hydrostatic test is performed. Hydrostatic test

-frequency will. meet the intent of IWC-2412 to distribute the examinations evenly throughout the inspection interval.

1 Open ended signifies free discharges that dissipate the transported fluid directly to the atmosphere (i.e., inside or outside containment structure).

Discharge lines to structural compartments (e.g , service water pump intake i structures) and collection tanks, sumps, and basins that are open (or may become open) to the atmosphere are cnnsidered open ended.

l L) Rev. O P3-2 J

( ,i J. M. Farley Nuclear Plant - Unit 2, Class 3 Components ' FNP-2-M-069-System Pressure Test Plan ,

2E13- Safety Injection Containment Spray i

ISI Bdry Exam Period Relief Line No. Hydro No. .Dwg. No. Coord.-' ISO Dwg. 3 1 2 Request Notes / Remarks .

3" HCC-132 D-356355-3 D-5 EG2-013, F F F RR-34. ,

EG2-014 4

3/4" HCC-132 (1) D-356355-3 E-6 E6506 F F F- RR-34 TO VALVE QV008 3/4" HCC-132 (2) D-356355-3 E-7 E6504 F F F RR-34 TO VALVES QV020A,8

) 3/4" HCC-132 (D) D-356355-3 E-8 E6777 F F F RR-34 DRAINS (1) h t

3/4" HCC-132 (TC) D-356355-3. E-9 E6776 F F F RR-34 TEST CONNECTIONS (1). ) I

~

2" HCC-132 D-356355-3 F-9 E5360 F F F RR-34 I 2" HCC-145(A) D-356355-3 D-8 E6450 F F F RR-34 TO VALVE 7 0','028A &'

QV0288 y

I 2" HCC-145(B) D-356355-3 D-9 E6451 F F F RR-34 TO VALVES QV027A &

QV027B .;

2" HCC-196 0-356355-3 E-9 E5917 F F F' RR-34 I 3/4" HCC-197 D-356355-3 D-8 E6405 F F F RR-34 Ii i

k' i

h 3E13-1 Rev.: 0 ..-  !.

f

gp

., .  :.g:. - 3 . .;

.;[\

c - 2 :- y ^ ^

-s .7 l47

. _ ,,'N)

3. U '

Nj'c  ;;:!qi L

~

O

~

[- J. M. Farley Nuclear Plant: - Unit 2,- Class'3 Components. ~FNP-2-M-069- _

2E21- Safety Injection. ,

I ,'

. .~...

ISI Boundry Examination Period; Relief Notes And/Or

. 'j 1

Comp:nent Drawing No. Coord. Loc. Drawing Third- First Second Request Remarks.~

p

~

BORON INJECTION SURGE -

) .'

i TANK ip~

j Q2E21T005 D-356355-1 A-10 D-205057 I I I RR-33 ' ,'

4

.e ' :' ,

SPRAY ADDITIVE TANK

- J .i? d-

'Q2E13T001 D-356355-3 D-9 D-205058 F F F RR-34  ;

j l17 80 ROM INJECTION

' -1; RECIRC. PUNPS '

Q2E21P004A-A D-356355-1 C-9 D-205366 I I I RR-33 '

Q2E21P004B-B D-356355-1 D-9 D-205366 I' I I 'RR-33 . ,

i 1

.j -

_. 11

!4.

l i

f, .

~

l l 1

.ei.

'3(SI)E21-1 Rev.: 0. _

a.

~ m sng -

mm qt -

.7. e. - i j.((

O-

_ _/ m ,

p m.d- '

m J. M. Farley Nuclear Plant - Unit 2, Class 3 Components

~

- FMP-2-M-069- '

]

System Pressure Test Plan 2E21- Safety Injection ,

~

I ISI Bdry Exam Period Relief  !-'

Line.No. Hydro No. Dwg. No. Coord. 150 Dwg. '3~ l 2- Request Notes / Remarks .] .

2" CCC-11 D-356355-1 C-8 E10165 I I -I' RR-33  ;

3/4" CCC-11 0-356355-1 C-8 .E10165 I I I RR-33 TO VALVES QV084A,B -

l' CCC-11 D-356355-1 C-9 E5950, I I I RR-33 1

i E9213, '

i-E10166 1 2" HCC-130 0-356355-1 D-10 E9451,- I I I RR j.

E9453 l-l' HCC-130 (D) D-356355-1 C-10 E9451 I I I RR DRAINS (1) t 2" HCC-130(A-A) 0-356355-1 0-10 E9451 I I I RR-33 TO B.I. RECIRC. PUMP P004A-A g 1

{'

1 1/2" HCC-130 D-356355-1 D-10 E9451 I I I RR-33 2" HCC-130(B-B) D-356355-1 D-10 E9451 I I I RR-33 TO B.I. RECIRC.' PUMP '

P004B-B l 1 1/2" HCC ,130 D-356355-1 D-10 E9451 I I I RR-33 4 i .

i l' HCC-131 D-356355 B E9597 'I I I . RR-33 i-1 D-356355-1 B-6 E5750 I I . I~ RR-33 F

3/4" HCC-131 l' HCC-226 D-356355-1 B-10 E6813, I I I RR-33
TO QV610A,B ,'

E6814 i I

.l-3(SI)E21-2 , Rev.: 0 1

+_ _ , , , #. ..#-..--..p.., ..w -w- w- h y

  • e*"'~ t- 4 m -m*"**-"W-w- v

3 -a.;=7w 32

-s g og. j-

'( _Q Q ~Y J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan 2E21- Safety Injection- .

i ISI Bdry Exam Period Relief l Line No. Hydro No. Dwg. No. Coord, ISO Dwg. 3 1 2 Request Notes / Remarks 1" HCC-263(A-A) D-356355-1 C-9 E5936 I I I RR-33 B.I. RECIRC. PUMP P004A-A DISCHARGE  ;

I 3/4" CCB-62 (D) D-356355-1 0-8 M3953 I I I RR-29 DRAINS (1), CLASS 2 TESTED WITH CLASS 3. .i 1" CCB-62 D-356355-1 D-8 E8720 I I I RR-29 CLASS 2 TESTED WITH

  • CLASS 3.

1* HCC-263(B-B) D-356355-1 D-9 E5936 I I I RR-33 B.I. RECIRC. PUMP

. P0048-B DISCHARGE 3/4" CCB-62 (D) D-356355-1 E-8 M3953 I I I RR-29 DRAINS (1), CLASS 2  !

TESTED WITH CLASS 3.

1" CCB-62 D-356355-1 E-8 E8720 I I I RR-29 CLASS 2 TESTED WITH  :

CLASS 3.  !

3/4" HCC-259 D-356355-1 B-9 E6579 I I I RR-33 4

3/4" HCC-260 D-356355-I B-9 E6579 I I I RR-33 .

1 i

3(SI)E21-3 Rev.: 0

. ,- . ~ . - - - .

.1 e ..

ga fy s,

g -

- c- .

J v7 .

,~

~

J. M. Farley Nuclear Plant -- Unit 2, Class 3 Components FNP-2-M-069 2E21- Chemical and Volume Control  !.

3 ISI Boundry Examination Period' Rel1ef Notes And/Or.-

l Component Drawing No. Coord. Loc. Drawing Third First .- Second Request Remarks  ;

i 1

BORIC ACID FILTER L Q2E21F007 D-356356-3 G-3 D-205058 H I I Ii 4

BORIC ACID TRANSFER j'

> PUNPS  :

Q2E21P005A-A D-356356-3 G-6 D-205058 H I I. .l 4 e Q2E21P0058-B D-356356-3 H-6 D-205058 H I I [.

BORIC ACID TANK j i Q2E21T002A D-356356-3 C-3 D-20$058 I I I RR-33 Q2E21T002B D-356356-3 C-6 D-205058 I I I' RR-33 i

i BORIC ACID BLENDER D-356356-2 E-8 D-205058 H I I-Q2E21P011 ]

i I

i 1 i

l <

3(CVC)E21-l' Rev.:.0

- i

F A~ ,.e g ' .

-I 1

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069. 4 System Pressure Test Plan '

2E21- Chemical and Volume Control

ISI Bdry Exam Period Relief ..
Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks j 3" HCC-121(A-A) 160.21 D-356356-3 F-6 'EG2-327 H I I RR-33 HYDRO TESTED TO VALVE  ;

, QV227A:(E-4) [>

2" HCC-121 160.21 D-356356-3 F-6 'EG2-327, H I I ;f E5919 , ,

3" HCC-122(B-B) 160.21 D-356356-3 G-6 EG2-327 H I I RR-33 HYDRO TESTED TO VALVE I

QV227B (E-7) l 2" HCC-122 160.21 D-356356-3 H-6 EG2-327, H I I E5919 -

3" HCC-146 D-356356-3 D-4 EG2-329 I I I RR-33 BORIC ACID TANK 2A 3/4" HCC-146 (D) D-356356-3 D-4 E6142 I I I RR-33 DRAINS (1) 3/4" HCC-146 (V) D-356356-3 D-4 E6143 I I I RR-33 VENTS (1) 3" HCC-147 D-356356-3 D-6 EG2-329 I I I RR-33 BORIC ACID TANK 28  ;

3/4" HCC-147 (D) D-356356-3 D-6 E6144 I I I RR-33 DRAINS (1) 1 3/4" HCC-147 (V) D-356356-3 D-6 E6145 I I I RR-33 VENTS (1)

, 3" HCC-178 160.21 0-356356-3 G-6 EG2-328- H I I 2" HCC-12(IA) D-356356-3 0-3 E5910 I I I RR-33 BORIC ACID TANK 2A 1

3/4" HCC-12 D-356356-3 D-3 E5910 I I I RR-33: i

i

! 3(CVC)E21-2 Rev.: 0  ;

-

  • e " W #  ;WT Wwe r WP

O o y ~y J. H. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan; .

r 2E21- Chemical and Volume Control ISI Bdry Exam Peried Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 '2 Request . Notes / Remarks 4

I I 2" HCC-12(2B) D-356356-3 D-6 E5910 I RR-33 BORIC ACID TANK 2B 3/4" HCC-12 D-356356-3 D-6 E5910 I I I RR-33 2" HCC-115 160.21 D-356356-2 G-10 E5682, H I I RR-33 HYDRO TESTED TO VALVES E8722, QV233 (D-9) & QV212 E8837 (J-9) 2" HCC-116 160.21 D-356356-2 E-8 E8722, H I I E8782 3/4" HCC-116 160.21 D-356356-2 E-9 E8782 H I I TO VALVE QV241 l I I - Z 3/4" HCC-116 (D) 160.21 D-356356-2 E-8 E8782 H DRAINS (1) 2" HCC-118 160.21 D-356356-2 F-7 E5681, H I I i' E8825, E8836, f E8837 L

> E9465 g

> 160.21 0-356356-3 G-2 E8713 3/4" HCC-118 (1) 160.21 D-356356-2 E-7 E6465 H I I TO VALVES QV384A,B -

3/4" HCC-118 (2) 160.21 D-356356-3 G-3 E5907 H I I TO VALVE QV217B 160.21 D-356356-3 F-4 E6584 H I I TO VALVE QV218A i 3/4" HCC-118 (3)

] i 3(CVC)E21-3 Rev.: 0 l i

- .--.- . - _ ~ - _ _ _ . . .  ?. .a

o o .

. o"L p-1 1 4

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 i

System Pressure Test Plan 2E21- Chemical and Volume Control i!

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" HCC-118 (4) 160.21 D-356356-3 F-4 E5901, H I I TO VALVE QV2188 E5902 4

3/4" HCC-118 (5) 160.21 D-356356-3 F-4 E5903 H I I TO VALVE QV218C j,

. 1 l

1" HCC-118 (1) 160.21 0-356356-2 E-8 E9465 H I I TO VALVE QV237

]

1" HCC-118 (2) 160.21 D-356356-2 G-8 E9465 H I I 2" HCC-177 160.21 D-356356-2 D-8 E8836 H I I 2" HCC-119 160.21 D-356356-3 G-4 E8710 H I I BORIC ACID TRANSFER , ,

PUMP NO 2A DISCHARGE t  ;

3/4" HCC-119 (1) 160.21 D-356356-3 G-4 E8710 H I I TO VALVE QV217A i

~

3/4" HCC-119 (2) 160.21 D-356356-3 G-5 E8710 H I I TO VALVE QV221A ,

4 I i 1" HCC-119 160.21 0-356356-3 G-5 E8710 H I I -j i

i 2' HCC-120 160.21 D-356356-3 H-5 E5904 H I I~ BORIC ACID TRANSFER 4 PUMP NO 2B DISCHARGC l

3/4" HCC-120 160.21 D-356356-3 H-5 E5904 H I I TO VALVE QV2218 ft 1" HCC-120 160.21 D-356356-3 H-5 E5904 H I I i

2' HCC-123 160.21 D-356356-3 F-5 E8711 H I I RR-33 HYDRO TESTED TO VALVE QV229A (E-5) 3(CVC)E21-4 Rev.: 0  ;

-- v*,_ h

. . s ., sc ,.g p - ).'

.e J. M. Farley Nuclear Plant - Unit 2, Class 3' Components FNP-2-M-069  !

System Pressure Test Plan  :.

2E21- Chemical and Volume Control {.

ISI Bdry Exam Feriod Relief j Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1. 2 Request -Notes / Remarks 1 3/4" HCC-179 160.21 0-356356-3 D-4 E5905 H I I RR-33 HYDRO TESTED TO VALVE i-QV228A (E-4) j l i i

2" HCC-124 160.21 D-356356-3 D-5 E8712 H I I RR-33 HYDRO TESTED TO VALVE QV2298 (E-5) 3/4" HCC-179 160.21 D-356356-3 D-5 E5912 H I I RR-33 HYDRO TESTED TO VALVE -

QV228B (E-6)

! 2" HCC-125 160.21 D-356356-3 F-2 E5906 H I I- RR-33 2" HCC-126 160.21 0-356356-3 E-4 E5909 H I I RR-33  :.

1

, 2" HCC-258(A1) 0-356356-3 C-2 E7127 I I I RR-33 BORIC ACID TANK 2A TO VALVE QV224A

i

, 2" HCC-258(A2) 0-356356-3 0-2 E7128 I I I RR-33 BORIC ACID TANK 2A TO  !

VALVE QV225A 2" HCC-258(B1) D-356356-3 C-7 E7131 I I I RR-33 BORIC ACIC TANK 28 TO

! VALVE QV2248 i

2" HCC-258(BI) D-356356-3 D-7 E7131 I I I RR-33 BORIC ACID TANK 2B TO i VALVE QV225B i l

. l-

.i I

I 3(CVC)E21-5 Rev.: 0

(

d,s fA .

i 4 f-

^

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 .

System Pressure Test Plan 2E22- Combustible Gas Control System  ;

j .1 ISI Bdry . Exam Period Relief i Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks  !

8" HCC-267(C001A-A) D-356349-1 D-6 F F F OPEN-ENDED SYSTEM.

EXEMPTED FROM HYDRO i

- TEST.'

2 1/2" HCC-267 D-356349-1 D-6 F F F OPEN-ENDED SYSTEM.

EXEMPTED FROM HYDRO TEST. .' -

4" HCC-267 D-356349-1 0-6 F F F OPEN-ENDED SYSTEM.

EXEMPTED FROM HYDRO TEST.

8' HCC-267(C0018-B) D-356349-1 E-6 F F F OPEN-ENDED SYSTEM.

EXEMPTED FROM HYDRO TEST.

D-356349-1 E-6 F F F OPEN-ENDED SYSTEM. .!

2 1/2" HCC-267 '

EXEMPTED FROM HYDRO TEST.

4" HCC-267 D-356349-1 E-6 F F- F OPEN-ENDED SYSTEM.

EXEMPTED FROM HYDRO TEST.

6" HCC-239 D-356349-1 B-9 EG2-317 I I I OPEN-ENDED SYSTEM, 1

EXEMPTED FROM HYDRO TEST.

f

! 4" HCC-239 EG2-317 r-3E22-1 Rev.: 0 , ,

sur

^ - m 4 ..

j , ! :1  ! < l gF

i -jl .i jT ,)j , i 7'  ;, ii j 7 F p i v

v e

X

O

)

E ,O O ,O O

- ,O RTO 1

( 8, V R ,R R ,R

  • MD E MD MD MD MD EY9 S A A EY EY EY EY v r 9 TH1 N 8 V TH TH TH TH 6 s S 0 O 3 S S S S 0 k YMV I 0 O YM YM YM YM

- r SOQ T V T SO SO SO SO M a R . C Q R R R R 0

- m DFMK E ) DF DF DF DF 2 e E OC N S 1 E E E E  : i

- R DDRA N E ( DD DD DD DD . w P / NEFT O V" NE NE NE NE v -

s ET C L S ET ET ET ET e N

F e P ,S A N9 P . P . P . P . R +

t NMTT T V I2 NMT NMT NMT NMT -

a o EESN S A0 EES EES EES EES rs PXE PXE N PXEE E O RV PXE PXE OETV T T DQ OET OET OET OET _

s _

t t n fs e ee '

n iu o

p l q ee m RR .

o C

I I I 3' 2 I I I I I d

s o _

s i a r _

l e '

I I I I I _

C P1 I I _

I n _

,a m a

2l _

P x _

t E I I I I I I _

it 3 I I _

ns _

O Ue _

T .

e g 9 , , , , 2 _

tr w 1 012 6 3 458 -

nu D 3 3 6 4 000 2 3 333 2 as - 1 5 1 888 0 0 000 2 l s O 2 7 4 7 8 8 888 E _

Pe S G 6 6 6 777 _

r I E E E E EEE E E EEE 3 rP -

a -

em l e d 0 0 0 ct r 8 1 1 1 2 8 9 8 9 us o - - -

H C

B D D E Ny o H H H _

S C y

e 1 1 1 1 1 1 1 1 l

r y. 9 9 9 9 5 9 9 9 9 a ro 4 4 4 4 4 4 4 4 4 F dN 3 3 3 3 0 3 3 3 3 B 6 6 6 6 5 6 6 6 6 -

5 0 5 5 5 5

. m e

. 5 5 5 3 2 3 3 3 3 M I g 3 3 3 t Sw - - - - -

D D D D _

. s ID D .

D D D D _

J y _

S _

l . _

o o _

r N -

t _

n o _

o r C d _

y s H a

G )

e C l T b ( )

i

(

D t 0 0 s 5 5 u 2 2 0 1 2 3 4

- 5 5 5 5 5 _

O b -

m 0 C C 2 2 2 2 2 _

C C - - -

o . 5 H C C C C C C o 2 H C C C C C _

N -

H H H _

- C " H H 2 e C 4 "4 " " " "

2 n H / / " 1 > 4 4 4 4 E i 3 3 2 L " / / / /

6 3 3 3 3

' l .!!  !!I l li ,  ; <

-~

y .c: _

_,gyg ;; g q;,v i

s -

J. M. Farley Nuclear. Plant - Unit 2, Class 3 Components

~

. -FNP-2-M-069 -

-.E 2G31- Spent Fuel Pool tooling g

4 ISI Boundry Exnination Period Relief. Notes'And/Or-  :

. Component Drawing No. Coord. Loc. Drawing Third First :Second~. Request Remarks' 4 '

SPENT FUEL POOL HEAT :i EXCHANGERS Q2G31H001A-B D-356360-1 C-8 D-205050 I I I RR-44 q i:

Q2G31H0018-A D-356360-1 B-8 D-205055 I I 41 RR-44 i-

1 SPENT FUEL POOL PUMPS '!-

i Q2G31P002A-B D-356360-1 E-7 D-205051 I .I I RR-33,RR-36  !

l Q2G31P0028-A D-356360-1 F-7 D-205051 I I I RR-33,RR-36 I ,

i z i .I

I

.l

.t.

3G31-1 Rev.: O q i.

.. ~ . - ~ . - - . - - . . . . .- ~-.-+ - . - . -

_7m, p

[ ') 4 i

J. N. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069.

System Pressure Test Plan +

2G31- Spent Fuel Pool Cooling ISI 8 dry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks ,

i i 10' HCC-105 D-356360-1 E-8 EG2-053 I I I RR-33,32 TO SPENT FUEL POOL PUMP N0.1.

3/4" HCC-105 (1) D-356360-1 E-8 E6341 I I I RR-33 TO VALVE QV009A 3/4" HCC-105 (2) 0-356360-1 E-8 E6286 I I I RR-33 TO VALVE QV024A 10" HCC-108 D-356360-1 E-8 EG2-053 I I I RR-33,32 TO SPENT FUEL POOL PUMP NO 2.

?

3/4" HCC-108 (1) D-356360-1 E-8 E6287 I I I RR-33 TO VALVE QV009B  :

1 3/4" HCC-IO8 (2) D-356360-1 E-8 E6342 I I I RR-33 TO VALVE QV024B 3/4" HCC-108 (D) D-356360-1 E-8 E6343 I I I RR-33 DRAINS 0" HCC-106 D-356360-1 C-7 EG2-049 I I I RR-33 SPENT FUEL POOL PUMP NO 1. DISCHARGE -

3/4" HCC-106 (D) D-356360-1 E-7 E6848, I I I RR-33 DRAINS (2) '

E6849 3/4" HCC-106 D-356360-1 E-6 E6284 I I I RR-33 TO VALVE VALVE V008A 3/4" HCC-IO6(V) D-356360-1 E-7 E6847 I I I RR-33 VENTS (1) - ..

1 3" HCC-154 0-356360-1 E-6 EG2-049 I I I RR-33 TO QV004A I' 8" HCC-107 D-356360-1 C-9 EG2-048, I I I RR-33 SPENT FUEL POOL HEAT j EG2-049 EXCHANGER NO 1. j.

DISCHARGE  ;

i 3G31-2 Rev.: 0

q :j i^ I iil!' .! l  :[II  !

q1  ! i!!

i g

+

g 7O P N

U P )

T A

E H

5 9 LE 2 L . .

6 s OG B 0 O2 0 k OR 8 V O

- r PA 0 Q PO M- a H 0 ( N 0 m ) LC V ) ) L )

2 e 1 ES ) ) 2 1 ERE 1  : -

~

- R ( UI E 1 1 ( ( UEG ( .

P / FD V ( ( FGR v N s S L S S NA S e F e N T . A S S N N TAH N S R t I N2 V T T I I NHC I T ,

o A E N N A A ECS A N N R PO G E E R R PXI R E D SN T V V D D SED D V s

t t n fs e ee 3 3 3 3 3 3 3 3 3 3 3 3 3 n i u 3 3 3 3 3 3 3 3 3 3 3 3 3 o l q - - - - - -

R R

R R

R R

R p ee R R R R R R m RR R R R R R R R R R R R R R o

C 3 2 I I I I I I I I 1 I I I I d

s s i o

a r l e C P1 I I I I I I I I I 1 I I I n

,a m a

2l P x t E it 3 I I I I I I I I I I I I I ns Ue O tr nu T

e D

g w

8 6 8

4 0

1 5

0 5 9 4 35 0

1 5

0 0

5 0 7 86

, 3 as 3 1 - - 8 3 4 44 4 - - 3 37 1 l s O 8 2 2 2 2 3 8 88 3 2 2 3 35 3 -

Pe S 6 5 G G 6 6 6 66 6 G G 6 66 G r I E E E E E E E EE E E E E EE 3 L rP a _

em l e d  :

ct r 7 9 7 6 7 8 7 7 7 6 9 9 9 us o - - - - - - - - - - -

B Ny o B D D C F B E B B E B B S C y

e 1 1 1 1 1 1 1 1

1 1

1 1

1 l - - - - -

r y. 0 0 0 0 0 0 0 0 0 0 0 0 0 a ro 6 6 6 6 6 6 6 6 6 6 6 6 6 F dN 3 3 3 3 3 3 3 3 3 3 3 3 3 B 6 6 6

. .' 6 5

6 5

6 5

6 5

6 5

6 5

6 5

6 5

6 5

6 5 5 5 5 M I g 3 3 3 3 3 3 3 3 3 3 3 3 3 _

Sw - - - - - - - - - - - - - _

. ID D D D D D D D D D D D D D _

J .

g .

n o .

i N _

l _

o o _

o r _

C d y

l H o _

o _

P _

) ) ) ) )

l V V D D D )

e ) ( ( ( ( ( V u D (

F ( 9 9 9 9 9 0 0 _

0 0 0 0 0 1 1 _

t 7 7 4 1 1 1 1 1 4 1 1 _

n 0 0 0 - - - - - 5 - - _

O S e

p N

o 1

C C

H H

1 C

C 1

C C

H 9

0 1

C C

C H

C C

H C

C H

C C

H C

C H

1 H

C C

0 1

1 C

C C

H C

C H

1 e C 4 4 4 4 4 C 4 4 3 n " " H / / / / / " H / /

G i 1 "2 3 3 3 3 3 3 3 3 3 2 L 8 8

..,.,y

.l.

.s. -.

.g.

d i i

l J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System-Pressure Test Plan i 2N12- Main & Auxiliary Steam i<

ISI Bdry Exam Period Relief y Request i Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Notes / Remarks 8" HBC-71 D-356350-2 E-3 EG2-548 F F F RR-38 TO ROOF VENT ,

1" HBC-71 (D) D-356350-2 E-3 E5986 F F F RR-38 DRAINS (1) [

i 6" EBC-3(IA) D-356350-1 F-6 EG2-604 NA NA NA OPEN-ENDED SYSTEM, . i.

EXEMPTED FROM HYDRO i I

TEST 3/4" EBC-3 D-356350-1 F-6 E5967 NA NA NA OPEN-ENDED SYSTEM, j EXEMPTED FROM HYDRO  :

l TEST ],

OPEN-ENDED SYSTEM, I 6* EBC-3(18) D-356350-1 D-6 EG2-604 NA NA NA EXEMPTED FROM HYDRO TEST ,,

i 3/4" EBC-3 D-356350-1 0-6 E5976 NA NA NA OPEN-ENDED SYSTEM, EXEMPTED FROM HYDRO TEST ';

6" EBC-3(IC) D-356350-1 B-6 EG2-604 NA NA NA OPEN-ENDED SYSTEM, EXEMPTED FROM HYDRO TEST D-356350-1 B-6 E6500 NA NA NA OPEN-ENDED SYSTEM, 3/4" EBC-3  ;,

EXEMPTED FROM HYDRO  !

TEST 4" EBC-1 0-356350-2 E-6 EG2-547 F F F RR-38 SUPPLY TO AUX F.W. i PUMP  !

i i

r!

],

3N12-1 Rev.: 0' i

a. .

_ +- _ ,

, .,m .

G 3;

~

O, -

O ~

4 .

J. M. . Farley K"xlear Plant s- Unit 2,. Class 3 Components

~

FNP-2-M-069 1 i

System Pressure. Test Plan 2N12- Main & Auxiliary Steam

}:

ISI Bdry Exam Period- Relief . .

T Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1. 2 Request Notes / Remarks. 11 3/4" EBC-1 D-356350-2 F-6 E6552 F F F RR-38 ~TO LT3608 i

  • D-356350-2 D E6553 F F RR-38 TO PT3223 3/4" EBC-1 F. l' 3" EBC-1 0-356350-2 D-4 EG2-547 F F F RR-38

}.

D-356350-2 F-7 EG2-658 F- F F RR-38 FROM STEAM GEN NO. 28- 1 i

4" EBC-1(A) 1 1" EBC-1 D-356350-2 G-7 E6499 F F F RR-38

1 3" EBC-1 D-356350-2 F-7 EG2-658 F F F RR-38

{

D-356350-2 D-7 EG2-658 F F F RR-38_ FROM STEAM GEN NO 2C 4" EBC-1(B) ,

1" EBC-1 D-356350-2 'C-8 E6498 F F F .RR-38 [y

. 3" EBC-1 D-356350-2' D-6 EG2-658 F F F- RR-38

  • i l' EBC-4(A) D-356350-2 G-6 E6816 F F F RR-38 TO LV3608

?

D-356350-2. G-6 E6568 F F F RR-3C TO VALVE V009 1" EBC-4(B) 0-356350-2 F-3 E5990 F F F RR-38 TO VALVE V016 1

3/4"NBC-131 4

e 4

4 3N12-2 Rev.: 0

~

. . ~ . . . . . _ . _ . _ . , , , _ . . .

, e : u =. ~ , , -

..+ .- -

~

O O -

De  ;

tz

.. p

~

'J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 2N23- Auxiliary Feedwater d

, .f 1 v l ISI Boundry .

Examination Period Relief Notes And/0r 1 T

Component Drawing No. Coord. Loc. Drawing . Third First Second Request Remarks

.p AUX. FEEDWATER PUMP . .

a .-

Q2N23P001A-A D-356346-1 B-5 D-205063 H F F MOTOR-DRIVEN PUMP. [

e

'[.

Q2N23P001B-B D-356346-1 E-5 D-205063 H F F- MOTOR-DRIVEN PUMP- -

i Q2N23P002 D-356346-1 H-5 D-205063 H F. F TURBINE-DRIVEN PUMP CONDENSATE STORAGE t

TANK i- Q2P11T001 D-356371-1 .E-7 D-200039 I I I .;

P '

t S

i l

l l i .

l i.

4

)

i '

F

. - 3N23-1. Rev.: 0

~,

_.__o.-

- - e____. _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ . _ _ _ _ . _- ww

___--,w- - _ _ +- i++ ~v-w-<-e e5-+-r s-==- .* e dmr*-+-

O O U3

~3 {

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan ,

2N23- Auxiliary Feedwater , ,

ISI Bdry Exam Period Relief 4 f

Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks l, 8" H8C-28 160.20 D-356346-1 B-2 EG2-480, I I H CROSSOVER LINE BETWEEN EG2-481, SUPPLY TO AUX FW PUMPS EG2-479 (MOTOR DRIVEN)  ; ,

QN23P001A-A & {-

QN23P0018-B & (TURB DRVN) AUX FW PMP  : H' Q2N23P002 j EG2-478 I

-l >

l I I' 3/4" HBC-28 160.20 D-356346-1 B-2 E6717 I H VENTS-(1) i 3/4" HBC-28 (V) 160.20 0-356346-1 B-2 E6757 I I H VENTS (1) i- ,'

1" HBC-28 (D) 160.20 0-356346-1 G-3 E6762 I I H DRAIN (1) l 8* HBC-28(A-A) 160.20 0-356346-1 A-2 EG2-478 I I H FROM SERVICE WATER, BOUNDARY VALVE QV014A l (A-2) FOR HYDRO PURPOSES a

l 1" HBC-28 (D) 160.20 D-356346-1 A-2 E6705 I I H DRAINS (1) 6" HBC-28 160.20 0-356346-1 B-2 EG2-478 I I H ,

I 8* HBC-28(B-B) 160.20 D-356346-1 D-2 EG2-4B0 I I H FROM SERVICE WATER, BOUNDARY VALVE QV0148 (0-2) FOR HYDRO  ;

PURPOSES i>

i l

3N23-2 Rev.: 0  ;

k

! ' , < . l } &  : ,

1

; ;' j ,I .

l' l

,~ [ , ,

_y l i ,1

~

a O .P P

M U

)

E V

L A

V E

V L

E' V

L A

V P 9 EON A s TTE C O V O 6

0 k A V 4 T O

T D.

- r SKI 7 8 , 0

.M a NNR 0 , T .

- m ) EAD V ) 1 ) W 2 e 2 DT 2 Q 7 1 ) 2 1 C .  :

- R ( N E0 1 ( 2 3 ( 1 F .

P / OEN0 T 2 ( L 8 A v N s S CGIP N 3 SA 8 S SA 0 X - e F e N AB3 E T N2 S2 I N2 V UA R t I MRR2 V P I7 T7 F I7 Q A1 o A OOUN A0 N0 A0 0 N^ R RTT2 O O RV EV O RV O O0 D FS(Q T T DQ VQ T DQ T TP s ,

.t t n fs e ee n iu o l q

.p ee m RR ,

o C

3 2 H H H H H H H H H H H d

s o s i a r l e I I I I I I I I C P1 I I I n

,a m 2l a P x t E I I I I -

it 3 I I I I I I I ns Ue O tr nu T

e D

g w

56 0

8 4

27 84 40 5 5 8

8 0 8 8

4 8

2 6

3 6

67 67 44 3

3 as 55 - - - 7 1 0 9 4 7 7 22 2 l s O 77 2 22 9 4 5 6 6 6 GG N

.Pe S 66 G GG 5 6 1 r I EE E EE E E E E E E E EE 3_

rP a

em l e d ct r 2 3 3 7 4 4 4 3 4 2 3 1 us o - - -

E H

H H H H G G Ny o D D H 6 S C y 1 1 1 1 1 ,

e 1 1

1 1

1 1

1 l .

r y . 6 6 6 1 6 6 6 6 6 6 6 6 a ro 4 4 4 7 4 4 4 4 4 4 4 4 F dN 3 3 3 3 3 3 3 3 3 3 3 3 B 6 6 6 6 6 6 6 6 6 6 6 6

. . 5 5 5 5 5 5 5 5 5 5 5 5 M I g 3 3 3 3 3 3 3 3 3 3 3 3 Sw - - - - - -

D D D D

. ID D D D D 0 D D 0 J

. 0 0 0 0 0 0 0 0 0 0 0 0 o 2 2 2 2 2 2 2 2 2 2 2 2 N 0 0 0 0 0 0 0 0 0 0 0 0 r o 6 6 6 6 6 6 6 6 6 6 6 6 1

e r 1 1 1 1 1 1 1 1 1 1 1 t d a y w H d

e e

F ) ) )

- y V D V

( )

r ) ) ( ( 7 a D 2 D 4 )

i ( 0 7 7 7 7 ( - A 0 4 4 4 4 C -

- l i 8 8 P - - - - 7 7 B A

( C C C C 4 4 H (

x

-O 2 2 u . - - 7 B B B B - - 8 A o C C 4 H H H H C C 4 N B B - B B "2 -

- H H C " " " " H H / C 3 e B 2 4 4 4 1 B 2 n " " H / / / / " " H N i 1 6 > 1 3 3 3 1 1 1 2 L "

8 8

m x q ;g

/T -;

GJ

  • i i

J. N. Farley Nuclear Plant - Unit 2. Class 3 Components FNP-2-N-069 System Pressure Test Plan ,

2N23- Auxiliary Feedwater i

! ISI Bdry Exam Period Relief

Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks ,

> 160.20 D-356371-1 E-7 l 1/2" HBC-48 160.20 D-356346-1 G-2 E6469 I I H TO FT3402

' I i 3/4" HBC-48 (D) 160.20 D-356346-1 B-4 E10llo I I H DRAINS (1)

I 3/4" HBC-48 (V) 160.20 D-356346-1 B-3 E6706 I I H VENTS (1) i 3/4" HBC-48 160.20 0-356346-1 B-4 E6483 I I H TO VALVES QV031A, 1 QV032A j 3/4" HBC-48 160.20 D-356346-1 B-4 E6482 I I H TO PT3211A 1" HBC-48 (D) 160.20 D-356346-1 G-3 E5717 I I H DRAINS (1) 1 1/2" HBC-48 160.20 D-356346-1 B-4 E6758 I I H TO QV081A

! 4" HBC-48 160.20 0-356346-1 B-4 EG2-478 I I H i

6" HBC-48 163.20 D-356346-1 E-3 EG2-477, I I H FRON CONDENSATE i

! EG2-478 STORAGE TANK 8' HBC-48(8-8) 160.20 D-356346-1 F-4 EG2-477 I I H TO AUX F.W. PUNP P0018-B  ;

D-356371-1 E-7

> 160.20 i j 1/2" HBC-48 160.20 D-356346-1 E-4 E6761 I I H TO QV0818 1/2" HBC-48 (V) 160.20 D-356346-1 E-4 E5998 I I H VENTS (1)

I f

3N23-4 Rev.: 0

_ _ _ . - - _ _ - . - - - _ . . _ - . . , . . - . - . . . ~ ..._ __ -

O O O '

i i

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 i System Pressure Test Plan 2N23- Auxiliary Feedwater ISI Bdry Exas Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" HBC-48 (V) 160.20 0-356346-1 E-4 E5991 1 I H VENTS (1) 3/4" HBC-48 (D) 160.20 D-356346-1 E-2 E6735 I I H DRAINS (1)  ;

3/4" HBC-48 (D) 160.20 D-356346-1 F-5 EIO109 I I H DRAINS (1) 3/4" HBC-48 160.20 D-356346-1 G-2 EG2-480 1 I H TO VALVES QV063A,8 i

3/4" HBC-48 160.20 D-356346-1 E-4 EG2-480 I I k TO PT32118  ;

1" HBC-48 160.20 0-356346-1 E-4 E6480 I I H To VALVES QV031B, i QV0328  ;

4" HBC-48 160.20 D-356346-1 E-4 EG2-479 I I H l 6" HBC-48 160.20 D-356346-1 E-3 EG2-477, I I H j' l

EG2-479, i EG2-480 160.19 D-356346-1 F-8 EG2-486, H F F TO MAIN F.W. SYSTEM 6" D8C-1(A)

! EG2-487 STEAM GEN. 2A 160.19 D-356346-1 D-7 E6410 H F F TO VALVES QV078A,8

! 3/4" DBC-l' .

' l 160.19 D-356346-1 D-9 E6736 H F F DRAINS (1), TO VALVE g 1" DBC-1 (D) -

QVG548 3" DBC-1 160.19 D-356346-1 D-8 EG2-486 H F F l

4" DBC-1 160.19 D-356346-1 D-8 EG2-486, H F F  ;

t EG2-487 l'

, i 3N23-5 Rev.: 0

.. .. - . ,,. y. ., :: g g O 4 O O .,

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069  !

i System Pressure Test Plan 2N23- Auxiliary Feedwater 151 Bdry Exas Period Relief  ;

4 Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks f

160.19 D-356346-1 G-8 EG2-487 H F F TO MAIN F.W. SYSTEM 6' D8C-1(8) STEAM GEN 28 j D-356346-1 F-8 E6427 H F F TO VALVES QV079A,B i

3/4" DBC-1 160.19 1" DBC-1 (D) 160.19 D-356346-1 F-9 E6741 H F F DRAINS (1)

., 3" DBC-1 160.19 D-356346-1 F-8 EG2-487 H F F

4" DBC-1 160.19 D-356346-1 F-8 EG2-487 H F F 160.19 D-356346-1 G-6 EG2-486 H F F DISCHARGE FROM AUX 6' DSC-1(P002)

F.W. PUMP (Q2N23P002)

TO MAIN F.W. SYSTEM 4

1/2" DBC-1 (V) 160.19 D-356346-1 G-5 EG2-486 H F F VENTS (1) 160.19 D-356346-1 G-5 EG2-486 H F F VENTS (2) TO VALVE i

3/4" DBC-1 (V) QV072D 3/4" DBC-1 (D) 160.19 D-356346-1 G-4 EG2-486 H F F DRAINS (1) TO VALVE l QV072F 160.19 D-356346-1 H-6 E6737 H F F DRAINS (1) TO VALVE 1" DBC-1 (D)

QV058 1" DBC-1 (D) 160.19 D-356346-1 H-9 E6739 H F F DRAINS (1) TO VALVE QV054 160.19 D-356346-1 G-4 EG2-486 H F F RR-39 PORTIONS OF THIS LINE 2" DBC-4 ARE RELIEVED FROM HYDRO TESTING

-3N23-6 Rev.: 0

- , . ...,,.-,~..,..;

4 J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan

, 2N23- Auxiliary Feedwater I

ISI Bdry Exan Period Relief Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks Line No. Hydro No.

EG2-487 H F F 3* DBC-1 160.19 D-356346-1 G-6 i D-256346-1 G-6 EG2-487 H F F 3" DBC-1 160.19 EG2-486 H F F RR-39 PORTIONS OF THIS LINE 3" DBC-4 160.19 D-356346-1 G-6 ARE RELIEVED FROM 4

HYDRO TESTING H F F 4" DBC-1 160.19 D-356346-1 J-8 EG2-487 i F D-356346-1 G-7 EG2-4% H F r 6* DBC-4 160.19 EG2-485, H F F CROSSOVER LINE BETWEEN 4" DSC-2(A) 160.19 D-356346-1 D-7 l EG2-490 AUX F.W. (MOTOR

DRIVEN) PUMPS i

Q2N23P001A-A &

Q2N23P0018-B

~

EG2-485, H F F FROM AUX FW PUMP 4" 08C-2(A-A) 160.19 D-356346-1 8-5 P001A-A TO MAIN FW EG2-488

SYSTEM 51EAM GEN 2A D-356346-1 B-4 EG2-485 H F F VENTS (1) 1/2" DBC-2 (V) 160.19

+

1 H F F TO F02861A l 3/4" DBC-2 (1) 160.19 D-356346-1 B-7 E6299 E6473 H F F TO FT3229A 3/4" DBC-2 (2) 160.19 D-356346-1 B-10 160.19 D-356346-1 B-5 EG2-485 H F F VENTS (1) l 3/4" DBC-2 (V) 3N23-7 Rev.: 0 4

  • " " - ' ~ * ***=*e- .. r . , _ ,_ ._

..7-,

O O o .

5 J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2N23- Auxiliary Feedwater J ISI Bdry Exam Period Relief Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks Line No.

160.19 D-356346-1 B-6 E6476 H F F VENT (1) TO PT3213A 3/4" DBC-2 (V) 160.19 D-356346-1 B-5 EG2-485 H F F DRAINS (1) 3/4" DBC-2 (D) 160.19 D-356346-1 B-7 E6252 H F F DRAINS (I) 1" DBC-2 (D) 160.19 D-356346-1 B-9 E6751 H F F DRAIN (1) TO QV054A 1" DBC-2 (D) 160.19 D-356346-1 C-9 E5978 H F F DRAINS (1) 1* DBC-9 (D) 160.19 D-356346-1 B-5 E6474 H F F RR-39 PORTIONS OF THIS LINE 2" DBC-4 ARE RELIEVED FROM HYDRO TESTING 160.19 D-356346-1 B-10 E5978 H F F TO VALVE QV020A 2" DBC-9 160.19 D-356346-1 B-8 EG2-488 H F F

3" DBC-2 160.19 D-356346-1 B-5 E6474 H F F

! 4" DBC-4 D-356346-1 E-8 EG2-490, H F F FROM CROSSOVER LINE TO 48 D8C-2(B) 160.19 EG2-491 MAIN FW SYSTEM STEAM GEN 2B c

160.19 D-356346-1 D-8 E6251 H F F TO F028618 3/4" DBC-2 (1) i~

D-356346-1 0-10 E6472 H F F TO FT3229B 3/4" DBC-2 (2) 160.19 160.19 D-356346-1 E-8 E6741 H F F DRAINS (1) TO VALVE 1" DBC-2 (D) QV054C 3N23-8 Rev.: 0

- - - -. - . . . .. .b - _. _

......y4 O O O J. N. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 '

System Pressure Test Plan 2N23- Auxiliary Feedwater ISI Bdry Exam Period Relief Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks Line No.

1" DBC-9 (D) 160.19 D-356346-1 E-10 E5979 H F F DRAINS (1) TO VALVE qV0668 2" DBC-9 160.19 D-356346-1 E-10 E5979 H F F 3* DBC-2 160.19 D-356346-1 0-8 EG2-490, H F F EG2-491 160.19 D-356346-1 F-6 EG2-484, H F F FRON AUX FW PUNP 4' DSC-2(8-8) EG2-489, P0018-8 TO NAIN FW

! SYSTEN STEAM GEN 2C i EG2-491 1

1/2" DBC-2 (V) 160.19 D-356346-1 E-5 EG2-484 H F F VENTS (I) 3/4" DBC-2 (D) 160.19 D-356346-1 E-4 EG2-484 H F F DRAINS (1) t 3/4" DBC-2 (V) 160.19 D-356346-1 E-5 EG2-484 H F F VENTS (1)

I 160.19 D-356346-1 G-10 E6742 H F F VENTS (1) 3/4" DBC-2 (V) 1" DBC-2 (D) 160.19 D-356346-1 G-10 E6743 H F F DRAINS (1) 1" DBC-2 (D) 160.19 D-356346-1 F-7 E6754 H F F DRAINS (1) 1" DBC-2 (D) 160.19 D-356346-1 G-9 E6740 H F F DRAINS (2). . . - -

1" DBC-9 (D) 160.19 D-356346-1 H-10 E5980 H F F DRAINS (1) i 2" DBC-4 160.19 D-356346-1 E-6 EG2-484 H F F RR-39 PORTIONS DF THIS LINE ARE RELIEVED FRON HYDRO TESTING ,

I 3N23-9 Rev.: 0 l

~. . .

. ,. . g O't O O

. .i .

FMP-2-M-069  ;-

J. N. Farley Nuclear Plant - Unit 2, Class 3 Components System Pressure Test Plan 2N23- Auxiliary Feedwater

! Exam Period Relief  ;

Hydro No. 151 Bdry Dwg. No. . Coord. 150 Dwg. 3 1 2 Requert Notes / Remarks Line No.

160.19 D-356346-1 H-10 E5980 N F F 2* DBC-9 I 3" DBC-2 160.19 D-256346-1 E-5 EG2-489 H F F .

1 1

I 160.19 D-356346-1 E-6 EG2-484 H F F 4" DBC-4 l

I i

l >

i i

i i

j i 1

i

! i I

4 i

i 3N23-10 Rev.: 0 l

l

P e!

.! i il' r4 j" i; i'

,!,;}i ,i .I- -I il  :} ' -

L M ~_

b .

9 L.

6 -

0 r

- 0 0 M- /

d 2 n . .

- As v ,

P k e -

N sr R -

~ F ea -

tmoe NR

~

s t t fs n ee e i u 3 3 3 3

n l q ee 3 3 o

p R P. R R

R m R R R o

C d -

dn 3 oo I I I ic -

s s

re eS a P l ~

n C

ot

, is I 2 tr I I -

ai t nF Q i i n ma U

xd

- Er I i I I 1 .

t h -

n a

T 2 1

l P P 3 g

r a i n

e w 2 2 9 -

l a 9 9 3 0

c r 2 2 N

u' D 0 0

0 0

0 0

~ . 2 2 2 y c -

D D

e o D l L r

a .

F .

d

. r 5 5 3 M' o -

C B

o B .

. C J

y.

ro 1 1 1 dN - -

n 3 3 3 r ug on 5 5 5 3

e 3 6

3 6 6 t Bi 5 a w 5 5 W I a 3 3 3 Sr -

p ID D D D U R R R

- E E E + .

e T T T k A A A a W W W M P P P '

r U A U B U o

O t E A E 8 EK c KA1 K81 KM3 a A20 A20 AA0 e t M 0 M 0 MT5 R n . P . P T e R02 RO2 RE2

- n ON1 P OM1 OG1 ,

2 o T T P TAP 1 p CP2 CP2 CR2 P m AMQ AMQ EU AOQ ET 2 o EU C RP RP RS l4 ?' ,!it .!!illj:'.;i!' l!!:! iIli!  !! ;e !ii '

^

~ -r4 -)

8 1-

, J. H. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan 2P12- Reactor Make-Up Water ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 1

4 8' HCC-241(T503) D-356369-1 B-8 EG2-620 I I I RR-33 VENT LINE 6' HCC-204 D-356353-1 C-7 EG2-430, I I I RR-33 i EG2-431, '

- EG2-432, l

> EG2-433 3/4" HCC-204 (V) D-356353-1 D-6 E6773, I I I RR-33 VENTS (2) i E6774 l' HCC-204 (D) D-356353-1 J-7 E6767 I I I RR-33 DRAINS (I) 6* HCC-236 D-356353-1 B-3 EG2-620 I I I RR-33 1

3/4" HCC-236 D-356353-1 B-3 E5192 I I I RR-33  ;

6" HCC-237 D-356353-1 A-6 EG2-622 I I I RR-33

{

i D-356353-1 B-6 E7047, I I I RR-33 TO N2P12PDT504; TO l 1/2" HCC-237 PT-503 E5583 6* HCC-239(T001) 0-356369-1 E-10 E5238 I I I RR-33 6* HCC-242(T503) D-356369-1 D-8 E5488 I I I RR-33 DRAIN TO SHUTDFF VALVE 6" HBC-239(T001) -

D-356369-1 B-4 E5238 I I I RR-33 4* HCC-207 ~

D-356353-1 D-5 EG2-428, I I I RR-33 EG2-429 3P12-2 Rev.: 0 e - o-- em - w .c~, , ~ - v w w ,-+-v-- ,w>e ,~~ , -.e, e,,- , e--,,w-- e,A

7}

i ;i f! i (1 i' I , I  !

  • e y w

, }v

~

(

8 1 w

3 4 A 8

- 0 0 2 2 9 V V #

6 s 2 2 O O

, 0- k 1 1 M M r P P N- a 2 2 P P 0 -

m ) Q ) Q M M w 2 e ) 1 2 U U  :

E E P P

- R 1 ( ( . g P / ( V V v N s S L S L W e F e S N A V

N I

A V

M R

W R

R

+

t T I o N A A w N E R O R O O O V D T D T T T _

s t' t n fs e

n i ee u

3 3 3 3 3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3 3 o -

l q - - - - - - - - - - - - 3 -

p ee R R R R R R R R R R R R R - -

m RR R R R R R R R R R R R R R R u o

C 3 2 I I I I I I I I I I I I I I ,_

d =

s o s i a r l e I I I I C P1 I I I I I I I I I I

,a n

m a

2l P x t E I I I I I I I it 3 I I I I I I I ns _

Ue v -

T . _

e g 2 2 6 0 0 0 3

w tr w , , 3 90

, 3 1 6

2 6

2 6

2 6

nu D 7 8 863 2 4 2 67  % 4 4

- - 2 as 4 4 610 7 - 0 - - 1 2

2 2 l s O 6 6 260 2 2 5 77 3 2 2 3 G

1 P

Pe S 6 6 599 5 G 6 66 5 G G 8 G G r I E E EEE E E E EE E E E M E E E 3 rP a

em l e d w

ct r 6 6 6 6 S 4 4 4 4 6 7 5 5 5 us o - - - - - - - - - - - - - -

Ny o D D D D G H H H H C 0 B B C _

S C _

y e 1 1

1 1

1 1

1 1

1 1

1 1

1 1

l _

r y. 3 3 3 3 3 3 3 3 3 9 9 3 3 3 _

a ro 5 5 5' 5 5 5 5 5 5 6 6 5 5 5 F dN 3 3 3 3 3 3 3 3 3 3 6

3 3 6

3 6

3 6

B 6 6 6 6 6 6 6 6 6 6 _

. . 5 5 5 5 5 5 5 5 5 5 5 5 5 5 M I g 3 B 3 3 3 3 3 3 3 3 3 3 3 3 Sw - - - - - - - - - - - - - -

. ID D D D D D D 0 D D D D D D D J

o r N

  • e -

t o a r -

W d y -

p H -

U e )

k a V ) )

M ( )

D D 3

)

r 7 ( 4 ( 0 5

3 )

A 8 o 0 2 7 7 8 2 1

4 4 4 T 3

2 I 6 1 t ( (

c - 0 0 0 - 1 1 1 ( - 3 a C 2 2 2 4 C 2 2 2 3 C 6 2 6 e . C - - - 1 C - - - 3 C 3 - 3 R o H C C C 2 H C C C 2 H 2 C 2 N C C C - C C C - - C -

- " H H H C " H H H C " C H C 2 e 4 C 4 C 4 C C 1 n / " " " H / ' " H / H " H P i 3 1 2 2 3 l 2 "3 "

3 3

2 L 4" 4 4 4 k < ji i l; ;j I i!;; l  ; i

. . . a . g a =p O O O i 7

~

h J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan p 2P12--Reactor Make-Up Water ISI Bdry Exam Period Relief Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks ,

Line No.

3* HCC-236 D-356353-1 C-5 EG2-620 I I I RR-33 4' HCC-238 D-356353-1 B-4 EG2-622 I I I RR-33  :

D-356353-1 A-5 E7051 I I I RR-33

, 1/2" HCC-238 4" HCC-240(T001) D-356369-1 D-4 EG2-616 I I I RR-33 s

3/4" HCC-240 0-356369-1 D-12 M8314 I I I RR-33 TO VALVE Q2PilV519 l 4" HCC-243 D-356353-1 D-4 EG2-621 I I I RR-33 3/4" HCC-243 (V) 0-356353-1 C-4 E654 I I I RR-33 VENTS (1)

l i 4* HCC-267(T503) D-356369-1 E-6 E5488. I I I RR-33 s

3* HCC-170 D-356353-1 J-6 EG2-433 I I I RR-33 L

D-356353-1 J-6 E6768 I I I RR-33 VENTS (1)

, 3/4" HCC-170 (V) 2* HCC-170 0-356353-; J-6 E5920 I I I RR-33

> D-356353-1 B-6 E5920 ,

t 1

1" HCC-170 D-356353-1 H-6 M8021, I I I RR-33 i

M8022, M8023, M8024

> M8025, i M8026 3P12-4 Rev.: 0 l

. _ . .~ .

.. _4 t

Os. O O +

i J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-N-069 i System Pressure Test Plan '

2P12- Reactor Make-Up Water

', i.

,! ISI Bdry Exam Feriod Relief Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks .

Line No.

l 3* HCC-216 D-356353-1 G-7 EG2-430 I I I RR-33 ,

3* HCC-217 D-356353-1 G-7 EG2-430 I I I RR-33

> D-356357-1 D-9 1

3* HCC-218 D-356353-1 F-6 EG2-431 I I I RR-33 D-356353-1 F-6 E6503 I I I RR-33 TO PC3737 3/4" HCC-218 D-356353-1 F-6 E6761, I I I RR-33 DRAINS (2) l' HCC-218 (D)

E6762

, 2* HCC-218 D-356353-1 F-6 E8543 I I I RR-33 RMW PUMP NO 2A

' DISCHARGE LINE D-356353-1 B-6 EG2-622 I I I RR-33 3* HCC-237(IA)

D-356353-1 B-5 E5581 I I I RR-33 DRAINS (1) 1/2" HCC-237 (D)

D-356353-1 B-5 E5581 I 1 I RR-33 DRAINS (1)

3/4" HCC-237 (D)

D-356353-1 B-5 E5390 I I I RR-33 1 1/2" HCC-237 f

D-356353-1 C-5 EG2-622 I I I RR-33 RMW PUMP NO.28 .

l 3* HCC-237(18) DISCHARGE LINE j l

D-356353-1 lC-5 E5581 I I I RR-33 DRAINS (1) l 1/2" HCC-237 (D)

D-356353-1 C-5 E5581 I I I RR-33 DRAINS (1) 3/4" HCC-237 (D)

. I i

3P12-5_ Rev.: 0 f

i

~

, ,_.. y i.

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components - FNP-2-M-069 .

System Pressure Test Plan  !

2P12- Reactor Make-Up Water ISI Edry Exam Period Relief .

i

' Hydro No. Dwg. No. Coord. 150 Dwg. 3 2 Request Notes / Remarks Line No. 1

1 1/2" HCC-237 D-356353-1 B-5 E5390 I I I RR-33 l

3* HCC-268(T503) D-356369-1 D-6 E5488 I I I RR-33 2" HCC-Il6 D-356353-1 E-7 E9565 I I I RR-33  !

, > D-356356-2 D-9 E5938 4

2' HCC-204 D-356353-1 H-8 E9130, I I I RR-33 E9150,

~] t E9151

3/4" HCC-203 D-356353-1 J-9 E8645, I I I RR-33 M8062 4

i' 3/4" HCC-203 D-356359-6 A-5 E8645, I I I RR-33 .

i MB062 I l 3/4" HCC-227 D-356353-1 H-9 E8650 I I I RR-33 1

( 3/4" HCC-227 D-356359-6 A-5 E8650 I I I RR-33 2* HCC-211 0-356353-1 D-7 E9210, I I I RR-33 i

! E9211 i > D-356356-4 E-4 E5445  ;

4 1" HCC-211 D-356353-1 0-7 M8063 I I .I RR-33 l 2" HCC-212 D-356353-1 D-7 E5469 I I I RR-33 3P12-6 Rev.: 0 i

.. _ _ _ , . _ ._ . - , . . . . . . - , - . . - . . ~ . . . . . ~ . . . . . - . . . - . . - . . . . - ~ , . - . . . - . ~ . - - . - . . . - . . - - .

n i

i . i

! il j' 'I i<

i:

'f .i t :1 i 4 c.

.~ .)  ; '

.O

~

9 6 s 0- k

. r 0 N- a m  :

2 R

e .

- v P /

s e N R

_ F e t

o N

s t t n fs 3 3 3 3 3 3 3 e ee 3 3 3

3 3 3 3 3 3 3 3 3 n i u 3

- op l q ee R R R R R R R R R R R R R R R R R R R m RR R o

C I I I I I I I I I 3 2 I d

s o s i a r l e I I I I I I I I I C P1 I n

,a m a

2l P x t E I I I I I I I O

it 3 I I I ns Ue T . _

e g , , , , , , , 7 _

tr w 202 0 0 6 2 345 13 00 10 - ,.

nu D 9 9 7 2 780 8 8 6 7 333 26 56 56 2 _

as 6 6 5 7 000 25 05 75 1 l s 0 4 4 0 880 8 8 99 88 88 P 5 5 5 8 889 8 8 9 8 888 Pe r 1 E E M EEE E E E E MMM EE ME EE 3 rP a

em l e d 1

7 7 .

1 4 7 9 7 7 .

ct r 8 7 7 4 us o - -

E H

F B D C E C C H Ny o D H .

S C .

y 1 1 6 1 3 1 1 1 3 .

e 1 3 1 9

l

y. 3 3 9 3 6 3 3 3 .

r 3 9 3 5 5 5 5 5 5 5 5 a ro 5 5 5 5 3 3 3 3 3 3 3 3 3 F dN 3 3 3 6 6 6 6 6 6 6 B 6 5

5 5

6 5

6 5

6 5 5 5 5 5 5 5 5 .

3 3 3 3 3 3 3 3 3 3 M I g 3 3 - - - - - - - -

Sw - - - -

D D D D 0 0 D D D D D _

. ID D _

J _

.o r N -

e t o a r -

W d y

p H U

e k

a M

  • r 2 0 0 2 2 o

O 1 1 2 2 2 2 3 t - - 2 6 c 1 C

0 C C 3 2 1 2 a 2 C 2 C C 2 - 6 - 6 e . -

H 2 H H 2 C 2 C 6 R o C

- - C - C -

N C C H C H C

- H C " "

C C e "4 C 4 4 C H 2

n " / H / / H " H "

1 P i 1 > 3 3 3 > 1 1 2 L 2 2" "2 1 -

< \ !

y  !'  ; E0 i[' j;  ! '  !!' .it  ! ,i 11 !

! , ,1 , ,  ! ' ' ?I

m. I 9

6 s

., 0 k _

- r M- a 2

m e

0

- R P / v N s e F e R t _

o ._

N ._

s .

t t -

n fs -

e ee 3 3 3 3 3 3 3 3 3 -

n iu 3 3 3 3 3 3 3 3 3 o

p l q ee R R

R R

R R

R R

R m RR R R R R R R R R R -

o C

3 2 I I I I i~ I I I I d

s' s

i o

a r _

l e _

C P1 I I I I I I I I I -

n .

2l

,a m a .

P x _

t E it 3 I I I I I I I I I ns Ue -

T e g ._

tr w 8 nu D 1 7 0 7 1 7 2 7 7 7 1 -

as 6 3 6 1 6 4 5 6 6 3 5 2 l s 0 5 6 8 0 5 2 0 5 5 9 7 1

._ Pe 5 8 8 8 8 9 9 8 9 9 5 8 P r 1 E E E M E E M E E E E 3 rP _

a em l e d 0

L

_. ct us r

o 8

8 8

1 5

8 89 6

1 2

4 6

_ Ny o 0 H H H H G HC F C H E H y-S C ..

e 1 1 1 5 1 2 3 1 4 1 6 3 -

l - - - - - - - - - - -

r

y. 3 3 3 9 3 9 9 3 6 3 9 9 a ro 5 5 5 5 5 5 5 5 5 5 5 5 F dN 3 3 3 3 3 3 3 3 3 3 3 3 B 6 6 6 6 6 -

_ . . 5 5 5 5 5 6

5 6

5 6

5 6

5 6

5 6

5 6

5 M I g 3 3 3 3 3 3 3 3 3 3 3 3

., Sw - - - - - - - - - - - - .

. ID D D D D D D D D D 0 D D

, J .

o -

r N e

t a

o r .

W d y .

p H U

e .

k -

a M

r 4 e 5 t 1 4 9 1 9 c

a

- 5 1 2 2 - ,

C e .

' 4 5 C 1

5 1

9 2

2 2

2 R

N o 1 C

H C

C H

2 C

2 C

C C

H C

C H

. C C

H 2 e C 4 C C -

1 n H / " H H " _

P i > 3 1 > 4" > 4 > 4" _

2 L " " " / / / -

1 1 1 3 3 3 _

j -

4 i j!i:  : , l ,!  : ,l' i  :! ' iji. :l: l l:I! i !  ;

~ -

1 J. M. Farley Nuclear Plant - Unit 2, Class 3 Components- FNP-2-N-069 2P16- Service Water ,,

ISI Boundry Examination Period Relief Notes And/Or Component Drawing No. Coord. Loc. Drawing Third First Second Request Remarks SERVICE WATER

STRAINERS Q2P16-F503A D-356368-1 E-1 0-200089 I I I RR-33 FOR COOLING AND LUBE WATER OF S.W. PUMPS Q2P16-F503B D-356368-1 E-12 D-200089 I I I RR-33 FOR COOLING AND LUBE
  • WTR-S.W. PUMPS.

CONTAINNENT C3OLERS Q2E12-H001A-A' D-356344-4 C-2 0-205050 I I I RR-37 l Q2E12-H001B-A D-356344-4 G-2 0-205050 I I I RR-37 Q2E12-H001C-B D-356344-4 C-6 D-205050 I I I RR-37

CONTAllWIENT SPRAY ,

i PUMP RM. COOLERS Q2E16-H002A-A D-356344-2 E-6 D-205063 I I I RR-37 l

Q2E16-H0028-B D-356344-2 B-6 D-205063 I I I RR-37 RHR/LHSI PUMP RN.

COOLERS

l. 02E16-H0038-B D-356344-2 A-6 D-205%3 I I I RR-37 I Q2E16-H0038-B D-356344-2 A-6 D-205%3 I I I RR ' '

COMPONENT COOLING PUMP RM. COOLERS 3PI6-1 Rev.: 0  ;

_ __ . _ , _ - . _ . _ . _ - . _ _ _ _ _ _ - _ _ _ _ . _ _ . _ _ . _ . _ . _ . ~ . _ _ _ _ _ . . _ . _ _ - - _ . _ . . -

.s s '

J. M..Farley Nuclear Plant - Unit 2, Class 3 Components -FNP-2-M-069

~2P16- Service Water ,

System Pressure Test Plan ISI Boundry Examination Period Relief Notes And/Dr

. Component Drawing No. Coord. loc. Drawing Third First Second Request Remarks Q2E16-H004A-A .D-356344-2 C-6 D-205063 I I I RR-37

! Q2E16-H0048-B D-356344-2 D-6 D-205063 I I I RR-37 AUX. FEEDWATER PUMP RM. COOLERS .

Q2E16-H005A-A D-356344-2 B-3 D-205063 I I I RR-37 Q2E16-H0058-B D-356344-2 D-3 D-205063 I I I RR-37 t

, BATTERY CHARGING ROOM 2

C0OLERS -

Q2E16-H006A-A D-356344-3 A-3 D-205057 I I I RR-37 Q2E16-HO%B-B D-356344-3 C-3 D-205057 I I I RR-37 Q2E16-H0060-AB D-356344-3 B-3 D-205057 I I I RR-37

~

MCC-2A ROOM ACU Q2E16-H007-A D-356344-3 E-3 D-205056 I I I RR-37

~

MCC-28 ROOM ACU 02E16-H008-B D-356344-3 F-3 D-205057 I I I RR-37 -

i 7

600V LOAD CENTER 2D  :'

i ACu Q2E16-H009-A D-356344-3 G-3 D-205061 I I I RR-37 .

~

600V LOAD CENTER 2E ' ~

MU .

i 3PI6-2 Rev.: 0

.e s e .v-- - e- ,r 3--%- , -.,s -.-,e --# - --,+-w - m, -.%.. _ , v--e.ew e-- + -+-e-.+ . , , . , , . .*-,,,w-.m ev--

3 ,r) ,e)

.(

/

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 2P16- Service Water . ,

- System Pressure Test Plan ..

ISI Boundry Examination Period Relief Notes And/Or Component Drawing No. Coord. Loc. Drawing Third First Second Request Remarks Q2E16-H010-B D-356344-3 H-8 D-205062 I I I RR-37 CHARGING PUMP ROOM COOLERS I RR-33,37 Q2E16-H001A-A D-356344-3 F-9 D-205058 I I 02EI6-H0018-AB D-356344-3 D-9 D-205058 I I I RR-33,37 ,

Q2EI6-H0010-B D-356344-3 A-9 D-205058 I I I RR-33,37 SERVICE WATER STRAINERS Q2P16-F501A D-356370-2 0-11 0-200089 I I I RR-33 MAIN S.W. STRAINER Q2P16-F501B D-356370-2 D-3 D-200089 I I I RR-33 MAIN 5.W. STRAINERS SERVICE WATER PUMPS

Q2P16-P001A-A D-356370-2 J-3 D-200089 I I I RR-31,33 Q2P16-P0018-A D-356370-2 J-5 D-200089 I I I RR-31,33 i

Q2PI6-P001C-AB D-356370-2 J-7 D-200089 I I I RR-31,33 Q2P16-P0010-B D-356370-2 J-9 D-200089 I 'I I RR-31,33 1

i 02P16-P001E-B D-356370-2 J-11 D-200089 I I I RR-31,33 COMP. COOLING NT.

EXCH.

Q2Pl7-H001A-B -D-356344-1 F-3 D-205063 I I I RR-36 TUBE SIDE  !

3P16-3 Rev.: 0 4 --._ sr . -  % ,- . -

. . - . - - .%-. . .e~ ...-- . . - . . . - - , - - - - , . - ...- --e..

,~, -(~

- (s J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 2P16- Service Water System Pressure Test Plan ISI Boundry Examination Period Relief Notes And/Dr Component Drawing No. Coord. Loc. Drawing Third First Second Request Remarks Q2Pl7-H0018-AB D-356344-1 G-3 D-205063 I I I RR-36 TUBE SIDE

.~

Q2Pl7-H001C-A D-356344-1 H-3 D-205063 i I I RR-36 TUBE SIDE DIESEL GEN. SW. HT.

EXCH.

