ML20064A343

From kanterella
Jump to navigation Jump to search
Forwards Corrected Insertion Instructions to Rev 8 to Updated FSAR for Jm Farley Nuclear Plant
ML20064A343
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/28/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064A344 List:
References
NUDOCS 9009040064
Download: ML20064A343 (2)


Text

-q.

'b 3

=

t 6

' ~ of.yAlabama Power Company

-e --

  • i 40 inverness C ntr Parkry _ N
i 5 >

' Post Offlee Box 1295 :

i" i

Birmingham, Alabama 35201

'. Telephone 205 B68 5581 =

4 -

j

/

W.'O. Hairston,11' it Senior Via President AlabamaPower Nuclear Operations f

August. 28,-1990 ite sourtern edectrs system

}

10 CFR'50.71-

)'

Docket Nos. 50-348 50-364 s

4 4 3.

i U. S.. Nuclear Regulatory Commission-m ATTN: Document Control-Desk Vashington,:D. C. 20555 l;

Gentlemen:

r Joseph H. Farley Nuclear Plant Updated Final Safety Analysis Report (FSAR)

By letter dated-June-'26, 1990, Alabama-Power Company submitted Revision 8' L

of the.Farley: Nuclear Plant FSAR Update.-. The' Revision Insertion.

1 Instructions and Effective Page List contain the three errors identified-1 1

below.-

l 1.

The Revision ~ Insertion Instructions specify that p.'5.2-79 should~be. replaced. The Effective Page List also indict.tes

'that.the current 1 version'of p. 5'.2-79 is Revision 8.

This information is incorrect _'since p. 5.2-79 did not change and a

~

vas:not included in the-update package.

2.~ The Revision Insertion Instructions state'that'f. 8.3-67 Sheet' M

2 should be added. However, f.' 8.3-67~ Sheet 2 actually Lreplaces f 8.3-67A'.

3.

In the Revision Insertion Instructions, the sequential listLof

=

figures to be replaced for Chapter 9.2. includes a typographical error which refers-to'f. 9.3-6 Sheet 2 rathe than f. 9.2-6~ Sheet'2.

\\

Attached-are replacements for pages 1 through 4 of the' Revision Insertion Instructions, pages y and vi of the Effective Page List for 4

Volume 23,.and page 5.2-79, Revision 6 (if required). These replacements' correct the errors discussed above and have no impact on

-previously submitted text, tables, or figures.

In accordance with the FSAR Update submittal, an original and 10 copies are included.

Copies are also being provided to the NRC Region II office and the NRC Resident Inspector.

O'"33 9009040064 900928 PDR ADOCK 05000348 l

i K

PDC l

r '

i

p yl';.,
-!q I

li.t

. :.y

er 1"*

Updated FSAR

~

August. 28, 19901 U. S.tNuclear Regulatory Commission 1

Page 2 y

e 4

1 5

4 1

S q; '

If you have any questions please advise..

E Respectfully submitted--

ALABAMA POVER COMPANY jh, h

f V. G. Hairston, III SVORN T0-AND SUBSCRIBED BEFORE ME.

. [O THIS jf DAY OF d d A u

.1990 w

t l L u.n bd

$1 lhY L

-}

f ' ' '

'l ll 0 Notary Publi$

q

.,(

My Commission Expires: j d /h 9 &

VGH,III/DRC:mgd 23.14

-l)

J Attachments hjiq Ff '.

cc: Mr. S. D. Ebneter Q 4!

Mr. S. T. Hoffman ip, Mr. G. F. Maxwell 1

r

{:

l i

ol 1

l 1

I

~i 4

._