QSR43A501-A D-356370-3 F-11 I I I RR-33 QSR43A502-B D-356370-3 F-4 I I I R.R-33 QSR43A503-A D-356370-3 F-9 I I I RR-33 QSR43A504-8 D-356370-3 F-3 I I I RR-33 QSR43A505-B D-356370-3 F-5 I I I RR-33 3PI6-4 Rev.: 0

^

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2P16- Service Water _

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 42* KBC-201(TR. A) D-356370-2 E-1 E6(13), I I I RR-33,35 TRAIN A, S.W. SUPPLY E46,E67

> D-356370-8 F-3 El,E6(7, TRAIN A, S.W. SUPPLY 12),E57, E61,E65 1/2" HBC-201 0-356370-8 E-2 E5185 I I I RR-33 TO VALVES V5948 1/2" HBC-201 D-356370-8 E-2 E5185 I I I RR-33 TO VALVE V5958 1/2" HBC-342 D-356370-2 H-2 E5576, I I I RR-33 TO VALVE QV698 WO20597 1/2" HCC-342 D-356370-2 H-4 E5577, I I I RR-33 TO VALVE QV699 WO20598 1/2" HCC-342 D-356370-2 H-6 E5578, I I I RR-33 TO VALVE QV700 WO20599 3/4" HBC-214 D-356370-2 F-6 E5818 I I I RR-33 TO VALVE QV640 3/4" HBC-214 D-356370-2 F-2 E5817 I I I RR-33 TO VALVE QV639 D-356370-2 H-2 E5576, I I I RR-33 TO VALVES QV590, QV585 2" HBC-200 (V)

WO20597 0-356370-2 H-4 E5577, I - I RR-33 10 VALVES QV581, QV586 2"HBC-200'(V) 1 WO20598 3P16-5 Rev.: 0

O S O O J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan -

2P16- Service Water -

ISI Bdry Exam Period Relief l_ine No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks D-356370-2 H-6 E5578, I I I RR-33 TO VALVES QV582, QV587 4 2* HBC-200 (V)

WO20599 2" HBC-201 0-356370-2 B-2 E5809 I I I RR-33 TO VALVES Q2PI6V601

AND Q2P16V603 1

2* HBC-208 D-355370-8 D-2 EG2-151 I I I RR-33 4" CAPPED PIPE 2* HCC-345 D-356370-8 G-2. WO20642 I I I RR-33 S.W. TO TURBINE BLDG. ';

TO VALVE QV731A 6" HBC-214 D-356370-2 F-6 EG2-076, I I I RR-33 MIN. FLOW BY-PASS TO E67 WETPIT 8" HBC-214 D-356370-2 F-2 EG2-078, I I I RR-33 MIN. FLOW BY-PASS TO E67 WETPIT 8" HBC-233 D-356370-2 B-3 E5401 I I I RP--33 VACUUM BREAKER THRU  !

I Q2PI6V680 20" HBC-200 (IA) D-356370-2 G-1 EG2-077, I I I RR-33 DISCHARGE S.W. PUMP E67 P001A-A 20" HBC-200 (IB) 0-356370-2 G-3 EG2-077, I I I RR-33 DISCHARGE S.W. PUMP E67 P0018-A 20" HBC-200 (IC) D-356370-2 G-5 EG2-077, I I I RR-33 DISCHARGE S.W. PUMP.,

E67 P001C-AB 30" HBC-208 D-356370-8 D-3 EG2-151, I I I RR-33,35 S.W. TO AUX. BUILDING E73 3PI6-6 Rev.: 0

Yl v

0 J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan ir

, 2PI6- Service Vater $.

-ISI Bdry Exam Period Relief

, Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Pequest Notes /Reparks 36' HBC-206 D-356370-2 C-2 E46, I I I RR-33 STRAINER BY-PASS E8913 D-356370-2 F-10 EI25(5, I I I RR-33,35 TRAIN B-5.W. SUPPLY TO 02" KBC-201(TR. B) 6),E8(4, AUX. BLDG.

5),E47, i E67

> D-356370-8 D-6 E2, E8(6),

E55,EEO, E64

, 1/2" HBC-201 (A) D-356370-8 E-5 E5185 I I I RR-33 TO VALVE V595A I/2" HBC-201 (B) D-356370-8 E-5 E5185 I I I RR-33 TO VALVE V594A

~

I/2" HCC-342 .D-356370-2 H-8 E5579, I I I RR-33 TO VALVE QV701 WO20600 1/2" HCC-342 D-356370-2 H-II E5580, I I I RR-33 TO VALVE QV702 WO20601 3/4" HBC-214 D-356370-2 F-9 E5819 I I I RR-33 TO VALVE QV641 2" HBC-200 (V) D-356370-2 H-8 E5579, I I I RR-33 TO VALVES QV583 AND WO20600 QV588 ,

2" HBC-200 (V) D-356370-2 H-10 E5580, I I I RR-33 TO VALVES QV584 AND WO20601 QV589 3P16-7 Rev.: 0 -

~"

3 i

~

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Presture Test Plan .,

2P16- Service Water .,.

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 2" HBC-201 0-356370-2 B-Il E5810 I I I RR-33 TO VALVES Q2PI6V599 AND Q2PI6V602 2* HBC-208 D-356370-8 C-6 EG2-151 I I I -RR-33 4" CAPPED PIPE .

l 2* HBC-231 D-356370-2 F-10 E5193 I I I RR-33 CHLORINATOR INJ. WATER l 2* HCC-345 D-356370-8 F-6 E5808, I I I RR-33 S.W. TO TURBINE BLDG.

WO20644 TO VALVE QV7318 i 8* HBC-214 D-356370-2 F-8 EG2-078 I I I RR-33 MIN.-FLOW BY-PASS 8" HBC-233 D-356370-2 B-10 E5400 I I I RR-33 VAC. BREAKER TO VALVE QV679 20" HBC-200 (ID) D-356370-2 G-8 EG2-077 I I I RR-33 DISCHARGE S.W. PUMP '

P0010-8 20" HBC-200 (IE) D-356370-2 G-10 EG2-077 I I I RR-33 DISCHARGE 5.W. PUMP

' P001E-B i

, 20" HBC-200 (BF) 0-356370-2 F-Il E67, I I I RR-33 BRANCH CONNECTIDN WITH EG2-077 BLIND FLG. - -

30" HBC-208 D-356370-8 D-6 E96, I I I RR-33,35 S.W. TO AUX. BLDG.

EG2-151

~

36* HBC-206 D-356370-2 C-11 E8913 I I I RR-33 STRAINER BY-PASS

~ '

42' KBC-202(TR. A) D-351130-2 E-8 E4,E50, I I I RR-33,35 TRAIN A, S.W. RETURN E58,E62 TO STOR. POND FLUME 3P16-8 Rev.: 0

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 2P16- Service S ter ,,

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 42' KBC-202(TR. 8) D-351130-2 E-8 E3,E52, I I I RR-33,35 TRAIN B, S.W. RETURN E59,E63 TO STOR.. POND FLUME.

30' HBC-211(TR. A) D-356370-8 A-8 E5141, I I I RR-33,35 TRAIN A-5.W. RETURN TO E5137, HEADER 42" KBC-202,

EG2-151 30" HBC-211 (TR. B)

AND 2VB-3

> EG2-387 1/2" HBC-211 (V) D-356370-8 B-12 EG2-387 I I I RR-33 TO VALVE QV752 30' HBC-211(TR. 8) D-356370-8 A-8 E5136, I I I RR-33,35 TRAIN 8 S.W. RETURN TO E5141, HEADER 42" KBC-202 AND EG2-151 VALVE V550 EG2-387 1/2" HBC-211 D-356370-8 A-Il E5187 I I I RR-33 TO VALVE QV624 i

20' HBC-211 0-356370-8 A-13 M5818, I I I RR-33 TO VALVE QV560 EG2-387 30' HBC-212 D-356370-8 E-12 EG2-387, I I I RR-33 S.W. FROM 30" HBC-211 WO20ll8 TR. 8 TO VALVE QV54 9

l 1/2" HBC-212 D-356370-8 D-12 ES211, I I I RR-33 TO VALVE QV644 IN .

WO20ll8 VALVE BOX 2VB-4 3/4" HBC-212 D-356370-8 D-12 E5211, I I I RR-33 TO VALVE QV644 IN WO20ll8 VALVE BOX 2VB-4 3P16-9 Rev.: 0

3 p

] G G J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan ,

2P16- Service Water ,,

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 24' NBC-26(TR. A) D-356344-1 F-2 E73, I I I RR-33 TRAIN A-AUX. BLDG. ,

EG2-153, MAIN S.W. HEADER ,

EG2-211 3/4" HBC-26 (V) D-356344-1 0-1 E6061 I I I RR-33 VENT (I) TO VALVE QV246A D-356344-1 C-1 E6202 I I I RR-33 TO PT3001A, TO VALVE 3/4" HBC-26 QV264 .

3/4" HBC-27 D-356344-1 G-2 E6217 I I I RR-33 TO VALVE QV266B
(PI3005B) 3/4" HBC-27 D-356344-1 H-2 E6266 I I I RR-33 TO VALVE QV266C ,

(PI3005C) s 1" HBC-26 (D) ,

D-356344-1 H-2 E6049 I I I RR-33 DRAIN (1) TO VALVE QV248A

, 24' HBC-26(TR. 8) D-356344-1 F-2 E96, I I I RR-33 TRAIN B-AUX. BLDG.

EG2-153, MAIN 5.W. HEADER l

EG2-210  ;

> EG2-211 3/4" HBC-26 (V) D-356344-1 0-2 E6060 I I I RR-33 VENT (1) TO VALVE Q2P16U2468 ,

3/4" HBC-26 ,

D-356344-1 0-2 E6209 I I I RR-33 TO QV265(PT3001B) 3PI6-10 Rev.: 0

- ~

,m en o

^

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan 2P16- Service Water _

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" HBC-27 D-356344-1 F-2 E6207 I I I RR-33 TO VALVE QV266A (PI3005A) 1" HBC-26 (0) D-356344-1 E-2 E6051 I I I RR-33 DRAIN (1) TO VALVE Q2P16U246 i 24" HBC-46(TR. A) D-356344-1 H-5 EG2-153, I I I RR-33,35 TRAIN A S.W. RETURN TD EG2-221 STDR. POND FLUME

{ > D-356370-8 C-9 l

2 3/4" HBC-46 D-356344-1 H-4 E7066 I I I RR-33 TO PI3006C D-356344-1 J-5 E6216 I I I RR-33 TO VALVES QV269A,8, 3/4" HBC-46 FT3009C 3/4" HBC-46 ,

0-356344-1 H-5 E6688 I I I RR-33 TO PSV3007C 3/4" HBC-46 (V) D-356344-1 J-5 E6103 I I I RR-33 VENTS (1) TO VALVE QV259A i

3/4" HBC-46 (V) D-356344-1 H-4 E6691 1 I I RR-33 VENTS (1) TO VALVE QV004C 3/4" HBC-46 (V) D-356344-1 H-5 E6101 I I I RR-33 VENTS (I) TO VALVE QV004F l' HBC-46 (D) 0-356344-1 J-5 EG2-153 I I I RR-33 DRAIN (1) TO VALVE ~

QV329 '

t 3P16-11 Rev.: 0 4

w -- . =e w . . - rg,- 4 w , - so.r --

s v, - -~

i p (- . ,~, ,

N.,

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069

.. System Pressure Test Plan 2P16- Service Water ,.

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 1" HBC-46 (D) D-356344-1 H-4 E6102 I I I RR-33 DRAIN TO VALVE QV258A 2" HBC-46 D-356344-1 H-4 E669B I I I RR-33 10 VALVE QV005E TO EQUIP DRAIN (CLASS III) 2" HBC-46 (D) D-356344-1 H-4 E6704 I I I RR-33 DRAIN TO VALVE QV005F TO EQUIP DRAIN 20" HBC-46 D-356344-1 H-4 EG2-221 I I I RR-33 5.W. FROM HT. EXCH.

H001C-A 24" HBC-46(TR. B) D-356344-1 H-5 EG2-220 I I I RR-33,35 TRAIN B S.W. RETURN TO STOR POND FLUME

> D-356370-8 A-9 EG2-153 3/4" HBC-46 (V) D-356344-1 H-6 E6044 I I I RR-33 VENTS (1) TO VALVE QV259B 3/4" HBC-46 (V) D-356344-1 H-5 E6689 I I I RR-33 VENTS (1) TO VALVE QV004A 3/4" HBC-46 (V) D-356344-1 H-5 E6042 I I I RR-33 VENTS (I) TO VALVE QV004D 3/4" HBC-46 0-356344-1 H-6 E6265 I I I RR-33 TO VALVES QV267A,B TO FT3009A 3/4" HBC-46

~

D-356344-1 H-4 E6214 I I I RR-33 TO PI3006A 3P16-12 Rev.: 0

I O t'O O  %.)  %,I J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2P16- Service Water .

ISI Bdry Exam Period Relief line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 I 2 Request Notes / Remarks 3/4" HBC-46 D-356344-I H-4 E6686 I I I RR-33 TO PSV3007A l' HBC-46 (D) D-356344-1 F-5 E6043 I I I RR-33 DRAINS (4) TO VALVE QV2588 i 1/2* HBC-46 D-356344-1 H-4 E6686 I I I RR-33 TO PSV3007A 2" HBC-46 (D) D-356344-1 H-6 E6694 I I I RR-33 DRAINS (1) TO VALVE QV005A 2" HBC-46 D-356344-1 H-6 E6700 I I I RR-33 DRAINS (I) TO VALVE QV005B 20" HBC-46 D-356344-1 F-4 EG2-220 I I I RR-33 S.W. FROM HT. EXCH.

!00iA-B

, 24' HBC-207(TR. A)  ; D-356370-8 G-3 EG2-150, I I I RR-33,35 DILUTION BY-PASS E99 1/2" HBC-207 D-356370-8 D-9 ES202 I I I RR-33,35 TO VALVE QV643 D-356370-8 D-9 Eb202 I I I RR-33,35 TO VALVE QV643 3/4" HBC-207 D-356370-8 E-7 E100, I I I RR-33,35 DILUTION BY-PASS 24" HBC-207(TR. 8)

EG2-150 1/2" HBC-207 D-356370-8 E-3 E5200 I I I RR-33,35 TO VALVE QV642 D-356370-8 E-3 E5200 I I I RR-33,35 TO VALVE QV642 3/4" HBC-207 ,

1 3PI6-13 Rev.: 0

( - O~, u i

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 ,

, System Pressure Test Plan-

'2P16- Service Water 1

. ISI Bdry .

Exam Period Relief Line No. Hydro No. Dwg. No. 00isid. 150 Dwg. 3 1 2 Request Notes / Remarks 24" HBC-209(TR. A) 0-356370-8 E-3 EG2-152 I I I RR-33,35 S.W. SUPPLY TO TURBINE BLDG, FROM TRAIN A I I I RR-33,35 S.W. SUPPLY TO TURBINE 24" HBC-209(TR. B) 0-356370-8 E-5 EG2-152 BLDG. FROM TRAIN B 0-356370-8 D-10 EG2-154 I I I RR-33,35 S.W. RETURN FROM 24" HBC-210(TR. A)

TURBINE BLDG TO 42" KBC-202 (TRAIN A)

, 24" HBC-210(TR. B) D-356370-8 B-10 EG2-154 I I I RR-33,35 S.W. RETURN FROM TURBINE BLDG TO 42" KBC-202 (TPAIN B) 20' HBC-27(TR. A) D-356344-1 H-2 EG2-211 I I I RR-33 TRAIN A SUPPLY TO CCW HT. EXCHANGER H001C-A 3/4" HBC-27 (V) D-356344-1 H-3 EC2-211 I I I RR-33 VENT (I) FROM C.C. HT.

4 EXCH.

1" HBC-27 (D) D-356344-1 H-3 E6048 I I I RR-33 DRAIN (1) 1 1/2" HBC-27 D-356344-1 H-3 E6048 I I I RR-33 TO PSV 3007C ,

j 2" HBC-27 (D) D-356344-1 H-3 E6048 I I I RR-33 DRAINS (2) FROM C.C.

HT. EXCH.

2G HBC-27(TR. A/B) D-356344-1 G-2 EG2-211 I I I RR-33 TRAIN A/B S.W. SUPPLY

. TO CCW HT. EXCH.

H0018-AB 3P16-14 Rev.: 0

i J. M. Farley Nuclear Plant - Unit 2, Class 3 Components

~

FNP-2-M-069.

System Pressure Te:;t Plan 2P16- Service Water _.

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. Request-ISO Dwg. 3 1 2 Notes / Remarks 3/4" HBC-27 (V) D-356344-1 G-3 EG2-211 I I I RR-33 VENT (1) FROM HT.

EXCH.

1" HBC-27 (D) D-356344-1 G-2 E6047 I I I RR-33 DRAIN (1) 4 1 1/2" HBC-27 D-356344-1 G-3 E6047 I I I RR-33 TO PSV 3007B 2" HBC-27 (D) 0-356344-1 G-2 E6047 I I I RR-33 DRAINS (2) FROM HT.

EXCH.

20' HBC-27(TR. B) D-356344-1 E-2 EG2-210 I I I RR-33 TRAIN B-SUPPLY TO CCW HT. EXCH. H001A-B

.l l 3/4" HBC-27 (V) D-356344-1 F-3. EG2-210 I I I RR-33 VENT (1) FROM HT.

! EXCH.

1" HBC-27 (D) 0-356344-1 F-3 E6050 I I I RR-33 DRAIN (1) 1 1/2" HBC-27 D-356344-1 F-3 E6050 I I I RR-33 TO PSV 3007A 2" HBC-27 (D) D-356344-1 F-3 E6050 I I I RR-33 DRAINS (2) FROM.HT.

< EXCH.

i 20" HBC-46(TR. A/B) D-356344-1 G-4 E6208 I I I RR-33 TRAIN A/B. S.W. RETURN FROM CCW HT. EXCH.

H001B-AB 1/2" HBC-46 D-356344-1 G-4 E6208 I I I RR-33 TO VALVE QV268A,B TO' FT30098 l

3P16-15 Rev.: 0

e m, O

C- -)

-l J. N. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2P16- Service Water _',

ISI Bdry .

Exam Period Relief Lina No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks

] 3/4" HBC-46 (V) D-356344-1 H-4 E6100 I I I RR-33 VENT (1) TO VALVE i QV004E 3/4" HBC-46 (V) D-356344-1 G-4 E6690- I I I RR-33 VENTS (1) TO VALVE QV0048 3/4" HBC-46 D-356344-1 H-4 E6222 I I I RR-33 TO PI3006B ,

1 1/2" HBC-46 D-356344-1 G-4 E6687 I I I RR-33 TO PSV30078-2" HBC-46 (D) D-356344-1 G-4 E6696 I I I RR DRAIN (1) TO VALVE QV005C 2" HBC-46 (D) 0-356344-1 G-4 E6702 I I I RR-33 DRAIN (1) TO VALVE QV005D 16' HBC-29(TR. A) D-356344-1 D-3 EG2-216, I I I RR-33 TRAIN A-HDR. TO CONT.

EG2-217 COOLERS I

1/2" HBC-29 D-356344-1 C-5 E6211 I I I RR-33 TO FT3013AA,AB 3/4" HBC-29 (V) D-356344-1 E-6 E6064 I I I RR-33 VENTS (1) TO VALVE QV247 -

3/4" HBC-29 (V) D-356344-1 C-6 E6000 I I I RR-33 VENTS (1) TO VALVE QV251A 3/4" HBC-29 (V) D-356344-1 B-8 E7605 I I I RR-33 VENTS (1) TO VALVE QV217A 1 1

3P16-16 Rev.: 0 i 1

W-6 d U V t

J.' M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 2P16- Service Water f.

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2- Request Notes / Remarks 3/4" HBC-29 D-356344-1 C-5 E6212 I I I RR TO PI3012A 3/4" HBC-29 D-356344-1 E-5 E6064 I I I RR-33 TO PI30128 1" HBC-29 (D) D-356344-1 C-5 E6041 I I I RR-33 DRAIN (1) TO VALVE QV286 1" HBC-29 (D) D-356344-1 C-6 E6037 I I I RR-33 DRAIN (1) TO VALVE QV252B 1" HBC-29 (D) D-356344-1 B-6 E6001 I I I RR-33 DRAIN (1) TO VALVE QV252A 1" HBC-29 (D) D-356344-1 B-7 E7831 I I I RR-33 DRAIN (1) TO VALVE QV253A 1 1/2" HBC-29 (A) D-356344-1 B-8 E7831 I I- I RR-33 TO VALVE PSV 3020 A 1 1/2" HBC-29 (B) D-356344-1 C-8 WO20554 I I I RR-33 TO VALVE PSV 3020 B 2" HBC-29 (D) D-356344-4 A-2, E7879,. I I I RR-33 DRAINS (8) 0FF 3" G-2 E7880, HBC-29(A & B)

WO20561

> WO20562 3" HBC-29 (A) D-356344-4 D-2 EG2-201, I I I RR-33 TYPICAL 4 PLACES WO20553 3" HBC-29 (B)

D-356344-4 H-2 EG2-201, I I I RR-33 TYPICAL 4 PLACES WO20553 l

3PI6-17 Rev.: 0

~

y.

=

f.- .

V . b i

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test' Plan 2P16- Service W'ater -,

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks 6" 118C-29 (A) D-356344-4 A-2 EG2-201 I I I RR-33 2 BRANCH LINES TO COOLER H001A-A 6" HBC-29 (B) D-356344-4 G-2 E203 I I I RR-33 4 BRANCH LINES TO COOLER H0018-A 10" HBC-29 (A) 0-356344-4 B-2 EG2-201 I I I RR-33 S.W. TO CONT. COOLER' H001A-A

10" HBC-29 (B) D-356344-4 E-2 E203 I I I RR-33 S.W. TO CONT. COOLER H0018-A 10" HBC-35 D-356344-1 0-5, EG2-217 I I I RR-33 TO BLOWDOWN HT. EXH. &

E-2 LETDOWN CHILLERS TO VALVE QV052 D-356344-2 E-2 12" HBC-29 (A) D-356344-1 A-6 EG2-200, I I I RR-33 ' S.W. TO CONT. COOLER EG2-201, H001A-A EG2-217 12" HBC-29 (B) D-356344-1 C-6 EG2-202, I I I RR-33 S.W. TO CONT. COOLER -

EG2-203, H0018-A EG2-217 16" HBC-29(TR. B) D-356344-1 E-3 EG2-215 I I I RR-33 TRAIN B-HDR. TO CONT.

COOLERS 1/2" HBC-29 D-356344-1 E-5 E6276 I I I RR-33 TO FT3013BA & BB i

3P16-18 Rev.: 0 i

i

~. _,..:. o ,

. . . _ _ _ _w.... .

A-* **,,4, J. M. Farley Nuclear Plant - Unit 2, Class 3 Components. FMP-2-M-069 System Pressure Test Plan 2P16- Service' Water ,,

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks-3/4" HBC-29 (V) D-356344-1 D-6 .E6070 I I I RR-33 VENTS TO VALVE QV251B 3/4" HBC-E9 (V) D-356344-1 E-6 E7520 I I I RR-33 VENT (1) TO VALVE QV217E 3/4" HBC-29 (V) D-356344-1 E-6 E7520 I I I RR-33 VENT (1) TO VALVE QV217G 3/4" HBC-29 D-356344-1 E-6 E6269 I I I RR-33 TO PI30128 1" HBC-29 (D) D-356344-1 E-2 E6055 I I I RR-33 DRAIN (1) TO VALVE QV252D 1" HBC-29 (D) D-356344-1 E-6 E6056 I I I RR-33 DRAIN (1) TO VALVE QV252C 1" HBC-29 (D) D-356344-1 E-6 E7829 I I I RR-33 DRAIN (1) TO VALVE QV288C 1" HBC-29 (D) D-356344-4 E-6 E7829 I I I RR-35 DRAIN (1) TO VALVE QV2880 1 1/2" HBC-29 (C) D-356344-1 E-8 E7829 I I I RR-33 TO '/ALVE PSV 3020 C 1 1/2" HBC-29 (D) D-356344-1 F-8 E7829 I I I RR-33 TO VALVE PSV 3020 D 2" HBC-29 D-356344-4 8-6, EG2-190, I I I RR-33 DRAINS (8) 0FF 3" -

G EG2-205 HBC-29 (C & D) 3" HBC-29 (C) -

D-356344-4 D-6 EG2'-205 I I I RR-33 TYPICAL 4 PLACES 3P16-19 Rev.: 0

J M, )

k .

R R R R 66 E '_

._ E E E E N L L L L R6 2 V O O O O O O U4 V L S T T O O O O T - Q A 9 E C C C C EC V 6 s C SB S8 RB E V O 0

k r

A L

E -

NC E -

N0 T T

T T

.H L T M a P I1 I1 N N N N A B A 0 .

- m L0 L0 O O O O' W "4

. A A V )

2 e 4 0 0 C C C C S2 4 4 O

1

(

- R HH HH - 1 1 .

P / L C C O8 OB OB OB AO 0 0 T v .-

M s A NR NR T - T - T - T - T 3 3 S8 e  :

F e C AE AE 0 D C 0 N T T S N3 R t I RL RL .1 .1 .1 .1 I E F F T I5 o P BO BO W0 W0 W0 W0 AN N A2 N Y O O 0 0 0 0 RI O O E RV T 4C 4C SH SH SH SH TL T T V DQ s

t t n fs e ee 3 3 3 3 3 3 3 3 3 3 3 3 3

n iu 3 3 3 3 3 3 3 3 3 3 3 o l q - -

R R

R R

R R

R R

R R

p ee R R m RR R R R R R R R R R R R R o

C 2 I I I I I I I I I 3 I I I d

s o s i .

a r l e C P1 I I I I I I I I I I I I n

,a m 2l a P x t E it 3 I I I I I I I I I I I I 4

ns 4

Ue T . , ,

.e g 0 5 0 4 0 45 1 88 0 tr w 9 0 9 0 9 01 9 15 2 nu D 1 2 1 2 1 22 1 22 3 3 4 5 -

as - - - - - - - - - - 1 1 9 '1 6 l s 0 2 2 2 2 2 22 2 22 2 2 0 6 1 Pe 5 G G G G G GG G GG 6 6 6 5 P r 1 E E E E E EE E EE E E E E 3 rP a

em l e d 0 l 2 ,-

ct r 6 6 6 8 8 6 6 1 I 1 8 99 us o - - - - - - - - - - -

Ny o H B G E G E F H A A A BC S C y

e 4 4

4 4

1 1

1 1

1 1

1 1

l r y . 4 4 4 4 4 4 4 4 4 4 4 4 a ro 4 4 4 4 4 4 4 4 3

4 3

4 3

4 3

4 3

F dN 3 3 3 3 3 3 3 B 6 6 6 6 6 6 6 6 6 6 6 6

. . 5 5 5 5 5 5 5 5 5 5 5 5 M I g 3 3 3 3 3 3 3 3 3 3 3 3 Sw - - - - - - - - - - - -

. ID D D D D D 0 D D D D 0 D J

o N

o r

  • d y

H r

e t

s a ) )

.W ) ) ) ) A V

) ) ) C D C D ( )

=

e D C D ( ( ( ( . D c ( ( ( R 9 9 9 (

i 9 9 9 9 T 3 3 3 e

v 9 9 9 2 2 2 2 ( - - - 9 r 2 2 2 - - - - 9 C C C 3 e . - - - C C C C 3 B B B -

S o C C C B B B B - H H H C N B B B H H H H C B

- H H H B " H 6 e " " H 4 4" "4 1 n " "0 "0 2 2 / / / "

P i 3 "6 "6 1 1 1 1 " 3 3 3 1 2 L 4 1

4 , , I

(v")

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan ,

2P16- Service Water ._

ISI Bdry Exam Period Relief Lina No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks-2" HCC-238 D-356344-1 A-12 WO20495 I I I RR-33 TO RE0020-A 2" HCC-329 D-356344-1 A-12 WO20495 I I I- RR-33 TO RE0020-A 2" HBC-39 (D) D-356344-4 B-4, E7879, I I I RR-33 DRAINS (8) 0FF 6"

G-4 E7880 HBC-39.(1 & 2) 3" 188C-39 D-356344-1 B-9 M3975 I I I RR-33 TO FIRE PROTECTION 3" HBC-39 (A) D-356344-4 H-4 EG2-206 I I I RR-33 TYPICAL 4 PLACES 3" HBC-39 (B) D-356344-4 D-4 EG2-208 I I I RR-33 TYPICAL 4 PALCES 6" HBC-39 (A) D-356344-1 B-10 EG2-218 I I I RR-33 BY-PASS VALVE QV044A 6" HBC-39 (B) D-356344-1 D-10 EGZ-218 I I I RR-33 BY-PASS VALVE QV044B 10" HBC-38 -

D-356344-1 A-12 EG2-218 I I I RR-33 SW RETURN TO HEADER 14" HBC-39

> D-356344-2 E-4 EGZ-308 I I I RR-33 10" HBC-39 (A) D-356344-1 0-11 EG2-206, I I I RR-33 RETURN LINE FROM CONT..

EG2-207, COOLER H001A-A EG2-218

> D-356344-4 F-5 ,,

10" HBC-39 (B) D-356344-1 A-Il EG2-209, I I I RR-33 RETURN LINE FROM CONT.

EG2-218 COOLER H0018-A 3P16-21 Rev.: 0

. -- ~ . _ _ _ - - - _ _ _ . - _ _ .- _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ -

y' y

m g

,Y

~ - .

C, 0 J. N E . 3 3 R6 E V N 4 4 U4 V L O 0 0 T - L A "6 I S S V V 9 EC A V T E E Q Q.

6 s RB V F) C C C O F2 E A A E E 0

k r .H O T 0 T L L P

V V M a T & O P L L 0

- m W "4. ) B 8 ) R A A 2 e S2 ) 1 0 0 81 P 4 4 V V  :

- R - 1 ( 2 2 (( .

P / BO ( 0 0 E L L S S v M s T F SD 0 0 S9 R A A S S e F e N S7 N3 E E N3 I C C A A R t IE T1 I 5 R R I - F I I P P o AN N2 A2 AC P P - -

N RI EV RV O O RB O Y Y Y Y TL VQ DQ T T DH T T T B B s

t t n fs e ee 3 3 3 3 3 3 3 3 3 3 3 n iu 3 3 3 3 3 3 3 3 3 3 3 o l q - - -

R R

R R

R R

R p ee R R R R m RR R R R R R R R R R R R o

C 2 I I I I I I I I 3 I I I d

s o s i a r l e C P1 I I I I I I I I 1 I I

, m a

2 x

t E i 3 I I I I I I I I I I I

).. -

U n

g 9 67 67 9 2 9 9 2 ,

t w 1 99 90 , 5 9 9 9 9 2 n D 2 1 9 44 45 01 7 1 1 1 1 -

a - 7 2 00 00 38 9 - - - - 6 l 0 2 5 3 22 22 88 3 2 2 2 2 1 P 5 G 7 6 OO OO 77 O G G G G P 1 E E E WW WW EE W E E E E 3 r

a e .

l l l ;d 0 l l l l c r 5 1 l I l l 8 9 9 9 I I u o - - - - - - - - - - -

N o B H G E H H E G D H E G C

y e 4 1

1 1

1 1

1 1

4 4

1 1

l r y . 4 4 4 4 4 4 4 4 4 4 4 4 a ro 4 4 4 4 4 4 4 4 4 4 4 3

4 3

F dN 3 3 3 3 3 3 3 3 3 3 B 6 6 6 6 6 6 6 6 6 6 6 6

. . 5 5 5 5 5 5 5 5 5 5 5 5 -

M I g 3 3 3 3 3 3 3 3 3 3 3 3 S w - - - -

. ID D D D D D D D D D D D D J

o N

o r -

d y

H r

e t

a ) )

W B V

( ) ) ) ) ) )

e . D D C D C D c R 9 ( ( ( ( ( (

i T 3 8 9 v ( - 9 2 2 9 9 9 9 9 9

,, r 9 C 3 3 3 3 3 3 3 3 3 e . 3 B - - - - - - - - -

S o - H C C C C C C C C C N C B C B B B B B B B

- B " H H H H H H H H H 6 e H 4 1 n / " " " " " "

"6 P i > 3 1 2 "2 2 3 3 "3 6 2 L 4" 1

4 <

O O -

O .;~:4 J. M. Farley Nuclear Plant .- Unit 2, Class 3 Components FNP-2-M-069 2P16- Service Gater l_

-ISI Bdry Exam Period Relief i Line No. Hydro No. Dwg. No. Coord. . ISO Dwg. 3 1 2 Request Notes / Remarks 10" HBC-39 (C) D-356344-1 E-Il EG2-199, I I I RR-33 RETURN FROM CONT.-

EG2-219 COOLER H001C-B

> D-356344-4 B-9 10" HBC-39 (D) 0-356344-1 F-11 EG2-293 I I I RR-33 RETURN FROM CONT.-

COOLER H0010-8

> D-356344-4 F-9 12" HBC-201(TR. A) 0-356370-3 C-2 Ell 4, I I I RR-33,35 TRAIN A S.W. TO DIESEL Ell 5, GEN. BLDG Ell 6,

' ~'

E120 i

> EG2-495, EG2-496 f 3/4" HBC-201 (V) D-356370-3 .B-9 E2206 1 I I RR-33 VENTS (1) ~

1" HBC-201 0-356370-3 B-2 E5812, I I I RR-33 TO VALVES QV672,QV755 A-200766 i

1" HBC-201 0-356370-3 B-3 E5812, I I I RR-33 TO VALVES QV671,QV756 A-200766 6" HBC-201 D-356370-3 C-9 EG2-495 I I I RR-33 SUPPLY TO D.G. 503-A, 8" HBC-201 D-356370-3 C-10 EG2.495 I I I RR-33 SUPPLY TO D.G. 501-A 1

3P16-23 .Rev.: 0

  • * '13<
  • _______________u -

__._____m__-- -

t 1 a O

L E

S f

. E 9 I 1 V D 5 9 8 L V 2 2 A 9 O 1 7 7 V .

6 s T 2 2 V V 0 k P 2 Q, Q G .

- r . 2 3 , T M- a W. Q, V 3 4 0 m . Q 5 5 )

2 e SG S0 E

S7 EV S7 EV I

(

- R D E1 v

P / Bl V5 V VQ VQ N s B LV L L , L , S e F e N A1 A A1 A2 N4 R t I . V2 V V8 V8 I2 o AN P 6 6 A3 N RE O2 O OV OV RV TG TQ T TQ TQ DQ s 5 t

n fs t 3, e ee 3 3 3 3 3 3 n iu 3 3 3 3 3 3 o l q -

R R

R R

R p ee R R R R R m RR R R o

C ,

3 2 I I I I I I d

s o s i a r l e C P1 I I I I I I

,a'n m

2l a P' x t E I I it 3 I I I I O ns Ue T

e g 4

6 6

6 6 4 tr w 9 , ,7 ,7 2 nu D , , , 4 8 6 30 30 6 -

as 7891 - 4 0 10 10 0 . 6 l s O ll12 2 l 2 82 82 2 1 Pe S ll11 G l 2 5 - 5 - 2 P r I EEEE E E E EA EA E 3 rP a

em l e d ct' .r 2 5 5 2 3 5 us o - -

C C

C E

Ny o C E y S C

e' 3 3 3 3 3 3 l

r y. 0 0 0 0 0 0 a ro 7 7 7 7 7 3

7 3

F dN 3 3 3 3 B 6 6 6 6 6 6

. . 5 5 5 5 5 5 M I g 3 3 3 3 3 3 Sw - - - -

. ID D D 0 0 D D J

o N

o r

  • d y

H r .

e )

t )

a B V

( )

.'W . D e R 1 1 (

c T 0 0 O ( 2 i 2 1 1 1 v 1 - - 0 0 0 r 0 C C 2 2 2 e . 2 B B - - -

S o - H H C C C N C B B B

- B " " H H H 6 e H 4 4 1 n / / " " "

P i " > 3 3 1 1 1 2 L 2 1

"J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 2P16- Service Witer i .

ISI Bdry Exam Period Relief line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request- Notes / Remarks l' HBC-201 (D)

D-356370-3 E-6 E2206 I I I RR-33 DRAINS (1) TO VALVE QV325 6" HBC-201 D-356370-3 D-4 EG2-494 I I I RR-33 SUPPLY TO b.G. 504-B 8* HBC-201 (IB) D-356370-3 0-5 EG2-494 I I I RR-33 SUPPLY TO D.G. 502-B 8" HBC-201 (28) D-356370-3 D-7 EG2-497 I I I RR-33 SUPPLY TO D.G. 505-8 (UNIT-2) 12" HBC-204(TR. A) D-356370-8 E-10 EG2-498, I I I RR-33,35 TRAIN A-S.W. RETURN TO EG2-499, STOR. POND FLUME E108, E109

> E110

> D-356370-3 J-2 E5139, EG2-154, E62 3/4" HBC-204 (V) D-356370-3 J-4 E2205 I I I RR-33 VENTS (1) TO VALVE QV317 l' HBC-204 (D) D-356370-3 G-9 E2205 I I I RR-33 DRAINS (1) TO VALVE QV320 1" HBC-204 (D) D-356370-3 G-Il E2205 I I I~ RR-33 DRAINS (1) TO VALVE l QV321 3PI6-25 Rev.: 0-

) -

, i J. M.'Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan ,,

2P16- Service Water _

, ISI Bdry- Exam Period Relief Line No. Hydro No. 'Dwg. No. Coord. 150 Dwg. 3 1 2- Request Notes / Remarks

, 6" HBC-204 0-356370-3 H-9 EG2-_498 I I I RR-33 S.W. RETURN FROM D.G.

503-A-8" HBC-204 D-356370-3 G-Il EG2-498 I I I RR-33 S.W.' RETURN FROM D.G.

4 501-A 12" HBC-204(TR. B) D-356370-8 E-10 EG2-154, I I I RR-33,35 TRAIN B-S.W. RETURH TO EG2-492, STOR. POND FLUME E63,Elll

> Ell 2, Ell 3, E5138 3/4" HBC-204 (V) D-356370-3 H-3 E2205 .I I I RR-33 VENTS (1) TO VALVE

, 02P16V316 I ' D-356370-3 G-6 E2205 'I I I RR-33 1" HBC-204 (D) DRAINS (1) TO VALVE Q2P16V319 -

1" HBC-204 (D) D-356370-3 G-4 E2205 I I I RR-33 DRAINS (1) TO VALVE Q2P16V315 1" HBC-204 (D) 0-356370-3 G-5 E2205 I I I RR-33 DRAINS (1) TO VALVE Q2P16V318 6" HBC-204 D-356370-3 H-4 EG2-492 I I I RR-33 S.W. RETURN FROM D.G_.

504-B

~

8" HBC-204 (IB)

D-356370-3 G-5 EG2-492 I I I RR-33 S.W.' RETURN FROM D.G.

502-B.

3P16-26 Rev.: 0

[

?

J. M. Farley Nuclear Plant -' Unit 2, Class 3 Components FMP-2-M-069 j 2P16- Service Water ~_

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord.- 150 Dwg. 3 I 2 Request Notes / Remarks 8' HBC-204 (2B) D-356370-3 H-7 EG2-493 I I I 'RR-33 S.W. RETURN FROM D.G.

-503-B(UNIT-2).

8" HBC-28(TR. A) D-356344-2 A-2 EG2-211 I I I RR-33 TRAIN A-S.W. TO AUX.

FW. PUMP SUCTION. (T0 VALVE QV014A)

> D-356346-1 A-2 3/4" HBC-28 D-356344-2 B-2 E6805 'I I I RR-33_ TO PDI2918A 1" HBC-28 (D) D-356344-2 B-2 E6113 I I I RR-33 DRAINS (1) TO VALVE QV013A 2 1/2" HBC-28 D-356344-2 B-2 EG2-304 I I I RR-33 S.W. SUPPLY TO FW PUMP ROOM COOLER H005A-A 2 1/2" HCC-233 D-356344-2 B-2 WO20519 I I I RR-33 8" HBC-28(TR. B) D-356344-2 C-2 EG2-210 I I I RR-33 TRAIN B-5.W. TO AUX.

FW. PUMP SUCTION (TO VALVE QV0148) i > D-356346-1 E-2 3/4" HBC-28 D-356344-2 D-2 E6804 I I I RR-33 TO PDI24188 1" HBC-28 (D) D-356344-2 D-2 E6114 I I I RR-33 DRAINS (1) TO VALVE' QVOI3B 3P16-27 Rev.: 0

s p , 7, .

1

, h~ ~-

J. M. Farley Nuclear Plant - Unit 2, Class ~ 3 Components '. FNP-2-M-069 .-

System Pressure. Test Plan 2P16- Service Water .i -

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks

~

2 1/2" HBC-28 D-356344-2 D-2 E259 I I I RR -33 S.W. SUPPLY TO FW PUMP ROOM COOLER H0058-B 2 1/2" HCC-323 D-356344-2 D-2 WO20517 I I I RR-33 l

6" HBC-36 D-356344-1 0-5 EG2-310 I I I RR-33 .S.W. SUPPLY TO R.C.

PUMP MOTOR COOLERS-j

> D-356344-2 A-9 EG2-310 1" HBC-36 (D) D-356344-2 A-9 E6370 I I I RR-33 DRAINS (1) TO VALVE QV223

! 6" HBC-37 D-356344-2 A-11 EG2-310 I I I RR-33 S.W. RETURN FROM R.C.

PUMP TO HEADER 14" '

HBC-39 D-356344-1 G-10 EG2-310 1" HBC-37 (TC) D-356344-2 B-11 E6373 I I I RR-33 T.C. & DRAIN (1) TO VALVE QV221

, 4" HBC-34(TR. A) 0-356344-1 B-4 EG2-213 I I I RR-33 TRAIN A S.W. SUPPLY TO

CHARGING PUMP RM.

COOLER H001A-A

> D-356344-3 F-7 EG2-213 .,

3/8" HBC-34 (D) D-356344-3 F-8 E8869 -I I I RR-33 DRAINS (2) FROM COOLER TO VALVES QV038A &

QV241A 3P16-?B.. _

Rev.: 0 -

l

s s

[~r

\

,r

-(s i

! J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069-2P16- Service' Water i ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks-3/8" HBC-34 (V) D-356344 E-9 E8869 I I I RR-33 VENTS (2) FROM COOLER TO VALVES QV039A & >

QV242A 3/4" HCC-297 D-356344-3 E-8 WO20482 I I I RR-33 TO PDI 2923A TO VALVE

j. QV339A 3/4" HCC-325 (V) D-356344-1 C-4 WO20508 I I I RR-33 VENTS (1) TO VALVE QV250 1" HBC-34 (D) 0-356344-3 E-8 E6063 I I I RR-33 DRAIN (1) TO VALVE QV240 2" HBC-34 D-356344-3 F-8 WO20409 I I I RR-33 TO VALVE QV066A 2" HCC-325 0-356344-3 F-8 WO20450 I I I RR-33 S.W. TO COOLER H001A-A .

(2) LINES 2 1/2" HBC-34 0-356344-3 E-8 EG2-213, I I I RR-33 S.W. TO COOLER H001A-A t EG2-223 & ANOTHER TO VALVE i QV0378 i 4" HCC-325 D-356344-1 C-4 WO20508 I I I RR-33 S.W. TO COOLER H001A-A k

4* HBC-34(TR. B) D-356344-1 D-5 EG2-223 I I I RR-33 TRAIN B S.W. SUPPLY TO CHIRGING PUMP RM COOLER H0010-B ,,

> D-356344-3 B-7 EG2-223 i

i 3P16-29 Rev.: 0

. ,m, U. - U, U 0

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components ~FWP-2-M-069 System Pressure Test Plan ~

2P16- Service' Water ,

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/8" HBC-34 (D) D-356344-3 B-9 E8S/l I I I RR-33 DRAINS (2) FROM COOLER.

TO VALVES QV241C &

QV038C-3/8" HBC-34 (V) D-356344-3 A-9 E8871 I I I RR-33 VENTS (2) FROM COOLER

. TO VALVES QV242C &

QV039C 3/4" HCC-297 D-356344-3 A-8 WO20484 I I I RR-33 TO PDIZ923C TO VALVE QV337A 3/4" HBC-34 (V) D-356344-3 B-8 E6649 I I I RR-33 VENTS (1) TO VALVE QV290A 2" HBC-34 D-356344-3 B-8 WO20414 I I I RR-33 TO VALVE QV066C 2" HCC-297 , D-356344-3 B-8 WO20454 I I I RR-33 S.W. TO COOLER H001C-B (2) LINES 2 1/2" HBC-34 D-356344-3 B-8 EG2-223 I I I RR-33 S.W. TO COOLER H001C-B EG2-307, WO20571 2 1/2" HBC-34 D-356344-3 C-8 EG2-223 I I I RR-33 TO VALVES QV037C AND QV0370 4" HCC-325 D-356344-1 D-5 I I I RR-33 S.W. TO COOLER H001,C-B 4" HBC-40(TR. A) D-356344-1 B-13. EG2-214 I I I RR-33 TRAIN A S.W. RETURN TO HEADER 14" HBC-39 3PI6-30 Rev.: 0

( _ .. ._%m- ------m,-.w-_

_ -sma-a.,m_-

F O :

O O J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan 2P16- Service Water .__

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks

> D-356344-3 F-Il EG2-214 3/4" HBC-40 D-356344-3 E-10 E6347 I I I RR-33 TO VALVE PSV3140A, TO VALVE QV040A 3/4" HCC-298 D-356344-3 E-9 WO20482 I I I RR-33 TO PDI2923A TO VALVE QV339B 3/4" HCC-326 (V) D-356344-1 B-12 WO20510 I I I RR-33 VENTS (1) TO VALVE QV255 1" HBC-40 (D) D-356344-3 -E-Il E6066 I I I RR-33 DRAIN TO VALVE QV281 l' HCC-326 (D) D-356344-1 B-12 WO20510 I I I RR-33 DRAINS (1) TO VALVE QV256 2" HBC-40 D-356344-3 F-10 WO20404 I I I RR-33 TO VALVE QV067A 2" HCC-298 D-356344-3 F-9 . WO20451 I I I RR-33 S.W. RETURN (2) LINES 2 1/2" HBC-40 D-356344-3 F-10 EG2-214, I I I RR-33 S.W. RETURN (2) LINES EG2-224 4" HCC-326 D-356344-1 B-12 WO20510 I I I RR-33 RETURN TO HEADER 14" HBC-39 4" HBC-40(TR. B) D-356344-1 H-Il EG2-224 I I i RR TRAIN B S.W. RETURN.,TO HEADER 14" HBC-39

> D-356344-3 'B-II EG22 224 3P16-31 Rev.: 0

-. - _ _ . .___ ___=

, y J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan ,

2P16- Service Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks D-356344-3 B-10 E6650 I I I RR-33 TO VALVE PSV31400, TO 3/4" HBC-40 VALVE QV040C 3/4" HBC-40 (V) 0-356344-1 B-10 E6651 I I I RR 33 VENTS (1) TO VALVE QV278 3/4" HCC-298- D-356344-3 A-9 WO20484 I I I .RR-33 TO PDI2923C TO VALVE QV3378 2" HCC-298 D-356344-3 B-9 WO20455- I I I RR-33 S.W. RETURN (2) LINES 2" HBC-40 D-356344-3 B-10 ~WO20414 I I I RR-33 TO VALVE QV067C 2 1/2" HBC-40 D-356344-3 B-10, EG2-224, I I I RR-33 S.W. RETURN (2) LINES C-11 EG2-307 4" HCC-326 ,,

D-356344-1 H-10 WO20512 I I I RR-33 RETURN TO 14" HBC-39 3" HBC-31(TR. A) D-356344-2 C-5 EG2-216 I I I RR-33 TRAIN A. 5.W. SUPPLY TO C. C. PUMP RM.

COOLER H004A-A

> D-356344-1 B-3 EG2-216 4 1" HBC-31 (D) 0-356344-1 D-6 E6065 I I I RR-33 DRAINS (1) TO VALVE QV023A-2 1/2" HBC-31 D-356344-2 C-6 EG2-216 I I I RR-33 S.W. SUPPLY TO C00CER '

H004A-A l

3P16-32 Rev.: 0 i i

t J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 i , System Pressure Test Plan ,

2P16- Service Water ..

i ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks-3" HCC-317 D-356344-1 C-2 WO20535 I I I RR-33 3" HBC-31(TR. B) D-356344-2 D-5 EG2-222 I I I RR-33 TRAIN B S.W. SUPPLY T0 C. C. PUMP RM. COOLER H0048-B

> D-356344-1 E-1 EG2-222

! 1" HBC-31 (D) D-356344-2 D-6 E6106 I I I RR-33 DRAIN (1) TO VALVE QV023B 2 1/2" HBC-31 D-356344-2 D-6 EG2-222 I I I RR-33 S.W. SUPPLY TO COOLER H004B-B 3" HCC-317 D-356344-1 E-1 WO20530 I I I RR-33 3" HBC-43(TR. A) ~

D-356344-2 D-8 EG2-258 I I I RR-33 TRAIN A S.W. RETURN TO 3 HEADER 14" HBC-39

> D-356344-1 C-13 3/8" HBC-43 (D) D-356344-2 C-6 E10012 I I I RR-33 DRAIN (1) ON COOLER QV236A .

3/8" HBC-43 (V) D-356344-2 C-6 E10012 I I I RR-33 VENT (1) ON COOLER QV237A ,

3/4" HBC-43 D-356344-2 C-6 E6806 I I I -RR-33 TO POI 2917A 3/4" HBC-43

~

D-356344-2 C-7 E6639 I I I RR-33 L?NE TO PSV3138A 9

3P16-33 Rev.: 0 i

[

J. M. Farley Nuclear Plant - Unit' 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan ,

2P16- Service Water ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks D-356344-2 D-7 I I 3/4" HBC-43 (V) E6640 I RR-33 VENT (1) TO VALVE-QV024A 2 1/2" HBC-43 D-356344-2 C-6 EG2-258 I I- I RR S.W. RETURN 3" HCC-318 D-356344-1 C-3 WO20535 I I I RR-33 3' HBC-43(TR. B) D-356344-2 D-7 EG2-222 I I I RR-33 TRAIN B S.W. RETURN TO HEADER 24" HBC-46

> D-356344-1 G-6 EG2-222 3/8" HCB-43 D-356344-2 0-7 EIO0ll I I I RR-33 DRAIN TO VALVE QV236B ON COOLER

3/8" HBC-43 (V) 0-356344-2 0-7 E10011 I I I RR-33 VENT TO VALVE QV237B ON. COOLER 3/4" HBC-43 D-356344-2 D-7 E6105 I I I RR-33 LINE TO PSV 3138B
3/4" HBC-43 D-356344-2 D-7 E6807 -I I I R-33 TO PDI2917B 3/4" HCB-43 (V) 0-356344-2 G-7~ E6104 I I I RR-33 VENT (1) -

4 2 1/2" HBC-43 0-356344-2 D-7 EG2-222 I I I RR-33 S.W. RETURN 3" HCC-318 D-356344-1 G-7 WO20530 I I I RR-33 ,

2 1/2" HBC-33(TR. A)" D-356344-2 F-5 EG2-302 I I I RR-33 TRAIN A S.W. SUPPLY TO CONT. SPRAY PUMP RM.

COOLER H002A-A 3P16-34 Rev.: 0

2;y.

t J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan ,

2P16- Service Water ..

ISI Bdry Exam Period. Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2- Request Notes / Remarks

> D-356344-1 A-4 EG2-302 1" HBC-33-(D) 0-356344-2 G-6 E6107 I I I RR-33 DRAIN (1) 2 1/2" HCC-319 D-356344-1 C-3 WO20537 I I I RR-33 i

2 1/2" HBC-33(TR. B) D-356344-2 G-5 EG2-305 I I I RR-33 TRAIN B S.W. SUPPLY TO CONT. SPRAY PUMP RM.

COOLER H0028-B

> D-356344-2 F-5 EG2-305 1" HBC-33 (D) D-356344-2 G-5 E6378 I I I RR-33 DRAIN (1) TO VALVE QV033B 2 1/2" HCC-319 D-356344-2 D-3 WO20540 I I I RR-33 2 1/2" HBC-34(TR. A/B) - D-356344-3 C-8 EG2-223, I I I RR-33 TRAIN A/B S.W. SUPPLY l EG2-306 TO CHARGING PUMP ROOM COOLER H001B-AB 3/8" HBC-34 (D) D-356344-3 D-9 E8870' I I I RR-33 DRAINS (2) FROM COOLER TO VALVE QV241B & .

. QV0388

3/8" HBC-34 (V) D-356344-3 D-9 E8870 I I I RR-33 VENTS (2) FROM COOLER

] TO VALVE QV039B & ,

QV242B 3/4" HBC-34 (V) -- D-356344-3 D-8 E6377 I I I .RR-33 .

VENTS (1) TO VALVE QV290B i

i l

3P16-35 Rev.: 0 3

~ - - - - -- - _ _ _ _ _ _ _ _

J. M. Farley Nuclear Plant - Unit 2, Class 3 Componerits FNP-2-M-069 ~

System Pressure Test Plan ,

2P16- Service Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks 3/4" HCC-297 D-356344-3 C-8 WO20483 I I I RR-33 TO PDI2923B TO VALVE QV338A 2" HBC-34 D-356344-3 D-8 WO20413 I I I RR-33 .TO VALVE QV066B 2" HCC-297 .D-356344-3 D-8 WO20452 I I I RR-33 LINES (2) TO H001B-AB

2 1/2" HBC-40(TR. A/B) D-356344-3 D-11 EG2-224, I I I RR-33 TRAIN A/B S.W. RETURN 4

EG2-306 TO HEADER 4" HBC-40 3/4" HBC-40 0-356344-3 D-10 E6376 I I I RR-33 TO VALVE PSV3140B,,TO VALVE QV040B l 3/4" HCC-298 D-356344-3 C-9 WO20483 I I I RR-33 TO POI 2923B TO VALVE ~

QV338G 2" HBC-40 D-356344-3 D-10 WO20413 I I I RR-33 TO VALVE QV067B 2" HCC-298 D-356344-3 D-9 WO20453 I I I RR-33 S.W. RETURN (2) LINES I 2 1/2" HBC-41(TR. A) D-356344-2 E-7 EG2-303 I I I RR-33 TRAIN A S.W. RETURN TO HEADER 14" HBC-39

> D-356344-1 B-13 EG2-303 3/8" HBC-41 (D) D-356344-2 E-7 E8873 I I I RR-33 DRAIN TO VALVE QV238A i

ON COOLER ,-

3/8" HBC-41 (V) ' 0-356344-2 E-7 E8873 I I I RR-33 VENT TO VALVE QV239A ON COOLER 3PI6-36 Rev.: 0

O 5:

O .,

OL s

^

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components- FNP-2-M-069 System Pressure Test Plan 2P16- Service' Water .

ISI Bdry Exam Period Relief
Line No. Hydro No. Dwg. No. 'Coord. 150 Dwg. 3- 1 2 Request Notes / Remarks 1/2" HBC-41 D-356344-2 E-7 E6210 I I I RR-35 TO FI3280A 3/4" HBC-41 D-356344-2 E-7 E6096 I I I RR-33 LINE TO PSV3139A

. 3/4" HBC-41 (V) 0-356344-2 F-7 E6097 I I I- RR-33~ VENT (1) 2 1/2" HCC-320 0-356634-2 B-13 WO20537 I I I RR-33 2 1/2" HBC-41(TR. 8) D-356344-2 G-8 EG2-305 I I I RR-33 TRAIN B S.W. RETURM-T0 HEADER 14" HBC-39

> D-356344-1 H-9 EG2-305 I 3/8" HBC-41 (V) D-356344-2 F-1 E8874 I I I RR-33 VENT (1) TO VALVE QV239B FROM C00LER' 3/8" HBC-41 (D) "

D-356344-2 G-8 E8874 I I I RR-33 DRAIN (1) TO VALVE QV2388 FROM COOLER

1/2" HBC-41 D-356344-2 H-9 E5326 I I I RR-33 TO FI3280B i 3/4" HBC-41 D-356344-2 F-7 E6110 I I I RR-33 LINE TO PSV 31398 3/4" HBC-41 (V) D-356344-2 G-7 E6109 I I I RR-33 VENT (1) TO VALVE QV034B 1" HBC-41 (D) D-356344-2 F-7 E6108 I I I RR-33 DRAIN (1) TO VALVE ~
QV280 -!

2 1/2" HCC-320 D-356344-1 H-9 WO20540 I I I RR-33 i

i 3P16-37 Rev.: 0 t

g + ,6' , ,s-- .  :-

n Us

?, -

.. Os U -

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2P16- Service' Water .'.

ISI Bdry Exam Period Relief' Line No. Hydro No. Dwg.~No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 2 1/2" HBC-45(TR. A) D-356344-2 B-4 EG2-304 I I I RR-33 TRAIN A-S.W. RETURN TO HDR. 24" HBC-46

> D-356344-1 J-7 EG2-304 3/8" HBC-45 (D) D-356344-2 B-3 E10002 I I I RR-33 DRAIN (1) TO VALVE j QV262A 3/8" HBC-45 (V) D-356344-2 6-3 E10002 I I I RR-33 VENT (1) TO VALVE QV263A 3/4" HBC-45 (V). D-356344-2 B-3 E6111 I I I RR-33 VENT (1) TO VALVE QV014A 3/4" HBC-45 0-356344-2 B-3 E6112 I I I RR-33 LINE TO PSV 3142A 3/4" HBC-45 ,

D-356344-2 B-3 E6805 I I I RR-33 TO PDI2918A D-356344-1 J-7 I I I 2 1/2" HCC-324 WO20519 RR 33 2 1/2" HBC-45(TR. B) D-356344-2 D-3 EG2-259 I I I RR-33 TRAIN B-S.W. RETURN TO HDR 24" HBC-46

> D-356344-1 H-6 3/8" HBC-45 (D) D-356344-2 D-3 E10003 I I I RR-33 DRAIN (1) TO VALVE QV2628 ,

3/8' HBC-45 (V) D-356344-2 D-3 EIOOO3 I I I RR-33 VENT (1) TO VALVE QV2638 3P16-38 Rev.: 0

, - _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ - _. _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ __ _ _ _ = _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ -

t J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 2P16- Service Yater .'_

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks 3/4" HBC-45 (V) D-356344-2 D-3 E6115 I I I RR-33 VENT (1) TO VALVE QV0148 3/4" HBC-45 D-356344-2 0-3 E6116 I I I RR-33 LINE TO PSV 3142B

3/4" HBC-45 D-356344-2 D-3 E6804 I I I RR-33 TO PDI29188 2 1/2" HCC-324 D-356344-1 H-6 WO20517 I I I RR-33 2 1/2" HBC-126(TR. A) 0-356344-1 G-1 EG2-659 I I I RR-33 S.W. SUPPLY TO 600V LOAD CENTER 2D ACU H009-A

> D-356344-3 G-2 EG2-659

. 3/4" HBC-126 D-356344-3 G-3 E6809 I I I RR-33 LINE TO PDI 2924 TO

.: VALVE QV340A 3/4" HBC-126 (V) D-356344-3 G-2 E6121 I I I RR-33 VENT (1) TO VALVE QV306A 1 1/2" HBC-125 D-356344-3 G-3 E6219 I I I RR-33 S.W. SUPPLY TO 600V LOAD CENTER 20 ACU H009-A 2 1/2" HCC-315 0-356344-1 G-1 WO20532 I I 1 RR-33 S.W. SUPPLY TO 600V LOAD CENTER 20 ACU '

H009-A 2 1/2" HBC-126(TR.-B) D-356344-1 0-1 EG2'-661 I I I RR-33 S.W. SUPPLY TO 600V

^

LOAD CENTER 2E ACU H010-8 3P16-39. .Rev.: 0

~

dd t

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan ,

2P16- Service Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks

> D-356344-3 H-7 EG2-661 3/4" HBC-126 D-356344-3 H-8 E6808- I I I RR-33 LINE TO PDI2926 TO VALVE QV341A l 3/4" HBC-126 (V) 0-356344-3 H-7 E6126 I I I RR-33 VENT (1) TO VALVE Q306B 1" HBC-126 (D) D-356344-3 H-7 E8125 i I i RR-33 DRAIN (1) TO VALVE QV308A 1 1/2" HBC-126 D-356344-3 H-7 E6220 I I I RR-33 S.W. SUPPLY TO 600V LOAD CENTER 2E ACU H010-8 2 1/2" HCC-315 D-356344-1 D-1 WO20525 I I I RR-33 S.W. SUPPLY TO 600V LOAD CENTER 2E ACU H010-8

~

' 2 1/2" HBC-127(TR. A) 0-356344-3 G-4 EG2-659 I I I RR-33 S.W. RETURN TO HEADER 24" HBC-46

> D-356344-1 J-5 EG2-659 -

3/8" HBC-127 (D) D-356344-3 G-3 E10015 I I I RR-33 DRAIN (1) FROM COOLER TO VALVE QV302A 3/8" HBC-127 (V) 0-356344-3 G-4 E10015 .I I I RR-33 VENT (1) FROM COOLER

, . TO VALVE QV303A 4

3P16-40 Rev.: 0

=

,yy ^

?,

J. M. Farley Nuclear Plant IJnit 2,~ Class 3 Components FNP-2-M-069 System Pressure Test Plan ,

2PI6- Service Water- ..

ISI Bdry .

Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks &;

3/4" HBC-127 D-356344-3 G-4 E6119 I I I RR-33 LINE TO PSV3993 TO VALVE QV304A-3/4" HBC-127 D-356?4-3 G-4 E6809 I I I RR-33 LINE TO PDI2924 TO VALVE QV340B 3/4" HBC-127 (V) D-356344-3 G-5 E6120 I I I RR-33 VENT (1) TO VALVE QV307A 1 1/2" HBC-127 D-356344-3 G-4 E6218 I I I RR-33 S.W. RETURN TO HEADER 24" HBC-46 2 1/2" HCC-316 D-356344-1 J-5 WO20532 I I I RR-33 S.W. RETURN TO HEADER 24" HBC-46 2 1/2" HBC-127(TR. B) D-356344-1 G-6 EG2-660 I I I RR-33 S.W. RETURN TO HEADER 24" HBC-46

> D-356344-3 H-10 EG2-660 l 3/8" HBC-127 (D) D-356344-3 J-8 E10010 I I I RR-33 DRAINS (1) FROM COOLER TO VALVE QV302B 3/8" HBC-127 (V) D-356344-3 H-9 E10010 I I I RR-33 VENTS (1) FROM COOLER ,

TO VALVE QV3038 l

3/4" HBC-127 D-356344-3 H-9 E6124 I I I RR-33 LINE TO PSV3994 TO ,

VALVE QV304B 3/4" HBC-127 D-356344-3 H-9 E6808 I I I RR-33 LINE TO PDI2926 TO.

VALVE QV3418 3P16-41 Rev.: 0

O t O O J. M. Farley N9 clear P7 ant - Unit 2, Class 3 Cpts FNP-2-M-069 i- .

System Pressure Test Plan ,

2P16- Service Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" HBC-127-(V) D-356344-3 H-10 E6123 I I I RR-33 VENTS {1) TO VALVE QV3078

'l 1" HBC-127 (D) D-356344-3 H-10 E6122 I I I RR-33 DRAINS (1) TO VALVE QV3088 1 1/2" HBC-127 D-356344-3 H-9 E6221 I I I RR-33 S.W. RETURN TO HEADER 24" HBC-46 l 2 1/2" HCC-316 D-356344-1 G-6 WO20525 I I I RR-33 S.W. RETURN TO HEADER t 24" HBC-46 2* HCC-275(TR. A) D-356368-1 0-1 M8200, I I I RR-33 TRAIN A.-FROM SERVICE M8305 WATER PUNPS 10/FRON CYCL. SEP.

> D-356370-2 F-I M8200 1/2" HCC-275 (A) D-356368-1 E-1 M8200 I I I RR-33 LINE TO PDS631 l

1/2" HCC-275 (B) D-356368-1 E-3 E7701, I I I RR-33 LINE TO PDS575 i

M8203

3/4" HCC-275 (A) D-356368-1 C-3 M8205 I I I RR-33 S.W. COOLING TO S.W.

PUMP P001A,8,C.

3/4" HCC-275 (B) D-356368-1 D-3 M8206 I I I RR-33 S.W. LUBE TO S.W. PUMP P001A,B,C.

1" HCC-275 D-356368-1 D-2 M8200 I I I RR-33 LINE FROM VALVE V6384.

(SCREEN WASH) 3P16-42 Rev.: 0 i

9 O  :

O O J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan ,

2P16- Service Water ,,

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 1 1/2" HCC-275 (A) D-356368-1 F-2 M8205 I I I RR-33 BYPASS LINE-TRAINS A &

B 1 1/2" HCC-275 (B) D-356368-1 F-2 M8203 I I I RR-33 S.W. TO BOOSTER PUMP QP002A-A 2" HCC-275 (A) D-356368-1 G-2 E7701, I I I RR-33 BYPASS LINE-TRAINS A &

M8203 B 2" HCC-275 (B) D-356368-1 G-2 M8200, I I I RR-33 S.W.-T0 BOOSTER PUMP M8202, QP002A-A M8203, M8204 4" HCC-275 D-356368-1 D-1 M8200 I I I RR-33 CONNECTIONS TO STRAINER F-503A 2* HCC-275(TR. 8)

~

D-356368-1 B-12 M8200 I I I RR-33 TRAIN B. S.W. COOLING AND LUBE WTR. TO S.W.

PUMPS AND T0/FROM CYCL. SEP.

> D-356370-2 F-11 M8305 .

1/2" HCC-275 (A) D-356368-1 D-12 M8200 I I I RR-33 LINE TO PDS 632 1/2" HCC-275 (B) D-356368-1 E-10 M8200 I I I RR-33 LINE TO PDS576 ,

1/2" HCC-27S (V) D-356368-1 B-11 M8200 I I I RR-33 VENTS. (4) 3P16-43 Rev.: 0

7 O (')

O -

J O J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2P16- Service Water .'.

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes /Rewarks 3/4" HCC-275 (A) D-356368-1 C-11 M8205 I I I RR-33 S.W. COOLING TO PUMP P00I0,E.

3/4" HCC-275 (B) D-356368-1 C-11 M8206 I I I RR-33 S.W. LUBE TO PUMP POOID,E.

1" HCC-275 D-356368-1 C-12 M8200 1 I I RR-33 LINE FROM VALVE V6388.

(SCREEN WASH) 1 1/2" HCC-275 (A) D-356368-1 E-11 E7701, I I I RR-33 BYPASS LINE-TRAINS A &

M8205 B 1 1/2" HCC-275 (B) D-356368-1 F-11 M8202, I I I RR-33 S.W.-TO BOOSTER PUMP M8204 QP0028-B 2" HCC-275 (A) 0-356368-1 G-11 M8200 I I I TT-33 BYPASS LINES-TRAINS A

&B 2" HCC-275 (B) D-356368-1 G-Il M8200, I I I RR-33 S.W.-TO BOOSTER PUMP M8202, QP0028-B M8203, M8204 4" HCC-275 D-356368-1 0-12 M8200 I I I RR-33 CONNECTIONS TO

' STRAINER F-5038 l

i 2* HCC-289(TR. A) D-356344-2 B-5 WO20424, I I I RR-33 TRAIN A-SUPPLY TO ,-

WO20425 RHR/LHSI PUMP RM.

COOLER H003A-A 3PI6-44 Rev.: 0

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2P16- Service Water ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks

> D-356344-1 0-3 3/8" HBC-44 (D) D-356344-2 B-6 E10013 I I I RR-33 DRAINS (1) ON COOLER TO VALVE QV23]A 3/8" HBC-44 (V) D-356344-2 A-6 E10013 I .I I RR-33 VENTS (1) ON COOLER TO VALVE QV234A D-356344-2 B-6 WO20425 I I I RR-33 LINE TO PDI2916A 3/4" HCC-289 3/4" HCC-289 (V) D-356344-2 A-5 WO20424 I I I RR-33 VENTS (1) TO VALVE QV249 1" HCC-289 (D) D-356344-2 B-5, WO20425 I I I RR-33 DRAINS (2) TO VALVE B-6 QV018A I 1/2" HCC-289 , D-356344-2 B-6 WO20425 I I I RR-33 SUPPLY TO RHR/LHSI PUMP RM. COOLER 2* HCC-289(TR. 8) D-356344-2 B-5 WO20428, I I I RR-33 TRAIN B-SUPPLY TO WO20429 RHR/LHSI PUMP RM.

COOLER H0038-8

> D-356344-1 B-3 3/8" HBC-44 (D) 0-356344-2 C-6 E10014 I I I RR-33 DRAINS (1) ON COOLER TO VALVE GV2318 ,

3/8" HBC-44 (V) D-356344-2 B-6 E10014 1 1 I RR-33 VENTS (1) ON COOLER TO VALVE QV234B 3P16-45 Rev.: 0

. _ - - = - - _ - _ . ._ - . .- -_- - -

O q O O J. N. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069

- System Pressure Test Plan ,

2 PIG- Service Water ISI Bdry Exam Period Relief Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks Line No.

D-356344-2 C-3 WO20429 I I I RR-33 LINE TO PD29168 3/4" HCC-289 D-356344-2 C-6 WO20429 I I I RR-33 VENTS (1) TO VALVE 3/4" HCC-289 (V) QV232 1" HCC-289 (D) D-356344-2 C-6 WO20429 I I I RR-33 DRAINS (I) TO VALVE QV313 1" HCC-289 (D) D-356344-2 A-5 WO20429 I I I RR-33 DRAINS (1) 1 1/2" HCC-289 D-356344-2 B-6 WO20429 I I I RR-33 SUPPLY TO RHR/LHSI PUNP RN COOLER 2* HCC-292(TR. A) D-356344-2 B-7 WO20426, I I I RR-33 TRAIN A-RETURN TO HDR.

WO20427 I4" HBC-39 4

> .. D-356344-1 D-13

3/4" HCC-292 D-356344-2 B-7 WO20427 I I I RR-33 TO PDI3137A 3/4" HCC-292 D-356344-2 B-7 WO20427 I I I RR-33 LINE TO PSV3137A 3/4" HCC-292 (V) D-356344-1 B-12 WO20427 I I I RR-33 VENTS (1) TO VALVE QV019A i

i 1 1/2" HCC-292 D-356344-2 B-7 WO20427 I I I RR-33 S.W. RETURN i

2' HCC-292(TR. 8) D-356344-2 B-7 WO20430, I I I RR-33 TRAIN B-RETURN TO HDR WO20431 14" H9C-39

.i 3P16-46 Rev.: 0

. . ~ . . .

=

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components TNP-2-M-069

- System Pressure Test Plan ,

2P16- Service Water .,

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 2 > D-356344-1 J-8 3/4" HCC-292 D-356344-2 B-7 WO20431 I I I RR-33 LINE TO PSV31378 3/4" HCC-292 (V) D-356344-1 H-7 WO20431 I I I RR-33 VENTS (1) 1" HCC-492 (D) 0-356344-2 B-7 WO20431 I I I RR-33 DRAINS (2) i 1 1/2" HCC-292 D-356344-2 B-7 WOZ0431 I I I RR-33 S.W. RETURN 2* HCC-293(TR. A) D-356344-1 C-3 WO20432, I I I RR-33 TRAIN A S.W. SUPPLY TO

< WO20437 BATTERY CHARGING RM.

COOLER H006A-A

> D-356344-3 A-2 3/8" HBC-122 (D)  ; D-356344-3 B-3 E8865 I I I RR-33 DRAINS (I) FROM COOLER TO VALVE QV2278 i 3/8" HBC-122 (V) 0-356344-3 A-4 E8865 I I I RR-33 VENTS (1) FROM COOLER j TO VALVE QV2268  ;

3/4" HCC-293 D-356344-3 A-3 WO20437 I I I RR-33 LINE TO PDI2925A 1 1/2" HCC-293 D-356344-3 B-3 WO20437 I I I RR-33 S.W. TO COOLER H006A-A i

2' HCC-293(TR. A/8) D-356344-3 B-2 WO20440 I I I RR-33 TRAIN A/B S.W. SUPPLY TO BATTERY CHARGI K RM COOLER H0060-AB 3PI6-47 Rev.: 0

,rc - --

-%s- -y , + . , ..- . -r , , , ., -. ,*

O h O O J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan ,

, 2PI6- Service Water ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 I 2 Request Notes / Remarks 3/8" HBC-122 (D) D-356344-3 C-3 E8864 I I I RR-33 DRAINS (I) FROM COOLER TO VALVE QV227C 3/8" HBC-122 (V) D-356344-3 B-4 E8864 I I I RR-33 VENTS (I) FROM COOLER i TO VALVE QV226C 3/4" HCC-293 D-356344-3 B-3 WO20440 I I I RR-33 LINE TO PDI2925C I I/2" HCC-293 0-356344-3 B-3 WO20440 I I I RR-33 S.W. TO COOLER

' H006C-AB D-356344-1 D-4 WO20433, I I I RR-33 TRAIN B S.W. SUPPLY TO 2* HCC-293(TR. B)

WO20436, BATTERY CHARGING RM.

WO20549 COOLER H0068-B 4

> D-356344-3 C-2

~

3/8" HBC-122 (D) D-356344-3 D-3 E8863 I I I RR-33 DRAINS (I) FROM COOLER TO VALVE QV227A 3/8" HBC-122 (V) D-356344-3 C-4 E8863 I I I RR-33 VENTS (I) FROM COOLER TO VALVE QV226A 3/4" HCC-293 D-356344-3 C-3 WO20433 I I I RR-33 LINE TO PDI29258 i

I I/2" HCC-293 D-356344-3 C-3 WO20433 I I I RR-33 S.W. TO COOLER H0068-B 2" HCC-294(TR. A) 0-356344-3 8-5 WO20434, i I I RR-33 TRAIN A S.W. RETURN TO WO20439 HEADER I4" HBC-39  ;

3PI6-48 Rev.: 0

O  %

O O J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan .

2P16- Service Water -

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks

> D-356344-1 C-13 3/4" HCC-294 D-356344-3 B-4 WO20439 I I I RR-33 LINE TO PSV393IA 3/4" HCC-294 D-356344-3 B-4 WO20439 I I I RR-33 LINE TO PDI2925A 1 1/2" HCC-294 D-356344-3 B-4 WO20439 I I I RR-33 S.W. RETURN 2* HCC-294(TR. A/8) D-356344-3 C WO20441 I I I RR-33 TRAIN A/B S.W. RETURN -

3/4" HCC-294 D-356344-3 B-4 WO20441 I I I RR-33 LINE TO PSV3931C 3/4" HCC-294 D-356344-3 B-4 WO20441 I I I RR-33 LINE TO PD2925C 1 1/2" HCC-294 D-356344-3 B-4 WO20441 I I I RR-33 S.W. RETURN 2* HCC-294(TR. 8) "

D-356344-3 D-5 WO20435, I I I RR-33 TRAIN B S.W. RETURN TO WO20438, HEADER 14" H6C-39 WO20550 j > D-356344-1 J-9 t 3/4" HCC-294 D-356344-3 C-4 WO20435 I I I RR-33 LINE TO PSV39318 -

3/4" HCC-294 D-356344-3 C-4 WO20435 I I I RR-33 LINE TO PDI2925C l

1 1/2" HCC-294 D-356344-3 C-4 WO20435 I I I RR-33 S.W. RETURN ,

i 2* HCC-295(TR. B-A) ' D-356344-1 C-6 WO20442 I I I RR-33 S.W. SUPPLY TO MCC-2A ROOM ACU H007-A 3P16-49 Rev.: 0 i

, .. ,, .,, + . . _ . - . . . . _ . - . - . , - , . . . . ,

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069

.. System Pressure Test Plan ,

2P16- Service Water ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. .Coord. 150 Dwg. 3 1 2 Request Notes / Remarks

. > D-356344-3 E-1 i 3/8" HBC-125 (D) D-356344-3 E-3 E10016 I I I RR-33 DRAINS (1) FROM COOLER TO VALVE QV242 3/8" HBC-125 (V) D-356344-3 E-4 E10016 I I I RR-33 VENTS (1) FROM COOLER TO VALVE QV243 3/4" HCC-295 D-356344-3 E-3 WO20443 I I I RR-33 TO PDI2927A 1" HCC-295 D-356344-3 E-3 WO20443 I I I RR-33 S.W. SUPPLY TO MCC-2A 1 ROOM ACU H007-A 1 1/2" HCC-295 D-356344-3 E-3 WO20442 I I I RR-33 .

2' HCC-295(TR. B-8) D-356344-3 F-2 WO20446 I I I RR-33 S.W. SUPPLY TO MCC-28 R 7 ACU H008-B

> D-356344-1 E-5 3/8" HBC-125 (D) D-356344-3 F-3 E8872 I I I RR-33 DRAINS (1) FROM COOLER TO VALVE QV297

, 3/8" HBC-125 (V) D-356344-3 F-4 E8872 I I I RR-33 VENTS (1) FROM COOLER TO VALVE QVZ96

, 3/4" HCC-295 D-356344-3 F-3 WO20447 I I I RR-33 TO PDI27298 ,

1 1/2" HCC-295 '

D-356344-3 F-2 WO20446, I I I RR-33 WO20447 3P16-50 Rev.: 0

-e v -

. - - - - e-- .-mm_ . . ____ _m__ . _ _ _ _ , -__m _._,

O O O

=

J. N. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 2PI6- Service Water i .

ISI Bdry Exam Period Relief

Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks  ;

2* HCC-296(TR. B-A) D-356344-1 A-10 WO20444 I I I RR-33 S.W. RETURN TO HEADER i

14" HBC-39

> D-356344-3 E-5 ,

3/4" HCC-2% D-356344-3 E-4 WO20445 I I I RR-33 LINE TO PSV3991 l 3/4" HCC-296 D-356344-3 E-4 WO20445 I I I RR-33 TO PDI2927A t 3/4" HCC-296 0-356344-3 E-4 WO20445 I I I RR-33 TO VALVE PSV3991 l' HCC-2% D-356344-3 E-5 WO20445 I I I RR-33 S.W. RETURN .

i 1 I/2" HCC-2% D-356344-3 E-5 WO20445, I I I RR-33 S.W. RETURN WO20449 i 2* HCC-296(TR. 8-B) ,,

D-356344-3 F-5 WO20448 I I I RR-33 S.W. RETURN

> D-356344-1 F-12 I I I RR-33 S.W. RETURN  ;

3/4" HCC-296 D-356344-3 F-4 WO20449 I I I RR-33 LINE TO PSV3992 .

3/4" HCC-2% D-356344-3 F-4 I I I RR-33 TO PDI2927B -

3/4" HCC-2% D-356344-3 F-4 WO20449 I I I RR-33 TO PSV3992 I" HBC-2% D-356344-3 F-5 WO20449 I I I RR-33 S.W. RETURN ,.

1 I/2" HBC-2% -

D-356344-3 F-5 WO20448, I I I RR-33 S.W. RETURN WO20449 3P16-51 Rev.: 0

0 :

O O -

J. N. Farley Nuclear Plant - Unit 2, Class 3 Components fMP-2-N-069 2Pl7- Component Cooling Water ISI Boundry Examination Period Relief Notes And/Or Component Drawing No. Coord. Loc. Drawing Third First Second Request Remarks RESIDUAL HEAT EXCHANGER NO 2A Q2EllH001A-A D-356343-1 E-10 0-205063 I I I RR-33 SHELL SIDE RESIDUAL HEAT EXCHANGER N0 28 Q2EllH0018-B D-356343-1 8-10 0-205063 I I I RR-33 SHELL SIDE

CVCS SEAL WATER HEAT EXCHANGER Q2E21H003 D-356343-2 G-8 D-205058 I I I RR-33 SHELL SIDE

! CVCS LETDOWN HEAT l

~

EXCHANGER Q2E21H004 D-356343-2 H-8 D-205058 I I I RR-33 SHELL SIDE RHR PUNP NO. 2A Q2EllP001A-A D-356343-1 G-Il D-205063 I I I RR-33 SEAL COOLER i

RHR PUNP NO. 2B Q2E11P001B-B D-356343-1 B-8 D-205063 I I I RR-33 SEAL COOLER CHARGING PUNP 2A Q2E21P002A-A D-356343-1 G-7 D-205058 I I I RR-33 SEAL COOLER

CHARGING PUNP 28 Q2E21P0028-AB D-356343-1 F-7 D-205058 I I I RR-33 SEAL COOLER

! CHARGING PUNP 2C Q2E21P002C-B D-356343-1 D-7 D-205058 I I I RR-33 SEAL COOLER 3Pl7-1 Rev.: 0

~

) ,.-

/

\v i J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-N-069 2Pl7- Component, Cooling Water System Pressure Test Plan ..

ISI Boundry Examination Period Relief Notes And/Dr Component Drawing No. Coord. -Loc. Drawing Third First Second Request Remarks SPENT FUEL P00L HEAT

' EXCHANGER Q2G31H001A-B D-356343-1 D-8 D-205050 I I I RR-33,36 SHELL SIDE Q2G31H001B-A D-356343-1 G-8 D-205055 I I I RR-33,36 SHELL SIDE

^

COMPONENT COOLING HEAT EXCHANGERS Q2Pl7H001A-B D-356343-1 D-5 D-205063 I I I RR-33 SHELL SIDE i Q2P17H001B-AB D-356343-1 E-5 D-205%3 I I I RR-33 SHELL SIDE

-Q2P17H001C-A D-356343-1 H D-205063 I I I RR-33 SHELL SIDE i

, COMPONENT COOLING PUNPS

! Q2Pl7P001A-B D-356343-1 C-2 0-205063 I I 1 RR-33 1

! Q2Pl7P0018-AB D-356343-1 E-2 D-205063 I I I RR-33 i

! Q2Pl7P001C-A D-356343-1 G-2 D-205063 I I I RR-33 -

COMPONENT COOLING -

) SURGE TAMK j Q2P17T001 0-356343-1 A-2 D-205064 I I I RR-33

~

3P17-2 Rev.: 0

O  :

O O J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 18' HBC-1(A-B) D-356343-1 C-2 EG2-247 I I I RR-33 SUPPLY C.C.W. TO HT.

EX. H001A-B 3/4" HBC-1 (D) D-356343-1 C-2 EB866 I I I RR-33 DRAIN (2) FROM PUMP P001A-B 3/4" HBC-1 (V) D-356343-1 C-2 E8866 I I I RR-33 VENTS (2) FROM PUMP 3/4" HBC-1 (V) D-356343-1 C-4 E5604 I I I RR-33 VENTS (1) 3/4" HBC-1 0-356343-1 C-4 E6226 I I I RR-33 TO FT3043A 3/4" HBC-1 0-356343-1 C-4 E6205 I I I RR-33 TO PI3038A 3/4" HBC-1 0-356343-1 C-2 E6227 I I I RR-33 TO PI3035A 3/4" HBC-1 (V) ,

D-356343-1 0-4 E6683 I I I RR-33 VENT (1) FROM HT. EX.

1" HBC-1 (D) D-356343-1 C-3 E6541 I I I RR-33 DRAIN (1) 1" HBC-123 D-356343-1 D-2 E8741, I I I RR-33 TO C.C.W. SURGE TANK E8743, l

E9781, E9782 I 1/2" HBC-1 0-356343-1 C-5 E6680 I I I RR-33 TO PSV 3040A 2" HBC-1 (D) D-356343-1 0-4 E6693, I I I RR-33 DRAINS (2) FROM HT.'

E6699 EX.

l 3Pl7-3 Rev.: 0

v J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water .

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 12" HBC-1 D-356343-1 C-2 EG2-247 I I I RR-33 SUPPLY C.C.W. HT. EX.

H001A-B 18" HEC-1(8-AB) D-356343-1 E-2 EG2-248 I I I RR-33 SUPPLY C.C.W. TO HT.

EX. H0018-AB OR H001A-B, H0010-A 3/4" HBC-1 (D) D-356343-1 E-2 E6687 I I I RR-33 DRAINS (2) FROM PUMP P9018-AB 3/4" HBC-1 D-356343-1 E-4 E6228 I I I RR-33 TO FT3043B 3/4" HBC-1 D-356343-1 E-3 E7057 I I I RR-33 TO PI30358 3/4" HBC-1 D-356343-1 E-4 E7068 I I I RR-33 TO PI30388 3/4" HBC-1 (V) D-356343-1 E-2 E6687 I I I RR-33 VENTS (2) FROM PUMP 3/4" HBC-1 (V) D-356343-1 E-3 E5609 I I I RR-33 VENTS (1)'

3/4" HBC-1 (V) D-356343-1 F-4 E6684 I I I RR-33 VENT (1) FROM HT. EX.

, l' HBC-1 (D) D-356343-1 E-3 E6542 I I I RR-33 DRAIN (1) 1" HBC-123 0-356343-1 0-2 E8742 I I I RR-33 TO C.C.W. SURGE TK.

I 1/2" H8C-1 D-356343-1 E-5 E6681 I I I RR-33 TO PSV 30408 .

2" HBC-1 (D) -

D-356343-1 F-4 E6695, I I I RR-33 DRAINS (2) FROM HT.

E6701 EX.

3Pl7-4 Rev.: 0

(J J V J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 12" HBC-1 D-356343-1 E-2 EG2-248 I I I RR-33 SUPPLY C.C.W. HT. EX.

H0018-AB 18' HBC-1(C-A) 0-356343-1 G-2 EG2-249 I 1 I RR-33 SUPPLY C.C. HT. EX.

H0010-A 3/4" HBC-1 D-356343-1 G-4 E7067 I I I RR-33 TO PI3038C 3/4" HBC-1 D-356343-1 G-4 E6224 I I I RR-33 TO FT3043C 3/4" HBC-1 D-356343-1 G-3 E7056 I I I RR-33 TO PI3035C 3/4" HBC-1 (D) D-356343-1 G-2 E8868 I I I RR-33 DRAINS (2) FROM PUMP P001C-A 3/4" HBC-1 (V) 0-356343-1 G-2 E8868 I I I RR-33 VENTS (2) FROM PUMP D-356343-1 G-3

~

3/4" HBC-1 (V) E5610 I I I RR-33 VENTS (I) 3/4" HBC-1 (V) D-356343-1 H-5 E6685 I I I RR-33 VENT (1) FROM HT. EX.

1" HBC-1 (D) D-356343-1 G-3 E6543 I I I RR-33 DRAIN (1) 1" HBC-123 D-356343-1 F-2 E8742 I I I RR-33 TO C.C.W. SURGE TANK 1 1/2" HBC-1 0-356343-1 G-5 E6682 I I I RR-33 TO PSV 3040C 2" HBC-1 (D) D-356343-1 H-5 E6697, I I I RR-33 DRAINS (2) FROM HT.'

E6703 EX.

3Pl7-5 Rev.: 0

/

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Ccord. ISO Dwg. 3 1 2 Request Notes / Remarks 12" HBC-1 0-356343-1 G-2 EG2-249 I I I RR-33 SUPPLY C.C.W. HT. EX.

H001C-A 18* HBC-2(A-B) D-356343-1 D-5 EG2-250 I I I RR-33 CCW TO RHR AND SPENT FUEL POOL HT. EX.

3/4" HBC-2 D-356346-1 D-4 E6512 I I I RR-33 TO PI3041A 18' HBC-2(B-A8) 0-356343-1 F-5 EG2-250 I I I RR-33 CCW 10 RHR AND SPENT FUEL POOL HT. EX.

3/4" HBC-2 D-356343-1 F-4 E6447 I I I RR-33 TO PI3041B 18' HBC-2(C-A) D-356343-1 G-5 EG2-250, I I I RR-33 CCW TO RHR AND SPENT EG2-251 FUEL POOL HT. EX.

3/4" HBC-2 ,

D-356343-1 H-4 E6229 I I I RR-33 TO PI3041C 18' HBC-3(8-A) D-356343-1 H-7 EG2-251 I I I RR-33 CCW TO RHR HT. EX.

H001A-A 1/2" HBC-7 D-356343-1 G-Il E5586 I I I RR-33 CCW TO RHR PUMP P001A-A 3/4" HBC-3 D-356343-1 E-10 E7062 I I I RR-33 TO PI3057A 3/4" HBC-7 D-356343-1 G-Il E5516, I I I RR-33 CCW TO RHR PUMP ,

E5517, P001A-A (SEAL COOLER)

E5586 3Pl7-6 Rev.: 0

O v v J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 1" HBC-7 D-356343-1 G-11 E5586 I I I RR-33 TO PSV 3381A 2* HBC-3 (D) D-356343-1 F-10 E6135 I I I RR-33 DRAIN (1) 14" HBC-3 D-356343-1 H-9 EGZ-251 I I I RR-33 TO RHR HT. EX. H001A-A 18' HBC-3(B-B) D-356343-1 C-10 EG2-250 I I I RR-33 CCW TO RHR HT. EX.

H0018-8 3/4" HBC-7 D-356343-1 C-9 E5595 I I I RR-33 CCW TO RHR PUMP P0018-B (SEAL COOLER) 3/4" HBC-7 D-356343-1 B-10 E5505 I I I RR-33 TO PI30578 1" HBC-7 D-356343-1 C-Il E5505 I I I RR-33 TO PSV 33818 2" HBC-3 (D) ^

0-356343-1 C-10 E6353 I I I RR-33 DRAIN (1) TO VALVE QV124B 14" HBC-3 D-356343-1 C-8 EG2-243 I I I RR-33 CCW TO RHR HT. EX.

H0018-B 18" HBC-14(A-A) D-356343-1 H-1 EC2-245, I I I RR-33 CCW RETURN TO CCW EG2-246 PUMPS i

3/4" HBC-14 D-356343-1 G-2 E7054 I I I RR-33 TO PI3308C 3/4" HBC-14 (D) D-356343-1 G-2 E6546 I I I RR-33 DRAIN (I) TO VALVE ^

QV280C 3P17-7 Rev.: 0

O  :

O O J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks i 3/4" HBC-14 D-356343-1 E-4 E7060 I I I RR-33 TO PI33088 3/4" HBC-14 (D) D-356343-1 E-4 E6544 I I I RR-33 DRAINS TO VALVE QV2808 3/4" HBC-14 D-356343-1 J-10 E7052 I I I RR-33 TO FISH 3445A 3/4" HBC-14 0-356343-1 E-10 E7055 I I I RR-33 TO PI3060A 3/4" HBC-14 (V) D-356343-1 6-10 EG2-244 I I I RR-33 VENTS (1) TO VALVE QV125A 1 1/2" HBC-14 D-356343-1 E-Il E6134 I I I RR-33 TO PSV 3354A 14" HBC-14 D-356343-1 H-10 EG2-244 I I I RR-33 CCW FETURN 18* HBC-14(B-B) D-356343-1 B-1 EG2-246 I I I RR-33 CCW RETURN TO CCW PUMPS 3/4" HBC-14 (V) D-356343-1 B-ll E5607, I I I RR-33 VENT (2)

E6528 3/4" HBC-14 D-356343-1 A-11 E7054 I I I RR-33 TO FISH 3445B 3/4" HBC-14 D-356343-1 B-11 E5608 I I I RR-33 TO PI30608 1" HBC-14 (D) D-356343-1 A-10 E7053 I I I RR-33 DRAIN (1) 1 1/2" HBC-14 D-356343-1 B-11 E6354 I I I RR-33 TO PSV 33548 14" HBC-14 -

D-356343-1 B-2 EG2-243, I I I RR-33 CCW RETURN EG2-246 3Pl7-8 Rev.: 0

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2PI7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 14' HBC-8 D-356343-1 E-6 EG2-250, I I I RR-33 CCW TO SEAL WATER &

EG2-252 LETDOWN HT. EXH.

> D-356343-2 H-1 EG2-252 3/4" HBC-8 (V) D-356343-2 H-1 E5612 I I I RR-33 VENT QV183 3/4" HBC-263 D-356343-2 H-8 E5373 I I I RR-33 PART OF SEAL WATER HT.

EX. DRAIN QV131 l' HBC-11 (D) D-356343-2 G-8 E6032 I I I RR-33 DRAIN (I) QV260 1 1/2" HBC-8 (D) D-356343-2 H-8 E603I I I I RR-33 DRAIN (1) OV133 1 1/2" HBC-263 D-356343-2 G-8 E5373 I I I RR-33 DRAIN (I) FROM SEAL WATER HT. EX.

2" HBC-8 D-356343-2 :1-1 WO20046 I I I RR-33 TO FINE COOLING CHILLER HV2229 3" HBC-8 D-356343-2 H-1 WO20044 I I I RR-33 TO FINE COOLING CHILLER QV286 3" HBC-Il D-356343-2 G-8 EG2-474 I I I RR-33 TO SEAL WATER HT.

EXCH. (SHELL SIDE) 6' HBC-8 D-356343-2 H-8 EG2-474 I I I RR-33 TO LETDOWN HT. EXCH,

(SHELL SIDE) 6' HBC-II -

D-356343-2 G-8 EG2-474 I I I RR-33 TO SEAL WATER HT. EXCH (SHELL SIDE) 3PI7-9 Rev.: 0

- - - - . . _ - .-. __-.m

d -

1 J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water .

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 8" HBC-10 D-356343-2 F-7 EG2-253 I I I RR-33 LINE TO RECYCL. EVAP.

HV3096 12" HBC-8 D-356343-2 H-4 EG2-252 I I I RR-33 CCW TO SEAL WATER &

LETDOWN HT. EXCH.

1* HBC-10 (D) D-356343-2 G-7 E6004 I I I RR-33 DRAIN (1) QV276 14" HBC-19 D-356343-1 E-1 EG2-255 I I I RR-33 CCW RETURN HDR. TO 18" HBC-14

> D-356343-2 J-l EG?-255 1/2" HBC-19 D-356343-2 H-10 E6223 I I I RR-33 TO FI3074 1/2" HBC-24 D-356343-2 H-10 E6235 I I I RR-33 TO FI3077

~

3/4" HBC-19 D-356343-2 H-9 E6358 I I I RR-33 TO PSV 3072 3/4" HBC-19 (V) D-356343-1 J-2 E5603 I I I RR-33 VENTS (11 lV275 3/4" HBC-24 D-356343-2 H-9 E6357 I I I RR-33 TO PSV 3075 3/4" HBC-24 (V) D-356343-2 H-9 E6021 I I I RR-33 VENT (1) QV132 3/4" HBC-19 (V) D-356343-2 H-9 E6019 I I I RR-33 VENT (1) QV134 3/4" HBC-19 D-356343-2 H-9 EG2-255 I I I RR-33 TO FI3374 3/4" HBC-19 D-356343-2 H-9 EG2-255 I I I RR-33 TO VALVE QV032 3Pl7-10 Rev.: 0

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 2Pl7- Component Cooling Water .

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks l' HBC-19 (D) D-356343-2 H-10 E6020 I I I RR-33 DRAIN (1) 2" HBC-19 D-356343-2 H-6 WO20047 I I I RR-33 RETURN FROM FINE COOLING CHILLER UNIT.

3" HBC-19 D-356343-2 H-6 WO20045 I I I RR-33 RETURN FROM FINE COOLING CHILLER UNIT.

3" HBC-24 0-356343-2 H-10 EG2-475 I I I RR-33 CCW RETURN FRON SEALWATLR HT. EX.

6* HBC-19 D-356343-2 H-10 EG2-475 I I I RR-33 CCW RETURN FROM LETDOWN HT. EX. i 6* HBC-24 D-356343-2 G-9 EG2-475 I I I RR-33 CCW RETURN FROM SEAL WATER HT. EX.

8" HBC-19 D-356343-2 G-ll EGZ-475 I I I RR-33 CCW RETURN 10* HBC-4(A-B) D-356343-1 D-8 EG2-250, I I I RR-33 CCW TO SPENT FUEL POOL EG2-455, HT. EX. H001A-B EG2-473 3/4' HBC-16 D-356343-1 E-8 EG2-475 I I I PR-33 TO FISL3055A 3/4" HBC-16 D-356343-1 F-8 EG2-475 I I I RR-33 TO FISL30558 3/4" HBC-16 D-356345-1 G-7 EG2-475 I I I RR-33 TO FISL3055C l' HBC-5 (A) 0-356343-1 H-7 E8807 I I I RR-33 CCW TO CHARGING PURP 2A 3Pl7-Il Rev.: 0

p -~

_r (J -

G G

i J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan i 2Pl7- Component' Cooling Water .

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2. Request Notes / Remarks l' HBC-5 (B) D-356343-1 E-7 E8807 I I I RR-33 CCW TO CHARGING PUMP 2B 1" HBC-5 (C) 0-356343-1 D-7 E8803 I I I RR-33 CCW TO CHARGING PUMP 2C l' HBC-5 (IA) D-356343-1 G-7 E8807 I I I RR-33 TO PSV 3355A I

l' HBC-5 (IB) D-356343-1 F-7 E8807 I I I RR-33 TO PSV 33558 1" HBC-5 (101 0-356343-1 D-7 E8803 I I I RR-33 TO PSV 3355C 1 1/2" HBC-5 D-356343-1 C-8 E8804 I I I RR-33 CCW TO CHARGING PUMP 28, 2C 2" HBC-4 (D) D-356343-1 D-8 E6139 I I I RR-33 DRAIN (1) FROM 10" HSC-4 10' HBC-4(8-A) D-356343-1 G-8 EG2-256, I I I RR-33 CCW TO SPENT FUEL POOL EG2-448 HT. EX. H0018-A 3/4" HBC-4 (V) D-356343-1 H-8 E5601 I I I RR-33 VENT (1) 1" HBC-4 (D) D-356343-1 H-8 E5602 I I I RR-33 DRAIN (I) l' HBC-5 (D) D-356343-1 B-3 E5602 I I I RR-33 DRAIN (I) 1 1/2" HBC-5 D-356343-1 H-7 E8804, I I I RR-33 CCW TO CHARGING PtNfP E8808 2A i

i i

3Pl7-12 Rev.: 0

O  :

O O J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan l 2Pl7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks 2" HBC-4 (D) D-356343-1 G-8 E6674 I I I RR-33 DRAIN (1) FROM 10" HBC-4 l' HBC-5 D-356343-1 G-7 E8813 I I I RR-33 CCW TO CHARGING PUMP 2A 10" HBC-15(A-B) D-356343-1 D-9 EG2-443, I I I RR-33 CCW RETURN FROM S.F.P.

EG2-472 HT. EX. H001A-B 3/4" HBC-15 D-356343-1 0-9 E6532 I I I RR-33 TO PSV 3078A 3/4"IIBC-15 D-356343-1 D-9 E6201 I I I RR-33 TO FI3080A 3/4" HBC-15 (V) D-356343-1 D-9 E6010 I I I RR-33 VENT (1) TO VALVE QV015A 4

l' HBC-15 (D) ~

D-356343-1 0-9 E6316 I I I RR-33 DRAIN (1), 10 VALVE QV264 ,

4 10' HBC-15(B-A) D-356343-1 G-9 EG2-257, I 1 I RR-33 CCW RETURN FROM S.F.P.

EG2-449 HT. EX. H0018-A 3/4" HBC-15 D-356343-1 H-10 E6533 I I I RR-33 TO PSV 30788 -

3/4" HBC-15 D-356343-1 H-10 E6206 I I I RR-33 TO FI3080B 3/4" HBC-15 (V) D-356343-1 F-9 E5606 I I I RR-33 VENTS (2) 1" HBC-15 (D) ~

D-356343-1 H-3 E5605 I I I RR-33 DRAIN (1) TO VALVE QV261 3Pl7-13 Rev.: 0

m e ~~.

V V 1

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069 System Pressure Test Plan ,

2Pl7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 8' HBC-9 D-356343-2 H-1 EG2-456 I I I RR-33 LINE FROM 14" HBC-8 (RC PUMPS CCW SUPPLY) 1" HBC-9 (TC) D-356343-2 C-1 E6033 I I I RR-33 TEST CONNECTIONS (1) 6* HBC-9 D-356343-2 E-1 E42-456 I I I RR-33 T0/FROM PEN. NO.

42/QV082 4

6* HBC-12 D-356343-2 F-1 EG2-456 I I I RR-33 TO PEN. NO. 45/HV3095

. 8" HBC-20 0-356343-2 F-6 EG2-457 I I I RR-33 CCW RETURN FROM R.C.

PUMPS 1/2" HBC-20 D-356343-2 C-7 EG2-456 I I I RR-33 TO FI3044 I/2" HBC-21 D-356343-2 E-7 E6292 I I I RR-33 TO FISH 3045

~

1/2" HBC-22 D-356343-2 E-7 E6291 I I I RR-33 TO FI3066 ,

3/4" HBC-21 0-356343-2 E-6 E6036 I I I RR-33 TEST CONNECTION (1) &

VENT +

3/4" HBC-20 D-356343-2 E-6 E6034 I I I RR-33 TEST CONNECTION & -

VENTS (1) 1* HBC-22 D-356343-2 F-6 E6035 I I I RR-33 TEST CONNECTION AND DRAIN .

3" HBC-21 0-356343-2 E-6 EG2-457 I I I RR-33 CCW RETURN FROM RCP-8 3Pl7-14 Rev.: 0

O '

O O J. M. Farley Nuclear Plant - Unit 2, Class 3 Comporents FMP-2-M-069 System Pressure Test Plan 2P17- Component' Cooling Water ..

ISI Bdry .

Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks 6* HBC-20 0-356343-2 C-7 EG2-456, I I I RR-33 CCW RETURN (OUTSIDE EG2-457 CONTAINMENT) 6" HBC-22 0-356343-2 F-6 EG2-457 I I I RR-33 T0/FROM PEN. NO. 46 6" HBC-9(RCP-A) D-356343-2 0-2 EG2-464 I I I RR-33 CCW TO PUMP RCP-A 3/4" CBC-I (V) 0-356343-2 B-3 E7845 I I I RR-33 VENTS (I) TO VALVE QV202 3/4" HBC-9 (V) 0-356343--2 B-3 E7845 I I I RR-33 VENTS (1) TO VALVE QVI98 1" CBC-1 (D) D-356343-2 B-3 E7845 I I I RR-33 DRAINS (1) 10 VALVE QV2008 3/4" HBC-9 ,

0-356343-2 C-2 E7848 I I I RR-33 TEST CONNECTION

l' HBC-9 D-356343-2 B3 E7846 I I I RR-33 CCW TO MOTDR (WITH FLEX. CONN.)

I* HBC-9 (D) D-356343-2 B2 E7845 I I I RR-33 DRAINS (2) TO VALVE QV267 -

1 1/2" CBC-1 0-356343-2 B-3 E7845 I I I RR-33 CCW TO RC PUMP 2" CBC-1 0-356343 2 B-3 E7845 I I I RR-33 CCW TO RC PUMP .

3" HBC-9 D-356343-2 A-3 EG2-466 I I I RR-33 CCW TO MOTOR 3PI7-15 Rev.: 0

(3 J '

V J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 4" HBC-9 D-356343-2 C-3 EG2-464, I I I RR-33 CCW TO PUMP RCP-4 i EG2-466 6" M9C-12 D-356343-2 E-I EG2-471 I I I RR-33 CCW SUPPLY TO LETDOWN HX 3/4" HBC-12 0-356343-2 F-4 E7549 I I I RR-33 TEST CONNECTION & VENT QV167 3/4" HBC-12 (V) D-356343-2 F-4 E7543 I I I RR-33 VENT ON HT EXCH 02E21H001 TO VALVE QV128 1" HBC-12 (D) D-356343-2 F-4 E7543 I I I RR-33 DRAIN TO VALVE QV127 3/4" HBC-13 (V) D-356343-2 G-3 E7544 I I I RR-33 VENT ON RC DRAIN TK HT EXC 10 VALVE QV129 1" HBC-13 (D) D-356343-2 G-4 E7544 I I I RR-33 DRAIN TO VALVE QV130 4" HBC-12 D-356343-2 F-4 EG2-471 I I I RR-33 CONT OF 6" HBC-12 4" HBC-13 D-356343-2 G-2 EG2-471 I I I RR-33 CCW SUPPLY TO RC DRAIN TK HEAT EXCHANGER 6* HBC-20(RCP-A) 0-356343-2 C-5 EG2-468 I I I RR-33 CCW RETURN FROM RCP-A (INSIDE CONTAINMENT) 1/2" HBC-20 D-356343-2 A-4 E7553 I I I RR-33 TO FISL3048A 3P17-16 Rev.: 0

V V U t

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water .

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 1/2" HBC-20 D-356343-2 A-4 E7847 I I I RR-33 TO FI3049A 1 3/4" HBC-20 D-356343-2 A-4 E7547 I I I RR-33 VENTS (1) t 3/4" HBC-20 (TC) D-356343-2 B-4 E7848 I I I RR-33 TEST CONNECTIONS (1) i 3/4" HBC-20 D-356343-2 C-6 E7848 I I I RR-33 TO PSV 3275 l' HBC-20 D-356343-2 B-4 E7847 I I I RR-33 CCW RETURN I" HBC-20 (D) D-356343-2 B-4 E7848, I I I RR-33 DRAINS (2)

E7545 3" HBC-20 D-356343-2 A-4 EG2-469 I I I RR-33 CCW RETURN FROM RCP-A 6" HBC-64(A) D-356343-1 C-2 EG2-260 I I I RR-33 MIN. FLOW PUMP P001A-B D-356343-1 B-2 I I

~

3/4" HBC-64 (V) E6005 1 RR-33 VENTS (1) 6* HBC-64(B) D-356343-1 E-2 EG2-255 I I I RR-33 MIN. FLOW PUMP P001B-AB 3/4" HBC-64 (V) D-356343-1 E-1 E5600 I I I RR-33 VENTS (I)

I 6" HBC-64(C) D-356343-1 G-1 EG2-257 I I I RR-33 MIN. FLOW PUMP P0010-A 4" HBC-9(RCP-8) D-356343-2 C-3 EG2-465 I I I RR-33 CCW TO PUMP RCP-B .

3/4" CBC-1 (V) D-356343-2 C-3 E7849 I I I RR-33 VENTS (1) TO VALVE QV217 4

3Pl7-17 Rev.: 0

f- ~s

(~ ~ .v ~s) ~ .s)

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan .

2Pl7- Component Cooling Water ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks l' CBC-1 (D) D-356343-2 C-3 E7849 I I I DRAINS (1) 1" HBC-9 D-356343-2 C-3 E7850 I I I RR-33 CCW TO MOTOR (WITH FLEX. CONN.)

1 1/2" CBC-1 0-356343-2 C-3 E7849 I I I RR-33 CCW TO PUMP RCP-B 2" CBC-1 0-356343-2 C-3 E7849 I I I RR-33 CCW TO PUMP RCP-B 3" HBC-9 D-356343-2 C-3 EG2-465 I I I RR-33 CCW TO MOTOR 4" HBC-9(RCP-C) D-356343-2 D EG2-463 I I I RR-33 CCW TO PUMP RCP-C 3/4" HBC-9 (V) D-356343-2 E-3 E7551 I I I RR-33 VENT (1) TO VALVE QV271 3/4" CBC-1 (V) ~

D-356343-2 D-3 E7852 I I I RR-33 VENT (1) TO VALVE QV208 1" CBC-I (D) D-356343-2 E-3 E7852 I I I RR-33 DRAIN (1) TO VALVE QV209 1" HBC-9 D-356343-2 D-3 E7853 I I I RR-33 CCW TO MOTOR (WITH -

FLEX. CONN.)

1" HBC-9 (D) 0-356343-2 E-3 E7851 I I I RR-33 DRAIN (1)

~

I I I/2" CBC-1 D-356343-2 E-3 E7852 I I I RR-33 CCW TO RC PUMP 2" CBC-1 -

D-356343-2 E-3 E7852 I I I RR-33 CCW TO PUMP RCP-C 3Pl7-18 Rev.: 0

y.

-n:3. 2 J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FMP-2-M-069i System Pressure Test Plan .

2P17- Component Cooling Water ISI Bdry- Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. -3 1 2 Request Notes / Remarks 3" HBC-9 D-356343-2 D-3 EG2-463 I I .I RR-33 CCW TO MOTOR 4" HBC-25(A) D-356343-1 C-1 EG2-446, I I I RR-33 T0/FROM C.C. SURGE TK.

EG2-476 4" HBC-25(B) D-356343-1 B-1 EG2-446, I I I RR-33 T0/FROM C.C. SURGE TK.

Er 176 4" HBC-123 0-356343-1 A-3 L I I RR-33 TO PSV 3029/CCW SURGE TK.

2" HBC-129 (D) D-356343-1 A-3 E9797 I I I RR-33 TO VALVES QV113A &

i QVI13B 2" HBC-129 D-256343-1 A-3 E6529 I 1 I RR-33 TO VALVE RV3028

! 2" HBC-128 ,

D-356343-1 A-3 E7065 I I I RR-33 TO LT3027A & LT3027C 2" HBC-128 D-356343-1 A-3 E7064 I I I RR-33 TO LT3027B & LT2037D l' HBC-122 0-356343-1 A-2 E6530 I I I RR-33 TO VALVES QV263A &

QV2638 VACUUM RELIEF LINE ON CCW SURGE TANK

3' CBC-2(A) D-356343-2 C-5 EG2-460 I I I RR-33 CCW RETURN FROM RCP-A 3/4" CBC-2 (V) 'D-356343-2 C-5 E7538. I I I RR-33 VENT (1) TO QV273A,B 3/4" CBC-2 ,

D-356343-2 B-4 E7527- I I I RR-33 TO PSV 3051A t

3P17-19 Rev.: 0

_. ____ _ . _ __ _ _ _ __.__ _ _____ - _ _ _ ~ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _

e -- - ,~"*-m--

O O O

h J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water . .

ISI Bdry Exam Period Relief j Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks t

3/4" CBC-2 D-356343-2 B-4 E7529 I I I RR-33 TO FI3050A

, 3/4" CBC-2 D-356343-2 B-4 E7533 I I I RR-33 TO PI3184A 3/4" CBC-2 D-356343-2 B-4 E7538 I I I RR-33 TEST CONNECTION & VENT QV171A,B 1" CBC-2 (D) 0-356343-2 B-4 E7528 I I I RR-33 DRAIN (1) TO QV279A 1 1/2" CBC-2 D-356343-2 B-4 E7527 I I I RR-33 CCW RETURN FROM RCP-A 2 1/2" CBC-2 D-356343-2 B-5 EG2-459 I I I RR-33 CCW RETURN FROM RCP-A 4

3" CBC-2(B) D-356343-2 C-5 EG2-459 I I I RR-33 CCW RETURN FROM RCP-B 3/4" CBC-2 D-356343-2 C-5 E7534 I I I RR-33 TO PSV 3051B 0-356343-2 0-5 3/4" CBC-2 E7536 I I I RR-33 TO PI31848 3/4" CBC-2 D-356343-2 D-6 E7536 I I I RR-33 TEST CONNECTION (1),

VENT (1) 3/4" CBC-2 0-356343-2 D-4 E7535 I I I RR-33 - TO FI30508 -

1" CBC-2 (D) D-356343-2 C-6 E7537 I I I RR-33 DRAINS (1) QV279B 1 1/2" CBC-2 D-356343-2 C-4 E7534 I I I RR-33 CCW RETURN FROM RCP-B-2 1/2" CBC-2 _

D-356343-2 C-5 EG2-459 I I I RR-33 CCW RETURN FROM RCP-B 3Pl7-20 Rev.: 0 4 - , .--...: -cw, . .

. + ,

.n n

([

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 2P17- Component' Cooling Water f.

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3" CBC-2(C) D-356343-2 C-5 EG2-461 I I I RR-33 CCW RETURN FROM RCP-C 3/4" CBC-2 0-356343-2 E-4 E7539 I I I RR-33 TO PSV 3051C

, 3/4" CBC-2 D-356343-2 E-4 E7540 I I I RR-33 TO FI3050C 3/4" CBC-2 D-356343-2 E-4 E7542 I I I RR-33 TO PI3184C 1" CBC-2 (D) D-356343-2 E-4 E7541 I I I RR-33 DRAINS (1) TO VALVE QV279C 1 1/2" CBC-2 D-356343-2 E-4 E7539 I I I RR-33 CCW RETURN RCP-C 2 1/2" CBC-2 D-356343-2 D-5 EG2-459 I I I RR-33 CCW RETURN FROM RCP-C 3" HBC-20(RCP-B) D-356343-2 C-5 EG2-470 I I I RR-33 CCW RETURN RCP-B 3/4" HBC-20 D-356343-2 C-4 E7554 I I I RR-33 TO FISL30488 3/4" HBC-20 (V) D-356343-2 C-4 E7548 I I I RR-33 VENT (1) 1" HBC-20 D-356343-2 C-4 E7851 I I I RR-33 CCW RETURN RCP-8 (WITH FLEX. CONN.)

, 1" HBC-20 (D) D-356343-2 C-5 E7848 I I I RR-33 DRAIN (1) 3" HBC-20(RCP-C) D-356343-2 D-4 EG2-467, I I I RR-33 CCW RETURN.RCP-C (TO EG2-468 6" HBC-20)

D-356343-2 D-5 I I I 1/2" HBC-20 E7659 RR-33 TO FISL3048C 3Pl7-71 Rev.: 0

_ .. ~ - . __ .

b V J. M. Farley Nuclear Plent - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2Pl7- Component Cooling Water ..

ISI.Bdry Exam Period Relief Line No. Hydro No. Dwg. No. . Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 1/2" HBC-2 D-356343-2 D-5 E7854 I I I RR-33 T0.FI3049C 3/4" HBC-20 (V) 0-356343-2 D-4 E7552 I I I RR-33 VENTS (1) 1" HBC-20 0-356343-2 E-4 E7854 I I -I RR-33 CCW RETURN RCP-C (T0-3" HBC-20).

1" HBC-20 (D) D-356343-2 D-5 E7551 I I I RR-33 DRAINS (1) 3" HBC-255(A-A) D-356343-3 D-5 WO20464 I I I RR-33 CCW TG CHARGING PUMP P002A-A 3/4" HBC-255 (V) D-356343-3 D-5 WO20464 I I I RR-33 VENTS (1) 1" HBC-255 D-356343-3 D-5 WO20464 I I I RR-33 DRAINS TO VALVE QV319 1" HBC-255 (D) ^

D-356343-3 D-5 WO20464 I I I RR-33 DRAIN (1) TO VALVE j QV302 ,

2" HBC-255 D-356343-3 D-6 WO20403 I I I RR-33 CCW TO CHARGING PUMP P002A-A 2 I/2" HBC-255 D-356343-3 D-6 WO20464 I I I RR-33 CCW TO CHARGING PUMP-P002A-A

> D-356343-1 H-9 WO20464 1

3* HBC-255(B-AB) D-356343-3 C-5 WO20464 I I I RR-33 CCW TO CHARGING PUMP P002B-AB '

I 3P17-22 Rev.: 0

J. M. Farley Nuclear Plant .- Unit 2, Class _3 Components FNP-2-M-069

^

2P17- Component Cooling Water .'

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 2" HBC-255 D-356343-3 C-7 WO20464, I I I RR-33 CCW TO CHARGING PtMP WO20408 P0028-AB 4

2 1/2" HBC-255 D-356343-3 D-5 WO20464 I I I RR-33 CCW TO CHARGING PUMP P0028-AB 3" HBC-255(C-B) D-356343-3 A-5 WO20462 I I I RR-33 CCW TO CHARGING PUMP P002C-8 3/4" HBC-255 (V) D-356343-3 B-5 WO20464 I I I RR-33 VENTS (1) 1" HBC-255 (D) 0-356343-3 A-5 WO20464 I I I RR-33 DRAINS (1) 2" HBC-255 D-356343-3 B-5 WO20409 I I I RR-33 CCW TO CHARGING PUMP P002C-B 2 1/2" HBC-255 ~

D-356343-3 B-5 WO20464 I I I RR-33 CCW TO CHARGING j P002C-B

> D-356343-1 B-8 WO20464 3" HBC-256(A-A) D-356343-3 D-9 WO20459 I I I RR-33 CCW RETURN FROM CHARGING PUMP P002A-A a

> D-356343-1 J-8 WO20463 3/4" HBC-256 D-356343-3 D-7 WO20404 I I I RR-33 TO PSV 3316A .

3/4" HBC-256 (V) D-356343-3 D-8 WO20463 I I I RR-33 VENTS (1) TO VALVE QV300 3

3Pl7-23 Rev.: 0

O O O -

J. M. Farley Nuclear Plant - Unit 2, Class 3 Components FNP-2-M-069 System Pressure Test Plan 2Pl7- Component' Cooling Water ..

ISI Bdry Exam Period Relief .

Line No. Hydro No. Dwg. No. Coord. ISO Dwg. '3 1 2 Request Notes / Remarks l' HBC-256 (D) D-356343-1 H-8 WO20463 I I I RR-33 DRAIN TO VALVE QV320 1" HBC-256 (D) 0-356343-3 A-9 WC20463 I I I RR-33 DRAINS (1) TO VALVE QV304 2" HBC-256 D-356343-3 D-7 WO20404 I I I RR-33 CCW RETURN 2 1/2" HBC-256 D-356343-3 D-9 WO20463 I I I RR-33 CCW RETURN

> D-356343-1 H-8 3" HBC-256(B-AB) D-356343-3 C-8 WO20463 I I I RR-33 CCW RETURN FROM CHARGING PUMP P0028-AB 1/2" HBC-256 0-356343-3 C-7 WO20407 I I I' RR-33 TO FI3322B 3/4" HBC-256 D-356343-3 C-7 WO20407 I I I RR-33 TO PSV 3316B 2" HBC-256 D-356343-3 C-8 WO20407 I I I RR-33 CCW RETURN 3" HBC-256(C-B) 0-356343-3 A-9 WO20461 I I I RR-33 CCW RETURN FROM CHARGING PUMP P002C-B l 1/2" HBC-256 D-356343-3 B-8 WO20410 I I I RR-33 TO FI3322C 1

3/4" HBC-256 D-356343-3 B-7 WO20410 I I I RR-33 TO PSV 3316C

3/4" HBC-256 (V) D-356343-3 B-8 WO20463 I I I RR-33 VENTS (1) 1" HBC-256 (D) D-356343-3 B-9 WO20463 I I -I RR-33 DRAINS (2)

, 3P17-24 Rev.: 0

~ . _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

O O  :

O O ~'

J. M. Farley Nuclear. Plant - Unit 2, Class 3 Components FNP-2-M-069

. System Pressure Test Plan 2P17- Component Cooling Water .-

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 2" HBC-256 D-356343-3 B-7 W020410 I I I RR-33 CCW RETURN 2 1/2" HBC-256 D-356343-3 B-9 WO20463 I I I RR-33 CCW RETURN 2" HBC-57 D-356343-1 B-3 E8721 I I I RR-33 DEM. WATER TO C.C.

SURGE TANK 1" HBC-67 (D) D-356343-1 B-4 E8721 I I I RR-33 DRAIN 2" HBC-68 D-356343-1 A-4 E8744 I I I RR-33 FROM RMWS TO C.C.

SURGE TANK 1" HBC-68 (D) D-356343-1 B-4 E8744 I I I RR-33 DRAINS (1) ,

i 2" HCC-170 D-356343-1 A-6 E5920 I I I RR-33 FROM RMWS TO C.C.

SURGE TANK 1 1/2" HBC-16 D-356343-1 F-8 E8802,' I I I RR-33 CCW RETURN FROM E8810, CHARGING PUMPS 2A, 28, E8812, 2C E8875 1 1" HBC-16 (A) 0-356343-1 G-7 E8811 I I I RR-33 CCW RETURN CHARGING -

PUMP 2A 1" HBC-16 (B) D-356343-1 E-7 E8809 I I I RR-33 CCW RETURN CHARGING PUMP 2B- .

1" HBC-16 (C) ,

D-356343-1 D-7 E8801 I I I RR-33 CCW RETURN CHARGING PUMP 2C t

3P17-25 Rev.: 0

'_ m ..

._ v .

- Q J. M. Farley Nuclear' Plant - Unit 2, Class 3 Components ~ FNP-2-M-069

' System Pressure-Test P1an 2Pl7- Component' Cooling Water ._

~

ISI Bdry Exam Period. Relief Line No. Hydro No.- Dwg. No. Coord. 150 Dwg. ~3 1 2- Request Notes / Remarks

, l' HBC-18(A) D-356343-1 G-11 E5514, I I I RR-33 CCW RETURN RHR PUMP E5515 NO. 2A 1/2" HBC-18 D-356343-1 G-11 E5585 I I I RR-33 CCW RETURN N0. 2A 3/4" HBC-18 D-356343-1 G-Il E5515 I I I RR-33 TO FISL3062A~

l' HBC-18(B) D-356343-1 B-8 E5504 I I I RR-33 CCW RETURN RHR PUMP NO. 28 1/2" HBC-18 D-356343-1 B-8 E5504 I I I RR-33 CCW RETURN NO.-28 3/4" HBC-18 D-356343-1 B-8 E5504 I I .I RR-33 TO FISL3062B 1

4

.l i

.i I

l 3P17-26_ , Rev.: 0

_ _ ._._ -- . ~ _ _ _ . . . . . .. .- . - - . . -

t FNP-2 M-069 l']

v Basis for Class 3 Inservice Insnection I. INTRODUCTION The American Society of Mechanical-Engineers Boiler and Pressure Vessel Code,Section XI, 1983 Edition through Summer 1983 Addenda requires the examination of the integral attachments of supports and. restraints to Class 3 pressure retaining components. These and other supports and restraints of the same Class 3 pressure retaining components are also required to be examined on the same basis. The. provisions for integral attachments of i~

supports and restraints and for all supports and restraints requiring examination are the same concerning the " multiple stream concept" as detailed in ASME Section XI, Note 3 of Table IWD-25001 and IWF-2510(b).

The following Multiple Stream Selection Summary and Examination Schedules  ;~

are intended to provide detailed description and schedule for implementing .

the examination requirements of the ASME Code,Section XI as provided in the Inservice Inspection Program.

II. CLASS 3 ISI~ PLAN

,.3 A. Ornanization The examination plan consists of information in this manual along.

with hanger isometrics.

1. Pressure Test / Class 3 ISI Plan 1 The examination schedule in this section of the plan is organized by systems that are to be examined. Each system schedule is divided into two groups where appropriate. Components (tanks, heat exchangers, etc.) and piping.
a. The component schedules are divided into columns for the IWF/IWD item number, location drawing, support type, component (name and TPNS No.), vendor drawing, and location.

Scheduling is done by means of placing X's in the appropriate period columns. An X in the period column opposite a component indicates that the component is to be examined during that period. The X is replaced with the year after the examination is completed.

o O

V SB-1 Rev. 0

p l' I l- FNP-2-M-069 -

s_- .

, i

b. The piping schedules are divided into columns for the IWF/IWD item number, hanger number, hanger type, line number, hanger isometric and vendor drawing number, and location.

Scheduling and completion are accomplished in the same way as for components.

B. Plan Drawina Packaaes The isometric and hanger drawing packages are set up with a different line number appearing on each folder. Within that folder will be

-found the. hanger isometrics for lines requiring VT-3 examinations. -

C. Examination Procedure Visual examinations may be performed either during normal system operation ~ or plant outages. Examination boundaries for integral attachments and component supports and restraints subject to examination are as detailed in ASME Section XI, figure IWD-2500-1 and Figure IWF-1300-1, respectively.

Visual examination of integral attachments and component supports r-~3 and restraints.will be performed per procedure.

O NDE-VT-003: Visual Examination VT-3 D. Examination Freauency The frequency of examination is established in accordance with ASME Section XI. All integral attachments. and supports and restraints requiring inservice inspection shall be examined once each inspection interval as detailed in the following examination schedules.

E. Corrective Action If discrepancies are detected the performance of an examination, the condition shall be thoroughly investigated to establish the extent of the nonconformance. Discrepancies will be documented on the Visual Examination or Support Examination Report, as appropriate.

Discrepancies will also be documented on an Indication Evaluation Report form. Repairs will be made using a Maintenance Work Request as required. .

i

.n.

SB-2 Rev. O

y ,.

Tl q); .

FNP-2-M-069

b. The piping schedules are divided into columns for the IWF/IWD item number, hanger number, hanger type, line number, hanger isometric and vendor drawing number, and location. g Scheduling and completion are accomplished in the same way as j for components.

B. Plan Drawina Packaaes The isometric and hanger drawing packages are set up with a different  !

line number appearing on each folder. Within that folder will be ]

found the hanger isometrics for lines requiring VT-3 examinations. i C. Examination Procedure Visual examinations may be performed either during normal system operation or plant outages. Examination boundaries for integral .

attachments and component supports and restraints subject to 1 examination are as detailed in ASME Section XI,' Figure IWD-2500-1 and Figure IWF-1300-1, respectively.

Visual examination of integral attachments and component supports l n and restraints will be performed per procedure. .;

V '

NDE VT-003: Visual Examination VT-3 D. Examination Freauency g

~

The frequency of examination is established in accordance with ASME  !

Section XI. All integral attachments anu supports and restraints '

requiring inservice inspection shall be examined once each inspection interval as detailed in the following examination schedules.

E. Corrective Action ,

t l

If discrepancies are detected during the performance of an examinatio l condition shall be thoroughly investigated to establish the extent of  !

the nonconformance. Discrepancies will be documented on the Visual l

Examination or Support Examination Report, as appropriate.

Discrepancies will also be documented on an Indication Evaluation Report form. Repairs will be made using a Maintenance Work Request p as required.

(

1 l o n

U SB-2 Rev. 0

FNP-2-M 069 J

III. EXAMINATION REPORT The Officia1' Test Copics of all procedures used during the period shall constitute the Official inspection Report. All Official Test Copies will t be maintained on site as an official plant document and will contain the following information:

1. Examination methods
2. Examination results

. Evaluation of results .'

4. Corrective actions and repairs d

v h

s.

SB-3 Rev. 0 l ,3 V

l l

y ,.

E , 1 p

l' q FNP-2 M-069

f. v .

TABLE 3.

ASME Class 3 Multiple Stream Selection-Summarv

  • Component selected-for examination.

[21 - Post Accident Ctmt. Vent System: NA Bil - Spent Fuel Pool Cooling System: multiple streams Eauipment (Ref. D-356360, Sh. 1)

Pumps (2)

  • Pump No 1 Pump No. 2 y Q2G31P001A-B Q2G31P001B A Heat Exchanaers.'(2)
  • Hx. No.-1 Hx, No. 2

.rs Q2G31H001A-B Q2G31H001B-A

o L) id2 - Aux. Steam System: NA N23 - Aux. Feedwater System: multiple streams

.i Eauipment (Ref. D-356346, Sh. 1)  !

R Pumps (2) )

Q2N23P001A-A 02N23P0018-B j i

o

.P_12 - Reactor Makeup Water System: NA

'E16 . Service Water System: Multiple Streams .

f s,

A L) Rev. 0 000636 1 of 2

!1

?

~

FNP-2-M-069-s o

7] .

Eauipment -

Pumps (5) - (Ref. D 356370, Sh. 2)

. Service Water Service Water -

Service Water o Pump 2A. Pump 2B Pump 2C Q2P16P001A. Q2P16P001B Q2P16P001C Service Water

Pump 2D Pump 2E

.Q2P16P001D Q2P16P001E Strainers (2) - (Ref. D-356370, Sh. 2)

Strainer Strainer Q2P16F501A *Q2P16F501B Heat Exchanaers (3) - (Ref. D-356344, Sh._1) e Hx. No. 2A- Hx. No. 2B Hx. No. 2C Q2Pl7H001A-B Q2Pl7H0018-AB -Q2Pl7H0010-A

,. x Coolers (4) - (Ref. D-356344, Sh; 1)

- Ctmt'. Cooler 2A Ctmt. Cooler 2B -i i

Q2E12H001A-A Q2E12H001B-A

  • Ctmt. Cooler 2C Ctmt. Cooler 2D Q2E12H001C-B Q2E12H001D B Pl7 - Component Cooling Water System: multiple streams Eauipment (Ref. D-356343, Sh. 1)

Pumns (3)

Pump 2A Pump 2B

  • Pump 2C-A 02Pl7P001A-B Q2Pl7P001B-AB Q2P17P001C-A I

Heat Exchanaers (3) e CCW'Hx. 2A CCW Hx. 2B *CCW Hx. 20 02Pl7H0018-AB 02P17H0010,-A Q2Pl7H001A-B u RHR.Hx. 2A *RHR Hx, 2B Q2E11H001A-A 02EllH0018-B n

U l

l 1

~

~~~

f '

~

.-('~  ; -

)

+--

O J. M. Farley Nuclear Plant' -' Unit 2, Class '3 Component Supports And . FMP-2-M-069 :-

Hanger Surveillance Plan ".

2E23- Post Accident Ctat. Vent System-40-MONTH RE-EXAM- . PERIOD-

. ISO DWG/ ~ '3- 2 IWF/IWD FIG. NO. LOCATION NOTES /IER. .I' ITEM HANGER NO. HANGER TYPE. LINE NO.

X 6" HCC-239- EG2-317. CTMT:

C-F3.40 2PA-R34 RESTR. HGR.

CV-278 124'-6" ,

CTNT X'

2PA-R35 SWAY STRUT 6" HCC-239 EG2-317 C-F3.50 CV-278 124'-6" X

6" HCC-239 EG2-317 CTMT SWAY STRUT C-F3.50 2PA-R36 CV-278 124'6" e

4E23-1 Rev.: 0

~~

y " -

(

v -

y .. .

~

J. M. Farley Nuclear Plant- .. Unit. 2, C1 ass' 3 Component Supports And FNP-2-M-069~ ,

Hanger Surveillance Plan 2G31- Spent Fuel Pool Cooling. ..

~40-MONTH-VENDOR RE-EXAM PERIOD

$ :IWF/IWD .3 1 2 ITEN LAYOUT DWG. SUPPORT TYPE COMPONENT DRAWING LOCATION NOTES /IER U277723 A139 VENDOR X A-F1.30 D205051 BED PLATES SPENT FUEL P0OL PUMP-#1 SUPPLIED Q2G31P002A-B U209558 A155 X

! -A-F1.20 D205055 U SUPPORTS = SPENT FUEL 3 POOL HX #1

- Q2G31P0028-A

.q s

L 4

4 4G31-1 Rev.: O'

% - e ., .m , , * * * -. y-+ +y +,me e %emi-av og zu w =s

._ r1 -- i e J. M. Farley Nuclear Plant - Unit. 2, Class 3 Component Supports And FNP-2-M-069 Hanger Surv'.tillance Plan ,

.2N12- Auxiliary Steam 40-MONTH RE-EXAH PERIOD

. IWF/ LWD 150 DFG/

3 -1 ~2 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. kD. E0 CATION NOTES /IER X-C-F3.40 AS-2A4 ANCHOR 8" HBC-71 EG2-548 AUX B-D2.20 .W/ ATTACH. CV-381 123'-6" X.

C-F3.50 2ASCR-BR13 SNUBBER 8" HBC-71 EG2-543 AUX (H)(2) CV-383 107'-0" X ,

C-F3.50 2ASCR-BR14 SNUBBER 8" HBC-71 EG2-5&l' AUX B-D2.20 (H)(2) CV-383 109'-0" W/ ATTACH X

8" HBC-71 EG2-543 AUX C-F3.30 2ASCR-BR15 RESTR. HGR.

B-D2.20 W/ ATTACH CV-383 102'-9 3/4" X

C-F3.40 2ASCR-R102 SPRING CAN 8" HBC-71 EG2-548 AUX C-F3.50 (2) CV-383 109'-0" '

r STANCH 10N

~

X.

C-F3.50 2ASCR-R103 SNkJBBER (H) 8" HBC-71 EG2-548 AUX CV-383 109'-0" 4

X 8" HBC-71 EG2-548 AUX C-F3.40 2ASCR-R104 RESTR. HGR.

CV-383 115'-0" X

C-F3.50 2ASCR-R105 SNUBBER (H) 8" HBC-71 EG2-548 AUX CV-383 112'-8 1/4"

~

X C-F3.30 2ASCR-R106 RESTR. HGR. 8" HBC-71 EG2-548 . AUX CV-383 115'-0" 4N12-1 Rev.: 0

_ _ _, ~ , . ,~ - . _ . . _ -.- ~.- ... ...

.A l l

J. M. Farley Nuclear Plant - Unit 2,' Class 3 Component Supports And - FNP-2-M-069 Hanger Surveillance Plan ~

'2N12- Auxiliary Steam 40-MONTH RE-EXAM PERIOD ISO DWG/

IWF/IWD NOTES /IER 3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. -FIG..NO. LOCATION X

2ASCR-R107 PESTR. HGR. B" HBC-71 EG2-548 AUX C-F3.30 CV-383 114'-11 5/8" X

8" HBC-71 EG2-548 AUX C-F3.30 2ASCR-R108 RESTR. HGR.

CV-383 115'-0" X

8" HBC-71 EG2-548 AUX C-F3.30 2ASCR-R109 RESTR. HGR.

CV-383 143'-10" X

8" HBC-71 EG2-548 AUX I C-F3.30 2ASCR-R110 RESTR. HGR.

CV-383 159'-6" X

8" HBC-71 EG2-548 AUX C-F3.40 2ASCR-R111 RESTR. HGR.

CV-383 177'-6" X

2ASCR-Rll2 RESTR. HGR. 8" HBC-71 EG2-548 AUX C-F3.40 203'-0" CV-383

~

X 2ASCR-Rll3 RESTR. HGR. 8" HBC-71 EG2-548 AUX C-F3.40 206'-6" CV-383 4N12-2. Rev.:_0

- . - - . - . u. . .;. . -. .- - -

- = .. -. , s. .

O O

~

n

-v J. M. Farley Nuclear Plant.- Unit 2, Class 3 Component Supports-'And FNP-2-M-069 Hanger Surveillance Plan ,

2N23- Auxiliary Feedwater

~

40-MONTH VENDOR RE-EXAM PERIOD IWF/IWD 3 1 2 LAYOUT DWG. SUPPORT TYPE COMPONENT DRAWING LOCATION NOTES /IER ITEM YARD X A-F1.30 D200039-01 ANCHOR BOLT CONDENSATE U213481 RING STORAGE TANK Q2P11T001 A100 -X A-F1.30 D205063 BASEPLATE AUX FEEDWATER U214885 PUMP-Q2N23P001A-A A100 X A-F1.30 D205063 BASEPLATE AUX FEEDWATER U214885 PUMP Q2N23P002 4N23-1 Rev.: 0

~

^ ~

L4

'FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class .3' Component Supports And ' '

Hanger. Surveillance Plan ~

2N23- Auxiliary Feedwater '

~40-MONTH RE-EXAM PERIOD 150 DWG/i 3 1 2

-IWF/IWO FIG. NO. LOCATION NOTES /IER ITEM HANGER NO. HANGER TYPE LINE NO.

X AUX C-F3.30 AFW-2A5 ANCHOR 8" HBC-28(P002) EG2-481 CV-162 113'-5" 3 B-D2.20 W/ ATTACH.

X 8" HBC-28 EG2-481 ' AUX C-F3.30 AFW-2A6 ANCHOR CV-162 115'-0" B-D2.20 W/ ATTACH. '

X 8" HBC-28 EG2-479 AUX C-F3.30 2AFW-R127 RESTR. HGR.

CV-164 108'-2 7/16" X 3 8" HBC-28 EG2-481 AUX C-F3.30 2AFW-R128 RESTR. HGR.

CV-162 133'-6" AUX X.

RESTR. HGR. 8" HBC-28 EG2-481 C-F3.30 2AFW-R129 CV-162 113'-6" X

8" HBC-28 EG2-481 AUX C-F3.30 2AFW-R130 RESTR. HGR.

CV-162 115'-0" X

8" HBC-28 EG2-481 AUX-C-F3.50 2AFW-R131 SWAY STRUT 115'-0" CV-162 X

AUX C-F3.30 2AFW-R132 RESTR. HGR. 8" HBC-28(P002) EG2-481 CV-162- 101'-6" X

RESTR. HGR. 8" HBC-28(P002) EG2-481 AUX' C-F3.40 2AFW-R133 CV-162 103'-0" .

X 8" HBC-28(P002) EG2-480- ' AUX C-F3.30 2AFW-R134 ' RESTR. HGR. CV-161' 113'-7" 4N23-2 Rev.: 0

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . _ . . - _. -- __ __ ._- -- --.a. . . . - , . - .a .- . . . .

. 3-J.' M. Farley Nuclear P1' ant - Unit,2, Class '3 Component Supports' And ' FNP-2-M-069

' Hanger Surveillance Plan ,

.2N23- Auxiliary Feedwater

'40-MONTH RE-EXAM- PERIOD IWF/IWD 150 DWG/

FIG. NO. LOCATION . NOTES /IER 3 1 2.

ITEM HANGER NO. HANGER TYPE LINE NO.

AUX X-C-F3.30 2AFW-R135 RESTR. HGR. 8" HBC-28(P002) EG2-480 CV-161 113'-4 7/8" EG2-045 AUX- 'X C-F3.30 2AFW-R44 RESTR. HGR. 8" HBC-47 i B-D2.20 W/ ATTACH. CV-370 153'-6" AUX X C-F3.40 2AFW-R45 RESTR. HGR. 8" HBC-47 EG2-045

'CV-370 150'-7 1/2" AUX X C-F3.40 2AFW-R45X RESTR. HGR. 8" HBC-47 EG2-045 CV-370 150'-0" EG2-045 AUX .X C-F3.40 2AFW-R46 RESTR. HGR. 8" HBC-47 CV-370 150'-0" X

C-F3.40 2AFW-R47 RESTR. HGR. 8" HBC-47 EG2-045 AUX CV-370 150'-0" ,

X C-F3.40 2AFW-R48- RESTR. HGR. 8" HBC-47 EG2-045 AUX CV-370 150'-0" X -

C-F3.40 2AFW-R49 RESTR. HGR. 8" HBC-47 EG2-045 AUX CV-370 150'-0" X

C-F3.40 2AFW-R50 RESTR. HGR. 8" HBC-47 EG2-045 AUX CV-370 150'-0" .

X C-F3.40 2AFW-R51 RESTR. HGR. 8" HBC-47 EG2-045 AUX

~

CV-370 150'-0" 4N23-3 Rev.: 0 i

.,1.. _ .; - n. . . . - . _. . . . . . . _ , . _ _ .

  • - g

.- q. ..

n J. M. Farley. Nuclear Plant - Unit'2, Class 3 Component Supports And FNP-2-M-069 Hanger Surveillance Plan ,

2N23- Auxiliary Feedwater 40-MONTH RE-EXAM: PERIOD IWF/IWD ISO DWG/'

FIG. NO. LOCATION ' NOTES /IER 3 .1 2 ITEM HANGER NO. HANGER TYPE _LINE NO.

X C-F3.40 2AFW-R52 RESTR. HGR. 8" HBC-47 EG2-045 AUX.

CV-370 150'-0" X

C-F3.40 2AFW-R53 RESTR. HGR. 8" HBC-47 EG2-045 AUX B-D2.20 W/ ATTACH. CV-370 150'-0" X

C-F3.40 2AFW-R54 RESTR. HGR. 8" HBC-47 EG2-045 AUX CV-370- 150'-0" X

C-F3.40 2AFW-R55 RESTR. HGR. 8" HBC-47 EG2-045 AUX CV-370 150'-0" X

C-F3.40 2AFW-R56 RESTR. HGR. 8" HBC-47 EG2-045- AUX

' CV-370 150'-0" EG2-045 AUX X-C-F3.40 2AFW-R57 RESTR. HGR. 8" HBC-47 l

CV-370 150'-0" AUX X C-F3.40 2AFW-R58 RESTR. HGR. 8" HBC-47 EG2-045 l CV-370 150'-0" X

C-F3.40 2AFW-R59 RESTR. HGR. 8" HBC-47 EG2-045 AUX CV-370 150'-0" X

C-F3.40 2AFW-R60 RESTR. HGR. 8" HBC-47 EG2-045 AUX CV-370 -150'-0 1/2" .

X C-F3.40 8" HBC-47 EG2-045 AUX 2AFW-R61 ' 'RESTR. HGR. 150'-0"-

CV-370 4N23-4 Rev.: 0 FNP-2-M-0691 J. M. Farley Nuclear Plant - Unit 2, ' Class 3 Component Supports And Hanger Surveillance Plan . 4 2N23- Auxiliary Feedwater 40-MONTH RE-EXAM. PERIOD 150 DWG/ 2-IWF/ LWD NOTES /IER 3 1 HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION ITEM X 8" HBC-47 EG2-045 AUX C-F3.40 2AFW-R65 RESTR. HGR. CV-370 150'-0" X 8" HBC-47' EG2-482 AUX C-F3.40 2AFW-R66 RESTR. HGR. CV-371 150'-0" X 8" HBC-47 EG2-482 AUX C-F3.30 2AFW-R136 RESTR. HGR. CV-371 111'-0" i X 8" HBC-47 EG2-482 AUX C-F3.50 2AFW-R137 SWAY STRUT

                                                                                                                                        'CV-371       111'-0" X

8" HBC-47 EG2-482 AUX C-F3.50 2AFW-R138 SWAY STRUT CV-371 111'-0" X RESTR. HGR. 8" HBC-47 EG2-482 ' AUX C-F3.30 2AFW-R139 119'-6 1/2" CV-371 X RESTR. HGR. 8" HBC-47 EG2-482 AUX C-F3.30 2AFW-R140 CV-371 136'-5.1/2" X RESTR. HGR. 8" HBC-47 EG2-482 AUX C-F3.30 2AFW-R141 108'-6" CV-371 AUX

                                                                                                                                                                                                   -X SWAY STRUT   8" HBC           EG2-482 C-F3.50                                                         2AFW-R142
                                                                                                                                                      '108'-6" CV-371 X

8" HBC-47 EG2-482- AUX C-F3.50 SPRING CAN CV-371 106'-11" B-D2.20 2AFW-R143X~ (2) STANCHION 4N23-5 Rev.: 0

- -+:.
                                                                             ;       Y                                                          _f]'     " $'

(/ -g

                                                                             'Q.
                                                                              .                                                        4
                                                                ~

FMP-2-M-069 i+*~~ J. M. Farley Nuclear: Plant - Unit'2, Class 3 Component Supports And

                                                                                                                                                         ~
Hanger Surveillance Plan

. , ..~ 2N23- Auxiliary Feedwater

                                                                                                                             .40-MONTH            i RE-EXAM       PERIOD 150 DWG/.

IWF/IWD 3 1 -2 LINE NO. FIG. NO. LOCATION NOTES /IER ITEM HANGER NO. HANGER TYPE X

.C-F3.40 2AFW-R62 RESTR. HGR. 8" HBC-48(A-A) EG2-046 AUX CV-369 '150'-0" AUX X'

8" HBC-48(A-A) EG2-046 C-F3.30 2AFW-R63 RESTR. HGR.

                                                                  .CV-369         150'-0" X

8" HBC-48(A-A) EG2-046 AUX C-F3.40 2AFW-R64 RESTR. HGR. CV-369 150'-0" X 1 ' AUX C-F3.40 2AFW-R67 RESTR HGR. 8" HBC-48(A-A) EG2-477 CV-163 150'-0" 1 X  : C-F3.30 2AFW-R76 RESTR. HGR. 8" HBC-48(A-A) EG2-046; . AUX- ,' CV-369 153'-6" l B-D2.20 W/ ATTACH. X RESTR. HGR. 8" HBC-48(A-A) EG2-046 AUX C-F3.40 2AFW-R77 ~ CV-369 150'-7.1/2" X C-F3.40 2AFW-R77X RESTR. HGR. 8" HBC-48(A-A) EG2-046' AUX CV-369 150'-0" . . AUX X C-F3.40 2AFW-R78 RESTR. HGR. 8" HBC-48(A-A) EG2-046 CV-369 150'-0" X AUX C-F3.40 2AFW-R79 RESTR. HGR. 8" HBC-48(A-A) EG2-046 CV-369 150'-0" , X RESTR. HGR. 8" HBC-48(A-A) EG2-046 . AUX C-F3.40 2AFW-R80 150'-0" CV-369

                                                             ~

4 4N23-6 Rev.:-0 , m - w- * ~

  • v n ~v e w%w -4
                                                  *+'"4
                                                     .                                                   r                           y                                 $

_= - , ._

   - .        *x t

FMP-2-M-069 J. M. Farley Nuclear Plant._- Unit 2,-Class 3-Component Supports' And Hanger Surveillance Plan- .. 2N23- Auxiliary Feedwater 40-MONTH RE-EXAM PERIOD 150.DWG/ 2-IWF/IWD NOTES /IER 3 -11 ITEM HANGER NO. HANGER TYPE LINE.NO.- FIG. NO. LOCATION AUX

                                                                                                                      ~ :X'-

C-F3.40 2AFW-R81 RESTR. HGR. 8" HBC-48(A-A) EG2-046 CV-369 150'-0" X RESTR. HGR. 8" HBC-48(A-A) tC?-046 AUX C-F3.40 2AFW-R82 150'-0" CV-36s X

                                                                          ~ AUX C-F3.40  2AFW-R83      RESTR. HGR. 8" HBC-48(A-A) EG2-046 CV-369         150'-0" AUX
X C-F3.40 2AFW-R84 RESTR. HGR. 8" HBC-48(A-A) EG2-046 CV-369 150'-0" X

AUX C-F3.40 2AFW-R85 RESTR. HGR. 8" HBC-48(A-A) EG2-046 CV-369 150'-0" B-D2.20 W/ ATTACH. X EG2-046 AUX C-F3.40 2AFW-R86 RESTR. HGR. 8" HBC-48(A-A) CV-369 150'-0" X 8" HBC-48(A-A) EG2-046 AUX C-F3.40 2AFW-R87 RESTR. HGR. CV-369 150'-0" X AUX C-F3.40 2AFW-R88 RESTR. HGR. 8" HBC-48(A-A) EG2-046 CV-369 150'-0" X 8" HBC-48(A-A) EG2-046- AUX C-F3.40 2AFW-R89 RESTR. HGR. CV-369 150'-0" . X

                                      -8" HBC-48(A-A)          EG2-046       AUX C-F3.40   2AFW-R90     RESTR. HGR.

CV-369 150'-0" 4N23-7 Rev.- 0

                                           .. _      _ _ . _ . .              _  _    _       a._ .       _   . - - _          _    _ . , ,         . _     _
                                                                                                  ~                -
                                                                                                                                                                                               ~
                                                                                                                                                                                                                                                                                                   - .                     g
                                                                                                                                                                                                                                                                                          -' ' '           b- k. ,. 3,           u   - e,-

FNP-2-M-069. J. M. Farley Nuclear Plant - UnitI2, Class 3 Component Supports And . Hanger Surveillance Plan.- .. 2N23- Auxiliary Feedwater 40-MONTH RE-EXAM PERIOD 150 DWG/ 2 lIWF/IWD LOCATION NOTES /IER 3 -1 HANGER NO.- HANGER TYPE LINE NO. FIG. NO. ITEM X AUX C-F3.40 2AFW-R91 RESTR. HGR. 8" HBC-48(A-A) EG2-046 CV-369 150'-0" X AUX

C-F3.40 2AFW-R92 RESTR. HGR. 8" HBC-48(A-A) EG2-046 -

' CV-369 150'-0 1/2" X

                                                                                                                     ' AUX C-F3.50             2AFW-R93        RESTR. HGR. 8".HBC-48(A-A) EG2-046 CV-369           - 150'-0" X

AUX C-F3.30 2AFW-R143 RESTR. HGR. 8" HBC-48(A-A) EG2-477 ' CV-163 136'-4" X AUX ! C-F3.30 2AFW-R144 RESTR. HGR. 8" HBC-48(A-A) EG2-477 CV-163 -111'-0" X 8" HBC-48(A-A) EG2-477 AUX C-F3.30 2AFW-R145 RESTR. HGR.

                                               ~

CV-163- 149'-0" TRAIN S X-6" DBC-1(P002) EG2-486 AUX C-F3.40 2AFW-R1 RESTR. HGR. CV-375 107'-7 1/16" TRAIN S X AUX C-F3.50 2AFW-R2 SWAY STRUT 6" DBC-1(P002) EG2-486 CV-041 107'-6 11/16" TRAIN S X AUX C-F3.50 2AFW-R3 SWAY STRUT 6" DBC-1(P002) EG2-486 CV-375 107'-6" .

                                                                                                                         -AUX                                                                            TRAIN S                                                            X' C-F3.30              2AFW-BR5         RESTR. HGR.        6" DBC-1(P002) EG2-486 CV-375            109'-0" L

4N23-8 Rev.: 0 , i L _4 _ - __ _ _ _ _ _ _ _ _ . _ _ _ . _ . _ _ _ s__- --e ' - _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ , _ _ _ _ _ _ _ . _ . _ _ _ _ _ . _ _ _ _ _- ____m___

                                                                                                                                                                                                                                                                 - - '            .,s_.      a       _.. .          mm_m.__._=_.._m.
                                                                                                                        ~

J. M. Farley Nuclear P1 ant - Unit 2,.C1 ass 3 Component Supports And FNP-2-N-069' Hanger Surveillance P1an-2N23- Auxiliary Feedwater 40-MONTH RE-EXAM PERIOD IWF/IWD ISO DWG/ LINE NO. FIG. NO. LOCATION _ NOTES /IER 3 1 2-ITEM HANGER NO. HANGER TYPE AUX TRAIN S X

.          C-F3.30  2AFW-R17      RESTR. HGR. 6" DBC-1(P002) -EG2-486
'                                                                         CV-375          113'-6" AUX             TRAIN S                                X C-F3.30  AFW-2A17      ANCHOR        6" DBC-1(P002)            EG2-486
,          B-D2.20                W/ ATTACH.                              CV-375          113'-6" AUX            ' TRAIN S                               X C-F3.30  2AFW-R35      RESTR. HGR. 6" DBC-1(P002)            EG2-487
                                                                        ' CV-376           114'-11" AUX              TRAIN S                               X C-F3.30  2AFW-R36      RESTR. HGR. 6" DBC-1(P002)             EG2-487 CV-376          114'-9 3/4" AUX             TRAIN S                               X C-F3.50  2AFW-R37      SWAY STRUT    6" DBC-1(P002)            EGZ-487 CV-376-         113'-0" 6" HBC-28(A-A) EG2-478                    AUX                                           .X i            C-F3.30  AFW-2A7       ANCHOR B-D2.20                W/ ATTACH.                              CV-166          107'-0"                                         ,

EG2-478 AUX X C-F3.30 2AFW-R126 RESTR. HGR. 6" HBC-28(A-A) l CV-166 101'-5 1/4" EG2-480 AUX X C-F3.50 2AFW-R149 SWAY STRUT 6" HBC-28(B-B) CV-161 107'-4 7/8" X C-F3.30 2AFW-R150 RESTR. HGR. 6" HBC-28(B-B) EG2-480 AUX CV-161 101'-6 1/2" . ' X C-F3.40 2AFW-R152 RESTR. HGR. 6" HBC-28(B-B) EG2-480 AUX ..

                                ~

CV-161 104'-5 1/2" 4N23-9 Rev.: 0 _ _ __ _ . _ _ . _ _ _ . _ .___2-- _ . _ _ _ _ - _ - 1

e *' FMP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class;3 Componem. Supports And ' Hanger Surveillance Plan .. 2N23- Auxiliary Feedwater l MONTH RE-EXAM .PERIDO-150 DWG/ 1'2-IWF/1WD NOTES /IER 3 HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION ITEM X~ 6" HBC-48(B-B) EG2-477 AUX C-F3.30 2AFW-R146 RESTR. HGR. CV-163 113'-6" . X AUX C-F3.30 2AFW-R147 RESTR. HGR. 6" HBC-48(B-B) EG2-477 CV-163 115'-0" X AUX C-F3.30 2AFW-R148 RESTR. HGR. 6" HBC-48(B-B) EG2-480 ' CV-161 113'-6" X 6" HBC-48(B-B) EG2-479 AUX C-F3.30 2AFW-R153 RESTR. HGR. CV-164- 113'-6" X , AUX C-F3.30 2AFW-R154 RESTR. HGR. 6" HBC-48(B-B) EG2-479 CV-164' 113'-6" X AUX C-F3.30 2AFW-R155 RESTR. HGR. 6" HBC-48(B-B) EG2-479 CV-164 113'-6" , X AUX j C-F3.50 2AFW-R156 SWAY STRUT 6" HBC-48(B-B) EG2-479 CV-164 112'-9 1/4" AUX

                                                                                                                                                                                                                              'X C-F3.50                  2AFW-R157         SWAY STRUT            6" HBC-48(B-B) EG2-479 CV-164.       112'-4" X

AUX i C-F3.30 2AFW-R158 RESTR. HGR. 6" HBC-48(A-A) EG2-478 CV-166 111'-0" . X AUX C-F3.30 2AFW-R159 RESTR. HGR. 6" HBC-48(A-A) EG2-478 CV-166 113'-6" 4N23-10 Rev.: 0

v J. M. Farley Nuclear Plant - Unit 2, Class 3 C=ponent Supports Ar.4 FNP-2-M-069 Hanger Surveillance Plan . 2N23 Auxiliary Feedwater 40-MONTH RE-EXAM PERIOD ISO DWG/ IWF/IWD 3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER X RESTR. HGR. 6" HBC-48(A-A) EG2-478 AUX C-F3.40 2AFW-R160 112'-6" CV-166 AUX X C-F3.50 2AFW-R161 SWAY STRUT 6" HBC-48(A-A) EG2-479 CV-164 107'-0 1/2" STM. GEN. X ANCHOR 4" DBC-1(2B) EG2-487 AUX C-F3.A0 AFW-2A10 W/ ATTACH. CV-376 124'-6" TRAIN S X AUX C-F3.40 AFW-2A12 ANCHOR 4" DBC-1(P002) EG2-487 B-D2.20 W/ ATTACH. CV-376 124'-6" STM. GEN. X EG2-486 AUX C-F3.30 AFW-2A14 ANCHOR 4" DBC-1(2A) B-D2.20 W/ ATTACH. CV-375 124'-3" STM. GEN. X RESTR. HGR. 4" OBC-1(2A) EG2-486 AUX C-F3.30 2AFW-R18 i

                                 ~

CV-375 117'-9" STM. GEN. X RESTR. HGR. 4* DBC-1(2A) EG2-486 AUX C-F3.30 2AFW-R19 CV-375 I19'-0 1/4" AUX STM. GEN. X C-F3.30 2AFW-R20 RESTR. HGR. 4" DBC-1(2A) EG2-486 CV-375 119'-0" AUX TRAIN S X C-F3.30 2AFW-R38 RESTR. HGR. 4" DBC-1(P002) EG2-487 CV-376 112'-0 3/8" . TRAIN S X RESTR. HGR. 4" DBC-1(P002) EG2-487 AUX C-F3.30 2AFW-R39 j

                           ~

CV-376 117'-7" i 4N23-Il Rev.: 0 Y ._ _

                                                                               'J

( ~ FNP-2-M-069 J. M.- Farley Nuclear Plant - Unit 2, Class 3 Gent Supports And Hanger Surveillance Plan .. 2N23- Auxiliary Feedwater 40-MONTH

                                                                                                         -RE-EXAM    PERIOD ISO DWG/                                                -2 IWF/IWD                                                                                  NOTES /IER          3      1 HANGER NO. HANGER TYPE                LINE NO. FIG. NO.      LOCATION ITEM TRAIN 0                        X AUX C-F3.40      2AFW-R40            RESTR. MR. 4* DBC-1(P002) EG2-487 CV-376        118'-4 1/4" TRAIN S                        X AUX C-F3.40      2AFW-R41            RESTR. HGR. 4" DBC-1(P002) EG2-487 CV-376        118'-3 5/8" STM. GEN.                      X' 4" DBC-1(28)     EG2-487      AUX C-F3.30     2AFW-R42             RESTR. HGR.

CV-376 115'-6" STM. GEN. X EG2-487 AUX C-F3.30 2AFW-R43 RESTR. HGR. 4" DBC-1(28) CV-376 115'-0" STM. GEN. X EG2-486 AUX C-F3.30 2AFW-R107 RESTR. HGR. 4" DBC-1(2A) CV-375 130'-0" STM. GEN. X EG2-486 AUX C-F3.30 2AFW-R108 RESTR. HGR. 4" DBC-1(2A)

                                          ^

CV-375 130'-0* , TRAIN S X 4" DBC-1(P002) EG2-487 AUX C-F3.30 2AFW-R113 RESTR. HGR. CV-376 130'-0* STM. GEN. X 4" DBC-1(2B) EG2-487 AUX C-F3.30 2AFW-R119 RESTR. HGR. CV-041 130'-0* STM. GEN. X 4" DBC-1(2B) EG2-487 AUX C-F3.30 2AFW-R120 RESTR. HGR. CY-041 130'-0" . X ANCHOR 4" DBC-2(B-B) EG2-489 AUX C-F3.30 AFW-2A1 140'-1" CV-042 B-D2.20 W/ ATTACH. 4N23-12 Rev.: 0

J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069 . Hanger Surveillance Plan 2N23- Auxiliary Feedwater - 40-MONTH 150 DWG/ RE-EXAM' PERIOD IWF/IWD ITEM HlWIGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER 3 1 2 EG2-490 AUX X C-F3.30 2AFW-BR2 RESTR. HGR. 4* DBC-2(B) CV-378 118'-6" EG2-490 AUX X C-F3.30 AFW-2A2 ANCHOR W/ 4" DBC-2(B) B-DZ.20 ATTACH. CV-041 133'-8" EG2-488 AUX X C-F3.30 AFW-2A3 ANCHOR 4" DBC-2(A-A) B-D2.20 W/ ATTACH. CV-343 133'-8" EG2-490 AUX X C-F3.40 AFW-2A9 ANCHOR W/ 4" DBC-2(B) B-D2.20 ATTACH. CV-041 124'-3" EG2-489 AUX X C-F3.30 AFW-2All ANCHOR 4" DBC-2(B-B) B-D2.20 W/ ATTACH. CV-042 128'-0" EG2-488 AUX X C-F3.30 AFW-2A13 ANCHOR 4" DBC-2(A-A) B-D2.20 W/ ATTACH. CV-343 124'-3" EG2-484 AUX X C-F3.50 2AFW-R21 SWAY STRUT 4" DBC-2(A) . CV-373 107'-6" EG2-484 AUX X - . C-F3.50 2AFW-R22 SWAY STRUT 4" DBC-2(A) i CV-373 107'-6" EG2-484 AUX X l C-F3.40 2AFW-R23 RESTR. HGR. 4" DBC-2(A) CV-373 111'-0" . i EG2-484 AUX X j C-F3.40 2AFW-R24 RESTR. HGR. 4" OBC-2(A) CV-373 112'-9" 4N23-13 Rev.: 0 i __ . . ~ . . . _ . . . .. _ . . , . . , . , , _ . . . . . _ _ , _ . _ - . . . _ _ . _ . , . . . , . . -

                                                                                                                                         , - ,         -[

4 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069 Hanger Surveillance Plan , 2N23- Auxiliary Feedwater 40-MONTH RE-EXAM PERIOD IWF/IWD 150 DWG/ FIG. NO. LOCATION NOTES /IER 3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. X C-F3.30 2AFW-R25 RESTR. HGR. 4" DBC-2(A) EG2-484 AUX CV-373 112'-11 1/16" EG2-490 AUX X C-F3.30 2AFW-R26 RESTR. HGR. 4* DBC-2(A) CV-378 112'-9" X C-F3.30 2AFW-R27 RESTR. HGR. 4" DBC-2(A) EG2-490 AUX CV-378 113'-10" X . C-F3.30 2AFW-R28 RESTR. HGR. 4" DBC-2(B) EG2-490 AUX E-D2.20 W/ ATTACH CV-378 114'-10 11/16" X > C-F3.30 2AFW-R29 RESTR. HGR. 4" DBC-2(A-A) EG2-488 AUX CV-343 114'-11" AUX X C-F3.30 2AFW-R30 RESTR. HGR. 4" DBC-2(B) EG2-490 CV-378 118'-0 3/4* X C-F3.30 2AFW-R30X RESTR. HGR. 4" DBC-2(B) EG2-490 AUX CV-378 118'-6" X C-F3.40 ZAFW-R31 RESTR. HGR. 4" DBC-2(A) EG2-485 AUX CV-374 112'-6" X C-F3.30 2AFW-R32 RESTR. HGR. 4" DBC-2(A) EG2-485 AUX CV-374 108'-10" . X 4" DBC-2(A-A) EG2-488 AUX

C-F3.30 2AFW-R68 ~ RESTR. HGR. 120'-3" CV-343 4N23-14 Rev.
0

(a) ('v ')

                                                                                                                                                                                    'a J. M. Farley Muclear Plant - Unit 2, Class 3 Component Supports And                                                  .FMP-2-M-069 Hanger Surveillance Plan                                                  .,
  '2N23- Auxiliary Feedwater 40-MONTH RE-EXAM          PERIOD 150 DWG/
 .IWF/IWD                                                                                                                                                  3         1   2 ITEM    HANGER NO. HANGER TYPE                                                          LINE NO. FIG. NO. LOCATION       NOTES /IER X

RESTR. HGR. 4" DBC-2(A-A) EGZ-488 AUX C-F3.30 2AFW-R69 CV-343 122'-0* X RESTR. HGR. 4" DBC-2(B-B) EGZ-489 AUX

 .C-F3.30    2AFW-R70 CV-377        113'-4 1/4" AUX                                                 X C-F3.40     2AFW-R71               RESTR. HGR.                                       4* DBC-2(B-B)    EG2-489                -

B-D2.20 W/ ATTACH. CV-377 113'-6* X C-F3.30 2AFW-R72 RESTR. HGR. 4" DBC-2(B-B) EG2 489 AUX CV-377 113'-3 3/16* AUX X C-F3.30 2AFW-R73 RESIR. HGR. 4* DBC-2(B-B) EG2-489 CV-377 117'-6" X SWAY STRUT 4" DBC-2(B-B) EG2-489 AUX C-F3.50 2AFW-R74 B-DZ.20 (2)~ CV-221 119'-6* W/ ATTACH. AUX X C-F3.40 2AFW-R94 RESTR. HGR. 4* DBC-2(B-B) EG2-489 147'-6*  ; CV-042 AUX X C-F3.30 2AFW-R95 RESTR. HGR. 4" DBC-2(B-B) EG2-491 B-D2.20 W/ ATTACH. CV-042 147'-6* AUX X C-F3.30 2AFW-R96 RESTR. HGR. 4' DBC-2(B-B) EG2-491 _ CV-042 141'-6* X RESTR. HGR- 4' DBC-2(B) EG2-491 AUX C-F3.30 2AFW-R101

                                                                                                -         CV-041       141'-6*

4N23-15 Rev.: 0

                                                                                                                                                                  ,.4 y

Y 0 l u.

                                                                                                                                                                                  ^

J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069 Hanger Surveillance Plan 2N23- Auxiliary Feedwater 40-MONTH , 150 DWG/ RE-EXAM PERIOD

                                                                                                                               -3           1             2 IWF/IWD ITEM      . HANGER WO. HANGER                       TYPE LINE NO.      FIG. NO. LOCATION        NOTES /IER EG2-488     AUX                                                                           X C-F3.30  2AFW-R109     RESTR. HGR.         4" DBC-2(A-A)

CV-343 130'-0* l EG2-488 AUX X

;  C-F3.50  2AFW-R110     RESTR. HGR.          4" DBC-2(A-A)

CV-343 133'-8" X ! C-F3.30 2AFW-Rill RESTR. HGR. 4" DBC-2(A-A) EG2-488 AUX CV-343 130'-0" j! EG2-488 AUX X

C-F3.30 2AFW-R112 RESTR. HGR. 4" DBC-2(A-A)

CV-343 130'-0" X i C-F3.40 2AFW-Ril4 RESTR. HGR. 4" DBC-2(B-B) EG2-489 AUX CV-377 130'-0 5/8" ' EG2-489 AUX X C-F3.50 2AFW-R115 SWAY STRUT 4" DBC-2(B-B) 133'-8" CV-377 EG2-489 AUX X C-F3.50 2AFW-Ril6 SWAY STRUT 4" DBC-2(B-B) CV-377 133'-8" EGZ-489 AUX X C-F3.30 2AFW-R117 RESTR. HGR. 4" DBC-2(B-B) CV-377 130'-0 1/8" AUX X

C-F3.c0 2AFW-R118 RESTR. HGR. 4" DBC-2(B-B) EG2-489 CV-377 129'-11 11/16"
~

EG2-490 AUX. X C-F3.40 2AFW-R121 RESTR. HGR. 4" DBC-2(B)

                        ~

CV-041 113'-8" 4NZ3-16 Rev.: 0 _. . - _ . ~ . . . - . __ _

n'% X X X X X X X X 9 2 X X _ 6 H 0- TD NO 0 M-

    ~

OI1 _ MR  : 2 E .

          -             0P                                                                                                                                     v P               4                                                                                                                                      e     .

M R . F 3 . M . A _ X E _ d E _ n R A s R . t E S r I ._ . 6 / N p S I _ p E A u T R _ S O T N t n e n "

                                                           "4                                           2 op                                                /                                            /                                                           _

1 s on N O 3

                                                                                                                                                        "0 Ca                      I             "8          0          "0           0          "6        l          1          "0          0 l                 T               -

3P A C X3 X0 X0 X '0 X '7 X '2 X '1 X '1 X '3 X U3

                                                                                                                                                        '1 U3          U3          U3          U0        U0         U0         U0        U3 O       U3 O     se sc an l a Cl
                            / .

L A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 7 1

            ,l i            GO           0          0           0            0          5 62               3          4                                   -

2e WN 91 91 91 91 84 0 0 3 44 44 44 47 27 87 47 ~ v D 44 0 0 0 0 3 13 73 73 8 8 2 tr . 2 - 2 - 5 - 5 - 4 - 9 9 N i u 0G 2 - 2 - 2 - GV GV GV 6V 6V 6V 5 5 4 nS 5I GV GV EC EC EC E E U 1F EC EC EC EC EC , r e g ) 2 ) ) , t n 0 B B na ) ) ) ) ) 0 ) ) - - aH . B B B A P A A B B l O B ( ( ( ( ( ( ( ( P N ( ( 2 2 2 2 4 4 4 4 9 9 r' E - - - C C C C C a N C C C C C B B B B B B B B B B e I L D D D D D D D D D D l c u "4 "4 "4 4 "4 "2 "2 "2 "2 "2 N y . . . . . e E . . . R R R R R R P T R R R G G l r Y U G G G G G G G R H H H I H H H H H a T I F~ T . . . . R S . . . . R R R R R

             .                     E                 R          R            R          R T        T             T r              G      Y                     T            T          T          T         T                                                      .

M e N A T S S S S S S S S S E E E E E E E E E _

             . t               A      W                                  R          R          R         R           R        R              R                  .

J a H S R R w ~ d e O 2 4 5 e 3 2 2 3 9 7 0 3 4 F N 2 1 2 1 1 1 3 9 2 3 5 5 9 3 3

                   .y               R     R          R           R R

R 5 4 9 4 4 3 3 r E - - W W W 1 1 1 1 1 a G W W - - - - - O i N F F F F F S l A A A A A A S 5 S 5 i H 2 2 2 2 2 S 5 S 5 5 x u A 0 0 0 0 0 0 0 0 D 0 0 3 3 3 3 3 3 3

                      -       W           5           3          3 3         IM                       3         3            3          3         3          3          3         3             3 2         /E          3                                   F          F         F          F          F         F             F N         FT          F           F          F                                                          -         -              -

2 WI - C C C C C C C C I C C

Q , () -( ) 4 FNP-2-M-069 J. 'M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports 'And Hanger Surveillance Plan -

      -2N23- Auxiliary Feedwater 40-MONTH RE-EXAM                   PERIOD IWF/IWD                                               150 DWG/

3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. . LOCATION NOTES /IEP. AUX X C-F3.30 55-13355 RESTR. HGR. 2" DBC-9(B-B) E5980 139'-3" AUX X C-F3.30 55-13356 RESTR. HGR. 2* DBC-9(B) E5979 4 129'-8" AUX X C-F3.30 5S-13357 RESTR. HGR. 2" DBC-9(B) E5979 132'-7" AUX X

  ~ C-F3.40    55-13360       RESTR. HGR. 2" DBC-9(A-A)    E5978 130'-5" t

AUX X C-F3.30 55-13376 RESTR. HGR. 2" DBC-9(B) E5979 129'-2 1/2" AUX TRAIN S X C-F3.30 SS-15477 RESTR. HGR. 3/4" DBC-1(P002)E5997

                                  ~

104'-8 5/8" AUX X C-F3.30 55-15006 RESTR. HGR. 3/4" DBC-2(A) E10109 101'-4 7/8* AUX X C-F3.40 55-15008 RESTR. HGR. 3/4" DBC-2(A) E10110

101'-11 7/8" AUX X C-F3.30 55-15475 RESTR. HGR. 3/4" DBC-2(A) E5991 104'-2 1/2" X

C-F3.30 55-15476 RESTR. HGR. 3/4" DBC-2(A) E5993. AUX 104'-l I/2" 4 Rev.: 0 1 4M23-18

L A t 9 2 6 H 0 TD 0

                -                    NO                X M-                    OI1 MRE 2                                                                                             v       _
                 -                   0P                                                                      e       _
 -             P                     4                                                                       R M                             3 F                                                                                                     .

M . A X E d E n R A s R t E _ r I

                                              / R O o

p S p E HG u T CN S O NI ~ N AR t n e n o p m N on O I Ca T l

       }

3P A D C R se O A sc L Y an l a Cl 1 .

                      ,li                         G      3                                                     2 2e                      RN             4                                                     1 v                OI             4                                                     P     _

tr DW 3 4 iu NA 1 _ nS ER 2 U VD U r

                     - e g                                                                                        .

tn E K na T K N aH N A A l P E M T3 N R 0 r O REE5 . a P OTGT e M TAA2 l O CWR1 c C A OP u EPT2 . RUSQ N y E e P G - l Y N r T R I a O R F T H r R C R

                       .       e                   O       NSO M          t                   P       ATH                      <

a P LC

                       .      W                    U       6ON J                              S       3BA                                           .

_ p U . G e W 1

            '.                 k                   D         -
                              .a                           9 M                   T       3 U      0
     .                          r                   O      0
     .                          o                   Y      0 t                    A      2 c                   L      D a

e R 0 D'

                                   -         W              3 2            IM             1
                              .1             /E             F P             FT 2             WI               -

I A

          .                                4  j ,                2    1     ii;\ i !    ll2   !4   ;1  ,   !
                                                                                                                  .r~T V                                                                           .(m,)

FNP-2-M-069' J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan 2P16- Service Water 40-MONTH I RE-EXAM PERIOD VENDOR IWF/IWO NOTES /IER 3 1 2 DRAWING LOCATION ITEM LAYOUT DWG. SUPPORT TYPE COM80NENT. INTAKE X D200089-1 PUMP BASE SERVICE WATER U276035 A-F1.30 BLDG SUPPORT PUMP i Q2P16P001E-B X BASE RING SERVICE WATER U214020 INTAKE i A-F1.30 D200089-1 WELDED TO STRAINER BLDG BOTTOM HEAD Q2P16F5018 i X CONTAINMENT U276580 C155 AZ230 A-F2.20 D205063 CHANNEL WELDED TO COOLER EMBED Q2E12H001C-B INSPECTION X COMPONENT U213435 A100 A-FI.30 D205063 2 SUPPORT WITH CCW SADOLES COOLING WATER SYSTEM HX Q2P17H001C-A 1 1 a 4P16-1 Rev.: 0 I

(3 f~ (

             - Y)                                                           Q-)

- v/ FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan ~~ . 2P16- Service Water 40-NONTH RE-EXAM PERIOD 150 DWG/ 2 IWF/IWO FIG. NO. LOCATION NOTES /IER 3 1 LINE NO. l ITEM HANGER NO. HANGER TYPE TRAIN A X RESTR. HGR. 42" KBC-201(A)- E6 RVR INTK C-F3.30 25W-R1 179'-1" CV-382 TRAIN A X SWAY STRUT 42" KBC-201(A) E6 RVR INTK C-F3.50 25W-R3 , B-D2.20 W/ ATTACH. CV-382 174'-10 1/16" TRAIN A X RESTR. HGR. 42" KBC-201(a) E46 RVR INTK C-F3.30 25W-RS 170'-4"' CV-382 TRAIN A X RESTR. HGR. 42" KBC-201(A) E46 RVR INTK C-F3.30 25W-R6 170'-4" CV-382 TRAIN B X RESTR. HGR. 42" KBC-201(B) E47 RVR INTK C-F3.30 25W-R7 170'-4" CV-382 TRAIN B X RESTR. HGR. 42" KBC-201(B) E47 RVR INTK C-F3.30 25W-R8 - 170'-4" CV-382 RVR INTK TRAIN A X C-F3.30 25W-R539 STANCHION 42" KBC-201(A) E6 l B-D2.20 CV-382 174'-9 7/8" TRAIN B X SWAY STRUT 47" KBC-201(B) E60 VLV BX C-F3.50 25W-R998 CV-387 2VB-1 (2) 142'-0" VLV BX TRAIN B X i C-F3.30 25W-R991 RESTR. HGR. 42" KBC-202(B) E63 CV-244 2VB-2 142'-6" 4P16-2 Rev.: 0

                                                                                                                  - - - .                         -.          _. . _ . _ _ _         ~

( J. M. Farley Nuclear Plant - Unit 2, Class 3 Couponent Supports Ami FNP-2-M-069 Hanger Surveillance Plan j 2P16- Service Water 40-MONTH 150 DWG/ RE-EXAM PERIOD IWF/IWD 3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER VLV BX TRAIN A X C-F3.50 25W-R995 SWAY STRUT 42" KBC-202(A) E62 (2) TRAPEZE CV-244 2VB-2 142'-3" VLV BX TRAIN A X C-F3.50 25W-R996 SPRING CAN 42' KBC-202(A) E62 CV-244 2VB-2 142'-6" RVR INTK TRAIN A X C-F3.30 25W-R23 RESTR. HGR. 36" KBC-206(A) E8913 CV-382 177'-4" RVR INTrs TRAIN B X C-F3.30 25W-R24 RESTR. HGR. 36" HBC-206(B) E8913 CV-382 177'-4* VLV BX TRAIN A X C-F3.30 25W-R990 RESTR. HGR. 30" HBC-208(A) EG2-151 CV-256 2BB-3 142'-5 9/16" VLV BX TRAIN B X C-F3.30 25W-R422 RESTR. HGR. 30" HBC-211(B) EG2-387 CV-239 2BB-3 143'-3" . VLV BX TRAIN B X C-F3.30 25W-R992 RESTR. HGR. 30" HBC-211(B) EG2-151 CV-256 288-2 138'-6 5/8" VLV BX TRAIN B X - C-F3.30 25W-R993 RESTR. HGR. 30" HBC-211(B) EG2-151 CV-256 288-2 138'-6* 4P16-3 Rev.: 0

                                                                                                                                                                                            's '
                                                                          .J                                                                                                             v J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And                                           FNP-2-M-069 Hanger Surveillance Plan 2P16- Service Water 40-MONTH 150 DWG/                                                 RE-EXAM          PERIOD IWF/IWD LINE NO.           FIG. NO. LOCATION             NOTES /IER                            3          1             2 ITEM    HANGER NO. HANGER TYPE C-F3.30   25W-R997     RESTR. HGR. 30" HBC-211(A) EG2-151                 VLV BX               TRAIN A                                          X CV-256      288-2 138'-6 5/8" C-F3.30   SW-ZA13      ANCHOR W/        24" HBC-26(A)         EG2-211     AUX                   TRAIN A                                         X B-02.20                ATTACH.                                CV-113       115'-6" C-F3.30   SW-2A15      ANCHOR           24" HBC-26(B)         EG2-210      AUX                  TRAIN B                                          X B-D2.20                W/ ATTACH.                             CV-146       123'-0"

- C-F3.30 SW-2A16 ANCHOR 24" HBC-26(B) EG2-210 AUX TRAIN B X ~ B-02.20 W/ ATTACH. CV-146 114'-6" C-F3.30 SW-2A18 ANCHOR W/ 24" HBC-26(A) EG2-211 AUX TRAIN A X B-D2.20 ATTACH. CV-Il3 123'-0* C-F3.40 2SW-R45 TRAPEZE 24" HBC-26(B) EG2-210 AUX TRAIN B X CV-146 118'-0" C-F3.50 25W-R46 SWAY STRUT '24" HBC-26(B) EG2-210 AUX TRAIN B X (2) TRAPEZE CV-146 118'-0" . C-F3.30 25W-R47 RESTR. HGR. 24" HBC-26(B) EG2-210 AUX TRAIN B X 115'-0* i CV-146 C-F3.40 2SW-R48 SWAY STRUT 24" HBC-26(B) EG2-210 AUX TRAIN B X CV-146 114'-5 1/8" EG2-210 AUX TRAIN B X C-F3.40 25W-R49 ' SWAY STRUT 24" HBC-26(B) CV-146 112'-8 13/16" 4P16-4 Rev.: 0

                           ...       __         . - _ . .          .         . . - . . - . - _ . . . _ - . . ..             - - . _ _      .~ _ . . . _ . . . . . _ _ - . _ _ _ _ - - _          __
                                                                                                                                                  ;>A
                                                                                                                                               ,y
                                                                                              '                                                %/    .

J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supoorts And FNP-2-M-069 Hanger Surveillance Plan ~ 2P16- Service Nater 40-MONTH RE-EXAM PERIOD 150 DWG/ IWF/IWD 3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER AUX TRAIN B X C-F3.40 25W-R50 SWAY STRUT 24" HBC-26(B) EGZ-210 CV-146 112'-8 13/16" AUX TRAIN 8 X C-F3.30 25W-R51X STANCHION 24" HBC-26(B) EG2-210 , B-D2.20 (2) CV-146 108'-5" AUX TRAIN B X C-F3.40 25W-R67 SWAY STRUT 24" HBC-26(B) EG2-210 4 CV-146 109'-8 13/16" AUX TRAIN B X C-F3.40 25W-R68 SWAY STRUT 24" HBC-26(B) EG2-210 CV-146 109'-0* 4 TRAIN B X C-F3.30 25W-R69 RESTR. HGR. 24" HBC-26(B) EG2-210 AUX CV-146 101'-11 3/8" AUX TRAIN A X i C-F3.30 25W-R86 RESTR. HGR. 24" HBC-26(A) EG'2-211 CV-113 123'-1" AUX TRAIN A X C-F3.30 25W-R87 RESTR. HGR. 24" HBC-26(A) EG2-211

'                                                                             CV-Il3        115'-6" AUX            TRAIN A                    X C-F3.30                        25W-R88      RESTR. HGR. 24" HBC-26(A)      EG2-211                                                              '

B-D2.20 W/ ATTACH. CV-113 111'-8 1/2* AUX TRAIN A X C-F3.30 25W-R89 RESTR. HGR. 24* HBC-26(A) EG2-211 CV-II3 106'-3 1/2" . AUX TRAIN A X C-F3.50 25W-R90 SWAY STRUT 24" HBC-26(A) EG2-211 CV-113 101'-11 3/8" 4P16-5 Rev.: 0

                                                                                                                                ~
  • i --

J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069 Hanger Surveillance Plan 2P16- Service Water 40-MONTH 150 DWG/ RE-EXAM PERIOD IWF/IWD 3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. . LOCATION NOTES /IER 24' HBC-26(A) EG2-211 AUX TRAIN A X C-F3.50 25W-R91 SWAY STRUT B-D2.20 (2) CV-113 101'-11 3/8" W/ ATTACH. EG2-211' AUX TRAIN A X C-F3.30 25W-R92 RESTR. HGR. 24' HBC-26(A) CV-II3 101'-11 3/8" C-F3.30 25W-R93 RESTR. HGR. 24' HBC-26(B) EG2-211 AUX TRAIN A X CV-113 101'-11 3/8" C-F3.50 25W-R142X SWAY STRUT 24" HBC-26(B) EG2-210 AUX TRAIN B X (2) TRAPEZE CV-146 114'-6* EG2-153 AUX TRAIN B X C-F3.40 25W-BR3 RESTR. HGR. 24" HBC-46(B) CV-465 129'-0* EG2-221 AUX TRAIM A X C-F3.30 SW-2A09 ANCHOR 24" HBC-46(A) B-D2.20 W/ ATTACH. CV-152 123'-0* EG2-220 AUX TRAIN B X C-F3.30 SW-2A10 ANCHOR 24" HBC-46(B) B-D2.20 W/ ATTACH. CV-148- 112'-8 13/16' . EG2-22.1 AUX TRAIN A X C-F3.50 25W-BR11 SNUBBER 20' HBC-4F(A) B-D2.20 (H)(2) CV-152 111'-1 1/2" W/ ATTACH. I EG2-22' AUX TRAIN B X C-F3.50 25W-BR12 SNUBBER (2) 24" HBC-46(B) B-D2.20 . W/ ATTACH. CV-148 111'-1 1/2* 4 4P16-6 Rev.: 0 4

                                                           ,e.      .     ,,u                      r. ~   r .- - . ' , ,          . - , ,     :.-..     ,-. . ,e -nr+.,-
            <' sp                                                                                                                                         /~

(y v J. N. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069 Hanger Surveillance Plan

                                                                                                                                                        ~

2P16- Service sater 40-MONTH RE-EXAM PERIOD 150 DWG/ IWF/IWO 3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER TRAIN B X SWAY STRUT 24" HBC-46(B) EG2-220 AUX C-F3.50 25W-H26 114'-6* CV-148 AUX TRAIN B X C-F3.50 25W-H27 SWAY STRUT 24" HBC-46(B) EG2-220 CV-148 114'-6* AUX TRAIN B X C-F3.50 25W-H28 SWAY STRUT 24" HBC-46(B) EG2-220 CV-148 114'-6* TRAIN B X EG2-220 AUX C-F3.50 25W-R29X SWAY STRUT 24" HBC-46(B) (2) CV-148 114'-6" AUX TRAIN B X C-F3.50 25W-H30 SWAY STRUT 24" HBC-46(B) EG2-220 CV-148 118'-11 3/8" AUX TRAIN B X C-F3.40 25W-R31 RESTR. HGR. 24" HBC-46(B) EG2-220

                                                                   -CV-148       117'-11 3/16"                                                      ,

AUX TRAIN A X 4 C-F3.30 25W-H505 RESTR. HGR. 24" HBC-46(A) EG2-221 CV-152 115'-6* AUX TRAIN A X C-F3.50 25W-H506 SWAY STRUT 24" HBC-46(A) EGZ-221 (2) CV-152 115'-6" AUX TRAIN A X 3 C-F3.50 25W-H507 SWAY STRUT 24" HBC-46(A) EG2-221 4 B-D2.20 (2) CV-152 115'-6' 4 W/ ATTACH. , TRAIN A X SWAY STRUT 24" HBC-46(A) .EG2-221 AUX C-F3.50 25W-H508 B-D2.20 (2) CV-152 119'-6* W/ ATTACH. 4P16-7 Rev.: 0

                .     , . . ~ .             -.   .            --.            . -      - - . - . .    .    .-       . . _ - . . - . . - . . - ~ .             . . .
                  .s                                                                                                                         7s Y                                                           Nj                                                                     .-

J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069 Hanger Surveillance Plan , 2P16- Service Water 40-MONTH RE-EXAM PERIOD 150 DWG/ IWF/IWO. 3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER AUX TRAIN A X SWAY STRUT 24" HBC-46(A) EGZ-221 C-F3.50 25W-H509 (2) CV-152 110'-10 3/4" AUX TRAIN B X SWAY STRUT 24' HBC-46(8) EGZ-220 C-F3.50 25W-H513 (2) CV-148 111'-1 1/2" AUX TRAIN B X C-F3.50 25W-R514 SNUBBER (2) 24" HBC-46(B) EG2-220 B-02.20 W/ ATTACH. CV-148 III'-I 1/2" AUX TRAIN B X 1- C-F3.40 25W-R519 RESTR. HGR. 24" HBC-46(B) EG2-220 CV-148 110'-9 1/2" TRAIN A X RESTR. HGR. 24" HBC-46(A) EG2-153 AUX C-F3.30 25W-H665X W/ ATTACH. CV-465 139'-9 1/2" l B-D2.20 AUX TRAIN A X C-F3.30 25W-H666X RESTR. HGR. 24" HBC-46(A) EG2-153

                                   ^

CV-465 130'-3" TRAIN A X RESTR. HGR. 24" HBC-46(A) EG2-153 AUX C-F3.30 25W-H667X 124'-5* CV-465 TRAIN A X C-F3.30 25W-H668X RESTR. HGR. 24" HBC-46(A) EG2-153 AUX B-D2.20 W/ ATTACH. CV-465 120'-3* l AUX TRAIN B X RESTR. HGR. 24" HBC-46(B) EG2-220 C-F3.20 25W-R673 123'-0* CV-148 AUX TRAIN B X C-F3.30 25W-R674 RESTP.. HGR. 24" HBC-46(B) EG2-153 B-D2.20 -W/ ATTACH. CV-465 129'-1" 6 4P16-8 Rev.: 0

f .

                                                                                                                                         -N_s i

FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan . , 2P16- Service Water i 40-MONTH ! RE-EXAM PERIOD 150 DWG/ 2 IWF/IWO NOTEL/IER 3 1 HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION ITEM TRAIN B X EG2-153 AUX C-F3.40 25W-R675 RESTR. HGR. 24" HBC-46(B) CV-465 139'-3" TRAIN B X SWAY STRUT 24" HBC-210(B) EG2-154 VLV BX C-F3.50 25W-R994 CV-401 2BB-2 142'-3" X AUX . TRAIN A/B C-F3.50 25W-BR13 SNUBBER (2) 20" HBC-45(A-B) EG2-221 B-D2.20 W/ ATTACH. CV-152 111'-7 1/2" TRAIN A X 20" HBC-46(A) EG2-221 AUX C-F3.50 25W-H501 SWAY STRUT CV-152 111'-1 1/2" TRAIN A X 20" HBC-46(A) EG2-221 AUX C-F3.50 25W-H502 SWAY STRUT CV-152 111'-1 1/2" TRAIN A X EG2-221 AUX C-F3.50 25W-H503 SWkYSTRUT 20" HBC-46(A) CV-152 111'-1 1/2* X 20" HBC-46(A-B) EG2-221 AUX TRAIN A/B C-F3.50 25W-H510 SWAY STRUT CV-152 111'-1 1/2" X ^ 20" HBC-46(A-B) EG2-221 AUX TRAIN A/B C-F3.50 25W-H512 SWAY STRUT (2) CV-152 111'-7 1/2" TRAIN B X . EG2-220 AUX C-F3.50 25W-R515 SWAY STRUT 20" HBC-46(B) 4 CV-148 111'-1 1/2" , TRAIN 8 X EG2-220 AUX C-F3.50 25W-R516 ' SWAY STRUT 20" HBC-46(B) CV-148 111'-1 1/2" i

)                                                              4PI6-9                                                     Rev.: 0
                                                                                                                                                                                                                                        ~ LT I
                                                                                                                                      ?

FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports Aad Hanger Surveillance Plan ' 4 2PI6- Service Oater 40-MONTH RE-EXAM PERIOD 150 DWG/ IWF/IWD NOTES /IER 3 .I 2 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION TRAIN B X 20" HBC-46(B) EG2-220 AUX C-F3.50 25W-RS17 SWAY STRUT CV-148 Ill'-I 1/2" TRAIN A X RESTR. HGR. 20" HBC-200(IA) EG2-077 RVR INTK C-F3.30 2SW-R18 184'-0* CV-379 8-D2.2G W/ ATTACH. TRAIN A X RESTR. HGR. 20" HBC-200(IB) EG2-077 RVR INTK C-F3.30 25W-RI9 CV-379 184'-0" B-D2.20 W/ ATTACH. TRAIM A X RESTR. HGR. 20" HBC-200(IC) EG2-077 RVR INTK C-F3.30 25W-R20 184'-0" B-D2.20 W/ ATTACH. CV-379 TRAIN A X RESTR. HGR. 20" HBC-200(ID) EG24077 RVR INTK C-F3.30 25W-R21 184'-0* CV-379

B-D2.20 W/ ATTACH.

TPAIN A X RESTR. HGR. 20" HBC-200(IE) EG2-077 RVR INTK C-F3.30 25W-R22 184'-0" CV-379 8-02.20 W/ ATTACH. i X RVR INTK TRAIN A ). C-F3.30 25W-R534 RESTR. HGR. 20" HBC-200(IB) EG2-077 CV-379 187'-10 3/8" TRAIN A X RESTR. HGR. 20" HBC-200(ID) EG2-077 RVR INTK f C-F3.30 25W-R534

  • CV-379 187'-10 3/8" l X RVR INTK TRAIN A C-F3.30 25W-R534 RESTR. HGR. 20" HBC-200(IE) EG2-077

' CV-379 187'-10 3/8" TRAIN A X RESTR. HGR. 20" HBC-200(IC) EG2-077 RVR INTK C-F3.30 25W-R534 ' CV-379 187'-10 3/8" 4P16-10 Rev.: 0

                                                                                                                                                                                                                            ~

J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069 Hanger Surveillance Plan . 4 2P16- Service Water ' 40-MONTH RE-EXAM PERIOD i IWF/IWD 150 DWG/ FIG. NO. LOCATION NOTES /IER 3 1 2 . ITEM HANGER NO. HANGER TYPr. LINE NO. RESTR. HGR. 20" HBC-200(IA) EG2-077 RVR INTK TRAIN A X C-F3.30 25W-R534 CV-379 187'-10 3/8" RVR INTK TRAIN A X C-F3.30 25W-R535 RESTR. HGR. 20" HBC-200(IB) EG2-077 CV-379 189'-10 3/8" RVR INTK TRAIN A X C-F3.30 25W-R536 RESTR. HGR. 20" HBC-200(IC) EG2-077 i CV-379 189'-10 3/8" RVR INTK TRAIN A X C-F3.30 25W-R537 RESTR. HGR. 20" HBC-200(ID) EG2-077 CV-379 189'-10 3/8" RVR INTK TRAIN A X C-F3.30 25W-R538 RESTR. HGR. 20" HBC-200(IE) EG2-077 CV-379 189'-10 3/8" AUX TRAIN B X C-F3.30 SW-2A14 ANCHOR 16" HBC-29(B) EG2-215 1 B-D2.20 W/ ATTACH. CV-II6 115'-6" AUX TRAIN A X C-F3.30 SWZ-A17 ANCHOR 16* HBC-29(A) EG2-216 B-D2.20 W/ ATTACH. CV-106 113'-8" AUX TRAIN B X 4 C-F3.30 SW-2A28 ANCHOR 16' HBC-29(B) EG2-215 B-DZ.20 W/ ATTACH. CV-II6 130'-9" AUX TRAIM A X C-F3.30 SW2-A29 ANCHOR 16" HBC-29(A) EG2-216 ., B-D2.20 W/ ATTACH. CV-106 113'-8" - i X 16" HBC-29(A) EG2-217 AUX TPAIN A l C-F3.30 SW2-A35 ANCHOR 4 B-D2.20 W/ ATTACH. CV-105 112'-6" 4P16-11 Rev.: 0

m [) V (}/

                                                                                                ;(

( J. M. Farley Nuclear Plant - Unit 2, Class 3 Component-Supports And FNP-2-M-069 Hanger Surveillance Plan . 2P16- Service Water 40-MONTH RE-EXAM PERIOD IWF/ LWD 150 DWG/ FIG. NO. LOCATION NOTES /IER 3 1 2 ITEM HANGER NO. HANGER TYPE LINE NO. AUX TRAIN A X C-F3.50 25W-R70 SWAY STRUT 16" HBC-29(A) EG2-216 ' CV-106 - 118'-0" AUX TRAIN A X C-F3.50 25W-R71 SWAY STRUT 16" HBC-29(A) EG2-216 CV-106 118'-0, 1 RESTR. HGR. 16" HBC-29(A) EG2-216 AUX TRAIN A ~~X C-F3.40 25W-R72 CV-106 118'-0" AUX TRAIN A X C-F3.30 25W-R73 RESTR. HGR. 16" HBC-29(A) EG2-216 B-D2.20 R00 HGR. CV-106 115'-5 1/16" ! WATTACH. AUX TRAIN A X C-F3.50 25W-R74 SWAY STRUT 16" HBC-29(A) EG2-216 CV-106 115'-5" AUX TRAIN A X C-F3.30 25W-R75 RESTR. HGR. 16* HBC-29(A) EG2-216 CV-106 115'-5"  : TRAIN A X C-F3.50 25W-R76 SWAY STRUT 16" HBC-29(A) EG2-216 AUX CV-106 113'-8" AUX TRAIN A X C-F3.50 25W-R77 SWAY STRUT 16" HBC-29(A) EG2-216 r.y-106 113'-8" 4 AUX TRAIN A X

C-F3.50 25W-R78 5WAY STRUT 16" HBC-29(A) EG2-216 .

B-D2.20 (2) CV-106 113'-7 3/8" W

                                               . / ATTACH.

4P16-12 Rev.: 0

                                                                                                           -           -n - .--               ~ . - - -        .,      . . _
          ~
               -s
                                          -i                                                                                                                                 ,
            %                                                            LJ                                                                                          ()

J..M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069 Hanger Surveillance Plan-

 '2P16- Service Water 40-MONTH 150 DWG/                                                   RE-EXM               PERIOD IWF/IWD                                                                                                                        3                       1   2 ITEM     HANGER NO. HANGER TYPE        LINE MU.       FIG. NO.         LOCATION    NOTES /IER TRAIN A                                                               X C-F3.50    25W-R79      SWAY STRUT   IG" HBC-29(A)      EG2-216          AUX CV-106           113'-8" TRAIN A                                                               X C-F3.50    25W-R80      SWAY STRUT   16* HBC-29(A)      EG2-216          AUX CV-106           113*-4" 1kAIN A                                                               X C-F3.50    25W-R81      SWAY STRUT   16" HBC-29(A)      EG2-216          AUX CV-106           113'-8*

AUX TRAIN A X C-F3.30 25W-R82 RESTR. HGR. 16' HBC-29(A) EG2-216 B-D2.20 W/ ATTACH. CV-106 113'-8* EG2-216 AUX TPAIN A X C-F3.50 25W-R83 SWAY STRUT 16" HBC-29(A) CV-106 113'-8" TRAIN A X C-F3.30 25W-R84 RESTR. HGR. 16* HBC-29(A) EG2-216 AUX CV-106 113'-8" TPAIN B X C-F3.40 25W-R94 RESTR. HGR. 16" HBC-29(B)- EG2-215 AUX CV-116 115'-6* TRAIN B X - C-F3.40 25W-R96 RESTR. HGR. 16" HBC-29(B) EG2-215 AUX B-D2.20 W/ ATTACH. CV-116 115'-6"

                                                        'EG2-215           AUX         TRAIN B                                                               X C-F3.40   25W-R97       RESTR. HGR. 16" HBC-29(B)

CV-II6 115'-6* _ AUX TRAIN B X C-F3.40 25W-R98 RESTR. HGR. 16" HBC-29(B) EG2-215 CV-II6 115'-6* 4P16-13 Rev.: 0

                                       -     -   -   _-     _  - ___- __        _ - _   - _ - _ - - - - _ _ _ _ _ _               _ - = - - . .- -- - - ...
                                                                     ,m                                                                                -

(% i J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069 Hanger Surveillance Plan 2P16- Service Water 40-NONTH 150 DWG/ RE-EXAM . PERIOD ! IWF/ LWD- 3 1 2

   -ITEM      HANGER NO. HANGER TYPE.      LINE NO.       FIG. NO.       LOCATION      NOTES /IER TRAIN B                                                 X C-F3.40    25W-R99     RESTR. HGR. 16" HBC-29(B)     EG2-215        AUX CV-II6         115'-6 5/8" TRAIN B                                                 X i   C-F3.40    25W-R100    RESTR. HGR. 16" HBC-29(B)     EG2-215        AUX CV-II6         121'-0*

TRAIN B X C-F3.40 25W-R101 RESTR. HGR. 16" HBC-29(B) EG2-215 AUX CV-116 130'-9" TRAIN A X C-F3.30 25W-R123 RESTR. HGR. 16" HBC-29(A) EG2-217 AUX B-DZ.20 W/ ATTACH. CV-105 112'-6" l TRAIN A X C-F3.30 25W-R124 RESTR. HGR. 16" HBC-29(A) EG2-217 AUX l CV-105 112'-6" l .1 TRAIN A X 4 C-F3.40 25W-R152 RESTR. HGR. 16" HBC-29(A) EG2-217 AUX CV-105 112'-6" AUX TRAIN A X C-F3.30 25W-R153 RESTR. HGR. 16" HBC-29(A) EG2-217 CV-105 112'-6" TRAIN A X - C-F3.30 25W-R154 RESTR. HGR. 16" HBC-29(A) EG2-217 AUX CV-105 112'-6" AUX TRAIM A X C-F3.30 25W-R155 RESTR. HGR. 16" HBC-29(A) EG2-217 CV-105 112'-6" TRAIN A X C-F3.30 STANCHION 16" HBC-29(A) EG2-217 AUX 25W-R560 ~ B-D2.20 (2) CV-105 114'-3 1/4" 4P16-14 Rev.: 0 -

p- [~}, L' w/ C J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FMP-2-M-069 Hanger Surveillance Plan

                                                   ~

2P16- Service Water 40-MONTH 150 DWG/ RE-EXAM PERIOD IWF/IWD 3 1 2 , ITEM HANGER NO. HANGER TYPE TINE NO. FIG. NO. LOCATION NOTES /IER TRAIN A X C-F3.30 25W-R561 RESTR. HGR. 16* HBC-29(A) EG2-217 AUX ~' B-DZ.20 W/ ATTACH. CV-105 116'-1* TPAIN A X C-F3.40 25W-R562 RESTR. HGR. 16' HBC-29(A) EG2-217 AUX B-D2.20 W/ ATTACH. CV-105 131'-8* AUX TRAIN A X C-F3.30 SW-2A11 ANCHOR 14' HBC-39(A) EG2-258 B-D2.20 W/ ATTACH. CV-132 118'-0* AUX TRAIN A X C-F3.30 SW-2A12 ANCHOR 14" HBC-39(A) EG2-258 B-D2.20 W/ ATTACH. CV-132 113'-8* AUX TRAIN B X i C-F3.30 SW-2A20 ANCHOR 14" HBC-39(B) EG2-219 B-D2.20 W/ ATTACH. CV-119 115'-6* AUX TRAIN B X C-F3.30 SW-2A22 ANCHOR 14' HBC-39(B) EG2-219 B-D2.20 W/ ATTACH. CV-119 134'-3* 4 AUX TRAIN A X C-F3.30 SW-2A27 ANCHOR 14' HBC-39(A) EG2-218 B-D2.20 W/ ATTACH. CV-131 130'-9' AUX TRAIM A X C-F3.50 25W-H32 SWAY STRUT 14" HBC-39(A) EG2-258 CV-132 116'-0 3/16" AUX TRAIN A X C-F3.50 25W-H33 SWAY STRUT 14' HBC-39(A) EG2-258 CV-132 115'-5* . AUX TRAIN A X C-F3.50 25W-R34 SWAY STRUT 14' HBC-39(A) EG2-258 CV-132 115'-3* 4P16-15 Rev.: 0 J

                                                                                               ,       i                                                                         '
                                                                                                                                                                                         ~-

w w m v e

                                                                                                                                                                                         ~

m X X X X X X X 9 2 X X X _ 6 H 0 TD

            -              NO                                                                                                                                                      0 M-              OI1                                                                                                                                                     :     e

_ MR . 2 E

             -             0P                                                                                                                                                      v     ,

P 4 e N R _ F 3 , M A X , E n d E a n R m A m s R - B t E A A A A A A B r I A A - o / N N N N N N N e p S N N N I I I I I I I p E I I I A A A A A A A n u T A A A R R R R O R R R R R R T T S T T T T T T N T T t n e n o p m N

  • o O "
                                                                               "8           "8            "8          "8           "8             "8          6             "6 C                         I                8           "8             -            -            -            -          -               -            -             -         ,

T - - ' 3 A ' ' X '3 X '3 X '3 X '3 X '3 X '3 X5 X '5 C X3 X3 U1 U1 U1 U1 U1 U1 U1 s O U1 U1 U1 A1 A1 A1 A1 L A1 A1 A1 A1 A1 A1 s a l C 6 9 9 1

                                / .                                     8            8            8            8            8              8
                ,               GO             8            8                                     52           52           52             52          19            19                -

2 WN 52 52 52 52 2? 2I 21 6 23 23 23 23 23 23 1 . D . 23 1 1 1 1 1 1 I I 2 - 1 P _ t 1 2 - 2 - 2 - 2 - 2 - 2 - 2 - i 0G 2 - 2 - GV GV GV GV GV GV GV 4 n 5I GV GV GV EC EC EC EC EC 1F EC EC EC EC EC U

                                                                                                               )             )             )           )             )                      -
                                                                        )             )           )
                                                             )                                                                                                        B t                                 )                                                                             A              A           B A            A          A             A            A            A                                       (             (

n ( ( ( ( ( ( ( ( 9 a . 9 9 9 9 9 9 9 - _ l O 9 9 3 3 3 3' 3 3 3 3 . P N 3 3

                                                                                        -             -           -            -              -           -             -                v s

C C C C C C C - r E C C C B B B B B B B B B B H _ a N H H H H H H H H e I H - l L " " " c " " 4 "4 4 "4 "4 4 "4 u "4 4 4 1 1 1 1 1 1 1 1 1 1 M - y . . R e E . R T T T R R l P R T U U U . G G G r Y G . U G R H H H H T HH R H R R a C T T T T R C . F S S S S E)A . . R R .A R B2T R R

                  .                     E        RT                                    Y            Y           Y'            B(T           T           T             T
                                                                                                                                                                                         ~

M G TT Y T A A U)A S S S N SA A S A E E E

                  .                     A        E/ W                    E             W S

W S W S NH/ S(W R R R J H RW S R - r . e O 8 - i t N 6 7 8 9 0 1 2 5 0 a 5 3 4 4 4 9 1 R 3 3 3 3 R R W H R H R H R R - E R - - - - - e G W W W W W W W W W W c N 5 5 5 5 5 5 5 5 i A 5 5 2 2 2 2 2 2 2 2 v H 2 2 r e 0 S 0 0 0 00 0 0

                                .D                00           0          0                                      5            52             3            4            4 5           3            5             5                                                                                   ~
                         -         W              42 6            IM                                                                 3          3            32             3            3            3

- 1 /E 32 3 3 3 FD F F F FD F F F F F P FT - - - - - - - 2 WI - - - - - C C CB C C C C C C I CB s

                       +     !          .l'      '                <                                 '
                                                                       - L.)                                                                              G J. M. Farley Nuclear. Plant - Unit 2, Class 3 Component Supports And                      FNP-2-M-069 Hanger Surveillance Plan 2P16- Service Water 40-MONTH RE-EXAM       PERIOD 150 DWG/

IWF/IWD '0

                                                                         . CATION 3       1         2 ITEM      HANGER N0. HANGER TYPE        LINE NO.       FIG. NO.                        NOTES /IER TRAIN B                                     X C-F3.50     25W-R109     SWAY STRUT   14" HBC-39(B)      EG2-219        AUX CV-II9          115'-6" AUX             TRAIN B                                     X C-F3.50     25W-R110     SWAY STRUT   14" HBC-39(B)      EG2-219 B-D2.20                  (2)                             CV-119           115'-6*

W/ ATTACH. AUX TRAIN B X C-F3.40 25W-R111 RESTR. HGR. 14* HBC-39(B) EG2-219 B-02.20 W/ ATTACH. CV-Il9 115'-6" AUX TRAIN B X C-F3.40 25W-R112 RESTR. HGR. 14" HBC-39(B) EG2-219 CV-119 115'-6" AUX TRAIN B X C-F3.40 25W-Ril3 RESTR. HGR. 14" HBC-39(B) EG2-219 CV-119 115'-6" TRAIN B X C-F3.30 25W-Ril4 RESTR. HGR. 14" HBC-39(B) EG2-219 AUX B-D2.20 W/ ATTACH. CV-II9 131'-6" TRAIN B X I C-F3.30 25W-R115 RESTR. HGR. 14" HBC-39(B) EG2-219 AUX B-D2.20 W/AFTACH. CV-119 131'-6" TRAIN B X C-F3.40 25W-Ril6 RESTR. HGR. 14" HBC-39(B) EG2-219 AUX CV-Il9 134'-3" TRAIN B X C-F3.40 25W-Ril7 RESTR. HGR. la" HBC-39(B) EG2-219 AUX , CV-119 134'-3" AUX TRAIN B X C-F3.50 25W-R118 ' SWAY STRUT 14" HBC-39(B) EG2-219 B-D2.20 (2) CV-II9.. 128'-9" W/ ATTACH. 4P16-17 Rev.: 0

                     -.       . _     __   . ~ .    . __.          ..-     _. _ . _     __        _

_ () (,1 FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan . 2P15- Service Water 40-MONTH RE-EXAM PERIOD 150 DWG/ 2 IWF/IWD NOTES /IER 3 1 ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION TRAIM A X AUX

          'C-F3.40                      25W-R125                           STANCHION                           14" HBC-39(A)_ EG2-218 CV-131          112'-6" B-D2.20                                                      (2)

TRAIN A X EG2-218 AUX C-F3.30 25W-R126 RESTR. HGR. 14" HBC-39(A) CV-131 112'-6" TRAIN A X 14" HBC-39(A) EG2-218 AUX C-F3.30 25W-R156 RESTR. HGR. CV-131 112'-6* TRAIN A X ' RESTR. HGR. 14" HBC-39(A) EG2-218 AUX C-F3.30 25W-R157 112'-6" CV-131 TRAIN A. X RESTR. HGR. 14" HBC-39(A) EG2-21b AUX C-F3.30 25W-R158 112'-0" CV-131 TRAIN A X 14" HBC-39(A) EG2-218 AUX C-F3.30 2SW-R159 RESTR. HGR. CV-131 112'-6* TRAIN A X 14" HBC-39(A) EG2-258 AUX C-F3.40 25W-R520 RESTR. HGR. CV-132 118'-0" TRAIN A X 14" HBC-39(A) EG2-258 AUX C-F3.50 25W-R521 SNUBBER (H)(2) CV-132 118'-0" B-D2.20 W/ ATTACH. TRAIN A X 14" HBC-39(A) EG2-218 AUX . C-F3.30 25W-R567 RESTR. HGR. CV-131 122'-8" TRAIN A X 14" HBC-39(A) EG2-218' AUX C-F3.30 25W-R568 ' RESTR. HGR. W/ ATTACH. CV-131 127'-5 3/4" l 4PI6-18 Rev.: 0 _ _ _ *"_ _ _- +__ - W_ N W e me p # ' 9 *W.-se-*_ena w. ___m +-

                                                                                                                                                                                     .      w-_ m

______2'-w-- - a'L ou_. _ _ _ +e---_a--__i__--_M

                                                                                                                              ~

j( ) .(\_ /~)- FMP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan .. 2P16- Service Water 40-MONTH RE-EXAM PERIOD 150 DWG/ 3 1 2 IWF/IWD FIG. NO. LOCATION NOTES /IER HANGER NO. HANGER TYPE LINE NO. ITEM X TRAIN A EG2-21B AUX C-F3.40 25W-R569 RESTR. HGR. 14" HBC-39(A) CV-131 124'-7" X EG2-217 AUX TRAIN A C-F3.30 SWZ-A45 ANCHOR 12" HBC-29(A) CV-105 134'-0" B-D2.20 W/ ATTACH. X EG2-215 AUX TRAIN B C-F3.30 25W-R102 RESTR. HGR. 12" HBC-29(B) CV-Il6 130'-9" X EG2-215 AUX TRAIN B C-F3.50 25W-R103 SWAY STRUT 12" HBC-29(B) CV-116 130'-9" ! X EG2-215 AUX TRAIN B I C-F3.50 25W-R104 SWAY STRUT 12" HBC-29(B) CV-Il6 130'-9" X EG2-215 AUX TRAIN B C-F3.50 25W-R105 SWAY STRUT 12" HBC-29(B) CV-Il6 130'-2" X 1 EGZ-215 AUX TRAIN B C-F3.30 25W-R106 SWAY STRUT 12" HBC-29(B) ' CV-II6 128'-8" B-D2.20 W/ ATTACH. X EG2-215 AUX TRAIN B C-F3.30 25W-R107 RESTR. HGR. 12" HBC-29(B) CV-II6 127'-9" B-02.20 W/ ATTACH. X EG2-217 AUX TRAIN A i C-F3.30 2SW-R563 RESTR. HGR. 12" HBC-29(A) 125'-2" CV-105 B-D2.20 W/ ATTACH. X EG2-217 AUX TRAIN A l C-F3.30 25W-R564 , RESTR. HGR. 12"fBC-29(A) 125'-2" CV-105 B-D2.20 W/ ATTACH. Rev.: 0 4P16-19

                                       -          -         -    -         ~ . . . .
                                                                                                   ~ um . .               .   .
                                                                                                                                                               ...e     m
  • s . . . , . .
             .y                                                         h                                                                 -

(j Ti FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And. Hanger Surveillance Plan .. 2P16- Service Water 40-MONTH RE-EXAM PERIOD: . ISO DWG/ 3 1 2- = IWF/IWO LINE NO. FIC. NO. LOCATION NOTES /IER ITEM HANGER H0. HANGT.R TYPE X EG2-191 CTMT TRAIN 8 C-F3.50 2SW-R597 SWAY STRUT 12" HBC-29(B) CV-140 '129'-1" 1 X EG2-191 CTMT . TRAIN B C-F3.50 2SW-R598 SWAY STRUT 12" HBC-29(B) CV-140 131'-2" B-D2.20 (2) W/ ATTACH.  ; X EG2-191 CTMT TRAIN B C-F3.40 25W-R599 RESTR. HGR. 12" HBC-29(B) CV-140- 150'-0 1/2" X EG2-191 CTMT TRAIN B

C-F3.40 25W-R600 PESTR. HGR. 12" HBC-29(B)

CV-140 152'-0" l X EG2-202 CTMT TRAIN A C-F3.40 2SW-R697 RESTR. HGR. 12" HBC-29(A) i CV-110 143'-0" X EG2-200 CTMT TRt'.TN A ~ C-F3.40 25W-R702 RES'TR. HGR. 12" HBC-29(A)

CV-104- 145'-0" X

EG2-202 CTMT TRAIN A C-F3.40 25W-R703 RESTR. HGR. 12" HBC-29(A) CV-110 145'-0" . X EG2-202 CTMT TRAIN A C-F3.40 2SW-R704 RESTR. HGR. 12" HBC-29(A)- CV-110 152'-0" X EG2-200 C MT TRAIN A . C-F3.40 25W-R707 RESTR. HGR. 12" HBC-29(A) _ , X EG2-202 CTMT TRAIN A C-F3.40 25W-R708 ~ RESTR. HGR. 12" HBC-29(A) 194'-0" CV-Il0 Rev.: 0 4P16-20

6 . l . X X X X X X X X 9 2 X X = 6 H 0 TD 0

              -               NO                                                                                                                                                        :

M- OI1 MRE v 2 e

              -               0P                                                                                                                                                      '

P 4 R ~ M F 3 _ M A X' . E - d' E n R _ A . s R A A A t E A A A A A - r I A A N N

                                      /                                                                N            N               N            N o

p S N N N N I I I I I E I I I I A A A A A p I A A A A A R R R R - u T R R R R R T T T S O R T T T T N T T T . t-n e "2 n / o p 1 m~ N "0- 0 "0 on "0 "0 "0 Ca M "5 "0 "5 "0 T

                                                                                                                                                                       -            -          2 l                  1                  -            -             -

T T' T M '7 T M '7 T M '3 M '5 T M '4 3P A C T M '5 TM '4 T M '5 M '7 M7 T6 T8 T4 T4 T9 . T9 T9 T6 T8 C1 C1 C1 C1 - se O T9 C1 C1 C1 C1 C1 sc L C1 an 1 l a 2 Cl 0 0 0 0 2 -

                  ,l              / .                          2            0             2              2                                         04          04           00               -

i GO 0 00 04 00 00 04 04 20 20 21 6 2e WN 04 20 21 21 20 20 1 1 1 v D . 20 1 21 1 1 1 1 2 - 1 2 - 1 2 - 1 2 - 2 - 4 P 1 _ tr OG 2 - 2 - 2 - 2 - 2 - GV GV GV GV GV iu GV GV GV GV EC EC EC EC nS SI GV EC EC EC EC IF EC EC U

        ~              r                                                                                                                                                                         ,

_ e g ) ) ) ) ) .

                                                  )            )            )             )              )

A A A A A t' n A A A A A ( ( ( ( na ( ( ( ( ( ( 9 9 9 9 9 _ aH O 9 9 9 9 9 2 2 2 2 2 _ l 2 2 2 2 - - P N 2 - - - - C C C C C C C C B B r E C C B B B B a N B B B B H H H H P H I H H H H e' L l

                                                                                                          "2           "2              "2           "2          "2           "2 c                                "2           "2           "2            "2                                          1            1           1            1 u                                1            1            1             1              1            1 N

_ y' . . . . R R R R e E . . R R . R R G G P R R G G G 6 l Y G G G GH HH H H H H _ r' H H H HC H . T F a -

                                                                                  .            .T A          .           .C   A R

R R R R . . R RT R RT T ~ - E R R TA T T.T T T T S G T T T SA S S S M N S S S S S E E/ E E E E _ A E E E E/ R R R R R R RW R RW J H R r '. 6 7 8 e O 2 5 6 7 2 3 2 2 2 t N 1 1 1 1 2 2 7 7

a 1 1 7 7 R 7 7 7 7 7 7 R R R R R W E R R R R R - - - - -

W e G - - - W W W W W W S c N W W W S S 5 5 S 5 2 A S 5 5 2 2 2 2 i 2 2 2 2 v H 2 r e 0 0 0 0 S 0 0 00 0 00 4 4 D 0 42 4 42 4 4 4 4

                            -         W              4 3           3            3 6            IM                           3             3             32            3            32              3 F           F            F 1           /E              3 F             F             FD            F            FD              F P            FT             F                                           - -           -           - -              -

C WI - - - C CB C C C 2 I C C C CB

                                                                                          .x         ~_
                                                                                                                                              .1, "       "W i                     _                                           )L
                                                                                                           'FMP-2-M-069 J. M. Farley Nuclear Plant.- Unit 2, Class 3 Component Supports And Hanger Surveillance Plan                                                             ..

2P16- Service Water 40-MONTH. RE-EXAM PERIOD ISO DWG/ 3 1- 2-IWF/IWO FIG.'NO. LOCATION NOTES /IER HANGER NO. HANGER TYPE- LINE NO. ITEM TRAIN A X. EG2-200 CTNT 2SW-R729 RESTR. HGR. 12" HBC-29(A)' C-F3.40 CV-104 195'-5" X EG2-201 CTMT . TRAIN A 2SW-R732 RESTR. HGR. 12"-HBC-29(A)- C-F3.40 CV-103 195'-5"- TRAIN A X-EG2-202 CTMT 25W-R733 RESTR. HGR. 12" HBC-29(A) C-F3.40 CV-110: 194'-1" X EG2-203 CTMT TRAIN A-25W-R736 RESTR. HGR. 12" HBC-29(A) C-F3.40 CV-111 194'-0" X EG2-201 CTMT TRAIN A C-F3.40 25W-R737 RESTR. HGR. 12" HBC-29(A) CV-103 195'-5" X EG2-201 CTMT TRAIN A C-F3.40 25W-R740 RESTR. HGR. 12" HBC-29(A) CV-103 195'-5" X EG2-203 CTMT TRAIN A C-F3.40 25W-R741 RESTR. HGR. 12" HBC-29(A) CV-111 190'-0" X - EG2-201 CTMT TRAIN A C-F3.40 25W-R791 RESTR. HGR. 12" HBC-29(A) CV-103 195'-5" X EG2-203 CTMT TRAIN A C-F3.40 2SW-R792 RESTR. HGR. 12" HBC-29(A) 190'-0* CV-111 X EG2-203 CTMT TRAIN A 25W-R795 RESTR. HGR. 12" HBC-29(A) C-F3.30 CV-111 194'-0" B-D2.20 W/ ATTACH. Rev.: 0 4PI6 , . -

I r - , 3.,(v. . X X X X X X 3 2 X X X X 9 6 H - 0 TD 0

                -                NO M-                OI1                                                                                          ,

MRE . 2 v -

                 -               0P                                                                                                                                                      e P                 4                                                                                                                                                       R M                        3 F

M A X E d E n R A ~ . s R B

  .             t                        E                                                         B             8                 B          B            B r                       I        A           B           B           8 o                       /                                                          N             N                N           N           N               N                   ,

p S N N N N I I I I I I p E I I I I A A A A A A u T A A A A R R R R R . R R R R R T O S T T T T T T . N T T T t n e . n o-p m N "0 on O .*

                                                                                  "3           "0 3             "0               "0           "5         "5 Ca                        I               0          "3             -         .-             -              -               -            -            -              -

T - - T' T M '5 l A T T M '5 T M '5 TM '0 T' T M '0 T M '0 T M '5 N4 3P C M '4 T5 T8 M3 T7 T9 T9 T9 T9 T9 C1 se O T9 T5 C1 C1 C1 C1 C1

     ,3d..

( sc an L C1 C1 C1 C1 l a 3 Cl 4 4 2

                    ,l
                                      / .                                   4           1            4             1                4           1 08               -

i GO 3 1 90 08 90 08 90 08 6 2e WN 0l 90 08 14 23 14 23 23 2l 14 23 14 23 1 1 v D 1 1 - 1 1 1 1 1 2 - P tr . I 1 2 - 2 - 2 - 2 - 2 - 2 - iu 0G 2 - 2 - 2 - GV GV GV GV GV GV 4 5I GV GV GV GV EC EC EC EC EC nS 1F EC EC EC EC EC U

                   -erg                                                                  )           )              )                )           )           )               )

tn ) ) ) B B B B B B A B B B ( ( na ( ( ( ( ( ( ( ( 9 9 9 aH . 9 9 9 9 9 2 l O 9 9 2 2 2 2 2 2 2 2 P N 2 - - - - - - - C C C C C C . r E C C C C B B B B B B B B B B H H a N H H H H H H e I H H L l' c "2 "2 "2 "2 "2 "2 u "2 "2 "2 "2 1 1 1 1 1 1 1 1 1 1 N y . . . . R e E . . . R R R R P R R R G G G G G l G G G N N H H H r Y T H H H O O H H a I I . . F R .- . H H . R R R R E R R R C C R T T T N N T T T S M G T T A) A) S. S S S N S S S E E E E E A E E E T2 T2 R R R R R S( S( R R J H R r O 4 5 e 4 7 8 1 2 3 4 6 t N 7 5 5 5 6 6 6 9 a 9 5 8 8 8 8 8 8

R 8 8 8 R R
                            .W               E 7

R R R R R R R R e G - - - W W W W W W W W W W

     ,O i

c v r N A H 5 2 5 2 5 2 5 2 5 2 5 2 5 2 S 2 5 2 5 2 e 0 0 S 0 00 00 0 0 0 D 0 0 42 4 4 4 4 4 4 4 42

                               -        W              4 3

6 IM 3 32 32 3 3 3 3 F 1 /E 3 3 FD F0 F F F F FT F F F - P - - - - - - - - - C 2 WI - - CB CB C C C C I C C C ' 4 t  : I

() fN=

                                                                                                                                                                                      ~~

r m _J  : - FNP-2-M-069 J. .M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan .. , ' ' 2P16- Service Water 40-MONTH RE-EXAM PERIOD 150 DWG/- 3 1 2 FIG. NO. LOCATION NOTES /IER IWF/IWD LINE NO. ITEM HANGER NO. HANGER TYPE X. CTMT TRAIN B 12" HBC-29(B) EG2-204 C-F3.40 25W-R872 RESTR. HGR. 155'-2" CV-138 X CTMT TRAIN B 12" HBC-29(B) EG2-204 C-F3.40 25W-R873 RESTR. HGR. 135'-0" CV-138 B-D2.20 W/ ATTACH. X CTMT TRAIN B 12" HBC-29(B)~ EG2-204 C-F3.40 2SW-R893 RESTR. HGR. 195'-5" CV-138 X DSL GEN TRAIN A RESTR. HGR. 12" HBC-201(A) EG2-496 C-F3.30 25W-R257 CV-167 164'-0" X DSL GEN TRAIN A RESTR. HGR. 12" HBC-201(A) EG2-496-3 C-F3.30 25W-R258 CV-167 164'-0" X DSL GEN TRAIN A RESTR. HGR. 12" HBC-201(A) EG2-496

,                            C-F3.30                                                                                       2SW-R259                                       CV-167       171'-0" X

DSL GEN TRAIN A RESTR. HGR. 12" HBC-201(A) EG2-496 i C-F3.30 25W-R260 CV-167 173'-3"

X DSL GEN TRAIN A RESTR. HGR. 12" HBC-201(A) EG2-496 4

C-F3.30 2SW-R262 CV-167 173'-3" X DSL GEN TRAIN A RESTR. HGR. 12" HBC-201(A) ;EG2-496 C-F3.30 25W-R264 CV-167 173'-3" 2 X DSL GEN TRAIN A RESTR. HGR. 12" HBC-201(A) EG2-496 C-F3.30 2SW-R266 CV-167 173'-3" Rev.: 0-4P16-24

                     ~_

_ .,.r.,T e _ + =c

             ,_                                                                                                                             3 h .
                                                                                 ~

J LFNP-2-M-069 J. M. Farley Nuclear. Plant - Unit'2, Class 3 Component Supports And Hanger Surveillance Plan I 2P16- Service Water 40-MONTH RE-EXAM PERIOD ISO DWG/ 3 1 2-

                                                                            ~ LOCATION            NOTES /IER IWF/IWD                                          LINE NO.-     FIG. NO.

ITEM HANGER NO. HANGER' TYPE X DSL GEN. TRAIN A RESTR. HGR. 12" HBC-201(A) EG2-496 C-F3.40 2SW-R268 CV-167 173'-3" B-D2.20 W/ ATTACH. X DSL GEN _ TRAIN B RESTR. HGR. 12" HBC-201(B) EG2;494 C-F3.30 2SW-R284 CV-169 157'-6" B-D2.20 W/ ATTACH

                                                                                                                               -X DSL GEN             TRAIN B 25W-R285         RESTR. HGR. 12" HBC-201(B) EG2-494          157'-6" C-F3.30                                                        CV-169 B-D2.20                      W/ ATTACH X

DSL GEN TRAIN B RESTR. HGR. 12" HBC-201(B) EG2-494 C-F3.30 25W-R286 CV-169 157'-6" B-D2.20 W/ ATTACH X DSL GEN TRAIN B RESTR. HGR. 12"'HBC-201(B) EG2-494 C-F3.30 2SW-R288 CV-169 166'-0 3/8" , X DSL GEN TRAIN B RESTR. HGR. 12" HBC-201(B) EG2-494 166'-0* , C-F3.30 25W-R290 CV-169 B-D2.20 W/ ATTACH. X DSL GEN TRAIN B RESTR. HGR. 12" HBC-201(B). EG2-494 C-F3.30 25W-R292 -CV-169- 173'-0" X - DSL GEN TRAIN B RESTR. HGR. 12" HBC-201(B) EG2-494 C-F3.30 2SM-R294 CV-169 173'-0" X DSL GEN TRAIN A C-F3.30 25W-R261 RESTR. HGR. 12" HBC-204(A) EG2-499CV-173 173'-3" X DSL GEN TRAIN A RESTR. HGR. 12" HBC-204(A) EG2-499 C-F3.30 25W-R263 CV-173 173'-2 5/B" Rev.: 0 4P16-25

a. ..n. --
                             .L                                          ., ,_                           ??' ~                              ,.J.                ., _ ,
  +
                                                                                                                                                           'I            I'$ '

E FMP-2-M-069 J. M. Farley Nuclear Plant - Unit 2,' Class 3 Component Supports And' Hanger Surveillance. Plan .. i- 2P16- Service Water 40-F9 NTH RE-EXAM- . PERIOD ISO DWG/. 3 1 2 IWF/IWD FIG. NO. LOCATION NOTES /IER HANGER NO. HANGER TYPE- LINE NO. ITEM TRAIN A X 12" HBC-204(A) EG2-499 -DSL GEN C-F3.30 25W-R265 RESTR. HGR. I

                                                                 -CV-173             173'-3" X

DSL GEN TRAIN A l C-F3.30 25W-R267 RESTR. HGR. 12" HBC-204(A) EG2-499 173'-3" CV-173 X DSL GEN TRAIN A.

C-F3.40 2SW-R269 RESTR. HGR. 12" HBC-204(A)- EG2-499 173'-3" CV-173 B-D2.20 W/ ATTACH.

TRAIN A X DSL GEN C-F3.40 2SW-R271X RESTR. HGR. 12" HBC-204(A) EG2-499 CV-174 173'-0 7/8" TRAIN A X EG2-499 DSL GEN 25W-R280X RESTR. HGR. 12" HBC-204(A) C-F3.30 CV-173 166'-0" X_ DSL GEN TRAIN A C-F3.30 25W-R281X RESTR. HGR. 12" HBC-204(A) EG2-499 CV-173 166'-0" X OSL GEN TRAIN B C-F3.30 25W-R283 RESTR. HGR. 12" HBC-204(B) EG2-492 CV-171 157'-6" B-D2.20 W/ ATTACH. TRAIN A X-DSL GEN C-F3.30 25W-R284X RESTR. HGR. 12" HBC-204(A) EG2-499 , CV-173 171'-0" 1 TRAIN B X 1 DSL GEN C-F3.40 25W-R287 RESTR. HGR. 12" HBC-204(B) EG2-492 168'-0" CV-171 X 1 DSL GEN TRAIN B C-F3.30 25W-R289 RESTR. HGR. 12" HBC-204(B) EG2-492 168'-0" CV-171 B-D2.20 W/ ATTACH.

Rev.: 0 4P16-26'
                                                                                                                                              -    . . . .    . . . - - ~ , . :.
                                                                                                                                                                  ~            :,;p
                                                                                                                                                             ;Q
                                                                        . O, C(-- (
                                                                                                                                 ~

uc - _ 1' " i  ;  % FMP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan . . 2P16- Service Water

 <                                                                                                                           40-MONTH RE-EXAM'         PERIOD 150 DWG/                                               3           1         2-
<  -IWF/IWD                                   LINE NO.          FIG. NO.-    LOCATION          NOTES /IER-                                                                   m ITEM     HANGER NO. HANGER TYPE l                                                                                               TRAIN B                             X 12" HBC-204(B) EG2-493            DSL GEN-C-F3.30   25W-R298      RESTR. HGR.

CV-172- 156'-10" B-D2.20 W/ ATTACH. TRAIN B X 10" HBC-29(B) EG2-205- 'CTMT C-F3.40 SW-2A8 ANCHOR

                                                               -CV-137       ~168'-5" B-D2.20                 W/ ATTACH.

TRAIN A X 10" HBC-29(A) EG2-201- CTMT C-F3.40 25W-R796 RESTR. HGR. CV-103- 195'-5" TRAIN A X 10" HBC-29(A) EG2-201 CTMT C-F3.40 25W-R802 RESTR. HGR. CV-102 170'-0" B-D2.20 W/ ATTACH. TRAIN A X EG2-201 CTNT C-F3.40 25W-R803 RESTR. HGR. -10" HBC-29(A) CV-102 170'-0" TRAIN A X 10" HBC-29(A) EG2-201 CTMT C-F3.40 2SW-R807 RESTR. HGR. CV-102 166'-5" TRAIN A .X 10" HBC-29(A) EG2-201 CTMT C-F3.40 25W-R809 RESTR. HGR. CV-102 166'-5" TRAIN A X EG2-201 CTMT. C-F3.30 25W-R812 RESTR. HGR. 10" HBC-29(A) l CV-102 166'-5" - t TRAIN A X 10" HBC-29(A) EG2-201 CTMT C-F3.40 2SW-R814 RESTR. HGR. . l CV-102 166'-2 3/4" i TRAIN A X EG2-203 CTMT C-F3.40 2SW-R816 . RESTR. HGR. 10" HBC-29(A) CV-ll2 166'-5" I o Rev.: 0 4P16-27

                                                                                        -+.      er - -  _

mw , e, - ---r-- m3 n ,- -,, e ar

il

           ~

j _ )) % f

-+;

1 _FMP-2-M-069_ J. M. Farley Nuclear Plant - Unit 2,IClass 3 Component Supports And Hanger Surveillance Plan . 2P16- Service Water 40-MONTH RE-EXAM PERIOD-

150 DWG/ 3- :1' 2 IWF/IWD LINE NO. FIG. NO. LOCATION NOTES /IER ITEM HANGER NO. HANGER TYPE X~

EG2-203 CTMT TRAIN A C-F3.40 25W-R819 RESTR. HGR. 10" HBC-29(A) CV-112 166'-5" TRAIN A. X 10" HBC-29(A) EG2-203 CTMT'

   .C-F3.30       25W-R820-    RESTR. HGR.

CV-112 166'-5" TRAIN A X 10" HBC-29(A) EG2-203 CTMT C-F3.40 2SW-R823 RESTR. HGR. CV-112 166'-5" TRAIN A X EG2-203 CTMT C-F3.50 25W-R824 SWAY STRUT 10" HBC-29(A)- CV-112 188'-0* 4 TRAIN A X EG2-203 CTMT-C-F3.40 25W-R825 RESTR. HGR. 10" HBC-29(A) CV-112 168'-0" B-D2.20 W/ ATTACH. TRAIN B X 10" HBC-29(B) EG2-205 CTMT C-F3.30 25W-R888 RESTR. HGR. CV-137 166'-5" ,

                                                                                                         -TRAIN B                                     X 10" HBC-29(B)     -EG2-205            CTMT C-F3.50       25W-R895     SWAY STRUT CV-137            193'-11" TRAIN B                                              X              -

10" HBC-29(B) EG2-190 CTMT C-F3.30 25W-R903 RESTR. HGR. CV-139 166'-5" X EG2-190 CTMT TRAIN B C-F3.30 25W-R908 RESTR. HGR. 10" HBC-29(B) CV-139 166'-5" . TRAIN B X

                                              -10" HBC-29(B)      EG2-190           CTMT C-F3.40      2SW-R916    RESTR. HGR.

CV-139 168'-5" B-D2.20 W/ ATTACH. I 4P16-28 Rev.: 0 __ u , . _ . -._ . _ , _ . _ _ . ._ . _ . _ - _ . . , _ - - _ . _ _

                                                                                 s-g  .

v .- FMP-2-M-069-J. M. Farley Nuclear Plant - Unit 2, Class 3 Comp ~onent Supports And Hanger Surveillance Plan .. 2P16- Service Water- 40-MONTH : RE-EXAM PERIOD ISO DWG/ 3 1 2 IWF/IWO FIG. NO. . LOCATION NOTES /IER LINE NO. ITEM HANGER N0. HANGER TYPE X EG2-190 CTMT TRAIN B 25W-R917 RESTR. HGR. 10" HBC-29(B) C-F3.40 CV-139 190'-0" 1 TRAIN A X-EG2-208 CTMT ANCHOR 10" HBC-39(A)

 'C-F3.40    SW-2A4                                           CV-136            167'-8" B-D2.20                 W/ ATTACH.

TRAIN B X EG2-193 CTMT ANCHOR 10" HBC-39(B) C-F3.30 SW-2A5 CV-144 168'-5" B-D2.20 W/ ATTACH. TRAIN B X EG2-193' CTMT ANCHOR 10" HBC-39(B) C-F3.30 SW-2A7 CV-144 167'-8" B-D2.20 W/ ATTACH. TRAIN B X EG2 -219 AUX RESTR. HGR. 10" HBC-39(B) C-F3.30 25W-R119 CV-119 127'-6" TRAIN B X EG2-219 AUX RESTR. HGR. 10" HBC-39(B) C-F3.30 25W-R121 CV-Il9 127'-6" B-D2.20 W/ ATTACH. TRAIN A X EG2-218 AUX' C-F3.30 25W-R570 RESTR. HGR. 10" HBC-39(A) 122'-0" CV-131 B-D2.20 W/ ATTACH. TRAIN A X EG2-218 AUX C-F3.30 2SW-R572 RESTR. HGR. 10" HBC-39(A) 127'-6" CV-131 B-02.20 W/ ATTACH. TRAIN B X EG2-199 CTMT 25W-R601 RESTR. HGP.. 10" HBC-39(B) . C-F3.40 CV-142. 152'-0" TRAIN B X EG2-193 CTMT 25W-R602 RESTR. HGR. 10" HBC-39(B) C-F3.49 ' CV-144 152'-0" Rev.: 0 4P16-29

                                                                                 ~
                                                                                                                                                             - =a.   .
                "                                                           ,w                                                    ,

i' 8 ; f:

              ~

d

s. v FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2,1 Class.3 Component Supports And ,

Hanger Surveillance' Plan' . 2P16- Service Water 40-MONTH' RE-EXAM ~ ~ PERIOD ~' ISO DWG/ . 3 .1 2 IWF/1WD FIG. NO. LOCATION NOTES /IER - HANGER NO. HANGER TYPE LINE NO. ITEM lCTMT ' TRAIN A ~ .X-RESTR. NGR. 10" HBC-39(A) EG2-209  ; C-F3.40 25W-R698 'CV-133 143'-0" _ i TRAIN A X EG2-209' CTMT C-F3.40 2SW-R699 RESTR. HGR. 10" HBC-39(A)'- CV-133- 145'-0"

                                                                                              ~

TRAIN A X EG2-209 CTMT 10" HBC-39(A) i C-F3.40 25W-R700 RESTR. HGR. 145'-0" CV-133 TRAIN A 'X EG2-207 CTMT RESTR. HGR. 10" HBC-39(A) C-F3.40 2SW-R701 CV-130 145'-0" , . TRAIN A- X EG2-209 CTMT C-F3.40 25W-R705 RESTR. HGR. 10" HBC-39(A) CV-133 152'-0" TRAIN A X EG2-207 CTMT 2SW-R706 RESTR. HGR. 10" HBC-39(A) C-F3.40 CV-130 152'-0" , t X-EG2-209 -CTMT TRAIN A 25W-R709 RESTR. HGR. 10" HBC-39(A) C-F3.40 CV-133 : 183'-6"

X EG2-207 CTMT TRAIN A '

25W-R710 RESTR. HGR. 10" HBC-39(A) C-F3.40 CV-130 185'-1 1/4" TRAIN A X

                                                                .EG2-209         CTMT C-F3.40      25W-R713     RESTR. HGR. 10" HBC-39(A)

CV-133 183'-6" . , t TRAIN A X EG2-207 CTMT 25W-R714 RESTR. HGR. 10" HBC-39(A) C-F3.40 185'-0" CV-130 Rev.i 0- a 4P16-30 4

                                                                   ._.s.               m           ~  .m.       ,    ,                             .,    , . < , , ,   - , . -

_ - .- ,.~ - ~ -_ FNP-2-M-069' J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And

                                                    ' Hanger Surveillance Plan                                                                                .. -

8 , 2P16- Service Water 40-MONTH

                                                                      ~

RE-EXAM PERIOD ISO DWG/ 3_ 1 2 lIWF/IWD FIG. NO. LOCATION NOTES /IER HANGER NO. HANGER TYPE LINE NO. ITEM TRAIN A X.. EG2-209 CTNT 25W-R718 RESTR. HGR. 10" HBC-39(A)- C-F3.40 CV-133- 162'-0" B-D2.20 W/ ATTACH. TRAIN A X EG2-209 CTMT 25W-R719 RESTR. HGR. 10" HBC-39(A) C-F3.40 CV-133 171'-0" TRAIN A X EG2-207 CTMT C-F3.40 2SW-R720 RESTR. HGR. 10" HBC-39(A) 162'-0" CV-130 B-D2.20 W/ ATTACH. TRAIN A X EG2-207 CTMT 25W-R721 RESTR. HGR. 10" HBC-39(A) C-F3.40 CV-130 171'-0" TRAIN A X EG2-207 CTMT 25W-R724 RESTR. HGR. 10" HBC-39(A) C-F3.40 -CV-130 143'-0" TRAIN A X EG2-207' CTMT 25W-R725 RESTR. HGR. 10" HBC-39(A)- C-F3.40 CV-130 145'-0" TRAIN A X EG2-207 -CTMT 25W-R730 RESTR. HGR. 10" HBC-39(A) C-F3.40 CV-130 185'-0" TRAIN A X l EG2-208 CTMr 25W-R731 RESTR. HGR. 10" HBC-39(A) C-F3.40 CV-135 183'-6" i TRAIN A 7 EG2-207- CTMT 25W-R734 RESTR. HGR. 10" HBC-39(A) . C-F3.40 CV-130 185'-0" I CTMT TRAIN A X' 10" HBC-39(A) EG2-208 . i C-F3.40 25W-R735 ' RESTR. HGR. CV-136 183'-1"

                                                                                                                                                                                                                  ^

l 1 l Rev.: 0 4P16-31 J.-a g g g ,<- e e4*. W _N-% .g__+e,____ .W4- m'-'-_m- .____ A_.__--__I.___C _ - a E-.___b _tW

             ,a..
k. .,~. -
                                                                                                                       -FMP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And                                                         ,

Hanger Surveillance Plan  :. 2P16- Service Water 40-MONTH RE-EXAM PERIOD 150 DWG/ 3 1 2 FIG. NO.' LOCATION ~ NOTES /IER IWF/IWD LINE NO. ITEM HAtlGER. NO. HANGER TYPE X CTMT . TRAIN A 10" HBC-39(A) EG2-206-C-F3.40' 25W-R738 RESTR. HGR. 185'-0" CV-129 TRAIN A X-EG2-208 CTMT RESTR. HGR. 10" HBC-39(A) C-F3.40 2SW-R739 CV-136 183'-0" TRAIN A X EG2-208 CTMT RESTR. HGR. 10" HBC-39(A) C-F3.40 25W-R789 CV-136 183'-6" B-02.20 X CTMT TRAIN A EG2-206 C-F3.40 2SW-R790 RESTR. HGR. 10" HBC-39(A) CV-129 185'-0" B-D2.20 W/ ATTACH. TRAIN A X EG2-208 CTMT RESTR. HGR. 10" HBC-39(A) C-F3.40 2SW-R793 CV-136 183'-6" TRAIN A X EG2-206 CTMT RESTR. HGR. 10" HBC-39(A) C-F3.40 25W-R794 CV-129 185'-0" X CTMT TRAIN A 10" HBC-39(A) EG2-208 C-F3.40 25W-R798 RESTR. HGR. 181'-6" CV-136 TRAIN A X EG2-206 CTMT RESTR. HGR. 10" HBC-39(A) C-F3.40 2SW-R799 CV-129 181'-6" TRAIN A X EG2-206 CTMT RESTR. HGR. 10"'HBC-39(A) . C-F3.40 2SW-R800 CV-129 176'-0"

                                                                                                      . TRAIN A              X EG2-208         .CTMT RESTR. HGR. 10" HBC-39(A)

C-F3.40 2SW-R801. CV-136 176'-0" Rev.: O 4P16 L_ _ _ ___

                                                                                                                                                                 --a---   -

s

                                                                                                                                                                                       ,A
                                                                                                                                                                                   .,Q mg-FMP-2-M-069 J. M. Farley Nuclear Plant. - Unit.2, Class 3 Component Supports And Hanger Surveillance Plan

< ~2P16- Service Water

                                                                                                                                            .40-MONTH RE-EXAM-              PERIOD
                                                                . ISO DWG/                                                                                -2 IWF/IWD                                                                                   . NOTES /IER                                 3         1 HANGER NO. HANGER TYPE              LINE NO.-        FIG. NO.-   LOCATION ITEM TRAIN A                                   X 10" HBC-39(A)          EG2-206. CTMT.

C-F3.40 25W-R804 RESTR. HGR. CV-128 155'-0" B-D2.20 W/ ATTACH. TRAIN A X 25W-R805 RESTR. HGR. 10" HBC-39(A) EG2-208- CTMT. C-F3.40 CV-136 174'-1" B-D2.20 W/ ATTACH. TRAIN A X EG2-208 CTMT C-F3.30 25W-R806 RESTR. HGR. 10" HBC-39(A) CV-136 167'-8"

                                                                                                                                                                                   ~

TRAIN A X EG2-206 CTMT. C-F3.40 2SW-R810 RESTR. HGR. '10" HBC-39(A) CV-128 165'-2" TRAIN A X EG2-208 C1MT C-F3.30 25W-R811 RESTR. HGR. 10" HBC-39(A) CV-136 167'-8" 1- ) TRAIN A. X

                                                                  .EG2-206       CTMT C-F3.30    2SW-R813       RESTR. HGR. 10" HBC-39(A)

CV-128 165'-2" , TRAIN A X 10" HBC-39(A) EG2-206 CTMT C-F3.40 2SW-R815 RESTR. HGR. CV-128 165'-1" TRAIN A X EG2-208 CTMT C-F3.40 25W-R817 RESTR. HGR. 10" HBC-39(A) CV-135 165'-2" TRAIN A X RESTR. HGR. 10" HBC-3'e(A) .EG2-208 CTMT

C-F3.40 2SW-R818 165'-2" .

CV-135 TRAIN A X RESTR. HGR. -10" HBC-39(A) EG2-208 CTMT ' C-F3.40 2SW-R821 CV-135 165'-2" 4 4P16-33 Rev.: 0

                        -e                 ,,ym.                      ,y .r m
                                       ~
                                                     #  . , . ,                       .   , - - _ . ..-         . , , ,       ,...~,.._#         ,        m

_%w.

g-

                                                                                   ,Q Q);
                                                                     ~
                                                                                                                                                          & ~:

2

                         ~

FNP-2-M-069. J. M. Farley Nuclear Plant - Unit 2,-Class 3 Component Supports And Hanger Surveillance Plan .. 2P16- Service Water 40-MONTH RE-EXAM PERIOD ISO DWG/ 3 1 2

IWF/IWD .

FIG. NO. LOCATION NOTES /IER HANGER NO. HANGER TYPE LINE NO. ITEM TRAIN A X EG2-208' CTMT ! 2SW-R822 PESTR. HGR. 10" HBC-39(A) C-F3.30 CV-135 165'-2" TRAIN B X EG2-199. CTMT RESTR. HGR. 10" HBC-39(B) ~ C-F3.40 2SW-R855 CV-142 155'-3" TRAIN B X EG2-193 CTMT 2SW-R856 RESTR..HGR. 10" HBC-39(B) C-F3.40 CV-144 155'-3" TRAIN B X EG2-199 CTMT 25W-R859 RESTR. HGR. 10" HBC-39(B) C-F3.40 CV-142 173'-3" TRAIN B -X EG2-193 CTMT 25W-R860 RESTR. HGR. 10" HBC-39(B) , C-F3.40 CV-144 173'-3" B-D2.20 W/ ATTACH. TRAIN B X 4 EG2-199 CTMT 2SW-R866 SWAY STRUT 10" HBC-39(B) C-F3.50 CV-142 124'-6" , TRAIN B X ! EG2-199 CTMT 25W-R867 SWAY STRUT 10" HBC-39(B) ! C-F3.50 CV-142 127'-0" B-D2.20 W/ ATTACH. TRAIN B X EG2-199 CTMT 25W-R868 RESTR. HGR. 10" HBC-39(B) C-F3.40 150'-0" CV-142 i X EG2-193 CTMT TRAIN 8 ~ 2SW-R869 SWAY STRUT 10" HBC-39(B) C-F3.50 CV-144 125'-0" TRAIN B X EG2-193 CTMT 2SW-R870 SWAY STRUT 10" HBC-39(B) C-F3.50 CV-144 127'-0" s B-D2.20 (2) W/ ATTACH. Rev.: .0 4P16-34 t u _ .2. _ ,_ ._;_ _ _ . -# _

t ,)

            ~
                      +__
                                                                                                                                                       ~

s' 9 2 H 6 0 0 TD ,

                                 -                     NO                                                                                                                                                                                  _
  • M- oil  :

MR' E v 2 e

                                 -                     0P                                                                                                                                                                     _

R P 4 X' X X X N X X X X 3 X X F M . A X' E d E n R A - s R B B B B t E B B B B r I 8 B N N

                                                                   /                                                                       N             N             N'            N o                                           N             N               N                 N                                        I              I            I            I p                                S                                                          I            I             I A            A            A p~                              E           I            I               I A            A              A            A                            R            R T          A             A                A                R            R              R            R              R T

u O R R R T T T T T S T T T T N t n "6 "6 e' n 1

                                                                                                                     /                           /

1 1 op 1 m' N 0 0 "2 "0 8 "8 "0 O "2 on I "0 "8 1 1 Ca - T T M '7 M '6

                                                                                                      -                  -                                              T' l                         T                    -

T' T TM '5 T M '8 T M '5 M1 T M '7 3P A C T M '0 M3 M '8 T6 T5 T6 T6 T6 T6 C1 T7 C1 T5 C1 O T5 T6 C1 C1 C1 ( se L C1 C1 C1 C1 . sc an 5 l a 3 Cl 3 3 3 9 -

                                                               / .                                                              3            3             3                                         94           92
                                         ,l                     GO               3            3                 3                            94            94            94             94                        14               6 i

94 94 94 94 14 14 14 1 2e WN 14 14 14 14 14 14 1 1 1 1 1 P v D 1 1 1 1 2 - 2 - 2 - 2 - 2 - 4 tr . 1 2 - 2 - 2 - GV GV GV GV iu 0G 2 - 2 - GV GV GV GV EC EC EC EC 5I GV GV EC EC EC nS 1F EC EC EC U r ) e ) ) ) ) ) B g ) ) ) ) B B B - B ( - tn B B B B ( ( ( na B ( ( ( ( ( 9 9 9'

                                                                          .      (                                                            9             9'            9                                        3'                      .

aH O 9 9 9 9 3 3 3 3 3 - l 3 3 3 - - - P N 3 - - - - C C C C' C C C C C B B B B r E C B B B B H H H a N B B H H H H . I H H H e L "0 l "

                                                                                                                                 "0           "0             "0           "0             "0            0 c                                        "0           0                 "0                                          1            1              1             1            1 u                                        1            1                 1               1            1 N                                                                                                                                                                 .            .

y . R R R R e E . . R R T R G G G R G P R G G U G H H H 1 l r Y G G . H R H H  : T H HH H T a . .

                                                                                                    .C F                                                               A                             .        S                 .

R R R R R . R R R T T E R RT Y T T T S S T T S S

   -                                    M G

N T S TT SA S S E W A S E E E E R E R A E E/ E S R R R R RW R R J H ~ r . 6 0 1 8 e O 9 1 4 7 9 8 0 1 1 1 N 1 8 8 9 9

.t a 7 7 8

8 8 8 8 8 9 R 9 R R R - W R 8 R R R R - - E R R - - - - - W W e G - - - W W W W W S 5 c N W W W S 5 5 5 S 2 2 5 S 2 2 i A 5 2 2 2 2 2 v H 2 r 0 e 0 0 0 0 0 3 S 0 00 0 0 3 4 4 3 D 42 4 3 5

                                                    '-              W                 4 3              3            3            3 6                IM                3            32                3               3            3             3 F             F              F            F            F 1                /E                             F0                F               F            F                                             -             -           -

P FT F - - - - - C C C WI - - - C C C C

   .~

2 I C CB C 3 ., ;li ,l'  ;' 4  ;  ;~ i ~;

cnp L [ - h ~_

                                                                                              ~

[ -. . s FNP-2-M-069' J. M.- Farley Nuclear Plant' - Unit 2, Class ~ 3' Component Supports And

                                                              ' Hanger Surveillance Plan                                                                ..

Al2P16-ServiceWater 40-MONTH 1 RE-EXAM. PERIOO_- ISO'DWG/ 3 1- 2

  - IWF/IWD                                                           FIG. NO.       LOCATION                  NOTES /IER LINE NO.

ITEM HANGER NO. HANGER. TYPE TRhlNB X ' EG2-199 CTMT I C-F3.40 25W-R919 RESTR. HGR. 10" HBC-39(B) 175'-9 7/8" CV-142 TRAIN B X EG2-193 CTMT C-F3.30 2SW-R920 RESTR. HGR. 10" HBC-39(B) 176'-0" CV-144 TRAIN B X EG2-193 CTMT RESTR. HGR. 10" HBC-39(B)- C-F3.40 25W-R921 CV-144 175'-9 7/8" TRAIN B X EG2-210 AUX RESTR. HGR. 8" HBC-28(B) C-F3.30 25W-R44 CV-146 115'-0" B-D2.20 W/ ATTACH. TRAIN A X EG2-211 -AUX _ RESTR. HGR. 8" HBC-28(A)

C-F3.30 25W-R182 -CV-113 115'-0" X

DSL GEN TRAIN A ! 8" HBC-201(A) EG2-495-C-F3.40 2SW-R270X RES.TR. HGR. 173'-3" , CV-168 X EG2-495 DSL GEN TRAIN A RESTR. HGR. 8" HBC-201(A) C-F3.40 2SW-R272X CV-168 173'-3" , i X

                                                                                        'DSL GEN                 TRAIN A 8" HBC-201(A)             EG2-495 C-F3.40   2SW-R274X          RESTR. HGR.                                            173'-3"
CV-168 X

l DSL GEN TRAIN A 8" HBC-201(A) EG2-495-C-F3.40 25W-R275X RESTR. HGR. 171'-0 15/16" CV-168 X EG2-497 DSL GEN TRAIN B 8" HBC-201(B) C-F3.40 2SW-R296 . RESTR. HGR. CV-170 -172'-10 13/16" Rev.- 0 4P16-36

                        . . _ -            - =.    - .a   - -          --            .-         _  - . - - -                           -

j ,l l l

                                                                                                                >{

7, _ 3 c. - . y-  : m - a l. v _- ~ X X X X X X X 2 X X X 9 6 H 0 TD 0 NO  : n M- OI1 . . MRE v 2 0P e 4 R

 -                P                                                                                                                                                                                                            m N                     .3 F

- M A

 -                                    X                                                                                                                                                                                         -

E v - d E n R A s R B B B E B B A A t B B B N N e r I N N N N I o' / N N N N I I I I A p S I I I A A A A p E I I A A A R R R R T A A R R R T T u O R R R T T T T T S N T T T t "6 1 n "8 "6 / e "8 / 1 7 n "8 5 / o p / / 1 3 N1 5 N N E "0 m .O N N N N1 N E0 E "3 N E "0 N E "0 E1 G - on . N E "0 E0 E7 E1 G - G - G - G - I G - Ca T G - G - G - G - L '7 L '3 L '1 L '1 L '1 L '0 3P l A C L '1 L '0 L '1 L S5

                                                                                                          '6         S5               S7              S7              S7           S7 D1 S7 D1                         -

O S7 N7 S7 D1 D1 D1 D1 se D1 D1 D1 D1 sc L an 7 l a 3 3 3 Cl 8 8 2 -

                                        / .                                            7           7                 7 94              91           92               92               6
                         ,l i            GO              7                7 90          90           90               90               94 47              47              47           47               47               1 2e                 WN              90               47           47           47               47                      1               1              1             1                1 P        ,

v 47 1 1 1 2 - 2 - 2 - , tr D'. 1 2 - 1 2 - 2 - 2 - 2 - GV 2 - GV GV GV GV 4 iu 0G 2 - GV GV GV EC EC EC EC 5I GV GV EC EC EC nS 1F EC EC EC U

                         -. er
                        - g                                                                          )                )                )               )               )

B~

                                                                                                                                                                                    )

B

                                                                                                                                                                                                    )

B

                                                          )                )            )

B B A A ( ( ( tn B B B ( ( ( 4 na ( ( ( ( 1 4 4 4 4 0 0 aH O 1 - 1 1 1 0 0 0 0 2 2 l 0 0 0 2 2 2 P N 0 2 2 2 - - - - 2 2 - - C C E - - - - C C C C B r C C C B B B B~ a N C B B B' H H H B B H H H H . e I L H H H l c "8 "8 "8 "8 . u "8 "8 "8 "8 "8 N "8 . y . . . R R' R R e E . . R R R G G G . P R R T G G G G H H l Y G G U HH H H H , r H H R H ,. F a T

                                                 '                                       T S                .                  .C A R

R R R R R . R R RT T T T T

                            .                     E         R                             Y            T                 TT              T.              S               S            S               S G        T                T                         S                  SA             S                               E            E               E M                         N        S                S            A E                  E/             E               E R               R A        E                E            W                               RW             R               R               R R                R            S            R J                         H X               X                                             5 r                  O 3              3               7               1            3 9

e 0 1 2 7 7 9 9 t N 9 0 0 0 0 2 2 2 2 2 a 9 3 3 3 R R R R W R 2 3 R R R - E R R R- - - - - - W G - - W W W W W 5 e N W W W W 5 5 5 5 5 2 c A 5 5 5 5 2 2 2 2 2 2

i. 2 2 v H 2 r 0 e 00 0 0 0 0 4

S 0 0 0 4 3 3 D 0 5 3 32 4

                                   -          W               3                4                                                                                                        3                3 32            3               3               3                             F 6            IM                               3            3             3                                                F               F            F 1            /E              3 F            F             F                  FD            F P            FT              F                               -               -                 - -            -

C C C C 2 WI - - C C CB C I C C

                                                                     . ;-                         . ~                 ,l'                        .                ,
                                                                                                                                                                               =                          'Y-m==3.'
                                                                                                                                                                                                   ^
           .f s '-                                                                                                                .g
                                                                                                                                                              .                    ;                         4.-            .
           ~ '
                                                                                                                                    %)'. .

kl_ J. M. Farley Nuclear Pl$nt Unit 2,' Class 3 Component Supports 'And. FNP-2-M-069 Hanger Surveillance Plan .. 2P16- Service Water 40-MONTH ' RE-EXAM PERIOD 150 DWG/

  • IWF/IWD 3 1 2 ITEM- HANGER NO. HANGER TYPE LINE NO. FIG. NO. -LOCATION NOTES /IER 7

TRAIN B X RESTR. HGR. 8" HBC-204(B) EG2-493 DSL GEN-C-F3.30 25W-R297 CV-172 156'-10" RVR INTK TRAIN A X C-F3.30 25W-R9 RESTR. HGR. 8" "'C-214(A) EG2-078 CV-381 178'-1" RVR INTK TRAIN A- X C-F3.30 25W-R10 RESTR. HGR. 8" HBC-214(A) EG2-078 CV-381 189'-4 1/2" RVR INTK TRAIN A X C-F3.30 25W-R11 STANCHION 8" HBC-214(A) EG2-078 B-D2.20 CV-381 190'-6" RVR INTK TRAIN B X C-F3.30 25W-R15 RESTR. HGR. 8" HBC-214(B) EG2-078 CV-381 178'-1" RVR INTK TRAIN B X C-F3.30 25W-R16 RESTR. HGR. 8" HBC-214(B) EG2-078 l CV-381 189'-6" , RVR INTK TRAIN B X C-F3.30 25W-R17 STANCHION 8" HBC-214(B) EG2-078 190'-6" 4 B-D2.20 CV-381 EG2-190 CTNT TRAIN B .X i C-F3.30 2SW-BR4 RESTR. HGR. 6" HBC-29(B) B-D2.20 W/ ATTACH. CV-139 162'-11 1/16" CTMT TRAIN B X C-F3.40 25W-BR5 RESTR. HGR. 6" HBC-29(B) EG2-190 CV-139 157'-8 1/16" CTMT' TRAIN B X-C-F3.40 2SW-BR6 , RESTR. HGR. 6" HBC-29(B) EG2-190 CV-139 157'-7" 4P16-38 Rev.: 0. _ . . -_ . _ . ._ -. , ,. a . ..-- - . . _ . - ._ . _ . . _ . _ .

                                                                                                                                                                                            ~
                                                                                                                                                                                                     ~
                                                                                                         .(                                                                .f s~ '             :=

x_ 4 FNP-2-M-069-J. M. 'Farley Nuclear Plant - Unit 2, Class 3 Component Supports' And Hanger Surveillance Plan .. 2P16 . Service Water 40-MONTH RE-EXAM .PER100 150 DWG/ 3 1 2 IWF/IWD FIG. NO. LOCATION NOTES /IER ITEM HANGER NO. HANGER TYPE LINE NO. 7

                                                                                                                             ' TRAIN A-                  X 6" HBC-29(A)      EG2-203        CTMT C-F3.50                   25W-R826               SWAY STRUT CV-112           157'-5 13/16" TRAIN A                    X 6" HBC-29(A)       EG2-203         CTMT C-F3.50                  25W-R827               SWAY STRUT

' CV-II2 157'-8 13/16" CTMT TRAIN A X-SWAY STRUT 6" HBC-29(A) EG2-203 C-F3.50 25W-R828 CV-Il2 157'-5 1/2" TRAIN A X 6" HBC-29(A) EG2-203 CTMT C-F3.50 25W-R829 SWAY STRUT CV-112 157'-8 13/16" TRAIN A X 6" HBC-29(A) EG2-203 CTMT C-F3.50 2SW-R830 SWAY STRUT ' CV-112 157'-8 13/16" TRAIN A X 6" HBC-29(A) EG2-203 CTMT C-F3.50 25W-R831 SWAY STRUT CV-Il2 157'-5 13/16" TRAIN A X 6" HBC-29(A) EG2-203 CTMT C-F3.50 2SW-R832 SWAY STRUT l CV-112- 157'-8 13/16" TRAIN A X 6" HBC-29(A) EG2-203 CTMT C-F3.50 2SW-R833 SWAY STRUT CV-112 157'-5 13/16" l TRAIN A X EG2-201 CTMT-C-F3.50 2SW-R840 SWAY STRUT 6" HBC-29(A) CV-102 157'-7 1/2" TRAIN A X EG2-201 CTMT C-F3.50 2SW-R841 SWAY STRUT 6" HBC-29(A) CV-102 157'-5 13/16" ) Rev.: 0 4P16-39

                . ~~                                                                                                       ,---.                                                          .. rs b(

FNP-2-M-069 J. M. .Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan 2P16- Service Water 40-MONTH , RE-EXAM PERIOD

                                                                                                           . ISO DWG/                                                  3         1  2 IWF/IWD                                                                                                  FIG. NO.         LOCATION            NOTES /IER' HANGER NO. HANGER TYPE         LINE NO.

i ITEM X EG2-201 CTMT  : TRAIN A C-F3.50 25W-R842 SWAY STRUT 6" HBC-29(A) CV-102 157'-8'1/2" TRAIN A X EG2-201 CTMT C-F3.50 25W-R843 SWAY STRUT 6" HBC-29(A) 4 CV-102- 157'-5" 4 TRAIN A X ' EG2-201 'CTMT C-F3.50 25W-R844 SWAY STRUT 6" HBC-29(A) CV-102 157'-5 13/16" TRAIN A X 6" HBC-29(A) EG2-201 CTMT C-F3.50 2SW-R845 SWAY STRUT CV-102 157'-8 13/16" TRAIN A X 6" HBC-29(A) EG2-201 CTMT C-F3.50 25W-R846 SWAY STRUT CV-102 157'-4 1/2" TRAIN A X 6" HBC-29(A) EG2-201 CTMT C-F3.50 25W-R847 SWAY STRUT CV-102 157'-8 13/16" TRAIN B , X EG2-205 CTMT C-F3.50 25W-R874 SWAY STRUT 6" HBC-29(B) CV-137 157'-7 3/8" TRAIN B X EG2-205 CTMT C-F3.50 25W-R875 SWAY STRUT 6" HBC-29(B) CV-137 157'-7 3/16" TRAIN B X EG2-205 CTMT C-F3.30 25W-R876 RESTR. HGR. 6" HBC-29(B) 157'-5" CV-137 TRAIN B X i

                                                                                                               'EG2-205          CTMT C-F3.30       2SW-R877    RESTR. HGR. 6" HBC-29(B)

CV-137 157'-5" Rev.: 0 4P16-40

                                                                                                                                      .       .   .=.               -...
                                                                                                                                                       ..,,u..-
                                                                                                                                                     ,( Q ~. :
               /*
                                                         .                  l        .

g-. -

                                                                                                                                                                           ~
                                                           . Unit" 2, Class 3' Component Supports And                        ' FNP-2-M-069_.                             -

J. M_. Farley Nuclear Plant

                                ~
                                                    ~ Hanger Surveillance Plan -                                                                  .
  '2P16- Service-Water 240-MONTH-RE-EXAM-      l PERIOD             - -:

ISO DWG/- 2 !IWF/IWD NOTES /IER 3 -1 LINE NO. FIG. NO. ~ LOCATION ITEM HANGER NO. HANGER TYPE TRAIN B ~X 6" HBC-29(B). EG2-205' CTMT C-F3.40 25W-R878 RESTR. HGR. CV-137 163'-8" B-D2.20 W/ ATTACH. TRAIN B X EG2-205 CTNT C-F3.40 2SW-R880 RESTR. HGR. 6" HBC-29(B). CV-137 157'-6 3/16" 1 RAIN B X 6" HBC-29(B) EG2-205 CTMT C-F3.40 25W-R882 RESTR. HGR. CV-137 157'-7" TRAIN B X 6" HBC-29(B) EG2-205 CTMT C-F3.30 25W-R885 RESTR. HGR. CV-137 166'-5" TRAIN B X EG2-190 AUX C-F3.40 25W-R891 RESTR. HGR. 6" HBC-29(B) CV-139- 157'-3 1/2" TRAIN B X 6" liBC-29(B) EG2-190 CTMT C-F3.40 2SW-R892 RESTR. HGR. CV-139' 157'-3 1/2" TRAIN B X EG2-190 CTMT C-F3.40 25W-R914 RESTR. HGR. 6" HBC-29(B) CV-139 157'-2" TRAIN B X 6" HBC-29(B). EG2-190- CTMT C-F3.40 25W-R915 RESTR. HGR. CV-139 159'-8" X 6" HBC-36 EG2-310 AUX C-F3.30 25W-R205Y RESTR. HGR.

  • CV-120 130'-8 1/2" ,

X 6" HBC-36 EG2-310 AUX.. C-F3.30 2SW-R207Y ~ RESTR. HGR. CV-120 130'-7 7/8" Rev.: 0 4P16-41

n. .
                                                                                                                                                 .: y; . m:            '

f~ .l . Unit. 2;; Class 3 Component Supports And FNP-2-M-069 . J. M. Farley Nuclear Plant

                                                         -Hanger Surveillance Plan                                                            ..

2P16- Service Water 40-MONTH. , RE-EXAM PERIOD.- ' ISO DWG/ -3 1 2 .. IWF/IWD LINE NO. FIG. NO. LOCATION NOTES /IER

' ITEM HANGER NO. HANGER TYPE
                                                                                                                          -X 6" HBC-36         EG2-310          AUX

, C-F3.40 2SW-R208Y RESTR. HGR. " CV-120 '130'-7'7/8" B-D2.20 W/ ATTACH. - " i X ' 6" HBC-36 EG2-310 AUX C-F3.30 25W-R209Y RESTR. HGR. CV-120 130'-8 1/2" X 6" HBC-37 EG2-310 AUX-SW-2A23 ANCHOR l C-F3.30 CV-120 132'-6" B-D2.20 W/ ATTACH. X 6" HBC-37 EG2-310 AUX C-F3.30 2SW-R204Y RESTR. HGR. 4 CV-120 134'-2 1/4" ' X 6" HBC-37 EG2-310 AUX C-F3.30 25W-R210Y RESTR. HGR. CV-120 132'-5 1/2" TRAIN B X EG2-219 AUX C-F3.30 25W-R120 RES,TR. HGR. 6" HBC-39(B) i CV-Il9 122'-0" TRAIN B X 6" HBC-39(B)- EG2-219 AUX C-F3.30 25W-R122 RESTR. HGR. CV-119 122'-6" TRAIN A X 6" HBC-39(A) EG2-218 AUX C-F3.30 25W-R571 RESTR. HGR. CV-131 122'-0" CTMT TRAIN A .X SWAY STRUT 6" HBC-39(A) EG2-208 C-F3.50 25W-R834 CV-135 .152'-2 5/16" TRAIN A X l 6" HBC-39(A) EG2-208 CTMT - C-F3.50 2SW-R835 SWAY STRUT CV-135 158'-5 5/16" i ' 4P16-42'

Rev.: 0 4 - - - s 3 y . _- -e, -
                                                                       +      +-        .          m    e nwg - i +-         n    y   e-         #          ,           -g,
                                                                                                                                                                                                   .a.
                                 'w f,q'} ~ _ _         >
                                                                                                                                                                                                               ~
                                                                                                                                      .FNP-2-M-069' J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan                                                                                                  ..

2P16- Service Water

                                                                                                                                            '40-MONTH.

RE-EXAM. ~ PERIOD. 150 DWG/' 3 12

  ' IWF/IWD                                       LINE NO.      FIG. NO.      ' LOCATION            NOTES /IER

, ITEM HANGER NO. HANGER TYPE f TRAIN A X EG2-208 -CTMT-C-F3.40 2SW-R836 RESTR. HGR. 6" HBC-39(A). ' 'CV-135 ~.158 ' - 6" TRAIN-A X 6" HBC-39(A) EG2-208 CTMT C-F3.40 25W-R837 RESTR. HGR. i CV-135 158'-7 1/4" ' TRAIN A X ' 6" HBC-39(A) -EG2-208 CTMT C-F3.50 25W-R838 SWAY STRUT CV-135 '158'-4" TRAIN A X 6" HBC-39(A) EG2-206 CTMT C-F3.50 25W-R848 SWAY STRUT CV-128 158'-11 1/2" TRAIN A X EG2-206 CTMT C-F3.50 2SW-R849 SWAY STRUT 6" HBC-39(A) CV-128 158'-8 15/16" 4 TRAIN A X EG2-206.- CTMT-C-F3.40 2SW-R850 RESTR. HGR. 6" HBC-39(A)

CV-128 158'-8 5/16" ,

! TRAIN A X EG2-206 CTMT C-F3.30 25W-R851 RESTR. HGR. 6" HBC-39(A) CV-128 158'-8" TRAIN A X 6" HBC-39(A) EG2-206 CTMT C-F3.50 2SW-R852 SWAY STRUT CV-128 158'-8 5/16" , TRAIN A X ' 6" HBC-39(A) EG2-206 CTMT C-F3.50 25W-R853 SWAY STRUT 1 CV-128 -158'-11 5/16" TRAIN B X

                                               .6" HBC-39(B)     .EG2-193            CTMT'     .

C-F3.50 2SW-R886 SWAY STRUT CV-144 158'-7.1/16"

                                                                                                                                            -Rev.:.0 4P16-43
                                                   .       ~                     .-              -.
                                                                                                            . __ __ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ = _ _ _ - _ _ _ _ _ - - _ - - _ - .     -
                                                                                                                                                                              +

fN h b [

             .Q..                                                                  -

FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And

Hanger Surveillance Plan

2P16- Service Water 49-MONTH RE-FXAM PERIOD 150 DWG/ . 3 1 2 IWF/IWD FIG. NO. LOCATION NOTES /IER - HANGER NO. HANGER TYPE LINE NO.. ITEM

                                                                                          . TRAIN B                X
                                                         .EG2-193          CTMT C-F3.30    25W-R890     RESTR. HGR. 6" HBC-39(B)

CV-144 158'-1 1/16" 1 TRAIN B X EG2-192 CTMT C-F3.30 25W-R897 RESTR. HGR. 6" HBC-39(B) CV-143' 163'-8" B-D2.20 W/ ATTACH. TRAIN B X-i EG2-192 CTMT C-F3.40 25W-R900 RESTR, HGR. 6" HBC-39(B) CV-143 158'-10 1/16" TRAIN B X EG2-192 CTMT C-F3.40 25W-R904 RESTR. HGR. 6" HBC-39(B)

                                                          'CV-143           165'-2" e

CTMT TRAIN B .X RESTR. HGR. 6" HBC-39(B) EG2-192 C-F3.40 2SW-R905 158'-8 1/2" CV-143 TRAIN B X EG2-192 CTNT C-F3.40 25W D.907 RESTR. HGR. 6" HBC-39(B) CV-143 161'-0" TRAIN B X EG2-192 CTMT C-F3.30 2SW-R909 RESTR. HGR. 6" HBC-39(B) , CV-143 165'-2" , TRAIN B X EG2-192 CTMT C-F3.40 25W-R912 RESTR. HGR. 6" HBC-39(B) ' CV-143 159'-2" TRAIN B X-EG2-192 CTMT-C-F3.40 25W-R913 .RESTR. HGR. 6" HBC-39(B)- 159'-2" CV-143

                                                                                             ~ TRAIN B                 X EG2-192          CTNT C-F3.30    2SW-R923 , RESTR. HGR.      6" HBC-39(B)

CV-143 158'-8 1/2" Rev.: 0 4P16-44 i i.

f k ~

                                                                                                         .FNP-2-M-069 J. M. Farley Nuclear Plant - Unit ~ 2, Class 3 Component Supports And'                                        ,
                                                 -Hanger Su~rveillance Plan                                                            ..

2P16- Service Water 40-MONTH RE-EXAM PERIOD-150 DWG/ .

3. 1 -2

- IWF/IWD FIG. NO. LOCATION NOTES /IER HANGER NO. HANGER TYPE LINE NO. ITEM TRAIN 8 X ' EG2-193 CTMT C-F3.40 2SW-R924 RESTR. HGR. 6" HBC-39(B) CV-144 158'-9" _ X EG2-495 DSL GEN TRAIN A 6" HBC-201(A) C-F3.40 25W-R276X RESTR. HGR. CV-168 169'-6 3/8" 4 X EG2-498 DSL GEN TRAIN A C-F3.30 2SW-R278X RESTR. HGR. 6" H8C-204(A) CV-174 171'-0" X EG2-498 DSL GEN TRAIN A C-F3.30 25W-R279X RESTR. HGR. 6" HBC-204(A) CV-174 169'-5 7/8" TRAIN A X 6" HBC-214(A) EG2-078 RVR INTK C-F3.30 2SW-R12 RESTR. HGR. CV-381 178'-1" 1 TRAIN A X 6" HBC-214(A) EG2-078~ RVR INTK C-F3.30 25W-R13 RESTR. HGR. CV-381 189'-0 1/2" , X TRAIN A

                                                                          ~
                                                        'EG2-078       RVR INTK C-F3.30    25W-R14     STANCHION    6" HBC-214(A)

CV-381 190'-6" B-D2.20 ' t h Rev.: 0 4P16-45

                                                                                                                                                                                , _- -        : = .
                                                                                         ,s.                             .                                            -

a-

                   ~'\ '

I - _ f.J.- V w.: FNP-2-M-069 J. M. Farley Nuclear Plant -: Unit 2, Class- 3 Component Supports And. Hanger Surveillance Plan 2Pl7- Component Cooling Water MONTH RE-EXAM- PERIOD ~

                                                                 -VENDOR' IWF/IWD                   .

LOCATION . NOTES /IER- 3: .1 2 COMPONENT DRAWING

   -ITEM       LAYOUT DWG. SUPPORT TYPE X

U205095 AUX'083 A-F1.30 D205063 - PLATE SHELL' RHR HX Q2E11H001B-B

                                                                                                                                                   .X COMPONENT            U213435              AUX 100' A-F1.30       D205063         SHELL WRAPPER       COOLING HX PLATE &        Q2Pl7H0010-A BASE X
                                            - COMPONENT            U209902             AUX'100 A-F1.30      D205063         CHANNEL ANCHOR         COOLING PUMP                                                                                                                                                      ;

BOLTS Q2P17H001C-A i ! s l l Rev.: 0 4P17-1 _

           -a,           w          g              .h.-,-.n.            <**4.,+am.

g - y  % =*p- .*pg- , + + - - - _7>- y re- y 'ws C 'ry,ia. -y-q -p g-

                                ^" '                                                      -
y. -
                                                                                                                            ,'                         -.   ;+
                                                                            ,~ :;. .
                                                                                                                                                 ~.
    ~

L_ .

                              +       .,
                                                                                                                                              ;\_/      a.     -= &  ~
                                                                                                                                                           ~

f. i FMP-2-M-069 J. M.' Farley Nuclear Planti- Unit-'2, Class ;3 Component Supports And , Hanger Surveillance Plan ~ .. 2P17- Component Cooling Water 40-MONTH.

                                                                                                            .RE-EXAM      PERIOD:

ISO DWG/. NOTES /IER- 3 1- 2 . IWF/IWO LINE NO. FIG. NO. LOCATION ITEM - HANGER NO. HANGER TYPE l X AUX' 18" HBC-1(A-B): EG2-247 4 - C-F3.30 CCW-2A11 ANCHOR 107'-8" CV-356 B-D2.20 W/ ATTACH. X 18" HBC-1(B-AB) EG2-248 A'lX C-F3.30 CCW-2A12 ANCHOR

                                                         'CV-185            107'-8 1/4" B-D2.20                  W/ ATTACH.

X

                                                                          ' AUX C-F3.30    2CCW-R199     RESTR. HGR. 18" HBC-1(A-B) EG2-247 CV-356           111'-10" AUX
                                                                                                                               \

C-F3.40 2CCW-R200 RESTR. HGR. 18" HBC-1(A-B) EG2-247 CV-356 111'-10" X AUX C-F3.50 2CCW-R201 SNUBBER (H) 18" HBC-1(A-B) EG2-247 111'-10 7/8"

                                                          .CV-356 B-D2.20                  (2)

STANCHION X EG2-247 AUX C-F3.30 2CCW-R202 RESTR. HGR. 18" HBC-1(A-B) CV-356' 106'-7* X AUX C-F3.40 2CCW-R203 RESTR. HGR. 18" HBC-1(A-B) EG2-247 102'-0" CV-356 X-AUX C-F3.30 2CCW-R204 RESTR. HGR. 18" HBC-1(C-A) EG2-249 113'-3" CV-357 X AUX C-F3.50 2CCW-R205 SMUBBER-(H) 18" HBC-1(C-A) EG2-249 CV-357 113'-3" B-D2.20 ,(2) STANCHION Rev.: 0. 4P17-2

                                   . ~                        -     -          :.    ..

a -

                                                                                                                          '^'

o j,-

                                                                                                                        -( v - 1, FNP-2-M-069 J. M. Farley ?xlear Plant - Unit 2, Class 3 Component Supports And Henger Surveillance Plan                                           .

2Pl7- Component' Cooling Water 40 *t0 NTH RE-EXAM PERICO ISO DWG/ 3 1 2 IWF/IWD FIG. NO. LOCATION NOTES /IER HAEER NO. HANGER TYPE LINE NO. ITEM X 18' HBC-1(C-A) EG2-249 AUX C-F3.50 6CCW-R206 SNUBBER (r) STANCHION CV-357 113'-3" B-D2.20 (2) X AUX C-F3.30 2CCW-R207 RESTR. HGR. 18" HBC-1(C-A) EG2-249 CV-357 113'-3" X AUX C-F3.30 2CCW-R208 RESTR. HGR. 18" HBC-I(C-A) EG2-249 102'-0" CV-357 X AUX C-F',.30 2CCW-R209 RESTR. HGR. 18" HBC ~{C-A) EG2-249 CV-357 107'-7 7/16" X AUX C-F3.30 2CCW-R210 RESTR. HGR. 18" HBC-1(B-AB) EGZ-248 CV-185 113'-8" X AUX C-F3.40 2CCW-R211 RESTR. HGR. 18" HBC-1(B-AB) EG2-248 CV-185 113'-8" X AUX C-F3.50 2CCW-R212 SNUBBER (H) 18" HBC-1(B-AB) EG2-248 CV-185 113'-8" (2) B-D2.20 STANCHION X AUX C-F3.30 2CCW-R213 RESTR. HGR. 18" HBC-1(B-AB) EG2-248 115'-11 1/2" CV-185 B-D2.20 W/ ATTACH. X L"." 248 AUX C-F3.30 2CCW-R214 - RESTR. HGR. 18" HBC-1(B-AB) CV-185 102'-0 1/2" Rev.: 0 4Pl7-3

               . , , .                                                                                                                                             , .m L

J

                                                                       \_ /                                                                                     (s_        j FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance plan                                                                       ..

2Pl7- Component Cooling Water 40-MONTH RE-EXAM PERIOD ISO DWG/ 3 1 2 IWF/IWD FIG. NO. LOCATION NOTES /IER HANGER NO. HANGER TYPE LINE NO. ITEM X AUX ANCHOR 18" HBC-2(C-A) EG2-250

C-F3.50 CCW-2A18 CV-340 102'-4 1/2"

~B-D2.20 W/ ATTACH. X AUX C-F3.30 2CCW-R76 RESTR. HGR. 18" HBC-2(A-B) EG2-250 102'-4 1/2" CV-340 X AUX C-F3.30 2CCW-R77 RESTR. HGR. 18" HBC-2(B-AB) EG2-250 102'-4 1/2" CV-340 X AUX ' C-F3.30 2CCW-R83 RESTR. HGR. 18* HBC-2(C-A) EGZ-251 102'-5 1/2" CV-344 X AUX CCW-2A4 ANCHOR 18" HBC-14(A-A) EG2-245 C-F3.30 CV-180 109'-8 3/8* l B-02.20 W/ ATTACH. X AUX SPRING CAN 18" HBC-14(A-A) EG2-245 C-F3.50 2CCW-H35 CV-182 105'-5" B-D2.20 (2)~ W/ ATTACH. X AUX SWAY STRUT 18" HBC-14(B-B) EG2-246 C-F3.50 2CCW-R37 CV-182 109'-8* X AUX 2CCW-R38 SWAY STRUT 18" HBC-14(B-B) EG2-246 C-F3.50 CV-182 109'-8* X . AUX i C-F3.30 2CCW-R39 RESTR. HGR. 18" HBC-14(B-B) EG2-246 109'-8 1/8" CV-182 X AUX C-F3.50 2CCW-R40 SNUBBER (H) 18" HBC-14(B-B) EG2-246 109'-7" CV-182 (2) Rev.: 0 4Pl7-4

r^N (,,') O_ V N / FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan .

  - 2Pl7- Component' Cooling Water 40-p0 NTH RE-EXAM       PERIOD 150 DWG/                                        3         1            2 4

IWF/ LWD FIG. NO. LOCATION NOTES /IER ITEM HANGER NO. HANGER TYPE LINE NO. X AUX C-F3.50 2CCW-H41 SPRING CAN 18" HBC-14(B-B) EG2-246 CV-182 105'-8" (2) W/ ATTACH. X AUX C-F3.50 2CCW-H49 SPRING CAN 18" HBC-14(A-A) EG2-245 CV-180 105'-l* ' B-D2.20 (2) W/ ATTACH. X AUX C-F3.30 2CCW-R81 RESTR. HGR. 14" HBC-3(B-A) EG2-251 CV-344 84'-7 1/4" X AUX C-F3.30 2CCW-R82 RESTR. HGR. 14" HBC-3(B-A) EG2-251 CV-344 102'-5" X AUX C-F3.40 2CCW-R84 RESTR. HGR. 14" HBC-3(B-A) EG2-251 CV-344 97'-6" j B-D2.20 W/ ATTACH. ' X AUX C-F3.40 2CCW-R85 SWAY STRUT 14" HBC-3(B-8) EG2-243 CV-184 96'-0 1/4" j B-D2.20 (2) W/ ATTACH. X AUX C-F3.30 2CCW-R87 SWAY STRUT 14" HBC-3(B-B) EG2-243 CV-184 91'-1 11/16" X EG2-252 AUX C-F3.50 2CCW-BR12 SNUBBER (H) 14" HBC-8 115'-0" CV-224 X EG2-252 AUX I C-F3.30 CCW-2A17 ANCHOR 14" HBC-8 CV-224 116'-9" B-D2.20 'W/ ATTACH. 4 Rev.: 0 4P17-5

               -.        -          - ,    .-         -           .   . - ~    --     .. .   . - ...   . .,     . _ _ .  . . - . . - . . -           . . _ _ . . _ . - .

( ,a ,- U (s- -

                                                                                                                                                                 ,)

FNP-2-M-069

  • J. M. Farley Nuclear Plant - Unit 2, Class 3 Compownt Supports And Hanger Surveillance Plan ..

2Pl7- Component Cooling Water 40-NONTH RE-EXAM PERIOD . 150 DWG/ 2 i IWF/IWD NOTES /IER 3 1 LINE NO. FIG. NO.~ LOCATION ITEM HANGER NO. HANGER TYPE X EG2-252 AUX C-F3.30 2CCW-R88 RESTR. HGR. 14" HBC-8 CV-224 112'-2" B-D2.20 W/ ATTACH. X 14" HBC-8 EG2-252 AUX C-F3.30 2CCW-R119 RESTR. HGR. CV-224 109'-11 1/8" X 14" HBC-8 EG2-252 AUX C-F3.30 2CCW-R120 RESTR. HGR. CV-224 110'-0" X RESTR. HGR. 14" HBC-8 E62-252 AUX C-F3.30 2CCW-R121 CV-224 110'-0* W/ ATTACH. X 14" HBC-8 EG2-252 AUX C-F3.50 2CCW-R122 SWAY STRUT CV-224 110'-0* . X 14".HBC-8 EG2-252 AUX C-F3.30 2CCW-R231 RES.TR. HGR. CV-224 115'-0* X 14" H3C-8 FG2-252 AUX C-F3.30 2CCW-R232 RESTR. HGR. CV-224 115'-0" X 14' HBC-14(A-A) EG2-244 AUX C-F3.30 CCW-2A5 ANCHOR l CV-359 96'-6 1/2" ? B-02.20 W/ ATTACH. X AUX l C-F3.50 2CCW-H36 SWAY STRUT 14" HBC-14(A-A) EG2-246 CV-182 109'-3* X AUX C-F3.50 2CCW-H45 SWAY STRUT 14" HBC-14(B-8) EG2-243 CV-184 91'-0" (PI7-6 Rev.: 0

             -.                            .      ..                  .       ,    .  . . _    _ , . ~ . . - . .                  - _ _ .     . . . _ . . _ . . _ . . _ _ _
                                                                                                                                             ,l                     t
 .-- D
     /,                                                                                                                                                                                                         _
                       ~

9 2 - 6 H TO 0 0 X X X X

            -                  NC                                X            X             X              X             X
   '      M-                   OI1                  X                                                                                                                                                :          _

MRE . 2 0P v e P 4 R . N 3 F M A _ X E _ d E n R . A s R t E r I

                                        /                                                                                                                                                                    _

o p S p E u T S O N t _ n "4 e / n 1 _ o p "2 " 1 N / " 1 m O 1 6 1 "0- "8 1 on I * *

                                                                                                                  "6               -              -                             -               -           ~

Ca "0 0 5 C ' l T A - - - X X '0 X '4 X '6 X9 X U0

                                                                                                                                                                                             '7 3P                                                   X'                                        X U '6                        U1             U0              U0                                  -

se C O X' U1 U1 X U '2 U A9

                                                                                                    '3       A9 U0 A1            A1             A1              A1             A1 sc                          L           A9           A9           A9                                                                                                                          .

an l a Cl 5 5 5 7

                                     /         .

4 4 4 5 56 - _ GO 3 3 56 56 56

                 .li WN 3

44 44 44 49 49 49 25 27 27 27 27 7 2e 28 28 25 25 1 1 1 l v D 28 1 3 3 3 1 2 - 2 - P tr . 1 1 2 - 2 - 2 - Z - GV 4 OG 2 - 2 - 2 - 2 - GV GV GV GV GV _ iu GV GV GV GV EC EC EC EC EC nS SI EC EC EC EC EC U IF _ r ) ) ) ) _

                                                      )            )                                                       A e                                              d           B             A              A g                                 8            ~-             -             -              -             -

tn - B B A A A B' ( na ( ( ( ( ( 4 9 9 9 9 aH . 4 4 4 4 1 1 1 . O 4 1 . 1 1 1 l 1 1 - - - N 1 - P - - - - - C C C C C . C C C C B B B B r E C B B B R B H H H a N B H H H H H e l H H " t "

                                                                                                                                                                         "4             "4 l

c " "4 "4 "4 "4 4 4 . u 4 "4 1 1 1 1 1 1 1 1 1 1 N . y E ) . . . R R R e R H R R R G . . G l P ( G . G .1 G G . H H H r Y G H5 H HH H r H HH C C F a e T R E .C A .C A . .C A R

                                                                                                                                              .           RA OT RA OT             R t                   R             .

B RT R T. R RT HT HT T a E R TT TT T T.T T CA CA S M W G T B SA S SA S N S U SA E/ E/ E E/ E N/ N/AW E R g A E N RW R RW R AW - n H R S RW J i l 3 3 o O 9 0 1 5 1 7 8 2 o N 6 7 9 4 5 R 2 2 1

.C 4 4 B 4 4 4 R B A A R H R R R 2 2 -

t R H - - - - -

                                                                                                                                                             -                -           W n                  E            -            -

W W W W W W C e G W W C C C C W C C N C C C C C C n A C C C C C 2 C C 2 o p H 2 2 2 2 2 2 m - o 0 00 0 00 00 0 C 0 0 00 00 3 32 32 3 D 5 32 32 3 42

                             -          W                  4 3              32               3Z             3 7            IM                              3            32            32             3             32                          FD               FD             F l            /E                 3 F            FD            FD             F             FD           F P            FT                F                            - -           - -            -             - -          -

CB C WI - - CB C CB C CB 2 I C C CB f !l ' i

7- 3 C V ' V' .,..

                        'e -                  _

i FNP-2-M-069 J. M. Farley Nuclear Plant _- Unit 2, Class 3 Component Supports And Hanger Surveillance Plan . 2P17- Component Cooling Water ' 40-NONTH RE-EXAM PERIOD 150 DWG/ 2 IWF/IWD NOTES /IER 3 1-HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION ITEM X , 14" HBC-19 EG2-255 AUX C-F3.30 2CCW-R124 RESTR. HGR. CV-176 108'-0" X EG2-255 AUX

, C-F3.30      2CCW-R125      RESTR. HGR. 14" HBC-19 CV-176       108'-0*

i X EG2-255 AUX C-F3.30 2CCW-R242 RESTR. HGR. 14" HBC-19 CV-176 108'-0" X EG2-255 AUX C-F3.30 2CCW-R243 RESTR. HGR. 14" HBC-19 CV-176 109'-8" ' < X

'                             RESTR. HGR. 14" HBC-19                    EG2-255     AUX C-F3.40    2CCW-R244 116'-9"

' CV-176 AUX X SNUBBER (2) 14" HBC-19 EG2-255 C-F3.50 2CCW-R245 116'-9" CV-176 B-D2.20 W/S'TANCHION (2) X 12" HBC-8 EG2-252 AUX ) C-F3.30 2CCW-Ril7 RESTR. HGR. CV-224 110'-0" i X RESTR. HGR. 12" HBC-8 EG2-252 AUX C-F3.30' 2CCW-R118 110'-0" CV-224 i X ANCHOR 10" HBC-4(B-A) EG2-256 AUX CCA-2A19 C-F3.40 115'-0"

 '                                                                       CV-352 B-D2.20                 W/ ATTACH.
  !                                                                                                                                                                      X 10" HBC-4(B-A) EG2-256              AUX l    C-F3.30   CCA-2A20 ' ANCHOR B-D2.20                  W/ ATTACH.                               CV-352      111'-3" 1

4Pl7-8 Rev.: 0 _ . . , _ _ - . __ - . . , _ . . ~ . _ . .___._ _ ._ - _ _ . _ . . _ _ _ . . _ _ . . _ .

FNP-2-M-069-J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And . Hanger Surveillance Plan . 2P17- Component Cooling Water 40-MONTH RE-EXAM PERIOD ISO DWG/ 3 1 2 IWF/IWD FIG. NO. LOCATION NOTES /ICR HAMGER NO. HANGER TYPE LINE NO. ITEM X AUX CCW-2A22 ANCHOR 10" HBC-4(A-B) EG2-473

. C-F3.30                                                   CV-341      109'-2"

' B-D2.20 W/ ATTACH. X AUX ! C-F3.30 20CW-BR26 RESTR. HGR. 10"ilBC-4(B-A) EG2-448 167'-0* CV-353 X EG2-448 AUX C-F3.30 CCA-2A34 ANCHOR 10" HBC-4(B-A) CV-353 124'-0" B-02.20 W/ ATTACH. X EG2-455 AUX C-F3.30 CCW-2A36 ANCHOR 10" HBC-4(A-B) CV-342 131'-0" 4 B-D2.20 W/ ATTACH. X AUX ' C-F3.30 CCW-2A37 ANCHOR 10" HBC-4(A-B) EG2-455 CV-342 132'-0* B-D2.20 W/ ATTACH. X i AUX RES,TR. HGR. 10" HBC-4(A-B) EG2-473 C-F3.30 2CCW-R78 CV-341 102'-4 1/2" X AUX C-F3.40 2CCW-R79 RESTR. HGR. 10" HBC-4(A-B) EG2-473 109'-2* CV-341 1 W/ ATTACH. X AUX C-F3.30 2CCW-R80 RESTR. HGR. 10" HBC-4(A-8) EG2-473 CV-341 109'-2" X AUX C-F3.30 2CCW-R86 RESTR. HGR. 10" HBC-4(B-A) EG2-256 107'-6* l CV-352 B-D2.20 W/ ATTACH. X AUX C-F3.40 2CCW-R93 RESTR. HGR. 10" HBC-4(A-8) EG2-473 115'-6" l CV-341 B-D2.20 'W/ ATTACH. Rev.: 0 4P17-9

  -(

s) . ( _ X X X X X X X X X X 9 2 _ 6 H _ 0- TO 0 _ NC , M- OI1  : MRE . - 2 v

           -                  0P                                                                                                                                                  e P                    4                                                                                                                                                  R M                           3 F                                                                                                                                                                               ._

M A X E d E n R . A _ s R t E _ r I

                                     /

o p S p E u T O . S N t ._ n e "6 * . n 1 8 . o p / / 5 1 " m N "2 "6 . on O "6 5 "6 4 "6 "2 2 Ca I "5 - - - - - - - T - ' 3P l A X '5 X '5 X5 X5 X '5 X5 X '9 X '9 X9 U0 X5 U1 . C U1 U1 U1 U0 U0 0V se sc an O L U1 A1 U1 A1 U1 A1 A1 A1 A1 A1 A1 A1 A1 l a 0 . Cl 3 3 3 3 1

                                  / .                                               5            5            5                                                                      -
               ,li                GO             3           3           3 71         52           52           52              71           71         71 44 71 44           7 2e                    WN             71 44 71 44          44         44           44           44              44           44 3           3                3    l v                D                               3           3           3            3            3              3 2 -             2 -          P tr                           .            3                                                      2 -             2 -          2 -

0G 2 - 2 - 2 - 2 - 2 - GV GV GV GV GV 4 iu GV GV GV GV GV EC EC EC EC nS 5I EC EC EC EC EC U 1F EC r ) ) ) ) )

               - e                               )           )           )          )            )

B B B g B B- B B 8 - tn B B- - - - - - A na - - A A A A A A A A A ( ( ( ( ( aH O ( ( ( ( ( 4 4 4 4 4 l 4 4 4 - - P N 4 4 C C C C C C C B r E C C C B B B B B N B B B B H H H H a H H H H H e I H - L "

                                                                                                                                                                       "0 l

c "0 "0 0 "0 "0 "0 _ u "0 "0 "0 1 1 1 1 1 1 1 _ 1 1 1 N y . . . . . T R E R e . . R R R T G P R R R G G . G . U U . - l r Y G G G . G HH HH R R H H H H HH H H C T C a r T C C

                                                                                                                                  .A T

S S A . F e R .A . . .A RT T R t R R RT R R RT Y Y T i

                .       a                E                                TT          T           T             TT             TT                       A)A             S M        W                 G        T            T                                   S            SA              SA           A N         S          S            SA         S E            E/         E/ RW  W                     W2/      E                      _

g A E E E/ E RW S S(W R R R RW R R J n H ~ i l 0 o . 1 3 4 7 8 9 1 o O 0 0 0 0 0 N 5 7 9 0 1 1 1

       '              .C                  R 9

R 9 R 9 R 1 R 1 R 1 R 1 R R R R-t - - - - W W n E - - W W W W W W C e G W W C C C C C C C n N C C C C C C C C A C C C C 2 2 2 o p H 2 2 2 2 2 2 2 m _ o 00 00 0 00 0 C 0 00 0 0 5 52 3 D 0 3 32 3 4 32 42

                            -        W              3 3          32               3 7            lM                         3           32         3            3            32              32 F0               F 1            /E             3 FD          F           F            F0              FD           F P           FT             F           F                                                   - -            - -          -

WI - - - - - - CB CB C CB C 2 I C C CB C C .

                                                                             +                             ;!                          !

X X X X X . X X X X X . 9 2 6 H _ 0 TD O .

    -                 NO M-                 OI1 NR 2                     E                                                                                                                                           v
     -                0P                                                                                                                                             e P

N F 4 3 R M A X E _ . d E n R _ A s R t E _ r I o p

                               /

S p E ~ u T O S - N t n e . n . o p m N " "

                                                                                                                                                                 "3       -
                                                                                                                                                     "3 on                        O "6            "0            "0          3           3          0"          "0             0 Ca                         I                                                         -           -          -           -

T 3P l A ' ' ' X '1 X '2 X '2 X '2 X '1 X1 C X '7 X0 U1 X0 U1 X1 U1 U1 U1 U1 U1 U1 A1 U1 A1 se O U1 A1 A1 A1 A1 A1 sc L A1 A1 A1 an l a l Cl 8 8 6 . I

         ,l               / .                            6              6          6          6           8          8                          43         52           -

i GO 5 52 52 52 52 43 43 43 45 25 7 . 2e WN 52 25 25 45 45 45 l _ v D 44 25 25 3 3 3 3 - 3 3 P 3 3 3 3 2 - 2 - 2 - tr . 2 - 2 - 2 - 2 - 2 - GV 4 0G 2 - 2 - GV GV GV GV GV iu 5I GV GV GV GV EC EC EC EC EC nS 1F EC EC EC EC EC - U r ) ) ) e ) ) ) ) ) ) ) A A A A g B A A A A A - - - - tn - - - - - B B B na - B B B B B B ( - aH . A ( ( ( ( ( ( ( ( 4 0 ( 4 4 4 4 4 l 4 4 4 4 4 - - - P i - - - - - C C C C C C C C B r E C C B B B B B B a N B B B H H H H H H H H H H e I L l c "0 "0 "0 "0 "0 "0 "0 "0 "0 "0 1 1 u 1 1 1 1 1 1 1 1 N y . . . . . R R e E . . R R R R R P R R G G G G G G l Y G N G . G H H H H r HH O HH H H H a r T F t e R .C A I H .C A R R R R R R R a E RT C RT T T T T T T G TT N TT T S S S S S N W N SA A SA S S E E E E E E/ E E R R g A E/ T R R R R R J n H RW S RW ~ i - l 6 e . 6 5 O 2 3 4 5 4 4 4 o N 1 l 1 1 l 2 3 4 4 1 1

                .C                           1 R

i R 1 R 1 R i R 4 1 1 1 R R t R - - - - - - n E W W W W W W W W C W C W C e G C C C C C C C n N C C C C C C C C C 2 o p A H C 2 2 2 2 2 2 2 2 2 m o 0 0 0 C 00 00 00 00 0 0 0 4 3 D 32 32 42 32 3 4 4 3

                    -        W                                                                                                                     3          3 7          IM               32            32            32          32         3          3           3              3 F           F          F 1          /E               FD            FD            FD          FD         F          F           F P          FT                                - -           - -        - -         -          -           -

C C 2 WI - - CB C C C C I CB CB CB

x ( a t QJ FNP-2-M-069 J. M..Farley Nuclear Plant - Unit 2, Class 3 Compsnent Supports And Hanger Surveillance Plan 2Pl7- Component Cooling Water 40-MONTH RE-EXAM PERIOD 150 DWG/ 3 1 2 IWF/IWD FIG. NO. LOCATION NOTES /IER HANGER NO. HANGER TYPE LINE NO.

.,   ITEM X

AUX Ck3.40 2CCW-R165 RESTR. HGR. 10" HBC-4(B-A) EG2-448 161'-6" CV-353 X AUX C-F3.40 2CCW-R166 RESTR. HGR. 10" HBC-4(B-A) EG2-448 161'-6" CV-353 X AUX i C-F3.30 2CCW-R167 EESTR. HGR. 10" HBC-4(B-A) EG2-448 156'-3" CV-353 B-D2.20 W/ ATTACH. X 10" HBC-4(B-A) EG2-448 AllX C-F3.30 2CCW-169 RESTR. HGR. CV-353 140'-0" X AUX C-F3.30 2CCW-R173 RESTR. HGR. 10" HBC-4(B-A) EG2-448 140'-0" 1 CV-353

B-D2.20 W/ ATTACH.

X i AUX C-F3.30 2CCW-R174 RESTR. HGR. 10" HBC-4(B-A) EG2-448 CV-353 134'-7" B-02.20 W/ ATTACH. X AUX C-F3.30 2CCW-R175 RESTR. HGR. 10" HBC-4(B-A) EG2-448 134'-7" CV-353 X AUX C-F3.30 2CCW-R177 RESTR. HGR. 10" HBC-4(A-B) EG2-455 133'-3" CV-342 X AUX C-F3.40 2CCW-R178 RESTR. HGR. 10" HBC-4(A-B) EG2-455 132'-0" ' CV-342 B-D2.20 W/ ATTACH. X AUX C-F3.40 2CCW-R179 , RESTR. HGR. 10* HBC-4(A-B) EG2-455 CV-342 132'-0" Rev.: 0 4Pl7-IZ

                                                                      . _ _ . ~ . _          _ . _ . _ _ . , _ .       _ . _ _ _ . _ . _ . _ _ _ ___.____ _.. ._

f3, Y (,) FNP-2-M-069 - J. N. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan .. 2P17- Component Cooling Water 40-MONTH RE-EXAM PERIOD 150 DWG/ 2 IWF/IWD NOTES /IER 3 1 HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION ITEM X AUX C-F3.30 2CCW-R180 RESTR. HGR. 10" HBC-4(A-B) EG2-455 CV-342 131'-0" i X AUX C-F3.40 2CCW-R181 RESTR. HGR. 10" HBC-4(A-B) EG2-455 CV-342 131'-0* X AUX C-F3.30 2CCW-R182 RESTR. HGR. 10" HBC-4(A-8) EG2-455 CV-342 140'-2" X AUX C-F3.30 2CCW-R183 RESTR. HGR. 10" HBC-4(A-B) EG2-455 CV-342 147'-2" B-D2.20 W/ ATTACH. X 10" HBC-4(A-B) EG2-455 AUX C-F3.30 2CCW-R184 RESTR. HGR.

CV-342 150'-0*

B-02.20 W/ ATTACH. X AUX C-F3.50 2CCW-R226 SWAY STRUT 10" HBC-4(B-A) EG2-256 CV-352 115'-0" X AUX C-F3.40 2CCW-R227 RESTR. HGR. 10" HBC-4(B-A) EG2-256 ' CV-352 115'-0" X l AUX C-F3.30 2CCW-R228 RESTR. HGR. 10" HBC-4(B-A) EG2-256 CV-352 115'-0 1/4" B-02.20 W/ ATTACH. X AUX C-F3.50 2CCW-R229 SWAY STRUT 10" HBC-4(B-A) EG2-256 CV-352 115'-0" X AUX C-F3.40 2CCW-R230 , RESTR. HGR. 10" HBC-4(B-A) EG2-256 CV-352 110'-0* i. 4P17-13 Rev.: 0

~

k) j FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan .. 2P17- Component Cooling _ Water 40-MONTH RE-EXAM PERIOD 150 DWG/ 3 1 2 IWF/IWD NOTES /IER LINE NO. FIG. NO. LOCATION ITEM HANGER NO. HANGER TYPE X AUX C-F3.30 CCW-2A2 ANCHOR 10" HBC-15(A-B) EG2-472 CV-181 109'-2" W/ ATTACH. X AUX C-F3.30 CCW-2A6 ANCHOR 10" HBC-15(B-A) EGZ-449 CV-354 113'-0" B-D2.20 W/ ATTACH. X AUX C-F3.30 2CCW-BR25 RESTR. HGR. 10" HBC-15(A-B) EG2-443 CV-183 167'-0" X 10" HBC-15(A-B) EG2-443 AUX C-F3.30 CCW-2A29 ANCHOR CV-183 155'-9" B-D2.20 W/ ATTACH. X 10" HBC-15(A-B) EG2-443 AUX C-F3.30 CCW-2A30 ANCHOR CV-183 133'-0" B-D2.20 W/ ATTACH. X AUX C-F3.30 CCW-2A31 ANCHOR 10" HBC-15(A-B) EG2-443 CV-183 150'-0" B-D2.20 W/ ATTACH. X AUX C-F3.30 CCW-2A32 ANCHOR 10' HBC-15(A-B) EG2-443 CV-183- 133'-3" B-02.20 W/ ATTACH. i X AUX C-F3.30 CCW-2A33 ANCHOR 10" HBC-15(A-B)_EG2-443 CV-183 133'-3" B-D2.20 W/ ATTACH. X AUX C-F3.30 CCW-2A43 ANCHOR 10" HBC-15(B-A) EGZ-449 CV-354 156'-11" . B-D2.20 W/ ATTACH. X AUX C-F3.30 2CCW-R48 , RESTR. HGR. 10" HBC-15(B-A) EG2-449 CV-354 172'-0" Rev.: 0 (Pl7-14

                                                                                                                                                               ~

( ,/ FNP-2-M-069 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And Hanger Surveillance Plan . 2P17- Component Cooling Water 40-MONTH RE-EXAM PERIOD ISO DWG/ 3 1 2 IWF/IWD- FIG. NO. LOCATION NOTES /IER i ITEM HANGER NO. HANGER TYPE LINE NO. X AUX C-F3.50 2CCW-H50 SWAY STRUT 10" HBC-15(B=A) EG2-257 ' CV-355 112'-2" B-D2.20 W/ ATTACH. X AUX C-F3.50 2CCW-H51 SWAY STRUT 10" HBC-15(B-A) EG2-257 CV-355 113'-2" X ' AUX C-F3.50 2CCW-H52 SWAY STRUT 10" HBC-15(B-A) EG2-257 CV-355 114'-11" X AUX C-F3.50 2CCW-H53 SNUBBER (H) 10" HBC-15(B-A) EG2-257 CV-355 115'-0" X 10" HBC-15(B-A) EG2-257 AUX C-F3.30 2CCW-H54 SNUBBER (H) CV-355 115'-0* (2) X AUX C-F3.50 2CCW-H55 SWAY STRUT 10" HBC-15(B-A) EG2-257 CV-355 112'-11 1/2" (2)- W/ ATTACH. X 10" HBC-15(B-A) EG2-257 AUX C-F3.30 2CCW-H56 STANCHION CV-355 110'-0" B-DZ.20 W/ ATTACH. X AUX C-F3.40 2CCW-H57 RESTR. HGR. 10" HBC-15(B-A) EG2-257 CV-355 110'-0* X 10" HBC-15(B-A) EG2-257 AUX C-F3.50 2CCW-H58 SNUBBER (2) W/ STANCHION CV-355 110'-0" B-D2.20

                                       . (2) 4PI7-15 Rev.: 0 t

o

               .W.

Op. O FNP-2-M-069 J. M. Farley Nuclear P1 ant - Unit 2, C1 ass 3 Component Supports And Hanger Surveillance Plan - 2Pl7- Component Cooling Water- ' 40-MONTH i RE-EXAM PERIOD 150 DWG/ 2 IWF/ LWD NOTES /IER 3 1 HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION ITEM X 10" HBC-15(B-A) EG2-257 AUX C-F3.30 2CCW-H59 RESTR. HGR. 111'-3 1/8" 4 CV-355 X AUX C-F3.40 2CCW-H60 RESTR. HGR. 10" HBC-15(B-A) EG2-257 CV-355 111'-3" X AUX C-F3.30 2CCW-R62 RESTR. HGR. 10" HBC-15(B-A) EG2-449 2 CV-354 172'-0" X 10" HBC-15(B-A) EG2-449 AUX C-F3.30 2CCW-R75 RESTR. HGR.

CV-354 172'-0"
X AUX I C-F3.50 2CCW-R90 SWAY STRUT 10" HBC-15(A-B) EG2-472 CV-181 113'-6" X '

10" HBC-15(A-8) EG2-472 AUX C-F3.50 2CCW-R91 SWAY STRUT CV-181 113'-6" (2) X AUX l C-F3.30 2CCW-R92 RESTR. HGR. 10" HBC-15(A-B) EG2-472 CV-181 113'-6" i W/ ATTACH. X 10" HBC-15(4-B) EG2-472 AUX C-F3.30 2CCW-R94 RESTR. HGR. CV-181 113'-8 1/2" -

.                                                                                                                                    X AUX C-F3.30     2CCW-R96    RESTR. HGR. 10" HBC-15(A-B) EG2-472 l

CV-181 113'-6" . I X AUX C-F3.30 2CCW-R98 , RESTR. HGR. 10" HBC-15(A-B) EG2-472 j CV-181 113'-6" l B-D2.20 W/ ATTACH. 4Pl7-16

                                                                                                    -                 Rev.: 0

1 ) U . - - .v i FNP-2-M-069 J. M.-Farley Nuclear Plant- . Unit 2, Class 3 Component Supports And Hanger Surveillance Plan - 2P17- Component Cooling Water 40-MONTH RE-EXAM PERIOD 150 DWG/ 3: 1 2 IWF/1WD FIG. NO. LOCATION NOTES /IER HANGER NO. HANGER TYPE LINE NO. ITEM

                                                                                                                 .X AUX C-F3.30   2CCW-R100   RESTR. HGR. 10" HBC-15(A-B) EG2-472 CV-181      113'-6" X

AUX C-F3.40 2CCW-R102 RESTR. HGR. 10" HBC-15(A-B) EG2-472 CV-181 113'-5 5/8" . X AUX C-F3.40 2CCW-R105 RESTR. HGR. 10" HBC-15(A-B) EG2-472 CV-181 115'-4 7/8" X AUX C-F3.30 2CCW-R106 RESTR. HGR. 10" HBC-15(A-B) EG2-472 CV-181 109'-2" B-D2.20 W/ ATTACH. X AUX C-F3.30 2CCW-R111 RESTR. HGR. 10" HBC-15(A-B) EG2-472 117'-6" CV-181 W/ ATTACH. X AUX C-F3.50 2CCW-R147 SPR.ING CAN 10" HBC-15(B-A) EG2-449 CV-354 112'-0" X AUX-C-F3.30 2CCW-R148 RESTR. HGR. 10" HBC-15(B-A) EG2-449 CV-354 112'-0" X AUX C-F3.50 2CCW-R149 SNUBBER (2) 10" HBC-15(B-A) EG2-449 112'-0" CV-354 B-D2.20 W/ ATTACH. X AUX C-F3.30 2CCW-R150 RESTR. HGR. 10" HBC-15(fi-A) EG2-449 111'-7 1/4" CV-354 i B-D2.20 W/ ATTACH. X AUX C-F3.40 2CCW-R151 , RESTR. HGR. 10" HBC-15(B-A) EG2-449 CV-354 111'-3" Rev.: 0 4P17-17 _ __ i

O ' O O I J. M. Farley Nuclear P1 ant - Unit 2, C1 ass 3 Component Supports And FMP-2*M-069

                  .                                   Hanger Surveillance Plan-2P17- Component Cooling Water                                                                                                                                   .

40-MONTH IWF/IWD ~ ISO DWG/' RE-EXAM PERIOD ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER 3 1 2 C-F3.30 2CCW-R152 RESTR. HGR. 10" HBC-15(B-A) EG2-449 AUX X CV-354 111'-3"

                                                                                                    ~

C-F3.50 2CCW-R168 SWAY STRUT 10" HBC-15(B-A) EG2-449 AUX X CV-354 143'-0" C-F3.40 2CCW-R170 RESTR. HGR. 10" HBC-15(B-A) EG2-449 AUX X ! B-02.20 W/ ATTACH. CV-354 140'-0" C-F3.30 2CCW-R171 RESTR. HGR. 10" HBC-15(B-A) EG2-449 AUX X CV-354 140'-0" C-F3.30 2CCW-R172 RESTR. HGR. 10" HBC-15(B-A) EG2-449 AUX X CV-354 140'-1" C-F3.40 2CCW-R176 RESTR. HGR. 10" HBC-15(B-A) EG2-449 AUX X W/ ATTACH. CV-354 133'-10 3/16" C-F3.30 2CCW-RI85 RESTR. HGR. 10"_HBC-15(A-B) EG2-443 AUX X

CV-183 167'-0" l'

C-F3.30 2CCW-R186 RESTR. HGR. 10" HBC-15(A-B) EG2-443 AUX X - CV-183 167'-0" C-F3.30 2CCW-R188 RESTR. HGR. 10" HBC-15(A-B) EG2-443 AUX X CV-183 113'-3" . C-F3.30 2CCW-R189 ' RESTR. HGR. 10" HBC-15(A-B) EG2-443 AUX X !. CV-183 133'-3" 4Pl7-18 Rev.: 0 i e .e<, e a , w ., , >-e-- -y-~- vv- . , _ . - ww-- =,w a+-- -----.--------ca.--wa---n --- - - -

O  : O O - J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069

                                             .                                                       Hanger Surveillance Plan                                                                                   ,          1 2Pl7- Component Cooling Water                                                                                                                                                    .-

40-MONTH IWF/IWD 150 DWG/ RE-EXAM PERIOD ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER 3 1 2 1 C-F3.40 2CCW-R190 RESTR. HGR. 10" HBC-15(A-B) EG2-443 AUX X CV-183 133'-0* C-F3.30 2CCW-R191 RESTR. HGR. 10* HBC-15(A-B) EG2-472 AUX X W/ ATTACH. CV-181 133'-0* C-F3.30 2CCW-R192 RESTR. HGR. 10" HBC-15(A-B) EG2-472 AUX X

CV-181 124'-8*

C-F3.50 2CCW-R161 SWAY STRUT 8" HBC-9 EG2-456 AUX X 4 (2) CV-277 110'-0* C-F3.40 2CCW-R162 RESTR. HGR. 8* HBC-9 EG2-456 AUX X , CV-277 110'-0* C-F3.30 2CCW-R452 RESTR. HGR. 8' HBC-9 EG2-456 AUX X B-D2.20 W/ ATTACH. CV-277 118'-0* C-F3.30 2CCW-R139 RESTR. HGR. 8' HBC-10 EG2-253 AUX X CV-228 108'-0* C-F3.30 CCW-2A26 ANCHOR 8" HBC-20 EG2-457 AUX X B-D2.20 W/ ATTACH. CV-235 122'-0* C-F3.30 2CCW-R163 RESTR. HGR. 8" HBC-20 EG2-457 AUX X i CV-235 110'-0*

C-F3.30 2CCW-R164 RESTR. HGR. 8" HBC-20 EG2-457 AUX X i CV-235 110'-0*

4Pl7-19 Rev.: 0

                                                                          .                    , , .       . .. . . , . .        . . . ~ . _ . .           . _ . . _ . _ _ _ _        . _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

1 J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069

                         .                                   Hanger Surveillance Plan 2Pl7- Component Cooling Water                                                                                                            _.

40-MONTH 150 DWG/ RE-EXAM PERIOD - IWF/ LWD. ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER 3 1 2 6" HBC-8 EG2-474 AUX X C-F3.30 2CCW-R135 STANCHION B-D2.20 CV-226 101'-0" C-F3.30 2CCW-R136 RESTR. HGR. 6" HBC-8 EG2 474 AUX X B-D2.20 W/ ATTACH. CV-226 101'-0" EG2-464 AUX X C-F3.40 2CCW-R332 RESTR. HGR. 6" HBC-9(A) CV-287 126'-6" C-F3.30 2CCW-R453 RESTR. HGR. 6" HBC-9 EG2-456 AUX X B-D2.20 W/ ATTACH. CV-277 124'-6" I C-F3.50 2CCW-R401 SWAY STRUT 6" HBC-12 EG2-471 AUX X CV-269 125'-0" 6" HBC-12 EG2-471 AUX X C-F3.40 2CCW-R402 RESTR. HGR.

B-D2.20 W/ ATTACH. CV-269 125'-0" C-F3.30 2CCW-R403 RESTR. HGR. 6" HBC-12 EG2-471 AUX X l B-D2.20 W/ ATTACH. CV-269 127'-4" 6" HBC-12 EG2-471 AUX X C-F3.30 2CCW-R404 RESTR. HGR.

CV-269 115'-0" X C-F3.30 2CCW-R405 RESTR. HGR. 6" HBC-12 EG2-471 AUX i CV-269 113'-0" . I 6" HBC-12 EG2-471 AUX X C-F3.30 2CCW-R406 RESTR. HGR. CV-269 113'-0" 4 1 4Pl7-20 Rev.: 0

s-- J. M. Farley Nuclear. Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069

                       -                              Hanger Surveillance Plan                                                          .       ~

2P17- Component Cooling Water .. 40-MONTH ISO DWG/ RE-EXAM PERIOD IWF/IWD ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER 3 1 2 C-F3.30 2CCW-R407 RESTR. HGR. 6" HBC-12 EG2-471 AUX X CV-269 113'-0" C-F3.30 2CCW-R408 RESTR. HGR. 6" HBC-12 EG2-471 AUX X CV-269 113'-0" C-F3.30 2CCW-H409 RESTR. HGR. 6" HBC-12 EG2-471 AUX X B-02.20 W/ ATTACH. CV-269 113'-0* C-F3.30 2CCW-R410 RESTR. HGR. 6" HBC-12 EG2-471 AUX X CV-269 113'-0" C-F3.30 2CCW-R411 RESTR. HGR. 6" HBC-12 EG2-471 AUX X CV-269 113'-0" C-F3.40 2CCW-R412 RESTR. HOR. 6" HBC-12 EG2-471 AUX X CV-269 113'-0" C-F3.30 2CCW-R126 RESTR. HGR. 6" HBC-19 EG2-475 AUX X B-D2.20 W/ ATTACH. CV-177 107'-0" C-F3.30 2CCW-R127 RESTR. HGR. 6" HBC-19 EG2-475 AUX X B-D2.20 W/ ATTACH. CV-177 107'-0" C-F3.30 2CCW-R128 RESTR. HGR. 6" HBC-19 EG2-475 AUX X-B-D2.20 W/ ATTACH. CV-177- 101'-0" . C-F3.30 2CCW-R129 STANCHION 6" HBC-19 EG2-475 AUX X B-D2.20 CV-177 101'-1" 4P17-21 Rev.: 0

s m U u _ U J. M. Farley Nuclear Plant - Unit 2, Class 3 Component Supports And FNP-2-M-069

                 .                                   Hanger Surveillance Plan                                       ,

2Pl7- Component Cooling Water _. 40-MONTH IWF/IWD 150 DWG/ RE-EXAM PERIOD ITEM HANGER NO. HANGER TYPE LINE NO. FIG. NO. LOCATION NOTES /IER 3 1 2

                                                                                                           ~

C-F3.30 2CCW-R219 RESTR. HGR. 6" HBC-20 EG2-457 AUX X B-D2.20 W/ ATTACH. CV-235 129'-7" C-F3.30 2CCW-R220 RESTR. HGR. 6" HBC-20 EG2-456 AUX X CV-277 132'-6" , C-F3.30 2CCW-R221 RESTR. HGR. 6" HBC-20 EG2-456 AUX X CV-277 132'-6" C-F3.30 RESTR. HGR. EG2-468 AUX X 2CCW-R354 6" HBC-20(A) CV-358 124'-9" C-F3.40 RESTR. HGR. EG2-468 AUX X 2CCW-R397 6" HBC-20(A) CV-358 130'-6" C-F3.30 2CCW-BR5 RESTR. HGR. 6" HBC-22 EG2-457 AUX X CV-235 122'-4" , C-F3.30 2CCW-BR6 RESTR. HGR. 6" HBC-22 EG2 457 AUX X CV-235 122'-6" C-F3.30 2CCW-BR9 RESTR. HGR. 6" HBC-22 EG2-457 AUX X B-D2.20 W/ ATTACH. CV-235 122'-6" C-F3.30 2CCW-BR10 RESTR. HGR. 6" HBC-22 EG2-457 AUX X B-D2.20 W/ ATTACH. CV-235 122'-6" C-F3.30 2CCW-BR2 . RESTR. HGR. 6" HBC-64(B) FG2-255 AUX X CV-176 115'-6" 4Pl7-22 Rev.: 0

                                                                                                <~

(-. ' J - V J. N. Farley Nuclear Plant . Unit 2, Class 3 Component Supports An:I' FNP-2-M-069

                   .                                          Manger Surveillance Plan                                                                                               .

2Pl7- Component Cooling Water .i 40-MONTH IWF/IWD ISO DWG/ RE-EXAM PERIOD ITEM HANGER NO. HANGER TYPE LINE NO. FIG.-NO. LOCATION NOTES /IER 3 1 2 C-F3.40 2CCW-BR2X RESTR. HGR. 6" HBC-64(2) EG2-255 AUX X CV-176 110'-0" C-F3.30 CCW-2A10 ANCHOR 6" HBC-64(A) EG2-260 AUX X B-D2.20 W/ ATTACH. CV-356 115'-6" C-F3.30 2CCW-BRll RESTR. HGR. 6" HBC-64(A) EG2-260 AUX X CV-356 115'-6" , s C-F3.30 CCW-2A14 ANCHOR 6" HBC-64(B) EG2-255 AUX X B-D2.20 W/ ATTACH. CV-176 115'-6 1/2" C-F3.30 CCW-2A16 ANCHOR 6" HBC-64(C) EG2-257 AUX X B-02.20 W/ ATTACH. CV-355 106'-0* C-F3.40 2CCW-H61 RESTR. HGR. 6" HBC-64(C) EG2-257 AUX X CV-355 115'-0" C-F3.30 2CCW-R444 RESTR. HGR. 6" HBC-64(A) EG2-260 AUX X ' CV-356 111'-0" C-F3.30 2CCW-R445 RESTR. HGR. 6" HBC-64(A) EG2-260 AUX X - B-D2.20 W/ ATTACH. CV-356 105'-6" l - 4 l 4PI7-23 Rev.: 0 i

.-       .             .                  _   - . . . . . . . . . . . .        . . . . . . . _ . _ . _ ~ . _ . . _m.- , _ _ . _ _ _ . . _ , . _ . .          .._. _ ._ _.._ _ _ _ ._._.. _ - ._
7. .

f f I-L I- ATTACHMENT 2 r 1 i Pressure Test Plan 1 9 1 b d

( -- f FNP 2 M 069

    \ /

1 Pressure lest Section - Basis

         !. INTRODUCTION                                     ,

The American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, 1983 Edition through Summer 1983 Addenda requires the performance of system pressure tests on Class 1, 2, and 3 pressure retaining L components. The following Hydrostatic Test Summary and Pressure Test Schedules are intended to provide detailed description and schedule for implementing the pressure testing requirements of the ASME Code, Section XI as provided in the Inservice Inspection Program. I

11. TEST DESCRIPTIONS A. System teakaae Tests System leakage tests are conducted foliowing opening and reclosing of a component in the system after pressurizction to nominal operating pressure. The boundary subject to test pressurization during a system leakage test shall extend to the pressure retaining components within the system boundary containing pressurizeo reactor coolant under the g plant mode of normal reactor startup. Afttr attaining test pressure and y temperature no holding time is requirt:d prior to commencing VT-2 examination.

B. System Functional Tests , System functional tests are conducted to verify operability in systems (or components) not required to operate during normal plant operation while under system operating pressure. The boundary subject to test pressurization during a system functional test shall include only those pressure retaining components within the system boundary pressurized under the test mode required during the performance of a periodic system (or component) functional test. 4 5 () 8 PB-1 Rev. O s a

r r t FNP 2 M 069 p l. After attaining the system operating pressure a 10 minute holding time is required prior to commencing VT-2 examination. C. System inservice Tests System inservice tests are conducted to perform visual examination VT 2 while the system is inservice under operating pressure. The boundary . subject to test pressurization during a system inservice test shall extend to those pressure retaining components under operating pressures during normal system service. No holding time is required prior to commencing VT 2 examination provided the system has been in operation for at least 4 hours. D. System Hydrostatic Test System hydrostatic tests are conducted during a plant shutdown at a pressure above nominal operating pressure or system pressure for which overpressure protection is provided. Hydrostatic test boundaries are determined by the following: . (1) The boundary subject to test pressurization during a system hydrostatic test shall be defined by the system boundary (or each portion of the . boundary) within which the components have the same minimum required classification and are designed to the same primary pressure rating as - (]. governed by the system function and the internal fluid operating conditions, respectively. , (2) Systems which share safety functions for different modes of p1'nta operation, and within which the component classifications differ, shall be subject to seaarate system pressure tests of each portion of the system boundary 1aving the same minimum required component classifications. (3) Systems designed to operate at different pressures under several modes of plant operation of post-accident conditions shall be subject to a system pressure test within the test boundary defined by the operating mode with the higher pressure. (4) Where the respective system primary pressure ratings on the suction and discharge sides of system pumps differ, the system test boundary shall be divided into to separate boundaries (such as suction side and discharge side test boundaries). In the case of positive displacement pumps, the boundary interface shall be . considered as the pump. In the case of centrifugal pumps, the boundary' interface shall be the first shutoff valve on the discharge side of the pump. ,

v. ,

4 g V l PB 2 Rev. 0

E FNP-2 M 069 n)

 >i                                                                    -

1 i A four (4) hour holding time is required prior to commencing VT 2 examination after attaining the test pressure and tem)erature conditions for insulated systems. A ten (10) minute aciding time is required for noninsulated system or components.

E. System Pneumatic Tests System pneumatic tests may be conducted in lieu of a hydrostatic pressure test for Class 2 and 3 components. A ten (10) minute holding time is required prior to commencing VT 2 examination after attaining the test pressure. Specific relief from Code requirements has been requested where the performance of a specific pressure test or associated examination has.

been determined to be impractical. Details of required pressure test, schedule, and relief, where applicable, has been provided for all Class 1, 2, and 3 components in the respective sections of this plan. Table 1 is provided as an overview of the hydrostatic / pneumatic testing to be performed on Class 1, 2, and 3 pressure retaining components. F. Gaae Recuirements - Hydrostatie or pneumatic Pressure Te}11 The test gages used in pressure testing shall provide results accurate to within 0.5% of full scale. All gages shall be calibrated against a standard () V dead weight tester or a calibrated master gage. The test gages shall be calibrated before each test or series of tests. A series of tests is a group of tests that use the same pressure test gage or gages, and that are conducted with a period not exceeding 2 weeks. Indicating pressure' gages used in testing shall have dials graduated over a range of at least 1.5 times, but not more than 4 times, the intended maximum test pressures. When testing an isolated component, the pressure measuring instrument or sensor shall be connected close to the component. When testing a group of - components or a multicomponent system, the pressure measuring instrument or sensor shall be connected to any point within the pressure boundary of the components or system such that the imposed pressure on any component, including static head, will not exceed 106% of the specified test pressure for the system. O v PB-3 Rev. O

o FNP 2 M 069 U '

      .t Ill. PRESSURE TEST / CLASS 3 151 EXAMINATIONS A. Oroanization The examination plan consists of information in this manual along with piping isometrics.
1. Pressure Test Plan The tables in Class 1, 2, and 3 sections of this plan are organized by sys,tems that are to be examined. Each system table is divided into two groups where appropriate. Components (pumps, heat exchangers, etc.) and piping,
a. The component tables are divided into columns for the component name and TPNS No.,151 Boundary Drawing and Location Drawing. The type of pressure testing to be performed (H hydrotest, F functional, and 1-inservice) will a) pear in the appropriate column for the examination period tlat the required pressure test and examination is to be performed.

After completion, the year performed will be added behind the o test designation. Applicable relief requests and appropriate d notes / remarks will be included in the last two columns.

b. The piping tables are divided into columns for the line -

number, STP/ Hydro No., ISI Boundary Drawing, and piping isometrics. The remaining columns are the same as for components.

2. Class 3151 Plan The table in the Class 3 ISI sections of this plan are organized by systems that are to be examined. Each system table is divided into two groups where appropriate. Components (pumps, heat exchangers, etc.) and piping,
a. The component tables are divided into columns for the Code item No., Support No., Support Type, Component, Vendor Drawing, and Location. Applicable relief requests and appropriate notes / remarks will be included in the last.two columns. An "X" will be place'd in the appropriate column for the examination period that the required examination is to be performed. After completion, the "X" will be replaced'with the year that the examination was performed, f) PB-4 Rev. O i

I

l L i l g FNP 2 M-069 V - 1

b. The piping support tables are divided into columns for the Code item No., Hanger No., Hanger Type, Line No., Iso Dwg/ Fig.

No., and location. The remaining columns are the same as for components. .

3. Plan Drawing Packages The isometric and hanger drawing packages are set up with a different line number appearing on each folder. Within that folder will be found the piping isometrics for lines requiring pressure testing and (VT 2) examination.

B. Examination procedures System Inservice Testing will be performed under operating pressures during normal system service. System functional Testing need include only those pressure retaining components piping within the system boundary and will be performed in conjunction with a system (or component) functional test. System Hydrostatic Testing will be performed by procedure listed in Table 11, Hydrostatic Test Summary Class 1, 2, and 3. Visual examination of components and piping during pressure testing hr will be performed per procedure: i NDE VT 002: Visual Examination VT-2 , In addition, examination of the buried piping in the Service Water Systems by the Operations Group will be performed and documented by procedure: FNP 0 STP-24.6: Service Water Buried Piping Inspection j The examination of components will include vents, drains, and instrument lines associated with that component. C. Corrective Action if discrepancies are detected during the performance of an examination, the condition shall be thoroughly investigated to establish the extent of the nonconformance. Discrepancies will be documented on the Visual Examination or Support Examination Report, as appropriate. Repairs ' will be made using a Maintenance Work R'equest as required. l l

      \\ ,

b PB-S Rev. O j i l

7. .

i- - FNP 2 M 069 L()f .

                             .t-IV.         EXAMINATION REPORT r

F -The official Test' Copies of all procedures used during the period shall constitute the Official Examination Report. All Official Test Copies will be maintained on site as an official plant document and will contain b , the following information:

1. Examination methods
2. -Examination results
3. Evaluation of- results
4. Corrective actions-and repairs
                                                                                                                                                                                                      .. g 6

f i I s

           .u                e                                                                                                                                                                           ;

{ PB 6 Rev. 0 l d E s -- w y y y --,,g.,p., m.,, , ,,p -ye.n_m. y. ,- . . ,_ , , , , , y,,-, ,, ., , , , . . _ , , _ , ,,,,.a....e.,-.,y%,mm-,e-,m.m,,,__,,,,,,,-,, -,,_e.w.._y . . , - ,.,w,__ rt*~5+w,-

d O, O O y

.                                                                                                                                                                                                                                                            FNP-2-M-069 Table 1 Hydrostatic Test Summary Class I, 2, and 3                                                                   ;

TEST TEST RELIEF VLV DESIGN TEMP .. .. PRESSURE SETPOINT PRESSURE' SCHEDULE- COMP. STP/ HYDRO. NO. DESCRIPTION (OF) (PSIG) (PSIG) (PSIG) DATE DATE FNP-2-STP-160.1 Class I piping in-the Note 2 Note 2 NA -2235I 3rd Period RCS, SIS, and CVCS lst Interval FNP-2-STP-160.2 Charging Pumps A and B Ambient 3107 NA 2485 2nd Period Discharge to the RCS Znd I:1terval FNP-2-STP-160.3 Charging Pumps B and C Ambient 3107 NA 2485 2nd Period Discharge to the RCS 2nd Interval FNP-2-STP-160.4 Excess Letdown Heat Ambient 3107 NA 2485 2nd Period Exchanger, Excess 2nd Interval Letdown Delay Tanks and Piping FNP-2-STP-160.5 Letdown Delay Tanks -Ambient 3107 NA 2485 3rd Period and Regenerative Heat 1st Interval Exchange (Shell Side) FNP-2-STP-160.6 RHR Train A Ambient 563 450 600 1st Period 2nd Interval , FNP-2-STP-160.7 RHR Train B Ambient 563 450 600 2nd Period 2nd Interval Notes: *

1. Nominal Operating Pressure
2. Test pressure and test temperature based on operating mode
3. See attached pages for cornplete listing Rev.: 0 I of 8

_ _ . . . .,m_ _ - . _ _ _ _ . _ . _ . __ _ _ _ _ . . . _ _ _ . . . , _ . _. _ . . .

w. (} s 0_ (T)' FNP-2-M-069 Table 1 Hydrostatic Test Summary Class 1, 2, and 3 ,. TEST TEST RELIEF VLV DESIGN TEMP PRESSURE SETPOINT PRESSURE SCHEDULE ' COMP. STP/ HYDRO. NO. DESCRIPTION (OF) (PSIG) (PSIG) (PSIG) DATE DATE FNP-2-STP-160.8 CVCS Low Pressure Ambient 750 600 600 1st Period Letdown 2nd Interval FNP-2-STP-160.9 VCT, Connecting Lines Ambient- 94/188 75/150 75/I50 2nd Period and Charging Pumps 2nd Interval Suction FNP-2-STP-160.10 RCP Seal Leakoff Ambient 188 150 150 1st Period 2nd Interval FNP-2-STP-160.11 Letdown Line from Ambient 375 300 300 2nd Period 600 PSI Piping to VCT 2nd Interval FNP-2-STP-160.12 Train A Main Steam, 700 1344 1075 1085 3rd Period l Main Feedwater, Aux lst Interval Feedwater, S/G Blowdown i and Chemical Injection - FNP-2-STP-160.13 Train B Main Steam, 700 1344 1075 1085 3rd Period Main Feedwater, Aux Ist Interval Feedwater, S/G Blowdown . and Chemical Injection FNP-2-STP-160.14 Train C Main Steam, 700 1344 1075 1085 3rd Period ! Main Feedwater, Aux Ist Interval Feedwater, S/G Blowdown - and Chemical Injection , Rev.: 0 2 of R g-. . ~ , . _

                                                                                                , 4 , . -. 3     -     .,+.m         ,    . -rw

g, O ,, O- O FNP-2-M-069 Table 1 Hydrostatic Test Summary Class I, 2, and 3  ;, TEST TEST RELIEF VLV DESIGN TEMP PRESSURE SETPOINT PRESSURE SCHEDULE COMP. STP/ HYDRO. NO. DESCRIPTION (DF) (PSIG) (PSIG) (PSIG) DATE' DATE-FNP-2-STP-160.15 Accumulators Ambient 875 700 700 3rd Period 1st Interval FNP-2-STP-160.16 Train A Containment Ambient 263 700 700 1st Period Spray 2nd Interval FNP-2-STP-160.17 Train B Containment Ambient 263 NA 210 1st Period Spray 2nd Interval FNP-2-STP-160.18 RCP Seal Bypass Piping Ambient 3107 NA 2485 2nd Period 2nd. Interval FNP-2-STP-160.19 Aux. Feedwater Ambient 1760 1900 1600 2nd Period Discharge Piping 2nd Interval FNP-2-STP-160.20 Aux. Feedwater Ambient 165 210 150 -2nd Period Suction Piping 2nd-Interval FNP-2-STP-160.21 Boric Acid Transfer Ambient -165 185 150 3rd Period Pumps and Piping ist Interval FNP-2-STP-160.22 RHR Train A to RCS Ambient 2459 NA 22351 3rd Period Suction 1st Interval Rev.: 0 3 of 8

               . . ~ ,. .         .
                                           .,.,-.i.._.-.
                                                                                                                                                                                                             ~
                                                                                                                                                                                                                                                                                                            -w
                                                                                                                                                                                                                                                                                                            -T
                                                                                                                                                                                                      '{                                                                                      '  ..
                            -                                                                                               I0g.                                                                         %.J                                                                                v':          -

FNP-2-M-069-

                                                                                                                                                                                                   . Table 1 Hydrostatic' Test Summary
                                                                                                                                                                                          -Class ~I, 2, and 3                                                                  .,",

TEST . TEST RELIEF VLV DESIGN TEMP PRESSURE SETPOINT PRESSURE SCHEDULE' COMP.- STP/ HYDRO. NO. DESCRIPTION (OF) - (PSIG) - (PSIG) (PSIG) DATE DATE FNP-2-STP-160.23 RHR Train B to RCS Ambient' - 2459 NA 2235I 3rd Period Suction 1st Interval FNP-2-STP-160.24 Class 2 Piping Ambient Note 3 Note'3 . Note 3 2nd Period ~ Penetrations 2r.d Interval FNP-2-STP-160.25 Refueling Water Ambient Tank- NA NA '3rd Period-Storage Tank Level 1st Interval-i ~ t i Notes:

1. Nominal Operating Pressure
2. Test pressure and test temperature based on operating mode ..
3. See attached pages for complete listing Rev.: 0
                                                                                                                                                                                             *A m

4 of 8

                                                                                                                   , > + .s           .
( ~

y b- U V .

                                                                                                                                                                        'FNP-2-M-069              ~

Table-1 Hydrostatic Test Summary Class ~1, 2, and 3 ,, TEST. TEST Relict VLV DESIGN TEMP PRESSURE SETPOIN1 PRESSURE SCHEDULE COMP. PEi!ETRATION NO. DESCRIPTION (DF) (PSIG) (PSIG) (PSIG) DATE ~ DATE 12 Containment Cooling Ambient 68 NA 54 3rd Period and Purge .lst Interval 13 Containment Cooling Ambient 68 NA 54 3rd Period and Purge 1st Interval 29 Accumulator Test Line Ambient 3112 NA 2485 3rd Period 1st Interval 30 Reactor Coolant Ambient 188 NA .150. 3rd Period 1st Interval 31 Liquid Waste Ambient -198 NA 150 3rd Period Processing Ist Interval 32 SW - Return from Ambient 194 150 150 3rd Period RCP's ist Interval 33 CTMT Sump Pump Ambient 198 NA 150 3rd Period Discharge 1st Interval 34/38 SW-To/From A CTMT Ambient 171 150 150 3rd Period Cooler 1st Interval 35/39 SW-To/From B CTMT Ambient 171 150 150 3rd Period-Cooler 1st Interval ~ Rev.: 0 5 of 8

r

           ~
                                                            ~'3 -
        . L,3' ;

J G~ FNP-2-M-069 Table ~l-Hydrostatic Test Summary Class 1, 2, and 3 , TEST' ' TEST ' RELIEF VLV DESIGN TEMP PRESSURE- SETPOINT PRESSURE SCHEDULE COMP. _ PENETRATION NO. DESCRIPTION (DF)- (PSIG) (PSIG) (PSIG) DATE DATE 36/41 SW-To/From C CTMT Ambient 171. 150 150 3rd Period Cooler 1st Interval 37/40 SW-To/From D CTMT Ambient 171 150 150 3rd Period Cooler 1st Interval 42 CCW-To RCP's Thermal Ambient 169 150 150 3rd Period Barriers 1st Interval 43 CCW-From RCP's Thermal Ambient 3107 NA 2485 3rd Period Barriers 1st Interval 44 CCW-From RCP's Oil Ambient 169 150 150 3rd Period Coolers 1st Interval 45 CCW-To RCDT/ Excess Ambient 168 150 150 3rd Period LTDN Hx Ist Interval 46 CCW-From RCDT/ Excess Ambient 169 150 150 3rd Period LTDN Hx Ist Interval 47 Service Air Ambient 188 NA 150 3rd Period 1st Interval 48 Instrument Air Ambient 188 NA 150 3rd Period 1st Interval ' Rev.: 0 6 of 8

                                                   .. _ = ---       -_     - - -    -     ___- .
                                                                                                              ~
                                                                  . -                            ., p            '\v      <

FNP-2-M-069-Table 1-Hydrostatic Test Summary

                                                     ~C lass 1, 2, and 3                                     .,

TEST TEST REtIEF VLV DESIGN TEMP PRESSURE SETPOINT PRESSURE . SCHEDULE COMP. PENETRATION NO. DESCRIPTION (OF) (PSIG) (PSIG) (PSIG) DATE DATE 49 Accumulator Fill Line Ambient 3107 NA 2485 3rd Period Ist Interval 54 Containment Air Sample Ambient 188 NA' 150 3rd Period 1st Interval 55 Containment Air Sample Ambient 188 NA 150 3rd Period Ist Interval 60 SW to RCP's Ambient 194 NA 150 3rd Period-1st Interval 61A/61B Post Accident CTMT Ambient 188 NA 150 3rd Period Sample - Out/In 1st Interval 62 Liquid Waste Processing Ambient 188 NA 150 3rd Period

                                                                                             'Ist Interval 63             N2 Supply to              Ambient        875             NA         700    3rd Period                                      :

Accumulators 1st Interval 64/A Reactor Coolant - N2 Ambient 188 NA 150 3rd Period to PRT 1st Interval 64/B RC-Pressurizer Dead- Ambient ~2300 NA Note 3 3rd Period weight Tester 1st Interval-Rev.:~0 7of8

                                           +           ,                                       n      , -   ,     n -w..  ,,  m-,r -s-,----
                                                                                                                       . . , . = .

O, C -

                                                                                                      .3

( FNP-2-M-069 Table 1-Hydrostatic Test Summary Class 1, 2, and 3 ., TEST TEST RELIEF VLV' DESIGN TEMP PRESSURE SETPOINT PRESSURE SCHEDULE COMP. PENETRATION NO. DESCRIPTION (OF) (PSIG) (PSIG)~ (PSIG) DATE DATE 66/67 Post Accident CTMT Ambient 188 NA 150 3rd Period Sample - In/0ut 1st Interval 70 CTHT Differential Ambient 188 NA 150 3rd Period Pressure 1st Interval 71 CTMT Leak Test Ambient 188 NA 150 3rd Period Connection 1st' Interval-72 CTMT Leak Test Ambient 188 NA 150 3rd Period Connection 1st Interval 78 CTMT Sump Pump Ambient 196 NA 150 3rd Period Discharge 1st Interval 82 Demineralized Water Ambient 191 NA 150 3rd Period 1st-Interval 95 Spent Fuel Pool Ambient 188 NA 150 3rd Period Cooling 1st Interval 97B Back-Up N2 Supply to Ambient 188 NA 150 3rd Period PORV's ist Interval 103 Post Accident CTMT Vent Ambient 68 NA 54 3rd Period 1st Interval Rev.: 0 8 of 8

                                                                                                       .~       , _ _ _ _ . .

y

                                                                                            ?

q sy . FNP 2-M 069

I Class 1 System Pressure Testina >
1. RE0VIREMENTS ASME Code Class 1 pressure-retaining components are required to have the following two types of system pressure tests to be performed on a regular -

basis. A. System Leakaae Test (Ref. Basis, 11 A)

1. The test must be conducted at a test pressure not less than the nominal operating pressure associated with 100% rated reactor power.
2. The system test pressure and temperature shall be attained at a rate in accordance with the heatup limitations specified for the system. '

The minimum test temperature shall not be lower than the minimum for. the associated pressure allowed by Plant Technical Specifications.

3. For tests of systems or portions of systems constructed entirely of
  -O                 austenitic steel, test temperature limitations are act required to V                 meet fracture prevention criteria. In cases where the components of the system are composed of ferritic and austenitic steels that are non-isolable from each other during a test, the test temperature' must be as required by 2 above.                                        '
4. The valves must be aligned in the position required for normal reactor startup; however, the VT-2 examination is required to extend to, and include, the second closed valve at the boundary extremity.

B. System Hydrostatic Test (Ref. Basis, 11 D and F)

1. Hydrostatic testing will be performed to the appropriate procedure listed in Basis - Table 1.
2. The system hydrostatic test may be conducted at any test pressure specified in Table IWB-5222-1, Section XI corresponding to the selected test temperature, provided the following requirements are met, for all ferritic steel components with the boundary of the system (or portion of system) subject to the test pressure.

(a) The minimum test temperature shall not be lower than the minimum for the associated pressure allowed by Plant Techncial i u . Specifications. L l Pl-1 Rev. O L

n i

    ?
          .rv                                                                            FNP 2 M-069 V     .

s

                     .1 (b)  For tests of systems or portions of systems constructed         >

entirely of austenitic steel,-test temperature limitaions are not required to meet fracture prevention criteria, in < cases where the components of the' system are com>osed of ferritic and ausenitic steels that are non isola)1e from , each other during a test, the test temperature must be as required by.(a) above. .

                            .3. Where adjoining pipe sections have different test pressures, the sections should be separated whenever practicable and each section tested at'its specified test pressure. Where it is impracticable to separate adjoining sections of piping for hydro testing, the sections may be tested together at the lower specified test pressures.-
4. Where. closed valves are used to establish' the hydrostatic test boundaries, precautions must be taken to assure that components on the lower pressure side of the boundary valve are not-over pressured, i 5. Line connected to process piping or equipment must be tested to the
                                . process piping . test pressure out to the last valve. Downstream of the last vent or drain valve vents to the atmosphere, or drains to O'f                    atmospheric tanks or sumps, may be left untested.

II. TEST MEDIUM , Reactor coolant shall be used as the pressurizing medium.- III. TEST FRE0VENCY The frequency is established in accordance with ASME Section XI. All Class I components shall be hydrostatically tested and examined at least once,'at , I or near the end of each inspection interval as detailed in the following-

schedule. Class I components shall also be subjected to a system leakage z test-following each refueling outage except for the refueling outage during which the system hydrostatic test is performed.

i M l-- ' V PI-2 Rev. O L

o g g se 1 - ,

J.

J. N. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-N-069: 2B13- Reactor C.colant-System , ISI Boundry Examination Period Relief Notes And/Or. j Component Drawing No. Coord; .. Loc. Drawing Third First Second Request Remarks REACTOR VESSEL ,

                                                                             ~

PRESSURE RETAINING B00NDRY G2811H001 D-356354-1 D-6 D-205050 H RV HEAD VENT N0ZZLE

     'Q2BilH001          0-356354-1             0-205050         H                                              EXANINE 25% OF ALL                                               +

N0ZZLES ! CRDN PENETRATION i N0ZZLES AND SEAL WELDS (65) Q2B11H001 D-356354-1 0-205050 H EXAMINE 25% OF ALL N0ZZLES. INCORE PENETRATION INSTRUMENTATION N0ZZ. ,. l (50) Q2811H001 0-356354-1 D-205050 H EXANINE 25% OF ALL i N0ZZLES STEAM GENERATORS Q2B21H001A D-356354-1 C-3 D-205050 H RR-30 LOOP 1 Q2B21H001B D-356354-1 E-3 D-205050 H RR-30 LOOP 2 ~ ,. Q2B21H001C D-356354-1 C-10 0-205050 H RR-30 LOOP 3 . 1 i j 1813-1 Rev.: 0

                                                                                                                                            .?

e .

                                                                  *Y t'                                                                                                                     .p J. M. Farley Nuclear Plant.- Unit 2, Class 1 Components             .FNP-2-M-069 2B13- Reactor C.oolant System                           .

f System Pressure Test Plan- .'. ISI Boundry . Examination Period Relief Notes And/Or Component Drawing No. Coord. Loc. Drawing Third First Second . Request ~ Remarks

PRESSURIZER PRESSURE RETAINING BOUNDARY Q2831K001 D-356354-2 G-4 D-205050 H
HEATER PENETRATION WELDS (78)

Q2B31K001 D-356354-2 D-205050 H EXAMINE ALL N0ZZLES R. C. PUMPS Q2B41P001A-N 0-356354-1 B-2 D-205051 H- LOOP 1 Q2841P001B-N 0-356354-1 G-2 0-205051 H ' LOOP 2 Q2B41P0010-N 0-3,56354-1 B-11 -D-205051~ H LOOP 3 1 1' , . 1 1813-2 Rev.: 0 .

O  :: O O J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FMP-2-M-069 System Pressure Test Plan 2813- Reactor Coolant System f ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 1" CCA-31 160.1 D-356354-1 E-7 E8042 H R.V. VENT LINE i 3/4" CCA-31 160.1 0-356354-1 E-7 E8042 H 1" CCB-47(A) 160.1 D-356356-1 F-5 E7886 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1. 3/4" CCB-47 160.1 D-356356-1 F-5 E7886 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1. 1" CCB-63(A) 160.26 D-356354-1 E-7 E8042 H RR-23(0), CLASS 2 HYDRO TESTED RR-43 WITH CLASS 1. l 1" CCB-47(B) 160.1 D-356356-1 F-5 E7887 H RR-23(A) CLASS 2 HYDRO TESTED

WITH CLASS 1.

3/4" CCB-47 160.1

                          ~~

D-356356-1 F-5 E7887 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1. 1" CCB-63(B) 160.26 D-356354-1 E-8 E8042 H RR-23(0), CLASS 211YDRO TESTED

RR-43 WITH CLASS 1..

160.1 D-356356-1 F-5 E7841 H RR-23(A) CLASS 2 HYDRO TESTED , - 1" CCB-47(C) WITH CLASS 1. 3/4" CCB-47 160.1 D-356356-1 F-5 E7841 H RR-23(A) CLASS 2 HYDRO TESTED-WITH CLASS 1. . 31" CCA-12(LOOP 1) 160.1 0-356354-1 0-1 E5366 H t 1813-3 Rev.: 0 t

                                                                                             -~s                                      ~g . . , -

f

(  : a J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069
System Pressure Test Plan .

2B13- Reactor Coolant System . i ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks-3/4" CCB-33 160.1 D-356354-1 C-2 E7607 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1. i

29' CCA-11(LOOP 1) 160.1 0-356354-1 D-5 -E5366 H HOT LEG 27.5" CCA-10(LOOP 1) 160.1 0-356354-1 B-4 E5366 H I
12" CCA-16(A)(LOOP 1) 160.23 D-356358-1 E-2 EG2-012 H HYDRO NO. 23 q 3/4" CCA-16 (V) 160.23 D-356358-1 E-2 E7566 H VENTS (1) 3/4" CCA-16 (TC & D) 160.23 D-356358-1 E-2 E7566 H TEST CONNECTIONS &

DRAIN 3/4" CCA-16 (TC & D) 160.23 D-356358-1 E-2 E7654 H TEST CONNECTIONS & . DRAIN 12" CCA-16(B)(LOOP 1) Y60.1 D-356354-1 C-4 EG2-101- H I > 160.1 D-356358-1 E-2 EG2-012 3/4" CCB-34 160.1 0-356354-1 E-4 E7583 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1. - 12" CCA-24(LOOP 1) 160.1 0-356354-1 8-5 EG2-101 H i > 160.1 D-356355-2 0-1 EG2-410 3/4" CCA-24 (V) ,, 160.1 D-356354-1 B-5 E7899 H , d 1B13-4 Rev.: 0

                                                                                                                                            \'

9 J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069-System Pressure Test Plan , 2813- Reactor Coolant System ., ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. .Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" CCA-24 (V) 160.1 0-356355-2 D-2 E7624 H VENTS (1) 3/4" CCB-53 160.1 D-356355-2 D-3 EG2-424 H RR-23(H) CLASS 2 HYDRO TESTED h WITH CLASS 1. ' 3/4" C08-54 160.1 D-356355-2 D-2 E7588 H RR-23(H) ' CLASS 2 HYDRO TESTED WITH CLASS 1. , 3/4" CCB-54 (D) 160.1 0-356355-2 D-2 E758B H RR-23(H) CLASS 2 HYDRO TESTED WITH CLASS 1, DRAINS (1) i 12" CCB-24 160.1 D-356355-2 D-3 EG2-424 H RR-23(H) CLASS 2 HYDRO TESTED WITH CLASS 1. 6 CCA-22(L00P 1) 160.1 D-356354-1 B-5 EG2-101 l > ~160.1 D-356355-l' D-1 EG2-409 i > 160.1 0-356355-2 G-1 EG2-409,

                                                                                                                                              -i l                                                           EG2-414 3/4" CCA-22 (V)          160.1   D-356355-1 D-2        E7630     H                               VENT (1)                  .-

3/4" CCA-22 (D) 160.1 D-356355-1 D-3 E7586 H l l 3/4" CCA-22 (V) 160.1 D-356354-1 A-5 E7899 H VENT (1) ,. 3/4" CCB-22 (D) 160.1 0-356355-2 H-2 E7864 H RR-23(J)- CLASS 2 HYDRO TESTED

                                                                                                    -WITH CLASS 1, DRAINS (1) i
                                                        '1813-5 Rev.: 0

J.'M. Farley Nuclear Plant - Unit 2, Classl Components FNP-2-M-%9 System Pressure Test Plan 2B13- Reactor Coolant System ,, ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks

3/4" CCB-22 (TC) 160.1 D-356355-2 H-2 E7864 H RR-23(J) CLASS 2 HYDRO. TESTED .i

' WITH CLASS 1, TEST CONNECTIONS (1) 3/4" CCB-22 (TC) 160.1 D-356355-2 G-3 E7864 H CLASS 2 HYDRO TESTED WITH CLASS 1, TEST CONNECTIONS (1) 8" CCA-22 160.1 D-356355-1 D-2 EG2-409 H 6" CCB-22 160.1 D-356355-2 G-2 EG2-414 H RR-23(J) CLASS 2' HYDRO TESTED WITH CLASS 1. ! 10" CCB-32 160.1 D-356355-2 G EG2-414 H RR-23(J) CLASS 2 HYDRO TESTED WITH CLASS 1, PENETRATION'(NO. 17) ! 6' CCA-27(LOOP 1) ~160.1 D-356354-1 D-5 E7899 H

    >                     160.1   D-356355-1 F-1      EG2-408 3/4" CCA-27 (V)       160.1   D-356354-1 0-5      E7899       H                            VENTS (1) 4 3/4" CCA-27 (V)       160.1   0-356355-1 F-2      E7628       H                            VENT                                  ;

3/4" CCB-29 (TC) 160.1 D-356355-2 F-3 E6733 H RR-23(I) CLASS 2 HYDRO TESTED ' WITH CLASS 1,. TEST , CONNECTIONS (1)  ; D-356355-1 F-4 EG2I414 6" CCB-29 160.1 H RR-23(I) CLASS 2 HYDRO TESTED WITH CLASS 1. 1813-6 Rev.: 0

O h O O J. M. Farley Nuclear Plant . Unit 2, Class 1 Components FMP-2-M-069

                                                   ..                                    System Pressure Test Plan                                          .

2B13- Reactor Coolant System ., ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. -ISO Dwg. '3 1 2 Request Notes / Remarks 10" CCB-29 160.1 D-356355-2 E-1 EG2-414 H RR-23(I) CLASS 2 HYDRO TESTED WITH CLASS 1, PENETRATION (NO. 101) 4' CCA-15(LOOP 1) 160.1 D-356354-1 8-5 EG2-112 .H TO PRESSURIZER SPRAY.

                      >                                    160.1             D-356354-2 F-8       EG2-Il2 3/4" CCA-15 (D)                       160.1            D-356354-2 F-8       E7632         H                        DRAINS (1) 3/4" CCB-57                           160.1            D-356354-2   F-7. E7514         H               RR-23(B) CLASS 2 HYDRO TESTED WITH CLASS 1.

3' CCA-5(LOOP 1) 160.1 D-356354-1 A-2 EG113, H EG608

                      >                                   ,160.1             D-356356-1 A-2       EG2-608 2" CCA-17                              160.1           D-356354-1 B-2       E7616         H                        TO VALVE QV001A 3' CCA-6(LOOP 1)                          160.1-          D-356354-1 C-5       EG2-101       H
                      >                                      160.1           0-356356-1 B-2       EG2-608                                                       -

3/4" CCA-6 (V) 160.1 D-356354-1 C-5 E7899 H. VENTS (1) i 3/4" CCA-6 (D) 160.1 D-356356-1 B-2 E7556 H DRAINS (1) . 3" CCB-9 , 160.1 D-356356-1 B-3 EG2-606 H RR-23(K) CLASS 2 HYDRO TESTED WITH CLASS 1. 1B13 Rev.: 0 ,

O " O O l l J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069' System Pressure Test:P1an 2BI3- Reactor Coolant System .', i ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request NoteN*emarks l 160.1 D-356354-1 D-4 E7823 H INCLUGES HOT LEG 2* CCA-13(LOOP 1) MANIFOLD

     >                       160.1  0-356354-3 B-6      E7823 3" CCA-19               160.1  D-356354-3 B-4      EG2-113     H 3/4" CCB-40 (V)         160.1  0-356354-3 C-6      E7825       H               RR-23(A)    CLASS 2 HYDRO TESTED WITH CLASS 1, VENTS (2)
3/4" CCB-43 (D) 160.1 D-356354-3 C-5 E7825 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1, DRAINS (2) ,

j 3/4" CCB-44 160.1 D-356354-3 C-4 E7530 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1, TD VALVES QV051A, QV052A l i , 2* CCA-14(LOOP 1) 160.1 0-356354-1 B-3 E7822 H INCLUDES COLD LEG MANIFOLD

     >                       160.1   D-356354-3 B-2     E7822                                                                                        _

l 3/4" CCB-41 (V) 160.1 D-356354-3 C-2 E7824 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1, VENTS

                                                                                                - (l)                                             ,.

3/4" CCB-42 (D) 160.1 D-356354-3 C-4 E7824 H RR-23(A) CLASS 2 HYDRO TESTED

                       '                                                                       ' WITH CLASS 1, DRAINS
_ (I) 1813-8 Rev.: 0
                                        * *                   ~       ~

e - r _ _ _ - - . _ _ . . - - _ _ . - + _-----_--._m --

                                                                                                                                  ^

s,, _ J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069 System Pressure Test' Plan ,

2B13- Reactor Coolant System ISI Bdry Exam Period Relief
Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request -Notes / Remarks 2" CCA-21(LOOP 1) 160.1 D-356355-1 E-2 EG2-408, H E7803 3/4" CCA-21 (TC) 160.1 0-356355-1 F-3 E7803 H TEST CONNECTIONS (1)

(LOOP 1)- 3/4" CCB-21 (L1) 160.1 0-356355-1 F-3 E7806 H RR-23(D) CLASS 2 HYDRO TESTED WITH CLASS'1, 3/4"

~

i LINES (2) (LOOP 1) 3/4" CCB-21 (D)(L1) 160.1 D-356355-1 F-4 E7569 H RR-23(D) CLASS 2 HYDRO TESTED WITH CLASS 1, DRAINS (1) (LOOP 1) 3/4" CCB-21 (TC) 160.1 0-356355-1 D-4 E7569 H RR-23(D) CLASS 2 HYDRO TESTED WITH CLASS 1,: TEST CONNECTIONS (1) (LOOP i 1) 2" CCB-21 (L1) 160.1 0-356355-1 F-3 E7806 H RR-23(D) CLASS 2 HYDRO TESTED WITH CLASS 1. t ! 3" CCB-21 160.1 0-355h 5-1 F-4 EG2-243 H RR-23(D) CLASS 2 HYDRO TESTED . WITH CLASS 1. ! PENETRATION (NO. 19) (LOOP I) 1B13-9 Rev.: 0 __- u- - - , _- _ ; . .- - _ . , _ . . _.i

s

                                             =                                            ~P                     a                                                                   .

w .. J. M. Farley Nuclear Plant - Unit 2, Class 1 Components 'FNP-2-M-069

                    .                                System Pressure Test Plan 2B13- Reactor Coolant System ISI Bdry                           Exam Period     Relief Line No.               Hydro No. Dwg. No. Coord. 150 Dwg. 3       1     2   Request      Notes / Remarks.

1" CCB-50 160.1 D-356355-1 D-5 E6424 H RR-23(D) CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 1) 3/4" CCB-21 (L2) 160.1 0-356355-1 E-3 E7806 H RR-23(D) CLASS 2 HYDRO TESTED , WITH CLASS 1, 3/4" LINES (2) (LOOP 2) 2* CCB-21 (L2) 160.1 D-356355-1 E-3 E7806 H RR-23(D) CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 2) 3/4" CCB-21 (L3) 160.1 0-356355-1 E-3 E7806 H RR-23(D) CLASS 2 HYDRO TESTED WITH CLASS 1, 3/4" LINES (2) (LOOP 3) , 2" CCB-21 (L3) 160.1 D-356355-1 E-3 E7806 H RR-23(D) CLASS 2 HYDRO TESTED-WITH CLASS 1. (LOOP 3) 2* CCA-26(LOOP 1) f60.1 D-356355-1 0-4 E7862 H . 3/4" CCA-26 (V) 160.1 D-356355-1 D-4 E7861 H VENTS (1) (LOOP 1) , 3/4" CCB-22 (L1) 160.1 D-356355-1 C-4 E7861 H RR-23(E) CLASS 2 HYDRO TESTED l WITH CLASS 1, 3/4"

LINES (2) (LOOP 1) t i 3/4" CCB-22 (TC) 160.1 D-356355-1 B-5 E7863 H RR-23(E) CLASS 2 HYDRO TESTED WITH CLASS 1, TEST .
CONNECTIONS (1)(LOOP t I) 1B13-10 Rev.: 0
                                                 - .                   ,~       r   ,                 .
                 ',/

J. M. Farley Nuclear Plant - Unit 2, Class I Components FMP-2-M-069 System Pressure Test Plan 2B13- Reactor Coolant System -, ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. . Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" CCB-22 (D) 160.1 0-356355-1 B-6 E7863, H RR-23(E) CLASS 2 HYDRO TESTED E6672 WITH CLASS 1, DRAINS (2) (LOOP 1) 2" CCB-22 (LI) 160.1 D-356355-1 C-4 E7861 ' H RR-23(E) . CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 1). 3" CCB-22 160.1 D-356355-1 B-5 E7861 H RR-23(E) CLASS 2 HYDRO TESTED WITH CLASS 1, PENETRATION (NO. 20) (LOOP 1) 160.1 D-356355-1 A-4 E7861 H RR-23(E) CLASS 2 HYDRO TESTED j 3/4" CCB-22 (V) WITH CLASS 1, VENTS (1) (LOOP 3) 4 3/4" CCB-22 (L2) 360.1 D-356355-1 B-4 E7861 H RR-23(E) CLASS 2 HYDRO TESTED

  • WITH CLASS 1, 3/4" LINES (2) (LOOP 2) 2" CCB-22 (L2) 160.1 D-356355-1 B-4 E7861 H RR-23(E) CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 2) 3/4" CCB-22 (L3) 160.1 D-356355-1 A-4 E7861 H RR-23(E) CLASS 2 HYDRO TESTED WITH CLASS 1, 3/4" LINES (2) (LOOP 3) 2" CCB-22 (L3) 160.1 D-356355-1 A-4 E7861 H RR-23(E) CLASS 2 HYDRO TESTED.

WITH CLASS 1. (LOOP 3) 1B13-11 Rev.: 0 4

                                                         -,,            ~          _                --,. ~       ,  , ., - -

p . J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069

                    .,                        . System Pressure Test Plan                                              ,

2B13- Reactor Coolant System ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 -1 2 -Request Notes / Remarks 2* CCA-29(LOOP 1) 160.1 D-356355-1 G-4 E7812 H 3/4" CCA-29 (TC) 160.1 D-356355-1 F-4 E7812 H TEST CONNECTIONS (1) (LOOP 1) 3/4" CCA-29 (TC) 160.1 D-356355-1 G-3 E7812 H TEST CONNECTIONS (1) (LOOP 2) 3/4" CCB-30 (LI) 160.1 D-356355-1 H-4 E7809 H RR-23(F) CLASS 2 HYDRO TESTED WITH CLASS 1, 3/4" LINES (2) (LOOP 1) < 3/4" CCB-30 (D) 160.1 D-356355-1 H-3 E7570 H RR-23(F) CLASS 2 HYDRO TESTED WITH CLASS 1, DRAINS i (1) (LOOP 1) 3/4" CCB-30 (TC) 160.1 0-356355-1 H-4 E7570 H RR-23(F) CLASS 2 HYDRO TESTED WITH CLASS 1, TEST i CONNECTIONS (1) (LOOP

                                                                                                ,1) 2" CCB-30 (L1)         160.1   D-356355-1 G-4       E7809-      H                 RR-23(F)   CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 1).

3" CCB-30 (LI) 160.1 D-356355-1 H-3 EG2-413 H RR-23(F) CLASS 2 HYDRO TESTED ' WITH CLASS 1,  !' PENETRATION (NO. 81)' (LOOP 1) 3/4" CCB-30 (L2) '- 160.1 D-356355-1 H-3 E7809' H RR-23(F) CLASS 2 HYDRO TESTED WITH CLASS 1, 3/4"  ! LINES (2) (LOOP 2) IB13-12 Rev.: 0

p.

         -                                                                L.)                                                     G 9

J. M. Farley Nuclear Plant - Unit.2, Class 1 Components FNP-2-M-069 System Pressure Test Plan , 2B13- Reactor Coolant System _ ISI Bdry . Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks-160.1 D-356355-1 H-3 E7809 H RR-23(F) CLASS 2 HYDRO TESTED 2* CCB-30 (L2) WITH CLASS 1. (LOOP 2) 160.1 D-356355-1 H-3 E7809 H RR-23(F) CLASS 2 HYDRO TESTED 3/4" CCB-30 (L3) WITH CLASS 1, 3/4" LINES (2) (LOOP 3) 160.1 D-h56355-1 G-3 E7809 H RR-23(F) CLASS 2 HYDRO TESTED 2" CCB-30 (L3) WITH CLASS 1. (LOOP 3) 2* CCA-30(LOOP 1) 160.1 0-356355-1 F-3 E7812 H 3/4" CCA-30 (TC) 160.1 D-356355-1 F-3 E7812 H TEST CONNECTIONS (1) (LOOP 1) 3/4" CCA-30 (TC) 160.1 0-356355-1 G-3 E7812 H TEST CONNECTIONS (1) (LOOP 2) 160.1 D-356355-1 G-2 E7812 H TEST CONNECTIONS (1) 3/4" CCA-30 (TC) (LOOP 3) 160.1 D-356355-1 H-3 E7811 H RR-23(G) CLASS 2 HYDRO TESTED 3/4" CCB-31 (L1) WITH CLASS 1, 3/4" - LINES (2) (LOOP 1) 160.1 0-356355-1 J-3 E7863 H RR-23(G) CLASS 2 HYDRO TESTED 3/4" CCB-31 (D) (L1) WITH CLASS 1, DRAINS (1) (LOOP 1) 160.1' D-356355-1 J-6 E6670 H RR-23(G) CLASS 2 HYDRO TESTED 3/4" CCB-31 (D) l('l) WITH CLASS 1, DRAINS (1) (LOOP 1) 1B13-13 Rev.: 0

J. M. Farley Nuclear Plant - Unit 2, Class I Components FNP-2-M-069 System Pressure Test Plan

  • 2813- Reactor Coolant System ,,

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. ~3 1 2 Request Notes / Remarks , 3/4" CCB-31 (TC) 160.1 D-356355-1 J-4 E7863 H RR-23(b) CLASS 2 HYDRO TESTED WITH CLASS 1, TEST CONNECTIONS (1) (LOOP 1) 2" CCB-31 (L1) 160.1 D-356355-1 H-3 E7811 H RR-23(G) CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 1) 3" CCB-31 (L1) 160.1 D-356355-1 J-5 EG2-415 H RR-23(G) CLASS 2 HYDRO TESTED j WITH CLASS 1, , PENETRATION (NO. 80)  ; (LOOP 1) 3/4" CCB-31 (L2) 160.1 D-356355-1 H-2 E7811 H RR-23(G) CLASS 2 HYDRO TESTED i WITH CLASS 1, 3/4" LINES (2) (LOOP 2) 2" CCB-31 (L2) 160.1 D-356355-1 H-2 E7811 H RR-23(G) CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 2) 3/4" CCB-31 (L3) 160.1 0-356355-1 H-2 E7811 H RR-23(G) CLASS 2 HYDRO TESTED , WITH CLASS 1, 3/4" LINES (2) (LOOP 3) . 2" CCB-31 (L3) 160.1 D-356355-1 H-2 E7811 H RR-23(G) CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 3) 1" CCB-36(A-B)(LOOP 1) 160.1 D-356354-1 D-6 E7998, H RR-25 VISUAL EXAN DURING E7999- CLASS 1 HYDRO TEST 1813-14 Rev.: 0

                                                                                                                                                               -                        -   ,.        ._   _ ~. ,          .
                      ?
                                                                                                                                                    ~ I
                                                                                                                                                     .J J. M. Farley Nuclear Plant - Unit 2, Class 1 Components              FMP-2-M-069 System Pressure Test Plan                                                  ,

2B13- Reactor Coolant System .. H ISI Bdry Exam Period Relief. Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request i Notes / Remarks 160.1 D-356354-1 B-6 E7998, H RR-25 VISUAL EXAM DURING 3/8" CCB-36 E7999 CLASS 1 HYDRO TEST 160.1 D-356354-1 C-6 E7998, H RR-25 VISUAL EXAM DURING 3/4" CCB-36 E7999 CLASS 1 HYDRO TEST 31' CCA-12(LOOP 2) 160.1 0-356354-1 G-1 E5367 H 2" CCA-17 160.1 0-356354-1 H-2 E7591 H 160.1 D-356354-1 H-2 E7591 H RR-23(A) CLASS 2 HYDRO TESTED 3/4" CCB-27 WITH CLASS 1. 3/4" CCB-33 160.1 D-356354-1 E-2 E7608 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1. 29" CCA-11(LOOP 2) ,160.1 0-356354-1 E-5 E5367 H HOT LEG 27.5" CCA-10(LOOP 2) 160.1 0-356354-1 G-4 E5367 H 14" CCA-18(LOOP 2) 160.1 D-356354-1 F-3 E5365 H PRESSURIZER SURGE LINE

       >                          160.1           D-356354-2 J-6            E5365                                                            -

12" CCA-24(LOOP 2) 160.1 D-356354-1 G-4 EG2-100 H

        >                         160.1           0-356355-2 D-1            EG2-410                                                       .-

3/4" CCA-24 (V) ,, 160.1 D-356355-2 D-2 E7625 H VENTS (1) 1813-15 Rev.: 0

w J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FMP-2-M-069 System Pressure Test Plan , 2B13- Reactor Coolant System _, ISI Bdry Exam Period Relief i Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks 3/4" CCA-24 (V) 160.1 0-356354-1 F-4 E7925 H VENT (1) 160.1 D-356355-2 D-5 E7589 H RR-23(H) CLASS 2 HYDRO TESTED 3/4" CCB-53 WITH CLASS 1. 160.1 D-356355-2 D5 1 E7589 H RR-23(H) CLASS 2 HYDRO TESTED 3/4" CCB-54 WITH CLASS 1. 160.1 0-356355-2 D-5 E7589 H RR-23(H) CLASS 2 HYDRO TESTED 3/4" CCB-54 (D) WITH CLASS 1, DRAINS i (1) 12" CCB-24 160.1 D-356355-2 D-5 EG2-410, H RR-23(H) CLASS 2 HYDRO TESTED EG2-424 WITH CLASS 1. I 6" CCA-20(A)(LOOP 2) 160.1 D-356354-2 E-5 EG2-453 H

                          ~160.1   D-356354-2 D-5      E7814      H                                             RR-23(A)                                                               CLASS 2 HYDRO TESTED 3/4" CCB-39 (D)                                                                                                                                                                    WITH CLAS5 1, DRAINS (1) 6' CCA-20(B)(LOOP 2)     160.1    D-356354-2 E-4      EG2-453    H
                                                                                                                                                                                                                   ~

160.1 0-356354-2 D-4 E7814 H RR-23(A) CLASS.2 HYDRO TESTED

3/4" CCB-39 (D) WITH CLASS 1, DRAINS ,
                                                                                                                                                                                     -(1)
                                                                                                                                                                                                                 ~

6* CCA-20(C)(LOOP 2) 160.1 .D-356354-2 E-3 EG2-453 H

                          '160.1    D-356354-2 D-3      E7814      H                                             RR-23(A)                                                               CLASS 2 HYDRO TESTED 3/4" CCB-39 (D)                                                                                                                                                                     WITH CLASS 1, DRAINS l

(1) 1813-16 Rev.: 0

2, c_

                       ,.                                                                                              .(   ,

t J. M. Farley Nuclear Plant - Unit' 2, Class 1 Components - FNP-2-M-069

                                             -System Pressure Tc3t Plan                                            ,               ,

2B13- Reactor Coolant System .. ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks-6* CCA-20(RL)(LOOP 2) 160.1 D-356354-2 E-3 EG2-453 H i 3* CCA-20 (A) 160.1 D-356354-2 D-2 EG2-453 H TO PORV QV053 3" CCA-20 (B) 160.1 D-356354-2 E-2 EG2-453 H TO PORY QV061 5" CCA-22(LOOP 2) 160.1 0-356354-1 G-5 EG2-100 H  ;

    >                     160.1   D-356355-1 D-4      EG2-412
    >                     160.1   D-356355-2 F-1      EG2-414 3/4" CCA-22 (V)       160.1   D-356355-1 0-2      E7631        H                          VENTS (1)                            !

3/4" CCA-22 (V) 160.1 0-356354-1 G-5 E7925 H VENTS (1) 3/4" CCB-22 (V) 160.1 D-356355-2 F-2 E7864 H RR-23(J) CLASS 2 HYDRO TESTED YITH CLASS 1, VENTS (1) 3/4" CCB-?2 (V) 160.1 D-356355-2 G-2 E7864 H RR-23(J) CLASS 2 HYDRO TESTED 4 WITH CLASS 1, VENTS (1) - I 6" CCB-22 160.1 0-356355-2 F-2 EG2-414 H RR-23(J) CLASS 2 HYDRO TESTED WITH CLASS 1. 4" CCA-22 160.1 D-356355-1 0-3 EG2-412 H 10" CCB-22 160.1 D-356355-2 F-2 EG2-414 H RR-23(J) CLASS 2 HYDRO TESTED' WITH CLASS 1. 1813-17 Rev.: 0

                                                                  ._-..~.a.,          .     .                   _

u.-

w ,

                                                                                                                                                       ~ i t                                                                                                                                                                              .

1 J. M. Farley Nuclear Plant - Unit 2, Class 1 Compor.ents FMP-2-M-069 System Pressure Test Plan , 4 2813- Reactor Coolant System .. 151 Bdry Exam Period Relief Lina No. Hydro No. Dwg. ho. Coord. ISO Dwg. 3 1 2- Request Notes / Remarks 6" CCA-27(LOOP 2) 160.1 D-356354-1 E-5 EG2-100 H , > 160.1 D-356355-1 G-1 EG2-412-s 3/4" CCA-27 (D) 160.1 0-356355-1 G-2 E7572 H DRAINS (1) 3/4" CCA-27 (V) 160.1 0-356354-1 E-5 E7633 H VENTS (1) 3/4" CCA-27 (V) 160.1 D-356355-1 G-2 E7629 H VENTS (1) 160.1 D-356354-1 G-4 EG2-Il2 H TO PRESSURIZER SPRAY. 4 4" CCA-15(LOOP 2)

    >                     160.1   D-356354-2 G-8      EG2-112 3/4" CCA-15 (D)       160.1   D-356354-2 G-8      E7557         H                                     DRAINS (1) 3/4" CCA-15 (V)       1,60.1   0-356354-1 G-4     E7925         H                                     VENTS (1) 3/4" CCB-57           160.1    D-356354-2 F-7     E7514         H                     RR-23(B)        CLASS 2 HYDRO TESTED WITH CLASS 1.                                                                           ,

3/4" CCA-15(V) 160.1 D-356354-2 G-7 E7816 H VENTS (1) 3* CCA-7(LOOP 2) 160.1 D-356354-1 G-4 EG2-100 H

    >                     160.1    0-356356-1 B-2      EG2-608 G                                                                                                                                                                                                     '

3/4" CCA-7 (V) 160.1 D-356354-1 E7925 H VENTS (1) 3/4" CCA-7 (D) 160.1 D-356356-1 B-2 E7559 H DRAINS (1) 1B13-18 Rev.: 0 l

                                                          -    ,  -          -  -- - .~ ,         _.n :-_ _ . --     ,_  _

O t O O J. M. Tarley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069

                       -                                   System Pressure Test Plan                                               ,

2813- Reactor Coolant System .. ISI Bdry Exam Period Relief Line b. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks , j 3* CCB-10 160.1 0-356356-1 B-3 EG2-606 H RR-23(L) CLASS 2 HYDRO TESTED WITH CLASS 1. ! 3/4" CCB-45 160.1 0-356356-1 B-3 E7819 H RR-23(M) CLASS 2 HYDRO TESTED WITH CLASS 1. 2* CCA-9(LOOP 2) 160.1 0-3563544 E-6 E7816, H E7817, E7818 4 > 160.1 0 356356-1 0-2 E7816, E7817, . E7818 8 160.1 D-356354-1 E-4 E7855 H INCLUDES ;0T LFC 2* CCA-13(LOOP 2) MANIFOLD

                                  ~
          >                      '160.1        D-356354-3 B-6      E7855 3" CCA-19                 160.1      D-356354-3 B-4      EG2-Il4     H

\ 160.1 0-356354-3 C-6 E7856 H RR-23(A) CLASS 2 HYDRO TESTED ' 3/4" CCB-40 (V) WITH CLASS 1, VENTS - (2) 1 ! 3/4" CCB-43 (D) 160.1 D-356354-3 C5 E7856 H RR-23(A) CLASS 2 HYDRO TESTED l '41TH CLA' '

                                                                                                                           , DRAINS-i                                                                                                           (2)
                           ~

3/4" CCB-44 '160.1 0-356354-3 C-4 E7577 H R2-23(A) CLASS 2 HYDRO TESTED 1 WITH CLASS 1, 10 VALVES QV0518. QV052B i 1813-19 Rev.: 0 ! t

O  : O O J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069 System Pressure Test Plan 2B13- Reactor Coolant System .'.

ISI Bdry Exam Period Relief f

Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 28 CCA-14(LOOP 2) 160.1 D-356354-1 G-3 E7855 H INCLUDES COLD LEG MANIFOLD

                                           >                       160.1    D-356354-3 B-2            E7855 3/4" CCA-14 (V)         160.1    D-356354-1 G-3            E7855    h                          VENTS (1) 3/4" CCB-41 (V)         160.1    0-356354-3 C-2            E7856    H                 RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1, VENTS (1) l 3/4" CCB-42 (D)         160.1    0-356354-3 C-4            E7856    H                 RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1, DRAINS                             l

! (1) l 2" CCA-21(LOOP 2) 160.1 D-356355-1 D-3 E7807 H j 3/4" CCA-21 (D) 160.1 D-356355-1 E-3 E7807 H DRAINS (1) 3/4" CCA-21 (TC) 160.1 D-356355-1 E-3 E7807 H TEST CONNECTIONS (1) 2* CCA-26(LOOP 2) 160.1 D-3563r5-1 C-3 E7862 H , 3/4" CCA-26 (V) 160.1 D-356355-1 C-3 E7862 H VENTS (1) 2* CCA-29(LOOP 2) 160.1 D-356355-1 G-3 E7812 H

3/4" CCA-29 (TC) 160.1 D-356355-1 G-3 E7812 H TEST CONNECTIONS (1}'

2* CCA-30(LOOP 2) 160.1 0-356355-1 G-2 E7809 H i 1813-20 Rev.: 0

O E O O J. M. Farley Nuclear Plant - Unit 2, Class I Components FNP-2-M-069

                                                    ,                                                    System Pressure Test Plan                                                              '

2813- Reactor Coolant System ISI Bdry Exam Period Relief , Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" CCA-30 (TC) 160.1 0-356355 G-2 E7809 H TESTCONNECTIONS(1) 3/4" CCA-34(A)(LOOP 2) 160.1 0-356354-2 G-3 E7850 H

3/4" CCB-38 160.1 0-356354-2 G-3 E7860 H RR-23(A) CLASS 2 HYDRO TESTED .

' WITH CLASS 1, TO VALVE t QV023A 3/4" CCA-34(C)(LOOP 2) 160.1 0-356354-2 G-5 E7860 H 3/4" CCB-38 160.1 D-356354-2 G-5 E7860 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1, TO VALVE

,                                                                                                                                                              QV023C i

3/4' CCA-35(LOOP 2) 160.1 0-356354-2 H-4 E7860 H I 3/8" CCB-55 160.1 0-356347-1 B-2 E9826 H RR-23(C) CLASS 2 HYDRO TESTED ' WITH CLASS 1, PENETRATION (NO. 57) 3/8" CCB-55 (TC) 160.1 D-356347-1 B-2 E9826 H RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1, TEST CONNECTIONS (1) . ! 3/t" CCB-55 160.1 D-356354-2 H-4 E7860, H RR-23(C) CLASS 2 HYDRO TESTED E9825 WITH CLASS 1.

> 160.1 0-356347-1 B-2 E9826 CLASS 2 HYDRO TESTED WITH CLASS 1, l ~

4 PENETRATION (NO. 57) 4 IB'3-21 Rev.: 0 n re %e- w ---y e prer ie'i*w- ew 4 * -e-- --'b- ww <g wwe-, e -eeew -,-yv-

J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-N-069

                                                                          ,                            System Pressure Test Plan 2B13- Reactor Coolant System                                                                                                                  _.

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 4 3/4' CC8-38(LOOP 2) 160.1 D-356354-2 G-4 E7860 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1, TO VALVES QV0238, QV033A 3/4' CCB-54(LOOP 2) 160.1 D-356354-2 E-2 EG2-453 H RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1.

                                  >                                                160.1   D-356347-2 F-1      E9800                                    CLASS 2 HYDRO TESTED

' WITH CLASS 1, PEMETRATION (NO. 56) 4 3/8" CCB-54 160.1 D-356347-2 F-2 E9800 H RR-23(C) CLASS 2 HYDRO TESTED

                                                                                 -                                                                      WITH CLASS 1, PENETRATION (NO. 56) 3/8" CCB-54 (TC)                                 160.1   D-356347-2 F-2      E9800       H                   RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1. TEST CONNECTIONS (1) 3/4" CCB-54 (V)                                 160.1   D-355354-2 E-3      EG2-453     H                   RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1, VENT (1)

! 3/4* CCB-56(LOOP 2) 160.1 D-356354-1 E-4 E7614 H RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1 i j

                                   >                                               100.1   D-356347-I B-2      E9812                                    CLASS 2 HYDRO TESTED WITH CLASS 1,             .

PENETRATION (NO. 58), 3/8" CCB-56 160.1 D-356347-1 B-2 E7614 H RR-23(C) CLASS 2 HYDRO TESTED i WITH CLASS 1. PENETRATION (NO. 58)

i 1813-22 Rev.
0 i

_.___________________,_.__.____m _ _ _ __ , - - , . . - - -.. _ , - .

w ~ O t O O J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069 System Pressure Test Flan , 2813- Reactor Coolant System .. . 151 Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks { 3/8" CCB-56 (TC) 160.1 D-356347-1 B-2 E7614 H RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1, TEST CONNECTIONS 31' CCA-12(LOOP 3) 160.1 D-356354-1 C-12 E5368 H 1 3/4" CCB-33 160.1 D-356354-1 C-Il E7609 H RR-23(A) CLASS 2 HYDRO TESTED WI1H CLASS 1.

29' CCA-11(LOOP 3) 160.1 D-356354-1 C-8 E5368 H HOT LEG l

27.5" CCA-10(LOOP 3) 160.1 0-356354-1 B-9 E5368 H 12' CCA-16(A)(LOOP 3) 160.22 D-356358-1 G-2 EG2-012 H HYDRO NO. 22 3/4" CCA-16 (V) 160.22 D-356358-1 G-2 E7575 H VENT (1) l 3/4" CCA-16 (TC & D) 160.22 D-356358-1 G-2 E7573 H DRAINS & TEST CONNECTIONS (2) 3/4" CCA-16 (TC & D) 160.22 D-356358-1 G-2 E7575 H DRAINS & TEST CONNECTIONS (2) I 12* CCA-16(8)(LOOP 3) 160.1 0-356354-1 C-8 EG2-454 H

           >                                      160.1   D-356358-1 G-2         EG2-012 3/4" CCB-34                            160.1   D-356354-1 C-9         EG2-454    H               RR-23(A)      CLASS 2 HYDRO TESTED' WITH CLASS 1.

3 i 1813-23 Rev.: 0

                                                                            .             .    . _.                 . . . _ - _ _ _ . ____-_     _ - _ =_ - __ _ -

p _ m b J. M. Farley Nuclear Plant - Unit 2, Class I Components FNP-2-M-069 System Pressure Test Plan 2813- Reactor Coolant System .', ISI Bdry . Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 12" CCA-24(LOOP 3) 160.1 D-356354-1 A-7 EG2-454 H

    >                     160.1    D-356355-2 E-1      EG2-410, EG2-454 3/4" CCA-24 (V)       160.1    D-356354-1 B-7      E7898       H                                 VENT.(1) 3/4" CCA-24 (V)       160.1    D-356355-2 0-1      E7626       H                                 VENT (1) 3/4" CCB-53           160.1    D 356355-2 0-8      E7590       H                  RR-23(H)       CLASS 2 HYDRO TESTED WITH CLASS 1.

1 3/4" CCB-54 160.1 D-356355-2 E-7 E7590 H RR-23(H) CLASS 2 HYDRO TESTED WITH CLASS 1. j 3/4" CCB-54 (D) 160.1 D-356355-2 E-7 E7590 H RR-23(H) CLASS 2 HYDRO TESTED WITH CLASS 1, DRAINS

(1) 12" CCB-24 160.1 0-356355-2 D-8 EG2-424 H RR-23(H) CLASS 2 HYDRO TESTED WITH CLASS 1.

, 6' CCA-22(LOOP 3) 160.1 0-356354-1 C-7 EG2-454 H

    >                      160.1   D-356355-1 C-1      EG2-454 l    >                       160.1  D-356355-2 E-1      EG2-411,                                                                    '

EG2-414 D-356354-1 C-7 3/4" CCA-22 (V) 160.1 E7898 H VENTS (1) 1813-24 Rev.: 0

s

                        .                                                                                                 v J. M. Farley Nuclear Plant - Unit 2, Class 1 Components        FNP-2-N 069
                      ,                            System Pressure Test Plan 2813- Reactor Coolant System                                                                                    ,

ISI Bdry Exam Period Relief line No. Hydro No. Dug. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" CCA-22 (D) 160.1 D-356355-1 0-3 E7579, H DRAINS (2) E7585 3/4" CCA-22 (V) 160.1 D-356355-1 C-3 E7578 H VENTS (1) 3/4" CCB-32 (TC) 160.1 0-356355-2 E-2 E7864 H RR-23(J) CLASS 2 HYDR 0 TESTED W/ CLASS 1. TEST CONNECTIONS (2) 6* CCB-22 160.1 D-356355-2 E-2 EG2-414 H RR-23(J) CLASS 2 HYDRD TESTED WITH CLASS 1. 8" CCA-22 160.1 D-356355-1 C-3 EG2-411 H 10" CCB-32 160.1 D-356355-2 F-2 EG2-414 H RR-23(J) CLASS 2 HYDRO TESTED WITH CLASS 1,

                              ,                                                                 PENETRATION (NO. 15) 6* CCA-28(LOOP 3)            160.1    D-356354-1 D-7      EG2-411,    H EG2-454
      >                       160.1    D-356355-1 H-1      EG2-454 3/4" CCA-28 (V)          160.1    D-356354-1 G-7     E7898        H                        VENTS (1) 3/4" CCA-28 (V)          160.1    D-356355-1 G-2     E7627        H                        VENTS (1) 3/4" CCA-28 (D)          160.1    D-356355-1 G-2     E7810        H                        DRAINS (2) 2" CCA-28                160.1    D-356355-1 G-2     E781O        H 1813-25                                    Rev.: 0

O t O O J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069 System Pressure Test Plan

2813- Reactor Coolant System [.

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 2* CCA-13(LOOP 3) 160.1 0-356354-1 D-8 E7820 H INCLUDES HOT LEG i MANIFOLD

                                                   >                    160.1     D-356354-3 B-6          E7820 3" CCA-19            160.1     D-356354-3 C-4          EG2-115    H 3/4" CCB-40 (V)      160.1     D-356354-3 C-6          E7821      H                 RR-23(A)        CLASS 2 HYDRO TESTED WITH CLASS 1, VENTS i                                                                                                                                                        (2)                                                  -

I 3/4" CCB-43 (D) 160.1 D-356354-3 C-5 E7821 H RR-23(A) CLASS 2 HYDRO TESTED j WITH CLASS 1, DRAINS ! (2) I

3/4" CCB-44 160.1 D-356354-3 C-4 E7531 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1, TO VALVES QV0510, QV052C ,

2* CCA-14(LOOP 3) 160.1 0-356354-1 B-10 E7820 H INCLUDES COLD LEG MANIFOLD

                                                   >                    160.1      D-356354-3 B-2         E7820                                                                                         .

3/4" CCB-41 (V) 160.1 D-356354-3 C-2 E7821 H RR-23(A) CLASS 2 HYDRO TESTED WITH CLASS 1, VENTS

(1) ,

! 3/4" CCB-42 (D) 160.1 D-356354-3 C-4 E7821 H RR-23(A) CLASS 2 HYDRO TESTED

                                                                   ~

WITH CLASS 1, DRAINS (1) I 1B13-26 Rev.: 0

i J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069 System Pressure Test Plan , 2813- Reactor Coolant System 4 ISI Bdry Exam Period Relief-i Line No. Hydro No. Dwg. No. Coord. 150 Dwg. '3 1 2 Request Notes / Remarks 2'CCA-17(L90P3) 160.1 D-356354-1 B-Il E7525 H

2' CCA-21(LOOP 3) 160.1 D-356355-1 C-3 E7808 H 3/4" CCA-21 (V) 160.1 0-356355-1 C-2 E7808 H VENTS (1) 3/4" CCA-21 (TC) 160.1 0-356355-1 E-3 E7808 H TEST CONNECTIONS (1)

, 2' CCA-26(LOOP 3) 160.1 D-356355-1 C-3 E7862 H + 2' CCA-29(LOOP 3) 160.1 D-356355-1 G-3 E7810 H 3/4" CCA-29 (TC) 160.1 D-356355-1 G-3 E7810 H TEST CONNECTIONS (1) l 3/4" CCA-29 (V) 160.1 D-356355-1 G-1 E7627 H VENTS (1) I 2' CCA-30(LCOP 3) 1,60.1 D-356355-1 G-2 H j 3/4" CCA-30 (TC) 160.1 D-356355-1 G-2 H TEST CONNECTIONS (1) i ! l' CCA-4(LOOP 3) 160.1 D-356354-1 B-11 E7525 H

                                   >                              160.1                                                       D-356356-1 C-6               E7526

, 3/4" CCH-37(LOOP 3) 160.1 D-356354-1 0-10 E7615 H RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1.

                                   >                              160.1                                                       D-356347-1 C-2               E9832                                                              CLASS 2 HYDRO TESTED' i

WITH CLASS 1, j PENETRATION (NO. 58) 4 1813-27 Rev.: 0

                                                                                                                                ,         w a          -r v      r--   . -. --#s,    -r   .     . . - - , +     .=,.-,m.,-e-y             . .-.a- ..w..-   - .-e . -,%e. ,. . . ~

O  : O O J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069 System Pressure Test Plan 2813- Reactor Coolant System .', , ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/8" CCB-37 160.1 D-356347-1 0-2 E9832 H RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1, PENETRATION (NO. 58) 3/8" CCB-37 (TC) 160.1 D-356347-1 C-2 E9832 H RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1, TEST CONNECTIONS (1) 3/8" CCB-37 (TC & D) 160.1 D-356347-1 C-4 E9832 H RR-23(C) CLASS 2 HYDRO TESTED WITH CLASS 1, TEST ' CONNECTIONS (1) & DRAINS (1) , t J 1B13-28 Rev.: 0 _ _ _ _ - _ _ _ _ - _ _ - _ - _ _ _ - _ _ _ _ _ - -. . - . - . . - ,. . . - . .-. .- - - - . ~ - .

s  ! a J. M. Farley Nuclear Plant - Unit 2, Class 1 Components FNP-2-M-069 System Pressure Test Plan , 2E21- Chemical and Volume Control .. ISI Bdry Exam Period Relief-Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks 2* CCA-1A 160.1 D-356356-1 F-3 E7568 H I- I 3/4" CCB-46A (D) 160.1 D-356356-1 F-3 E7568 H I 1 CLASS 2 HYDRO TESTED WITH CLASS 1, DRAIN (1) 1 1/2" CCA-1A 160.1 D-356356-1 F-4 E7568 H I I 2* CCA-18 160.1 D-356356-1 F-3 E7532 H I I 3/4" CCB-468 (D) 160.1 0-356356-1 F-3 E7532 H I I CLASS 2 HYDRO TESTED WITH CLASS 1, IMtAIN (1) 1 1/2" CCA-18 160.1 D-356356-1 F-4 E7532 H I I 2* CCA-IC 1,60.1 D-356356-1 F-3 E7828 H I I 3/4" CCB-46C (D) 160.1 D-356356-1 F-3 E7828 H I I CLASS 2 HYDRO TESTED WITH CLASS 1, DRAIN (1) I 1/2" CCA-1C 160.1 D-356356-1 F-4 E7828 H I I - 3/4* CCA-32(A) 160.1 D-356356-1 F-3 E7888 H I I 3/4" CCB-49A (V) 160.1 D-356356-1 F-2 E7888 H I I CLASS 2 HYDRO TESTED, . WITH CLASS 1, VENT (1) 3/4* CCA-32(8) 160.1 D-356356-1 F-3 E7888 H I I IE21-1 Rev.: 0

o h o -

                                                                                                           - -                                       cy J. M. Farley Nuclear Plant - Unit.2, Class 1 Components                        FNP-2-M-069-2E21- Chemical a'nd Volume Control                                                                                                           ,'_                            ,

ISI Bdry - Exam Period Relief

Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" C00-498 (V) 160.1 D-356356-1 F-2 E7888 H I' I CLASS 2 HYDRO TESTED WITH CLASS 1, VENT (1) 3/4" CCA-32(C) 160.1 0-356356-1 F-3 E7888 H I I 3/4' CCB-49C (V) 160.1 D-356356-1 F-2 E7888 H I I CLASS 2 HYDRO TESTED j WITH CLASS 1, VENT (1) i l

4 l

                                                                                    ~

i . . i i i i

                                                                                                                                                  ~~

IE21-2 Rev.: 0

e i

    /   'T                                                                     FNP-2-M-069
    ')           .

Class 2 System Pressure Testina

1. RE001REMENTS 7

ASME Code Class 2 pressure retaining components are required to have the i following three types of system pressure tests to be performed on a regular basis. A. System Functional and inservice Tests (Ref. Basis,11 B and C) i 1. The pressure retaining boundary includes only those portions of the ' ' system required to operate or support the safety system function up to and including the first normally closed valve (including a safety - or relief valvo) or valve capable of automatic closure when the safety function is required.

2. The nominal operating or inservice operating pressure of the system test or system operation shall be acceptable as the test pressure '

f- the system functional or system inservice test, respectively. fj 3. Where portions of a system are subject to system )ressure tests V associated with two different system functions, tie VT-2 examination need only be performed during the test conducted at the higher of the test pressure of the respective system function. B. Syltem Hydrostate Test (Ref. Basis, 11 D)

1. Hydrostatic testing will be performed to the appropriate procedure listed in Basis - Table 1,
2. The system hydrostatic test pressure and temperature shall be as detailed in Basis - Table I which reflects the requirements of IWC-5222(a) and IWC-5230.
3. In the case of atmospheric storage tanks, the nominal hydrostatic pressure, developed with the tank filled to its design capacity, shall be acceptable as the system test pressure. For 0-15 psi storage tanks, the test pressure shall be 1.1 PG Design Pressure of vapor or gas space above liquid level for which overpressure protection is provided by relief valves. ,
4. For the purpose of the test, open ended portions of a suctio.n or drain line from a storage tank extending to the first shutoff valve
           "              shall be considered as an extension of the storage tank.

(% P2-1 Rev. O

l

  ,~j
          /

FNP-2-M 069

5. For open endedl portions of discharge lines beyond the last shutoff valve in nonclosed systems (e.g., containment spray header),

demonstration of an open flow path test shall be performed in lieu of the system hydrostatic test. Where adjoining pipe sections have different test pressures, the 6. sections should be separated whenever practicable and each section tested at its specified test pressure. Where it is impractical to separate adjoining sections of piping for hydro testing, the sections may be tested together at the lower specified test pressures.

7. Where closed valves are used to establish the hydrostatic test boundaries, precautions must be taken to assure that components on the low pressure side of the boundary valve are not over-pressurized.
8. Since check valves cannot isolate in the direction of flow, the upstream test pressure shall be used up to the first valve downstream of the check valve.
9. Lines connected to process piping or equipment must be tested to the
    -s process piping test pressure out to the last valve. Downstream of    ,

the last vent or drain valve vents to the atmosphere, or drains to l (V) atmospheric tanks or sumps, may be left untested,

11. TEST MEDIUM ,

1 The contained fluid in the system shall service as the pressurizing medium, except that in steam systems, either water or air may be used. Where air is used, the test procedure shall permit the detection and location of through wall leakages in components of the system tested. III. TEST FRE0VENCIES Test frequencies are established in accordance with Section XI as detailed in the following schedules. System inservice or system functional testing must be performed each inspection period except for the period during which the system hydrostatic test is performed. Hydrostatic test frequency will meet the intent of IWC-2412 to distribute l the examinations evenly throughout the inspection interval. 1 Open ended signifies free discharge that dissipate the transported fluid directly to the open atmosphere (i.e., inside or outside containment

            " structure). As an example, piping terminating in spray devices is considered open ended, k

P2 2 Rev. 0

O O O J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FMP-2-M-069 2B13- Reactor Coolant System _ ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks l' CCB-36(A)(LOOP 1) 160.1 D-356354-1 D-6 E7998, NA I I RR-25 WILL BE VISUALLY E7999 EXAMINED DURING CLASS I HYDRO 3/8" CCB-36 (A) 160.1 0-356354-1 B-6 E7998, NA I I RR-25 WILL BE VISUALLY E7999 EXAMINED DURING CLASS I HYDRO 3/4" CCB-36 (A) 160.1 D-356354-1 C-6 E7998, NA I I RR-25 WILL BE VISUALLY E7999 EXAMINED DURING CLASS 1 HYDRO 1" CC8-36(8)(LOOP 1) 169.1 D-356354-1 D-6 E7998, NA I I RR-25 WILL BE VISUALLY E7999 EXAMINED DURING CLASS 1 HYDRO 3/8" CCB-36 (B) 160.1 D-356354-1 B-6 E7998, NA I I RR-25 WILL BE VISUALLY E7999 EXAMINED DURING CLASS 1 HYDRO 3/4" CCB-36 (B) 160.1 0-356354-1 C-6 E7998, NA I I RR-25 WILL BE VISUALLY E7999 EXAMINED DURING CLASS 1 HYDRO 3/4" CC8-27(LOOP 2) 160.1 0-356354-1 H-1 E7591 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS 3/4" CCB-33(LOOP 1) 160.1 0-356354-1 C-2 E7607 NA I I RR-23(A) CLASS 2 HYDRO TESTED s TO CLASS 1 REQUIREMENTS 2813-1 Rev.: 0

3 i' ed J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 System Pressure Test Plan 2813- Reactor Coolant System ,', ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4' CCB-33(LOOP 2) 160.1 D-356354-1 E-2 E7608 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS 3/4" CCB-33(LOOP 3) 160.1 D-356354-1 C-12 E7609 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS 3/4" CCB-34(LOOP 1) 160.1 D-356354-1 E-4 E7583 NA I I RR-33(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS 3/4' CC8-34(LOOP 3) 160.1 0-356354-1 C-9 E7583 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I a REQUIREMENTS l 3/4" CCB-38(LOOP 2) 160.1 D-356354-2 F-4 E7860 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS

       >                          160.1   0-356354-2 F-4             E7860
       >                          160.1   D-3$6354-2 F-5             E7860                                                                   .
       >                          160.1   D-356354-2 G-5             E7860 1/8" CCB-38 (SS)          160.1   D-356354-2 F-2            E7860      NA            I           I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1

! REQUIREMENTS, PENETRATION (NO. 648) 4 2813-2 Rev.: 0

                                                               .,~

O- U U,m J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 System Pressure Test Plan 2B13- Reactor Coolant System J. ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks

3/4" CCB-39(LOOP 2) 160.1 0-356354-2 D-5 E7814 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS
    >                      160.1  D-356354-2 0-4      E7814 i    >                     160.1  D-356354-2 D-3      E7814 3/4" CCB-40(LOOP 1)      160.1  0-356354-3 C-6      E7825        NA     I      I RR-23(A)    CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS, VENTS (2)

, 3/4" CC8-40(LOOP 2) 160.1 D-356354-3 C-6 E7856 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS, VENTS il (2) 3/4" CC8-40(LOOP 3) 160.1 0-356354-3 C-6 E7821 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS, VENTS (2) 3/4" CCB-41(LOOP 1) 160.1 0-356354-3 C-3 E7824 NA i I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS, VENTS (1) , 3/4" CCB-41(LOOP 2) 160.1 D-356354-3 C-3 E7856 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS, VENTS (I)

2813-3 Rev.
0
                                       ,                                                   e -            -
                                                                                                               +   --     . -_. ,n-- -wmd
                                                                                                                             -3 (m                                                                                                          ,~

J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 System Pressure Test Plan 2B13- Reactor C601 ant System . ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" CCB-41(LOOP 3) 160.1 D-356354-3 C-3 E7821 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS, VENTS (1) 3/4" CCB-42(LOOP 1) 160.1 0-356354-3 C-4 E7824 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS, DRAINS (1) 3/4" CCB-42(LOOP 2) 160.1 D-356354-3 C-4 E7856 NA I I RR-23(A) CLASS 2 HYDRO TESTED

TO CLASS 1 REQUIREMENTS, DRAINS (I) 3/4" CCB-42(LOOP 3) 160.1 D-356354-3 C-4 E7821 NA I I RR-23(A) CLASS 2 HYDRO TESTED

, TO CLASS 1 REQUIREMENTS, DRAINS (I) 3/4" CCB-43(LOOP 1) 160.1 D-356354-3 C-5 E7825 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS, DRAINS

                                                                                                   .(2) 3/4' CC8-43(LOOP 2)      160.1               D-356354-3 C-5   E7856      NA      I     I RR-23(A)  CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS, DRAINS' (2)

I 2B13-4 Rev.: 0

O  : O - O J. M. Farley Nuclea'r Plant - Unit 2, Class 2 Components FNP-2-M-069 System Pressure Test Plan 2813- Reactor C6olant System __ ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 I 2 Request Notes / Remarks 3/4* CCB-43(LOOP 3) 160.1 0-356354-3 C-5 E7821 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS, DRAINS (2) , 3/4" CC8-44(LOOP 1) 160.1 D-356354-3 B-4 E7530 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS, TO VALVES QV051A, QV052A 3/4" CCB-44(LOOP 2) 160,1 0-356354-3 B-4 E7577 NA I I RR-23(A) CLASS 2 HYDRO TESTED

!                                                                                                       TO CLASS 1 REQUIREMENTS, TO VALVES QV051B, QV0528,                               ,

3/4" CC8-44(LOOP 3) 160.1 D-356354-3 B-4 E7531 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I

REQUIREMENTS, TO VALVES QVOSIC, QV052C 3/4" CC8-54(LOOP 2) 160.I D-356354-2 E-2 EG2-453 NA I I RR-23(C) CLASS 2 IfYDRO TESTED TO CLASS I i

REQUIREMENTS i

       >                   160.1     0-356347-2 F-1       EG2-453                                       CLASS 2 HYDRO TESTED

, TO CLASS 1 REQUIREMENTS. PENETRATION (NO. %)' l 3/4" CCB-54 (V) 160.1 D-356354-2 E-3 EG2-453 NA I I RR-23 (C) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS. VENTS (1) 2813-5 Rev.: 0

                   )                                    ,

p d V '\ j J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FN*-2-M-069 System Pressure Test Plan

  • 2B13- Reactor Coolant System ,,

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" CCB-54 (D) 160.1 D-356347-2 F-3 EG2-453 NA I I RR-23 (C) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. DRAINS (I) 3/4" CCB-54 (TC) 160.1 D-356347-2 F-3 EG2-453 NA I I RR-23 (C) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. TEST CONNECTIONS (I) 3/8" CC8-54 160.1 D-356347-2 F-3 EG2-453 NA I I RR-23 (C) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS. 3/4' CC8-55(LOOP 2) 160.1 D-356354-2 H-4 E7860, NA I I RR-23(C) CLASS 2 HYDRO TESTED E9825, TO CLASS 1 E9826 REQUIREMENTS.

                                            ?
      >                                     160.1   D-356347-2 B-2        E9826                                               CLASS 2 HYDRO TESTED
                                                                                                                           , TO CLASS I REQUIREMENTS.

PENETRATION (NO. 57) 3/4" CCB-55 (TC) 160.1 D-356347-1 B-3 E7860 NA I I RR-23 (C) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. TEST CONNECTIONS (1) , 3/8" 008-55 160.1 0-356347-1 B-3 E7860 NA I I RR-23ft) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. 2813-6 Rev.: 0

  -    ._ _ _    _   - - - _ _ _ . - -              - . . _ . _ -     ._        - _ = _        . _ . . - - -   .        --     __ .-         _ _ . _ _ - . . -        --__-- -.

J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FMP-2-M-069 System Pressure Test Plan 2B13- Reactor Cholant System , ... ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" CCB-57(LOOP 1) 160.1 D-356354-2 E-2 E7514 NA I I RR-23(B) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. 3/4" CCB-57(LOOP 2) 160.1 0-356354-2 E-7 E7514 NA I I RR-23(B) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS.

    >                     160.1   D-356354-2 F-7      E7514 3' HCB-40                160.24  0 356354-2 C-10     EG2-430             H      I      I                     PENETRATION (NO. 30)
    >                     160.24  0-356353-1 G-8      EG2-430 3/4" HCB 40 (D)       160.24  D-356354-2 B-10     EG2-430             H      I      I                     DRAINS (1) 3/4" HCB-40 (TC)      160.24  D-356354-2 B-10     EG2-430             H      I      I                     TEST CONNECTIONS (1) l    3/4" HCB-40 (TC)      160.24  D-356354-2 B-10     E7648               H      I      I                     TEST CONNECTIONS (1) 4    3/4" HCB-40 (V)       160.24  D-356354-2 B-10     E7648               H      I      I                     VENTS (1) 2' HC8-62                160.24  0-356354-2 C-6      E7501,              I      I      I       RR-24         PENE' RATION (NO. 59)

E8%9, E9189 1 3/4" HCB-62 (D) 160.24 0-356354-2 C-6 E9189 I I I RR-24 DRAINS (1) 3/4" HCB-62 (TC) 160.24 D-356354-2 C-6 E9189 I I I RR-24 TEST CONNECTIONS (1) 2813-7 Rev.: 0

                                         ..                     - . - - -          ,.     . + ,        .r - _    ,       ,-i.,-,,   m_.-+, . _ _ - - ~ w, - ..a
                                                                                                                                                                                             ;    \s_ '

J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-N-069 2B13- Reactor Coolant System 2. ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks l' HCB-62 (1) 160.24 D-356354-2 C-6 E9189 I I I RR-24 TO VAEVES QV/63A,8 I 1" HCB-62 (2) 160.24 D-356354-2 C-7 E8974 I I I RR-24 l' HCB-62 (3) 160.24 D-356354-2 0-7 E8974 I I I RR-24 1" HCB-62 (4) 160.24 D-356354-2 D-7 E8974 I I I RR-24 l' HC8-41 160.24 0-356354-2 B-10 E5787, H I I PENETRATION (NO. 64A) E7670 3/4" HCB-41 (TC) 160.24 D-356354-2 B-10 E5787 H I I TEST CONNECTIONS (1) 3/4" HCB-41 (V) 160.24 D-356354-2 B-10 E5787 H I I VENTS l' CC8-63(A) 160.26 0-356354-1 E-7 E8042 NA I I RR-23(0), CLASS 2 HYDRO TESTED RR-43 TO CLASS 1 REQUIREMENTS ! 1* CC8-63(8) 160.26 D-356354-1 E-8 E8042 NA I I RR-23(0), CEASS 2 HYDRO TESTED RR-43 TO CLASS 1

REQUIREMENTS
                                                                                                                                                                                                               ~

2B13-8 Rev.: 0

O ' O O J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 2 Ell- Residual Heat Removal ISI Boundry Examination Period Relief Notes And/Or Component Drawing No. Coord. Loc. Drawing Third First Second Request Remarks RESIOUAL HEAT EXCHANGER NO 1 Q2E11H001A-A D-356358-1 B-9 D-205063 F H F TUBE SIDE RESIDUAL HEAT REMOVAL PUMP MO 1 Q2EllP001A-A D-356358-1 G-7 D-205063 F H F , RESIDUAL HEAT EXCHANGER NO 2 Q2EllH0018-B D-356358-1 C-9 D-205063 F F H TUBE SIDE RESIDUAL HEAT REMOVAL i i PUMP NO 2 Q2EllP0018-B D-356358-1 E-7 D-205%3 F F H T i . i j - l 2 Ell-1 Rev.: 0 i i

O  ; O O J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 System Pressure Test Plan 2 Ell- Residual Heat Removal 1 l ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks i 14' EC8-14 160.6 D-356358-1 G-6 EG2-285 I H I ! 3/4" ECB-14 160.G D-356358-1 G-6 E6262 I H I TO PI601A i t 3/4" ECB-14 (V) 160.6 D-356358-1 G-6 E6308 I H I VENTS (1) 3/4" ECB-38 160.6 D-356358-1 G-6 E5512 I H I i 12" EC8-14 160.6 D-356358-1 G-3 EG2-012, I H I PENETRATION (NO. 16) EG2-284, EG2-285 3/4" ECB-14 (D) 160.6 D-356358-1 G-4 E6197 I H I DRAINS (1) i 3/4" ECB-14 (V) 160.6 D-356358-1 G-3 E6198 I H I VENTS (1) 3" ECB-14 160.6 D-356358-1 G-4 EG2-012 I H I 10' EC8-16 160.6 D-356358-1 G-9 EG2-217, F H F , EG2-285 3/4" ECB-16 (1) 160.6 D-356358-1 G-9 E5507 F H F TO VALVE QV005A,C

3/4" ECB-16 (2) 160.6 D-356358-1 G-8 E6263 F H F TO VAEVE QV007A

, 3/4" ECB-16 (3) 160.6 D-356358-1 G-9 E6264 F H F TO VALVES QV004A & QV006A , 3/4" ECB-16 (D) 160.6 D-356358-1 G-8 E6548 F H F DRAINS (1) 2 Ell-2 Rev.: 0 h n - v , -- w .- .-s -

                                                                                                                    ,-,       -.,,,e.w e---

O ' O O J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 System Pressure Test Plan ~ 2 Ell- Residual Heat Removal .. ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" ECB-16 (D) 160.6 D-356358-1 0-10 E6167 F H F DRAINS (1)

                                                                                                                                                ^

3/4" ECB-16 (LC) 160.6 D-356358-1 G-9 E5507 F H F TO VALVE QV010A 3/4" ECB-16 (V) 160.6 D-356358-1 G-7 E6307 F H F VENTS (1) 8" ECB-16 160.6 D-356358-1 G-8 EG2-285 F H F 10" EC8-18 160.6 D-356358-1 B-7 EG2-277, F H F EG2-283

       >                         160.6   D-356355-2 F-4       EG2-283 3/4" ECB-18 (1)           160.6   0-356358-1 B-4       E6256       F         H    F           TO VALVES QV012A &

QV011A 1 3/4" ECB-18 (D) 160.6 D-356358-1 B-4 E6195 F H F DRAINS (1) 3/4" ECB-18 (TC) 160.6 0-356358-1 B-4 E6196 F H F TEST CONNECTIONS (1) 3/4" ECB-18 (V) 160.6 D-356358-1 B-4 E6196 F H F VENTS (1) 3/4" ECB-18 (V) 160.6 D-356358-1 B-5 E6563 F H F VENTS (1) , 3/4" ECB-18 (V) 160.6 D-356358-1 B-8 E6166 F H F VENTS (1) 3/4" ECB-24 (D) 160.6 D-356358-1 B-8 E6165 F H F DRAINS (1) ,

l 2" ECB-21 160.6 0-356358-1 B-7 EG2-277 F H F HYDRO TESTED TO VALVE QV013A 2El1-3. Rev.: 0
   ,                                               ,-   . ,              . ,    , ~                .   ,              .      --_- - . , ~ . - .

o  ;

                                                                               ~

O - o J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 System Pressure Test Plan 2E11- Residual ifeat Removal , ISI Bdry Exam Period Relief Line No. Hydro No. 'Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks

                                    -3" ECB-30                        160.6       D-356358-1 F-5      EG2-283,       F       H     F 1

EG2-283,

E6255 8" ECB-24 160.6 D-356358-1 B-8 EG2-277 F H F 8" ECB-18 160.6 D-356358-1 B-7 EG2-277 F H F 3' ECB-30 160.6 D-356358-1 F-5 E6255, I H F EG2-285 14* ECB-13 160.7 D-356358-1 E-6 EG-282 I I H 3/4" ECB-13 (V) 160.7 D-356358-1 E-6 E6181 I I H VENTS (1) 3/4" ECB-13 160.7 D-356358-1 E-7 E6248 I I H TO PI601B i

3/4" ECB-32 160.7 D-356358-1 F-6 E5513 I I H 12" EC8-13 160.7 D-356358-1 E-3 EG-280 I I H PENETRATION (NO. 18) l 3/4" ECB-13 (V) 160.7 D-356358-1 E-4 E6177, I I H VENTS (2) i E7567 3/4" ECB-13 (D) 160.7 D-356358-1 E-4 E6178, I I H DRAINS (3) i E7567,. l E7574 3" ECB-13 160.7 D-356358-1 E-4 EGli I I H 2 Ell-4 ~Rev.: 0

__ _ x 0  : 0 0 J. M. Farley Nuclear Plant - Unit 7, Class 2 Components FNP-2-M-069 System Pressure Test Plan 2E11- Residual Heat Removal ,1 151 Bdry Exam Period Relief line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 10' ECB-15 160.7 D-356358-1 E-8 EG278, F F H EG281 3/4" ECB-15 (1) 160.7 D-356358-1 E-7 E6249 F F H TO VALVE QV0078 i 3/4" ECB-15 (2) 160.7 D-356358-1 E-9 E6250 F F H TO VALVES QV0048 & QV006B 3/4" ECB-15 (3) 160.7 D-356358-1 F-9 E5587 F F H TO VALVE QV0058 & QV005D 3/4" ECB-15 (LC) 160.7 D-356358-1 E-8 E5506 F F H TO VALVE QV0108 3/4" ECB-15 (V) 160.7 D-356358-1 E-9 E6184 F F H VENTS (1) 4 1" ECB-15 160.7 D-356358-1 F-7 E6597 F F H 8" ECB-15 160.7 D-356358-1 E-7 EG281 F F H 10' ECB-17 160.7 D-356358-1 C-7 EG278, F F H

EG281
      >                                160.7    D-356355-2 G-4      EG279 3/4" ECB-17 (1)                  160.7    D-356358-1 C-4      E6245       F     F       H          TO VALVCS QV0128 &
-QV0llB 3/4" ECB-17 (D) 160.7 D-356358-1 D-9 E6175 F F H DRAINS (1) 3/4" ECB-17 (D) = 160.7 D-356358-1 C-4 E6172 F F H DRAINS (1) i 2 Ell-5 Rev.
0 i

+ _._.._._-.m-_.~_-mm.m. - -. ~ . -

O  :: O O J. M. Farley Nuclear Plant - Unit 2, C! ass 2 Components FNP-2-M-069 System Pressure Test Plan ' 2E11- Residual Heat Removal ,, ISI Bdry Exam Period Relief j Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" ECB-17 (TC) 160.7 D-356358-1 C-3 E6176 F F H TEST CONNECTIONS (1) 3/4" ECB-17 (V) 160.7 D-356358-1 C-8 E6173 F F H TO VALVE QV0688 & QV0680 3/4" ECB-17 (V) 160.7 D-356358-1 C-3 E6176 F F H VENTS (1) 3/4" ECB-25 (D) 160.7 D-356358-1 C-8 E6174 F F H DRAINS (1) 8" ECB-25 160.7 D-356358-1 C-8 EG-278 F F H 8* ECB-17 160.7 D-356358-1 0-8 EG-278 F F H 2" ECB-22 160.7 D-356358-1 B-8 EG-278 F F H 3* EC8-28 160.7 D-356358-1 D-5 EG-278, I I H EG-280, EG-282 3/4" ECB-28 (D) 160.7 D-356358-1 D-5 E9154 I I H DRAINS (1) 3/4" ECB-28 (V) 160.7 D-356358-1 0-5 E6129 I I H VENTS (1) 2" ECB-21 160.8 D-356358-1 A-7 E5518, F H F NOT NORMALLY E8823, PRESSURIZED BETWEEN E9102, VALVES QV013A AND E9139 QV351 (D-35Ill6-2, ~ ~ B-2)

    >                  -  160.8   D-356356-2 B-2 1

2 Ell-6 Rev.: 0 4

                                                                                                         -   =  -.-_.w.    -.___-_2--

_ a. mW

2 ._ - - _

4 s - x -

                                                                                                                              . . q-.g       [._ }O ~ 2I p J. M. Farley Nuclear Plant'- Unit 2, Class 2 Components"                     FNP-2-M-069                                  -

System Pressure Test Plan 2Lil- Residual' Heat Removal .',

        .                                ISI Bdry                            Exam Period           Relief Line No.               Hydro No. -Dwg. No. Cocrd. ISO Dwg. 3-    1              2- Request        Notes / h arks                                     ,

2* ECB-22 160.8 D-356358-1 A-8 E5518,. 'F H F ~ i E8823, '

E9102, .

E9139  ! t i i

                                                                                                                                                                    .h
!                                                                                                                                                                     t i
r u

i l 2 Ell-7 Rev.: 0 __2., -. _ .- . . ~ . . . ,. _ - _

                                                                                                                .     ,-~ .            .       .. v . . _    2_
               .,                y y        ::p         _
                                                                                                      #   _               y                            -
                                                                                                                                                                   =-w q (s
                                                                                       ~
                                                                                                                                                         .b__
                      .                                                                                                                                    m-J. M. Farley Nuclear Plant - Unit 2, Class 2 Components .                FMP-2-M-069                                     _

2E13- Safety Injection Containment Spray ISI Boundry . Examination Period Relief Notes And/Or Component Drawing No.,Coord. Loc. Drawing Third. First. Second Request Remarks

   -EDUCTORS Q2E13F002A           D-356355-3    C-6     D-205058,               F.       H         F 0-205063 CONTAIMMENT SPRAY PUMPS Q2E13P001A-A         D-356355-3    B-8     D-205058,               F        H         F-D-205063-

, EDUCTORS Q2E13F002B D-356355-3 G-6 D-205058, F H F 4 0-205063 CONTAINMENT SPRAY PUMPS Q2E13P0018-8 D-356355-3 G-8 'D-205058, F H F D-205063

                                                                                                                                      ~

l \ i i I i 2E13-1 Rev.: 0

                                -.~         .     ,.     .      .,_a..           - ..           .   -
                                                                                                        .       _ _ _ _ _ _ _ - _ _ _   _ - _ ___ _              _    =

r- .- + E 6 F O l,

                                                    )

1 O T

                                                                                                     )

1 W ( ) 2 S P4 U - C, . B, 4 9 N H A A A A O A A A 6 s O T( 8 l 2 9 N 9 3 6 0 k I S 3 l 3 3 ( 0 3 1

          -                 r                       T     EA               0     o     0       0           0     0     0 M-                  a                       C     T4               V     V     V       V     N     V     V     V         0 m           )           E            0         Q     Q Q           Q     O     Q     Q     Q              %

2 e 1 ) N E0 E E E I E E E

          -                R            (     1     N     CV                                   E     T                              .

P / ( O IQ V V V V A V V V v N s S C V . L L L L R L L L e F e N S RE A A A A T A A A R - f t I T T EV V V V V E V V V o A N S SL N N R E E NA O O O O E O O O D V T I V T T T T P T T T s t t

       'n              fs e              ee n             iu o             l q p              ee                                                                                                            g m             RR o

C 2 2 F F F F I I I I I I F F F F e d s o s i a r l e C P1 H H H H H H H H H H H H H H n

            ,a          m 2l              a P         x t              E it                 3      F     F     F     F     I          I     I     I     I       I     F     F     F     F O      ns Ue T

e g 7 7 7 74 tr w 1 1 1 18 ,- 2 nu D 0 4 3 4 0 0 0 8 4 6 00 3 1 59 02 as - 8 8 8 - - 4 0 9 1 0 1 3 l s O 2 7 7 7 2 2 7 5 5 7 22 5 5 44 1 E Pe S G 6 6 6 G G 5 6 5 5 GG 6 6 69 r I E E E E E E E E E E EE E E EE 2 rP a em l e d 0 0 ct r 3 4 4 4 9 1 1 9 8 8 5 6 4 6 us o - - - - - - B B C C C D C Ny o H H H H J D 8 S C y e 3 3 3 3 3 3 3 3 3 3 3 3 3 3 l r y y . 5 5 5 5 5 5 5 5 5 5 5 5 5 5 a a ro 5 5 5 5 5 5 5 5 5 5 5 5 5 5 F r dN 3 3 3 3 3 3 3 3 3 3 3 3 3 3 6 p B 6 6 6 6 6 6 6 6 6 6 6 6 6

            . S            . 5     5     5     5     5          5     5     5     5       5     5     5     5     5 M              I g        3     3     3     3     3          3     3     3     3       3     3     3     3     3 t     Sw           -     -     -     -      -         -     -     -       -     -     -     -     -     -
            .      n   ID         D     D     D     D     D          D     D     D     D       D     D     D     D     0 J          e m

n 6 6 6 6 6 6 6 6 i . 6 6 6 6 6 6 a o 1 1 1 1 1 1 1 1 1 1 1 1 1 1 t N . . . . . . . . . . . . 0 n 0 0 0 0 0 0 0 0 0 0 0 0 0 o o r 6 6 6 6 6 6 6 6 6 6 1 6 6 6 6 1 C 1 1 1 1 1 1 1 1 1 1 1 1 d n y

   .             i o       H t

c ) e )

                                                                                                                 )     C
j i

f

                                        )

D

                                              )

V T C ) 1 2 L I ( ( ( ( ( ( y 2 2 2 2 8 8 8 O 1 1 1 t 5 5 5 5 5 5 5 4 4 4 e - - - - B B B B f 1 B B B 1 2 B 8 B a . 5 C C C 5 5 C C C C 8 C C C S o - H H H - - H H H H 4 H H H N B B B -

                    -             C     "     "           C          C     "     "     "       "     B     "     "     "

3 e H 4 4 "4 H H 4 4 4 4 C 4 4 4 1 n / / / / / / / H 3

                                                                                                           / / 3/      3 E        i      "      3    3      3    "          "     3      3            3           3 2        L      2                       0          0                               "

1 1 1 8

1 - y1 V g J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 2E13- Safety Injection Containment Spray J. ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks 3/4" HCB-48 (TC) 160.16 D-356355-3 C-3 E6535, F H F TEST CONNECTIONS (2) E7672 3/4" HCB-48 160.16 D-356355-3 B-8 F H F TO VALVE QV039A 1" HCB-48 (D) 160.16 D-356355-3 C-2 E7642 F H F DRAINS (1)

1" HCB-48 (TC) 160.16 D-356355-3 C-2 E7642 F H F TEST CONNECTIONS (I) 2" HCB-48 160.16 D-356355-3 B-5 E6786 F H F TO VALVE QV006A
                                                                                                                                                                                                                  't 2" HCB-50                          160.16                          D-356355-3 B-8        E6510            F      H       F             TO VALVE QV010A 3" HCB-49                             160.16                          D-356355-3 C-9        EG2-014          F      H       F 3" HCB-80                          160.16                          D-356355-3 C-6        EG2-014          F      H       F            .T0 VALVE QV007A 12" HCB-54                            160.17                           D-356355-3 H-4       EG2-015          F      H       F 3/4" HBC-54 (D)                    160.17                           D-356355-3 H-4       E6779            F      H       F             DRAINS (1) 3/4" HCB-54 (TC)                   160.17-                          D-356355-3 H-4       E6779             F     H       F             TEST CONNECT 10NS (1) 3/4" HCB-54 (V)                    160.17                           D-356355-3 H-4       E6778             F     H       F             VENTS (1) 10" HCB-53                            160.17                           D-356355-3 G-10      EG2-015           I     H       I             ALSO HYDRO NO. 160.25 3/4" HCB-53                        160.17                          D-356355-3 G-9        E5328             I     H       I             TO VALVE QVollB. Also

, HYDRO NO. 160.25 2E13-3 Rev.: 0 _. , _ . - _ _ . . _ _ . - _ _ _ . ~ ~ _ _ _

O  : O O J. M. Farley Nuclear Plant .- Unit 2, Class 2 Components FMP-2-M-069 System-Pressure Test Plan ' 2E13- Safety Ihjection Containment Spray - Line No. Hydro No. . o Coord. ISO Dwg. 3 2 R st Notes / Remarks 3/4" HCB-53 (LC) 160.17 -D-356355-3 G-8 E5595 I H I TO VALVES QV0328,0. ALSO HYDRO NO. 160.25 3/4" HCB-53 160.17 D-356355-3 G-10 E5742 I H I TO VALVE QV038B' l 10' HCB-54 160.17 D-356355-3 H-10 EG2-015 I H I' INSERVICE TEST UP TO VALVE QV004B (H-4) . 8" HCB-55 160.17 D-356355-3 G-7 EG2-015, F H F PENETRATION (NO. 22) l EG2-087 3/4" HCB-55 (1) 160.17 D-356355-3 G-3 E6507 F H F TO VALVES QV034A,8

3/4" HCB-55 (2) 160.17 D-356355-3 G-7 E5327 F H F TO VALVE QV009B 3/4" HCB-55 (LC) 160.17 D-356355-3 G-5 E9538 F H F TO VALVE QV016B 3/4" HCB-55 (TC) -160.17 D-356355-3 G-3 E6782, F H F TEST CONNECTIONS (2)

E7672 '- 3/4" HCB-55 160.17 D-356355-3 G-8 E5598 F H F TO VALVE QV039B , 1" HCB-55 (D) 160.17 D-356355-3 F-2 E7642 F H F DRAINS (1)- . l 1" HCB-55 (TC) 160.17 D-356355-3 F-2 E7642 F H F TEST CONNECTIONS (1)

2" HCB-55 160.17 D-356355-3 G-4 E6781 F H F TO VALVE QV0%B 2" HCB-58 160.17 D-356355-3 H-8 E5529 F H .F 4

2E13-4 Rev.: 0

                                                                                              .              ,-                       3-                ,  -%  .              3,       3   ..y -
                                                                                                                                 ...r.

O

                                                                                                                   ~

O  : 01

                                       -J. M. Farley Nuclear Plant - Unit 2, Class 2 Components-          FMP-2-M-069 System Pressure Test Plan
 ~2E13- Safety injection. Containment Spray                                                                      .      .

ISI Bdry- _ ' Exam Period Relief. Line No. Hydro No. Dwg. No. Coord. ' ISO-Dwg. ~3 1 12. Request Notes / Remarks:

                                                                                                        ~

3" HCB-57 160.17 D-356355-3 G-7 EG2-014 F H F 3" HCB-80 160.17 'D-356355-3 G-6 EG2-014. F H F-1 12" HCB-52 160.25 D-356355-3 E-11 EG2-016 H I I

   >                        160.25       D-356355-1 D-13       EG2-016 2" HCB-62                160.25       D-356355-3 F-ll       EG2-016   H      I      I 4

l s 2E13-5 Rev.: 0

                                                                                                              --      , _ . .        .- - . - . . . _. - ..,. w

7

=.L., >
                                                                                                                                         ,               a J. 'N.' Farley Nuclear Plant !- Unit 2, Class 2 Components        FNP-2-N-069 2E21- Safety Injection  .                                                                                             .-
                                                                                                                             ~

ISI Boundry . Examination Period Relief. Notes'And/Or

 ~ Component                   Drawing No. Coord. Loc. Drawing         Third    First    Second Request   Remarks BORON INJECTION TAR Q2E21T006                  D-356355-1     F-6      D-205058          F        F          F-ACCUNULATOR TARS Q2E21T008A                 D-356355-2     C-3      D-205051          I        H          I Q2E21T008B                 D-356355-2     C-6      D-205051          I        H          I Q2E21T008C                 D-356355-2     C-8      D-205051          I.       H          I REFUELING WATER STORAGE TANK Q2F16T501                  D-356355-1     B-12                       H        I          I 4

i } i i , 2(SI)E21-1 Rev.: 0-

                                                                                        ._ _    _       . -   _._  __               . ._   ~ . . . _ ,

J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 System Pressure-Test Plan 2E21- Safety I'njection 'i ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request. Notes / Remarks 12"CCB-24(LOOP 1) 160.1 D-356355-2 D-3 EG2-424 NA I I RR-23(H) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. 3/4" CCB-53 (TI) 160.1 D-356355-2 0-3 E7588 NA I I RR-23(H) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. 12" CCB-24(LOOP 2) 160.1 D-356355-2 D-5 EG2-424 NA I I RR-23(H) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS.

3/4" CCB-53 (T2) 160.1 0-356355-2 D-5 E7589 NA I I RR-23(H) CLASS 2 HYDRO TESTED TO CLASS I ,

i REQUIREMENTS. 12" CCB-24(LOOP 3) 160.1 0-356355-2 D-8 EG2-424 NA I I RR-23(H) CLASS 2 HYDRO TESTED TO CLASS 1 j REQUIREMENTS. 3/4" CCB-53 (T3) 160.1 0-356355-2 D-8 E7590 NA I I RR-23(H) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. . 10" CCB-29(t00P 1) 160.1 0-356355-2 E-1 EG2-414 NA I I RR-23(I) CLASS 2 HYDRO TESTED

TO CLASS 1 i

REQUIREMENTS UP TO , VALVE QV044. , PENETRATION (NO. 101) 2(SI)E21-2 Rev.: 0

 ~

J. M. Farley Nuclear Plant - Unit 2, Class 2 Component: FNP-2-M-069 System Pressure Test Plan 2E21- Safety In~jection 2. ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1. 2 Request Notes / Remarks

> 160.1 0-356355-1 F-5 EG2-414

! 160.1 D-356355-2 F-3 E6733 I I CLASS 2 HYDRO TESTED 3/4" CCB-29 (TC) NA RR-23(I) TO CLASS 1 REQUIREMENTS. TEST CONNECTIONS (1) 10' CCB-32(LOOP 2) 160.1 D-356355-2 G-2 EG2-414 NA I I RR-23(J) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS UP TO VALVE QV023A (G-3)  ! PENETRATION (NO. 17) 3/4" CCB-22 160.1 D-356355-2 G-3 E7635 NA I I RR-23(J) CLASS 2 HYDRO TESTED

                                                                                                              'TO CLASS 1
REQUIREMENTS. TO VALVES QV098A,B

. 3/4" CCB-22 (TC) 160.1 D-356355-2 G-3 E7864 NA I I RR-23(J) CLASS 2 HYDRO TESTED , 4 TO CLASS 1 REQUIREMENTS. TEST CONNECTION (1)' ? 3/4" CCB-22 (D) 160.1 0-356355-2 G-3 E7864 NA I I RR-23(J) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. DRAINS (1) ,, 3/4" CCB-32 (TC) 160.1 0-356355-2 G-3 E7864 NA I I RR-23(J) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS. TEST CONNECTIONS (1) 2(SI)E21-3 Rev.: 0-

                                                         ,'       -l:               ;    ,ll!                ll            '   ,

v

    /

s S

                       .          D           D              )        D               D              D              S'       S   D
                       .          E           E               5       E               E              E              A        T   E T           T        O      1       T       T       T              T              L        N   T S           S        T              S       S       S              S              COE          S E           E T        P      O
                                                                . E       E       E         O T B, E                   ,T ME E       O 9

6 s T U N T T) 2 T T EDR T T 8, 0 k O . O .( O ,( O .A O . NEI O .A

            -                 r   R       S   R        S8             R       S       R         S6   R        S     ITU           R      S7 M                   a   D       T   D        T3N            D       TS      D         T9   D        T     LSQ D                T9   0
            -                 m   Y1N         Y1N2O                   Y1NN            Y1N0           Y1N                  EE      YIN 0 2                   e   H       E   H        E0I            H       EO      H         EV   H        E     RTR           H      EV    :   _
            -                R          SM          SMVT                    SMI               SMQ          SM       E                  SMQ       . ~

P / 2SE 2SEQA 2 SET 2SE 2SE VO1 2SE v M s AR AR R ARC ARS AR 0R ARS e F e SLI SLIET SLIE SLI E SLI SDS SLI E R t SCU SCUVE SCUN SCUV SCU SYS SCUV o A OHA Q A QLN A QN A QL A Q A QL N LOE L0EAE LOEO LOEA LOE R L LOEA CTR C1RVP CTRC CTRV CTR C2C CTRV s ) ) ) ) ) ) )' t t J J J J J J J n fs ( ( ( ( ( ( ( e ee 3 3 3 3 3 3 3 n iu 2 2 2 2 2 2 2 o l q - - - - - - - p ee R R R R R R R m RR R R R R R R R o + C 2 2 I I I I I I I d s o s i a r l e C P1 I I I I I I I n

              ,a          m 2l              a P          x t -            E        A           A                       A               A              A              A            A
    /. it                 3    N           N                       N               N              N              N            N
      . ns p        Ue                                                                                                                                  4 T                                  ,                                                      ,                                    1 e             g   4           14                                                     14             4                         2 tr                  w   1           11                                                     11             1                         E nu                D    4           44                      4               7              44             4            6            )

as - - - 6 3 - - - 3 I l s 0 2 22 8 6 22 2 6 S Pe 5 G GG 7 7 GG G 7 ( r 1 E EE E E EE E E 2 rP a em l e d ct r 2 3 2 2 2 3 us o - - - - - - Ny o G F E E G F _ S C . y e 2 2 2 2 2 2 2 l r y . 5 5 5 5 5 5 5 a ro 5 5 5 5 5 5 5 F dN 3 3 3 3 3 3 3 B 6 6 6 6 6 6 6

             .                  . 5           5                       5               5              5              5            5 M              I g      3           3                       3               3              3              3            3 Sw         -           -                       -               -              -              -            -
             .           ID       0           0                       0               0              D              D            0 J

o 1 1 1 1 1 1 1 N . . . . . 0 0 0 0 0 0 0 o 6 6 6 6 6 6 6 r 1 1 1 1 ' 1 1 1 d n y i o H _ t c _ e ) )

                                                                                                                    )

0 j 3 C i r T 2 _ I P ( O P - y O 2 2 O 2 t L 3 3 O 2 O

                                                                                        -            2                             -

f e 2 ( 2 B B 3 L ( B 2 a . - 3 C C - 2 C S o B - C C B 2 C N C B C -

                     -            C           C                       "               "              C              B 1           e               C                       4               4                             C            "4 2          n   "                                   /               /              "              C            /

E i 6 " 3 3 6 3 2 L 0 " 1 6

                                                                           '                      :l                                   '

O' '. D D D ) D S D D

                                                                                                                             ~

E S E E 5) E N E E . T T T T - 9 T I T T T O S N S S b1 S A S S S T E E E E F( E R E E E 9 T V T T T 8, O N T D T T) T P 6 s 7 U 0 k O . O . O .A( O . O .( O

        -                 r  R       S     R       S   R       S4       . R            S              R        S      R        S M                   a  D~      T     D       T   D       T0N           D         T        -

D TS D T9 0

        -                 m  YIN           Y1N         YIN 0O                 Y1N                     Y1NN            Y1N2 2                   e  H       E     H       E   H       EVI            H        E             H         EO     H        E0         :
        -               R          SM            SM          SMQT                  SM                      SMI             SMV              .

P / 2SE 2SE 2SE A 2SE 2 SET 2 SEQ v M s AR AR ARSR AR ARC AR a F e SLI SLI SLIET SLI SLIE SLIE R t SCU SCU SCUVE SCU SCUN SCUV o A Q) A Q A QLN A Q) A QN A QL N LOE2 LOE LOEAE LOE2 LOEO LOEA CTR( CTR CTRVP CTR( CTRC CTRV s ) ) ) ) ) t t J J 0 D D n fs ( ( ( ( ( e ee 3 3 3 3 3 n iu 2 2 2 2 2 o l q - - - - - p ee R R R R R m RR R R R R R o C 2 2 I I I I I I d s o s i a r l e C P1 I I I I I I n

         ,a           m 2l              a P          x t             E        A             A           A                     A                       A                A O                             N             N           N                     N                       N it                3                                                                                             N ns Ue                                                                                                                                 5 T                                               ,
                           .                                                                                                             1
           .e             g                4           3                                                                                 2 t r                 w                1           2                                                                                 E nu               D    4             4           44                    9                       9               4                   )

as 6 - 2 6 6 2 I l s 0 8 2 24 5 5 4 S Pe 5 7 G G6 7 7 6 ( r 1 E E EE E E E 2 rP a em l e -r d ct 3 2 4 4 3 5 us o - - - - - - Ny o F F E F F E S C y e 2 2 1 1 1 1 l - - - - - - r y . 5 5 5 5 5 5 a ro 5 5 5 5 5 5 F dN 3 3 3 3 3 3 B 6 6 6 6 6 6

         .                 . 5            5            5                     5                       5               5 M             I g      3            3            3                     3                       3               3 Gw         -             -           -                     -                       -               -
         .          !   D    D            0            D                     0                       D               0 J

o 1 1 1 1 1 1 N . . . . . . 0 0 0 0 0 0 o 6 6 6 6 ' 6 6 r 1 1 1 1 1 1 d n y o H ' i t c

  '           j e                                                                                     )
                             )                         )                     )                       C n             V

( 1 D T I ( ( P y O O 2 1 1 t 2 2 O 2 2 e - 2 L - - 0 f B - ( B B 5 a . C B 1 C C - S o C C 2 C C B N C - C

                -                                      B                    "                        "               C 1          e   "4          "             C                    4                        4 2          n   /            0            C                    /                        /               "

E i 3 1 3 3 1 2 L " 3

                                         '                                     -     '     ;!j<              l         <4      j     i        :
                           .~
                                                                                                      ,-   l f
                      .                               c                                                        .

D D D D ) D S D D

                '.               E       -

E E E 0 E N E E S L . T T T T 2 T I T T T T S' S S S S A S S S N c 9 E T E T E T E T O

                                                                                          . E T

R D E T E T) E T E V , 6 s N 7 0 k O . O . O . O .( O . O ( O .

       -                      r  R         S   R        S   R       S    R          S       R       S        R       S    R      S M-                       a  D         T   D        T   D       T    D          TN      D       T        D       TS   D      T    0 m  Y1N           Y1N          Y1N          Y1NO               Y1N              Y1NN         YIN               .

2 e H E H E H E H EI H E H EO H E  :

       -                    R           SM            SM          SM           SMT                SM               SMI        SM        .

P / 2SE 2SE 2SE 2 SEA 2SE 2 SET 2SE v N s .AR AR AR ARR AR ARC AR e F e SLI SLI SLI SLIT SLI SLIE SLI R t SCU SCU SCU SCUE SCU SCUN SCU o A Q A Q A Q A QN A Q) A QN A Q) N LOE LOE LOE LOEE LOE2 LOEO LOE1 CTR CTR CT!  ! CTRP CTR( CTRC CTR( _ s ) ) ) ) ) ) ) t t D D D E E E E n f s ( ( ( ( ( ( ( e ee 3 3 3 3 3 3 3 n i u 2 2 2 2 2 2 2 o l q - - - - - R R p ee R R R R R m RR R R R R R R R - o C 2 2 I I I I I I I d s o s i a r l e C P1 I I I I I I I n

         ,a              m 2l                  a P           x                     A            A            A                  A                A            A t                  E        A it                     3    N             N            N            N                  N                N            N ns                                                                                                                              6 Ue                                                                                                                                 -

T 1 e g 5 2 E t r w 1 , nu D 6 6 6 4 23 3 6 1 6

                                                                                                                                      )     ,

as 0 0 0 - 76 . I l s 0 8 8 8 2 68 8 8 S Pe 5 7 7 7 G 67 7 7 ( r 1 E E E E EE E E 2 rP a em l e d ct r 3 3 3 5 5 5 4 us o - - - - - - - Ny o E E F B B B A S C y e 1 1 1 1 1 1 1 l r y. 5 5 5 5 5 5 5 a ro 5 5 5 5 5 3 5 3 5 3 F dN 3 3 3 3 B 6 6 6 6 6 6 6

         .                     . 5             5            5            5                  5                5            5 M                  I g      3             3            3            3                  3                3            3 Sw         -              -           -            -                  -                -            -
         .              ID       0             D            D            0                  D                0            D J

_ o 1 1 1 1 1 1 1 N . . . . . 0 0 0 0 0 0 0 o 6 6 6 6 6 6 6 r 1 1 1 1 1 1 1 d n y i o H t ~ c ) e ) ) C ) j

                .n               )             )            )            1                  D                T            V I                A             B            C                               (                (            (

V V V P y ( ( ( O 2 2 2 _ t O 2 2 2 e 1 1 1 L - - - . f 2 2 2 ( B B B a . - - - 2 C C C S o B B B 2 C C C N C C C -

                  -              C             C            C            B                  "                "            "

1 e C 4 4 4 2 n " " C / / / _ E i "2 2 2 3 3 3 2 L 3

5 ' } m D D D D ) D S D d , E E E E 1 E N E t

                               .           T                T             T            T        8   T           I      T        T     T
                        '                   S               S             S            S            S           A      S        S     S E               E             E            E          . E           R      E        E     E                  .

9 T T T T O T D T T) T 6 s N 7 0 k O . O . O . O .( O . O .( O .

               -                      r     R         S     R        S    R       S    R     S      R           S      R        S     R     S           -

M- a D T D T D T D TN D T D TS D T 0 m Y1N YIN Y1N YINO Y1 N YINN YIN 2 e H E H E H E H EI H E H EO H E  :

               -                     R            SM              SM            SM         SMT                SM           SMI            SM          .

P / 2SE 2SE 2SE 2 SEA 2SE 2 SET 2SE v N s AR AR AR ARR AR ARC AR e F e SLI SLI SLI SLI T SLI SLIE SLI R - t SCU SCU SCU SCUE SCU SCUN SCU o A Q A Q A Q A QN A Q) A QN A Q N LOE LOE LOE LOEE LOE1 LOEO LOE CTP, CTR CTR CTRP CTR( CTRC CTR

            ~

s ) ) ) ) ) ) ) t t E E E F F F F n fs ( ( ( ( ( ( ( e ee 3 3 3 3 3 3 3 n iu 2 2 2 2 2 2 2 o l q - - - - R R R p ee R R R R m RR R R R R R R R o C 2 2 I I I I I I I d s o s i a r i e I C P1 I I I I I I n

                 ,a               m 2l                   a P             x t

E A A A A A A A it 3 N N N N N N N ns 7 Ue - T 1

 '                    e               g                                                3                                                           2 E

tr w 1 nu D 1 1 1 4 0 0 9 ) as 6 6 6 - 7 7 0 I l s O 8 8 8 2 5 5 8 S Pe S 7 7 G 7 7 7 ( r I E E E E E E 2 rP a em l e d ct r 4 4 4 5 4 4 3 us o - - - - - - - . Ny o A B C H H H H S C y e 1 1 1 1 1 1 1 l r y . 5 5 5 5 5 5 5 a ro 5 5 5 5 5 5 5 3 F dN 3 3 3 3 3 3 6 6 B 6 6 6 6 6

                 .                      . 5               5             5            5            5                  5              5 M                   I g        3               3             3            3            3                  3              3 Sw           -               -             -            -              -                -              -
                 .               ID         D               D             D            D            D                  D              D J

o 1 1 1 1 1 1 1 N . . . . 0 0 0 0 0 0 0 E_ o 6 6 6 6 6 6 6 r 1 1 1 1 1 1 1 d - n y - o H i t - c j e ) )

                                                                                                                       )

C n ) ) ) 1 D T )

      .:                                    A               B             C                         (                  (              A
                        ~1                  V               V             V            P                                              V y               (               (             (            O            0                  0              (

t O 3 3 e 2 2 2 L - - 0 f 2 2 2 ( B B 3 a . - - - 0 C C - S o B B B 3 C C B N C C C - C

                             -              C               C             C            B            "                                 C 1            e                                               C            4                  "4 2           n    "                             "            C            /                  /              "

E i 2 "2 2 3 3 2 2 L 3"

                   ," '                   l       ' i         :1        .          *                        ,      ,l:      iii                  :
   ,.r                                                         h ,,,.#
                                                                                 ?

l 2  : J. M. Farley. Nuclear' Plant '- Unit 2, Class 2 Components - L FNP-2-M-069-l System Pressure lest Plan l 2E21- Safety Ihjection ', L ISI Bdry Exam Period Relief i Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1. 2 Request Notes / Remarks , i .a l 2" CCB-30 (VB) 160.1 D-356355-1 H-3 E7809 NA I I RR-23(F) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. 2" CCB-30 (VC) 160.1 D-356355-1 H-3 E7809 NA I I RR-23(F) CLASS 2 HYDRO TESTED-TO CLASS 1 4 REQUIREMENTS. , 3" CCB-31(LOOP 1) 160.1 D-356355-1 J-5 EG2-415 NA I I RR-23(G) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. PENETRATION (NO. 80) 3/4" C08-31 (D) 160.1 D-356355-1 J-2 E7863 NA I I RR-23(G) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. DRAINS s (1). 3/4" CCB-31 (D) 160.1 D-356355-1 J-6 E6670 NA I I RR-23(G) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. DRAINS , (1) 3/4" CCB-31 (TC) 160.1 D-356355-1 H-4 E7863' NA I I RR-23(G) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. TEST CONNECTIONS (7) ,, 2" CCB-31 (VA) 160.1 D-356355-1 H-2 E7811 NA I I RR-23(G) CLASS 2 HYDRO TESTED 4 TO CLASS 1 REQUIREMENTS. 2(SI)E21-8 Rev.: 0

                                                   ,                                                       ; '       ,        <            I p
 -                      .r

=. g 5 . D D D D S D D . S D~ _ E E E E N E E N E _ T T T T I T T I T

 =.                                            S            S           S           S       A    S             S       A    S E            E           E           E       R    E             E       R    E                       _

D 9 T T T T D T T T

                                                                                                                                                  =

6 s 0 k O . O . O . O . O . O . O . .

                    -                   r      R       S    R       S   R       S   R        S   R       S     R       S    R        S              _

M a D D D D D D D T T T T T T T 0

                    -                   m      Y1N          Y1N         Y1N         YIN          Y1N           Y1N          Y1N
       -          2                     e      H       E    H       E   H       E   H        E   H       E     H       E    H        E        :
                    -                  R             SM           SM          SM          SM           SM          SM              SM           .

P / 2SE 2SE 2SE 2SE 2SE, 2SE 2SE v N s AR AR AR AR AP AR AR e F e SLI SLI SLI SLI SLI SLI SLI R - t SCU SCU SCU SCU SCU SCU SCU o A Q A Q A Q A Q) A Q A Q A Q N LOE L O' E LOE LOEI LOE LOE LOE CTR CTR CTR CTR CTR CTR CTR( . a s .

                                               )            )           )           )            )'            )            )

t t G G H H H H H g n fs ( ( ( ( ( ( ( e ee 3 3 3 3 3 3 3 n iu 2 2 2 2 2 2 2 o l q - - - - - - - . p ee R R R R R Ps R m RR R R R R R R R o C~ - 2 2 I I I I I I I d s e

  • s i a r l e C P1 I I I I I I I n
                      ,a            m 2l                a P         x t                E -         A            A           A           A            A             A            A it                   3       N            N           N           N            N             N            N ns Ue                                                                                                                         9 T                                                                                                                    -
                    - .                    .                                                                                                 1 e             g                                                                                                    2 tr                    w                                                                                                    E nu                .D        1            1           8           8            9             9            0                )

as 1 1 8 8 8 8 9 I l s 0 8 8 5 5 5 5 5 S Pe 5 7 7 7 7 7 7 7 ( r 1 E E E E E E .E 2 rP a em l e .d ct r 2 2 2 2 4 4 7 us o - - - - - - - Ny o H H D D D D E S .C y e 1 1 2 2 2 2 2 l - r y. 5 5 5 5 5 5 5 a ro 5 5 5 5 5 5 5 F dN 3 3 3 3 3 3 3 B 6 6 6 6 6 6 6

                      .                    . 5            5           5           5            5             5            5 M                I g 3                    3           3           3            3             3            3 Sw            -            -           -           -            -             -            -
                      .            ID          D            D           D           0            D             0            D J

o 1 1 1 1 1 1 1 N . . . . . . 0 0 0 0 0 0 0 o 6 6 6 6 6 6 6 r 1 1 1 1 1 1 1 d n y ) )' ) i o H 1 2 3 t P P P . c O O O e O O O j L ) L ) L n ) ) ( D ( D ( i B C ) ( ) ( ) V V I 2 3 y ( ( T 4 T 4 T t ( 5 ( 5 ( f e 1 1 4 5 B

                                                                                      -          4 5             B
                                                                                                                 -          4 5

3 3 a . - - - C - C - S o B B B C B C B N C C C C C

                               -               C            C           C           "            C             "            C 1          e                                           4                          4 2          n                               "           /            "             /

E i "2 "2 4 3 4 3 4" 2 L / / / 3 3 3

n a J. M. Farley Nuclear Plant.- Unit 2, Class 2 Components FNP-2-M-069-System Pressure Test Plan 2E21- Safety injection '. 4 ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks !~ 3/4" CCB-54 (D) 160.1 D-356355-2 E-7 E7590 NA I I RR-23(H) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS. DRAINS (1) 3' CCB-21(A) 160.2 D-356355-1 F-7 EG-421 I I H FROM S.I. CHARGING PUMPS TO VALVES QV016A,B 3/4" CCB-21 160.2 D-356355-1 ~G-7 E6651 I I H TO VALVES QV013A,8 , , 3/4" CCB-21 (D) 160.2 0-356355-1 H-7 E6536 I I H DRAINS (1) 3/4" CCB-30 (D) 160.2 D-356355-1 H-7 E6625 I I H DRAINS (1) 3/4" CCB-30 (V) 160.2 0-356355-1 H-7 E6626 I I H VENTS (1) I 3/4" CCB-50 (TC) 160.2 D-356355-1 E-5 E6424 I I H HYDRO TESTED UP TO VALVE QV029 (F-4), TEST CONNECTIONS (1) 1" CCB-50 160.2 D-356355-1 H-5 E6424, I I H HYDRO TESTED UP TO 4 E8834 VALVE QV029 (F-4) , 3" CCB-30 160.2 0-356355-1 H-7 EG-413, I I H TO VALVE QV068 EG-421 4" CCB-21 160.2 D-356355-1 G-8 EG-421 I I H 3* CCB-21(B) - c160.2 0-356355-1 F-6 E8835, F F H NORMALLY NOT EG421, PRESSURIZED BETWEEN EG423 ' VALVES QV016A,B (G-7)

                                                                                                & QV004A,B (D-5)..
                   ~

2(SI)E21-10 Rev.: 0

                                                                        --                              __ __ ~ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _   __ -

O  : O O J. M. Farley Nuclear Plant Unit 2, Class 2 Components FNP-2-M-069

                                              -System Pressure Test Plan 2E21- Safety' Injection                                                                                      i ISI Bdry                          Exam Period     Relief Line No.             Hydro No. Dwg. No. Coord. 150 Dwg. 3      '1     2   RequestL  Notes / Remarks 3/4" CCB-21 (1)        160.2   D-356355-1   F-6    E5684       F       F     H            TO VALVES QV012A,B 3/4" CCB-21 (2)        160.2   D-356355-1   F-7    E5685       F       F     H            TO VALVES QV011A,8 3/4" CCB-21 (3)        160.2   D-356355-1 E-6      E5254       F       F     H            TO VALVES QV010A,8 I

3/4" CCB-21 (4) 160.2 D-356355-1 D-6 E5678 F F H TO VALVE QV009 3/4" CCB-21 (TC) 160.2 D-356355-1 D-6 EG6624 F F H TEST CONNECTIONS (1) 3/4" CCB-21 (V) 160.2 D-356355-1 D-6 EG6624 F F H VENTS (1) 1" CCB-62 160.2 D-356355-1 0-7 E8835, F F H RR-29 E8720, E9450 3* CCB-21 160.2 D-356355-1 F-6 EG421 F F H BORON INJECTION ! TANK-INLET l' CCB-23 160.2 D-356355-1 C-6 EG423 F F H 3/4" CCB-23 160.2 D-356355-1 B-6' E8951 F F' H TO VALVE QV017 3/4" CCB-23 (V) 160.2 D-356355-1 C-6 EG423 F F H VENTS (1) 3' CCB-22(A) 160.3 D-356355-1 E-7 EG2-415, I I H TESTED BETWEEN VALVES ! EG2-416 QV063 (B-6) & QV1238 &

                                                                                                                  ~

C(356356-2 H-3) 4 3/4" CCB-22 - 160.3 0-356355-1 E-8 E6'288 I I H TO VALVES V014A,B i 2(SI)E21-ll Rev.: 0 4

                                                               -                         ~~,      -             ,     , ,

en in . y

         ~%                                                    %J                                                 '%)

J. M. Farley Nuclear Plant'- Unit 2, Class 2 Components FNP-2-M-069 System Pressure' Test Plan 2E21- Safety injettion L. ISI Bdry Exam Period . Relief Line No. Hydro No. Dwg.'No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" CCB-22 (D) 160.3 0-356355-1 G-8 E6345 I I H DRAINS (1) 3/4" CCB-22 (D) 160.3 D-356355-1 B-7 EG6671 I I H DRAINS (1) 3/4" CCB-22 (TC) 160.3 D-356355-1 B-7 EG6671 1 I H TEST CONNECTIONS (1) 3/4" CCB-22 (V) 160.3 D-356355-1 G-8 E6346 I I H VENTS (1) 3* CCB-31 160.3 D-356355-1 F-7 EG2-415 I I H HYDRO TESTED TO VALVE QV072(J-6) 4" CCB-22 160.3 D-356355-1 E-8 EG2-415, 1 I H EG2-416 , 14" ECB-5(L1) 160.6 D-356355-2 F-8 EG2-285 I I H 4 14" ECB-6 160.6 D-356355-2 J-6 EG2-285, F H F FUNCTIONAL TESTED TO EG2-424 VALVE QV025A (J-5). 3/4" ECB-6 (D) 160.6 D-356355-2 J-5 EG381 F H F DRAINS (1). 3/4" ECB-6 (TC) 160.6 D-356355-2 J-5 EG381 F H F TEST CONNECTIONS (1)  ; 3/4" ECB-6 (V) 160.6 D-356355-2 J-5 EG656 .F H F VENTS (1) 14' HCB-46(L1) 160.6 D-356355-2 J-3 EG2-424 -F H F PENETRATION NO. 11. 10' ECB-2 160.6 D-356355-2 F-4 EG2-417 F H F CROSSOVER LINE BETWEEN RHR NO 1 & RHR NO 2

                    '                                                                        HEAT EXCHANGERS i

2(SI)E21-12 Rev.: 0

                                                , - -                    .-    -   -                 ..             .   ~ -.
1
                                                                                                                                                                                                                         .[
                                                                                                                                  -J. M. Farley Nuclear Plant - Unit 2,' Class 2 Components FMP-2-M-069 System Pressure Test Plan 2E21- Safety Injection                                   _

l, ISI Bdry. Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks. 10" ECB-2(RHR 1) 160.6 D-356355-2 F-3 E6559- F H F HYDRO (NO. 6) UP TO. VALVE.QV023B (F-3) 3/4" ECB-2 (D) 160.6 D-356355-2 F-3 E6549 F H F DRAINS (1) 3/4" ECB-2 (TC) 160.6 D-356355-2 F-3 E6549 F H F ' TEST CONNECTIONS (1) 3/4" ECB-2 (V) 160.6 D-356355-2 F-3 E6559 F H F VENTS (1) 4 10' ECB-28 160.6 D-356355-2 F-4 EG2-417, F H F HYDRO (NO. 6) UP TO l EG2-422 VALVE QV044 (F-3) 3/4" ECB-28 (D) 160.6 0-356355-2 F-4 E6560 F H F DRAINS (1) 3/4" ECB-28 (TC) 160.6 D-356355-2 F-3 E6331 F H F TEST CONNECTIONS (1) 3/4" ECB-28 (V) , 160.6 D-356355-2 F-3 E6332 F H F VENTS (1) 10" ECB-29 160.6 D-356355-2 E-4 EG2-417, F H F EG2-422 14" ECB-5(L2) 160.7 D-356355-2 G-8 EG2-281, I I H EG2-420 i 14" ECB-7 160.7 D-356355-2 H-5 EG2-420 F F H FUNCTIONAL TESTED TO VALVE QV0258 (H-5) 3/4" ECB-7 (D) 160.7 D-356355-2 H-5 EG2-420 F F H DRAINS (1) 3/4" ECB-7 (TC) - cl60.7 D-356355-2 H-5 EG2-420 F F H TEST CONNECTIONS (1) 2(SI)E21-13 Rev.: 0

O i O O J. M. Farley Nuclear Plant '- Unit 2, Class 2 Components FMP-2-M-069 2E21- Safety injection . ISI Bdry Exam Period . Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 'l '2 Request Notes / Remarks 3/4" ECB-7 (V) 160.7 D-356355-2 H-5 EG2-420 F F H VENTS (1) 14' HCB-47(L2) 160.7 D-356355-2 H-3 EG2-420 F F- H PENETRATION N0. 10 10' ECB-2(RHR 2) 160.7 D-356355-2 G-3 EG279, .F F' H~ HYDRO (NO. 7) UP TO EG422 VALVE QV023A (G-3) 3 3/4" ECB-2 (D) 160.7 D-356355-2 G-3 E6334 F F H DRAINS (1) 3/4" ECB-2 (D) 160.7 D-356355-2 G-4 E6336 F F H DRAINS (1) , 3/4" ECB-2 (TC) 160.7 D-356355-2 G-3 E6334 F F H TEST CONNECTIONS (1) 3/4" ECB-2 (V) 160.7 D-356355-2 G ,3 E6335 F F H VENTS (1) . 12" ECB-8(TI) 160.15 D-356355-2 C-3 EG2-424 H I I OPEN ENDED SUCTION / DRAIN LINES TESTED WITH TANK. f 2" ECB-35 (TI) 160.15 0-356355-2 C-2 E7610 H I I OPEN ENDED i SUCTION / DRAIN LINES TESTED WITH TANK. l 12" ECB-8(T2) 160.15 D-356355-2 C-5 EG2-424 H I I OPEN ENDED

SUCTION / DRAIN LINES- l TESTED WITH TANK.

i + 2" ECB-35 (T2) 160.15 D-356355-2 C-5 E7611 H I I OPEN ENDED

                                                             ,                                    SUCTION / DRAIN LINES TESTED WITH TANK.

l i 2(SI)E21-14 Rev.: 0 i

m

                =

J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069

                                                                                                                      ~

2E21- Safety lnjection ., ISI Bdry- ' Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks 12" ECB-8(T3) 160.15 0-356355-2 C-8 EG2-424 H- I I OPEN END SUCTION / DRAIN LINES TESTED WITH TANK.  ; 2" ECB-35 (T3) 160.15 D-356355-2 C-8 E7612 H I I OPEN END SUCTION / DRAIN LINES TESTED WITH TANK. 2" ECB-39(TI(A)) 160.15 D-356355-2 B-3 E7651 H I I OPEN ENDED SUCTION / DRAIN LINES TESTED WITH TANK TO VALVES QV043A, QV042A 2" ECB-39(TI(B)) 160.15 D-356355-2 B-4 E7651 H I I OPEN ENDED SUCTION / DRAIN LINES TESTED WITH TNAK TO VALVES QV044A, QV045A l 2" ECB-39(T2(A)) 160.15 0-356355-2 B-5 E7652 H- I I OPEN ENDED 4 SUCTION / DRAIN LINES TESTED WITH TANK T0 t VALVES QV043B, QV042B 2" ECB-39(T2(B)) 160.15 D-356355-2 B-6 E7652 H I I OPEN ENDED SUCTION / DRAIN LINES TESTED WITH TANK TO VALVES QV0448, QV045B 2" ECB-39(T3(A)) 160.15 D-356355-2 B-8 E7653 H I I OPEN END SUCTION / DRAIN LINES TESTED WITH TANK TO VALVES QV043C, QV042C 2(SI)E21 Rev.: 0

N J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FMP-2-M-069 System Pressure Test P1an 2E21- Safety In~jection .', ISI Bdry . Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. -3 'l' 2 Request Notes / Remarks 2" ECB-39(T3(B)) 160.15 D-356355-2 B-9 E7653 H I I OPEN ENDED SUCTION / DRAIN LINES' TESTED WITH TANK TO VALVES QV0440, QV045C 1" ECB-10(TI) 160.15 D-356355-2 C-4 E7908 H I I OPEN ENDED SUCTION / DRAIN LINES TESTED WITH TANK l' ECB-10(T2) 160.15 D-356355-2 C-6 E7944 H I I OPEN ENDED SUCTION / DRAIN LINES TESTED WITH TANK 1" ECB-10(T3) 160.15 D-356355-2 C-9 E7935 H I I OPEN ENDED ! SUCTION / DRAIN LINES TESTED WITH TANK l' ECB-11(TI) 160.15 D-356355-2 B-3 E7910 H I I OPEN ENDED SUCTION / DRAIN LINES

TESTED WITH TANK 1" ECB-11(T2) 160.15 D-356355-2 B-6 E7945 H I I OPEN ENDED SUCTION / DRAIN LINES ,

TESTED WITH TANK 1" ECB-11(T3) 160.15 D-356355-2 B-8 E7936 H I I OPEN ENDED SUCTION / DRAIN LINES ' TESTED WITH TANK

                                                                                                                                                                                                             ~

l' ECB-12(TI) - 160.15 D-356355-2 B-4 E7908 H I I OPEN ENDED SUCTION / DRAIN LINES TESTED WITH TANK 2(SI)E21-16 Rev.: 0

N

                                                                   ,                            t     i               ,
                                                                                             )             ).,  )
             ~
                 ._                  S          S                                             9            1    3 E          E                                             4            (    6 N          N                                                                             .

IK IK . S . 9 LN LN O N O 6 s A A N O N 0 k NT NT ( I (

         -                  r        I          I                                                          T M                    a        AH         AH                                            N            C    N       0    _
         -                  m  DRT        DRT                                                 O      )     E    O 2                    e  EDI        EDI                                                 I      1     N    I        :
         -                R    D/W        D/W                                                 T      (     N    T          .

P / NN NN A O A v N s EOD EOD R S C R e F e IE IE T N T R t NTT NTT E I T E o ECS ECS N A S N _ N PUE PUE E R E E _ OST OST P D T P s t t n fs e ee n iu o l q p ee m RR o C 2 2 I I I I I H I H H d s o s i a r l e C P1 I I I I I I I I I m 2 a x t E i 3 H H H H H I H I I n 7 U 1

         -                   .                                                                                          1
                         .g                                                                                             2 t                    w                                  , ,                                                      E n                 D    4          5          1     234       2     2     3     0     6      5     5    5        )

a 4 3 5 222 5 2 5 2 4 5 5 8 I l O 9 9 6 888 6 8 6 8 9 6 6 7 S P S 7 7 7 999 7 9 7 9 8 7 7 5 ( I E E E EEE E E E E E E E E 2 r a e . l d 0 0 c r 6 9 3 2 6 2 8 2 1 9 9 1 u o - - - - - - - - - - - - N o B B C G C H 0 H D D D A C y e 2 2 2 1 2 1 2 1 2 2 2 2 l r y . 5 5 5 7 5 7 5 7 5 5 5 5 a ro 5 5 5 4 5 4 5 4 5 5 5 5 F dN 3 3 3 3 3 3 3 3 3 3 3 3 B 6 6 6 6 6 6 6 6 6 6 6 6

          .                  . 5          5          5     5         5     5     5     5     5      5     5    5 M            I g        3          3          3     3         3     3     3     3     3      3     3    3 Sw           -          -          -     -         -     -     -     -      -       -    -    -
          .         ID         D          D          D     D         0     0     D     D     D      D     D    0 J
                             . 5          5          5     5         5     5     5     5     4      4     4    4 o   1          1          1     1         1     1     1     1     2      2     2    2

~ N . . . . . . . 0 0 0 0 0'- 0 0 0 0 0 0 0 o 6 6 6 6 6 6 6 6 6 6 6 6 r 1 1 1 1 1 1 1 1 1 1 1 1 d n y i o H t c e ) j ) C I n D ( T (

                                                     )               )           )

y ) ) I 2 3 1 1 t 2 3 T T T 5 5 e T T ( ( ( ( - - f ( 9 9 9 B B a . 2 2 - - - 1 C C S o 1 1 B B B 5 C C 5 N - - C C C - -

               -               B          B          E               E           E           B      "          B 1             e   C          C                                                  C      4     "4   B 2             n   E          E          "               "           "           C      / /        E E            i                          4     >         4     >     4     >            3     3 2            L    "          "          /               /           /           "                 "

1 1 3 3 3 1 1 1 , ,

m ..,--. . _9- 3

                                                                     ?                                                   .

J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 --

                                                                                                                                       ~-

System Pressure Test Plan 2E21- Safety Irijection l. ISI Bdry Exam Period Relief. Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 3/4" EBB-5 (D) 160.24 D-356355-2 A-9 E7656 H I I DRAINS (1) 3/4" EBB-5 (TC) 160.24 D<356355-2 A-9 E7656 I I H TEST CONNECTIONS (1) 3/4" CCB-52 160.24 D-356355-2 E-10 E5751, H I I PENETRATION (NO. 29) E7649 16" HCB-42 160.25 0-356355-1 B-12 EG2-418, H I I OPEN ENDED EG2-419, SUCTION / DRAIN LINES EG2-612 TESTED WITH TANK. 3/4" HCB-42 (1) 160.25 D-356355-1 C-12 E6391 H I I OPEN ENDED

                                                                                           . SUCTION / DRAIN LINES TESTED WITH TANK. TO VALVE QV505, QV506 3/4" HCB-42 (D)         160.25  D-356355-1 D-12     E6572       H      I      I           OPEN ENDED SUCTION / DRAIN LINES TESTED WITH TANK.

DRAINS (1) TO V547 2" HCB-42 160.25 D-356355-1 C-Il E8777 H I I OPEN ENDED SUCTION / DRAIN LINES ~ TESTED WITH' TANK.~ 2" HCB-79 160.25 0-356355-1 0-11 E5754 H I I OPEN ENDED SUCTION / DRAIN LINES ' TESTED WITH TANK. 16' HCB-43 ' 160.25 D-356355-1 C-12 EG2-419, H I I OPEN ENDED EG2-420 SUCTION / DRAIN LINES TESTED WITH TANK. n 2(SI)E21-18 Rev.: 0 1

O O

                                                                                                    ~

O  :: J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069 , 2E21- Safety Injection I f,, ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. ISO Dwg. 3 1 2 Request Notes / Remarks , 14" HCB-43 160.25 D-356355-1 0-13 EG2-419, H I I OPEN ENDED EG2-420 SUCTION / DRAIN LINES  ! TESTED WITH TANK. l > 160.25 D-356355-2 F-ll EG2-420 - 3/4" HCB-43 (D) 160.25 D-356355-2 G-10 EG2-420 H I I DRAINS (1) i 14" ECB-5 160.25 D-356355-2 F-10 EG2-424 H I I 12' HCB-78 160.25 D-356355-1 C-13 EG2-016 H I I OPEN END SUCTION / DRAIN' , LINES TESTED WITH TANK.

    >                       160.25  D-356355-3 E-11     EG2-016 8' HCB-42                  160.25  D-356355-1 D-Il     EG2-342,    H      I      I         OPEN ENDED EG2-418                             SUCTION / DRAIN LINES TESTED WITH TANK.

3/4" HCB-42 (D) 160.25 D-356355-1 F-12 E6571 H I I OPEN ENDED SUCTION / DRAIN LINES TESTED WITH TANK. . DRAINS (1) DRAINS (1)- 8" HCB-14 (A) 160.25 D-356355-1 F-11 EG2-342, H I I OPEN ENDED EG2-418 SUCTION / DRAIN LINES TESTED WITH TANK, - TESTED TO VALVE QV336A 2(SI)E21-19 Rev.: 0 l

                                                                                                        ,       ,   -     :        ,;.            j j ,.                                                                                                                   ~

s~ '

                                                                                                                                                         ~
                                          ~

N.T. N I 9 LN 6 s A 0 k NT "

                      -                          r                I      B                                                                 0 M                           a                AH6
                       -                         m         DRT3                         )
                                                                                                )             .                            :
                                                                                                                                                         ^

2 e EDI3 1 D/WV (

                                                                                                                                                       +
                      -                         R                                               1                                                      '

P ./ NN Q ( v N s EOD S e e IEE N S R F T

                                               .t          NTTV                         I V

o ECSL A N

                                              .N          .PUEA                         R       E                                                     Y
                                                          .OSTV                         D       V                                                      " '

l s

                                                                                                                                                         =

t t n fs e ee " n i u o l q p ee m o ^RR C I I 2 2 I I d s o ' s i M a r ~ l e I I C P1 I I n .

                          ,a                 m a

2l ' P x + t E it' 3 H H H H - 0

  • ns 2 Ue' T 1
                                               .,g                         9        9                                                       2 e'                            58                                                                               E
                                                                                                                                                      +-

t r~ .w 41 1 1 3 4

                                                                                                                                            )

nu D 34' 4 4 7 7 I as - - - - S r l s 0 22' 2 2 5 5 ( Pe 5 GG G G 6 6 2 e' r 1 EE E E E E rP - a 'a em l e d l 2 ct r l 5 1 5 5 us o - - - E E Ny o G E D S C 1 y 2 2 e 1 2 1 l r y. 5 5 5 5 5 Y a ro 5 5 5 5 5 F dN 3 3 3 3 3 B 6 6 6 6 6

                           .                         .      5               5       5     5      5 M                      I g            3               3       3     3      3 Sw                -              -

D

                           .                 ID             D               D       D            0 J
                                                     .      5               5       5     5       5                                                   '

o 2 2 2 2 2 N 0 0 0 0 0 o 6 6 6 6 6

        ;                                          r        1               1       1     1       1 d                                                          .

_ n y i o H t c j e ) )

              's                   n                                                       D      V I                         )                             (       (

B 3 y ( 3 t 4 4 e 4 B B f 1 a . - 3 C C S o B 4 H H N C -

                                      -                      H               B             "      "

1 e C 4 4 2 n H / / E i "8 > 3 3 2 L " 8 l '

                  !.                                                   <                                  l                 !          ' :    !

n _

                                                                                                                                                                     -         e
            -fw                                                            .- .                           _ . .
                                                                                                                                                 . ('A')-
                  ?                                                                                                                     .                            ;~

J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-N-069 . '.

  • 2E21- Chemical and Volume Control- ,

. ISI Boundry Examination Period Relief Notes And/0r Component Drawing No. Coord. Loc. Drawing. Third First Secorid Request Remarks SEAL INJECTION FILTERS Q2E21F004A D-356356-2 G-2 0-205056 H I I .;,, Q2E21F004B D-356356-2 H-2 D-205056 H I I EXCESS LETDOWN HEAT EXCHANGER Q2E21H001 D-356356-1 C-7 D-205053 F H F REGENERATIVE HEAT

EXCHANGER Q2E21H002 0-356356-1 B-6 D-205053 I I H RR-18 i

LETDOWN HEAT EXCHANGER Q2E21H004 D-356356-2 B-3 0-205058 I H I CHARGING PUNPS P002A-A D-356356-2 F-5 D-205058 'I I H 4 P0028-AB D-356356-2 G-5 D-205058 I I H P002C-B D-356356-2 H-5 D-205058 I I H l SEAL WATER HEAT

; EXCHANGER                                                                                                                                     '

Q2E21H003 D-356356-2 C-4 D-205058 I I H VOLUdE CONTROL TSNKc i 4 } 2(CVC)E21-1 Rev.: 0: I

                   .g .
                             +e ,     - , ~ ,          - - V. , E ec-g,                -.r,,

a , ,.4e- , - ~v y- m. -s., enm,-,:y r- --w

l_~ r J. M. Farley Nuclear Plant - Unit 2, Class ~2 Components 'FNo-2-M-069-2E21- Chemical and Volume Control-

                                                                                                                                                                                                                    ~

Systect Pressure Test Plan. .'. ISI-Boundry __ Examination Period Relief- Notes And/Or~ Component Drawfng No. Coord.- Loc; Drawing Third First Second- Request Remarks Q2E21T03% D-356356-2 0-6 D-205057 I. I H- ! SEAL-WATER RETURN FILTER Q2E21F001 D-356356-2 D-2 D-205058 I I 'H REACTOR COOLANT FILTER Q2E21F003 D-356356'2 B-8 D-205058 I I H- , 4 i s< i - l i - l l l l - l l 2(CVC)E21-2 Rev.':.0' i

 - _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ .                                           -           . _ _      _ _ _ _ _                             ..- - - _      _ __ =            . . - -      . - . .-
                                                                                                                                                                                                       .      ~ . .   -     -  . . . .      - - -

o ,

                                   "3
                                                                                                                                                 ^fy             '

a u J. M. Farley Nuclear Plant - Unit 2, Class 2 ov ents FNP-2-M-069 System Pressure Test Plan 2E21- Chemical and Volume Control ,, ISI Bdry Exam Period Relief Line No. hydro No. Dwg. N3. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 28 CC8-48A(LOOP 1) 160.1 0-356356-1 F-4 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS 3/4" CCB-48A 160.1 0-356356-1 F-3 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS 3/4" CCB-48A (V) 160.1 D-356356-1 F-3 E7957 NA I I RR-?l(N) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS VENTS (1) 1 1/2" CCB-48A 160.1 D-356356-1 F-5 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS 2' CC8 888(LOOP 2) ,,160.1 0-356356-1 F-4 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS 3/4" CCB-488 160.1 0-356356-1 F-3 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS 3/4" CCB-48 (V) 160.1 D-356356 1 F-3 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS , ! 1 1/2" CCB-488 160.1 D-356356-1 F-5 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS 1 2(CVC)E21-3 Rev.: 0

rm (m '

                                                 =

J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-M-069

                                               -                                                         System Pressure Test Plan                                                                                             7 2E21- Chemical and Volume Control                                                                                                                                                          ..

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 2" CC8-48C(LOOP 3) 160.1 D-356356-1 F-4 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS 3/4" CCB-48C 160.1 D-356356-1 F-3 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TG CLASS 1 REQUIREMENTS 3/4" CCB-48 (V) 160.1 0-356356-1 F-3 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS 1 1/2" CCB-48C 160.1 D-356356-! F-5 E7957 NA I I RR-23(N) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS

1* CCB-47A(LOOP 1) ,160.1 D-356356-1 F-5 E7886 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1

! REQUIREMENTS 3/4" CCB-47A 160.1 D-356356-1 F-5 E7886 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 l REQUIREMENTS . 1* CCB-478(LOOP 2) 160.1 D-356356-1 F-5 E7887 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS , 3/4" CCB-47B ' 160.1 D-356356-1 F-5 E7887 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS 2(CVC)E21-4 Rev.: 0 y u- +- - - ' .- y, = _ _ - _ _ _ _ _ _-- __m.___mu______m..____

                                                                                                                                                                                                                      -- =._
  • p ,e V

d' U J. M. Farley Nuclear Plant - Unit 2, Class 2 Components FMP-2-M-069 System Pressure Test Plan 2E21- Chemical and Volume Control i ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 1* CCB-47C(LOOP 3) 160.1 0-356356-1 F-5 E7841 NA I 1 RR-23(A) CLASS 2 HYDRO TESTED TO CLASS I REQUIREMENTS 3/4" CCB-47C 160.1 D-356356-1 F-5 E7841 NA I I RR-23(A) CLASS 2 HYDRO TESTED TO CLASS 1 REQUIREMENTS 4" CCB-15(A) 160.2 D-356356-2 F-3 EG335 I I H HYDRO (NO. 2) UP TO VALVE QV327A (G-3)

                                                             >                     160.2                     D-356355-1 G-8 3/4" CCB-15 (D)       160.2                     D-356356-2 G-3                           E6155                  I      I      H          DRAINS (1) ALSO IN HYDRO NO. 3 3/4" CCB-15 (V)       160.2                     D-356356-2 F-3                           E6154                  I       I     H          VENTS (4) 3" CCB-16             160.2                     D-356356-2 F-3                                                  1       I     H          HYDRO (NO. 2) UP TO VALVE QV123A (F-4) 3" CCB-17             160.2                     D-356356-2 G-3                           EG-334                 I       I     H          HYDRO (NO. 2) UP TO VALVE QV1238 (G-4) 3' CCB-10                160.2                     0-356356-1 B-4                           EG606,                 I       I     H RR-23(L) HYDR 9 (NO. 2) UP TO E7819                                           VALVE 9VZ44 (B-3)
                                                                                                                                                                                                                                  ~

3/4" CCB-10 (D) 160.2 0-356356-1 B-5 E7522 I I H DRAINS (1) 3/4" CCB-45 160.2 0-356356-1 B-4 EG606 I I H RR-23(M) HYDRO (NO. 2) UP TO VALVE QVI43 (C-3) 2(CVC)E21-5 Rev.: 0

                                                                                                                                                                                                                  .    -._-.-.-           - . _ ~
                                                                                                                                                     ~ _ . . .

O  :: O O J. N. Farley Nuclear Plant - Unit 2, Class 2 Components FNP-2-N-069

                      .                           System Pressure Test Plan 2E21- Chemical and Volume Control                                                                                     _.

ISI Bdry Exam Period Relief Line No. Hydro No. Dwg. No. Coord. 150 Dwg. 3 1 2 Request Notes / Remarks 2" CCB-12 160.2 D-356356-1 C-3 E7812 I I H HYDRO (NO. 2) UP TO VALVE QV245 (C-}}