ML20059J291

From kanterella
Jump to navigation Jump to search
Forwards Operator Licensing Natl Exam Schedules for FY91 Through FY94,per Generic Ltr 90-07.Requalification Schedules & Estimated Number of Candidates Expected to Participate in Generic Fundamental Exam,Also Encl
ML20059J291
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/12/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-90-07, GL-90-7, NUDOCS 9009190255
Download: ML20059J291 (4)


Text

.., ._ .

-6 ..

i.

.' ' Alabama Power Comp;ny . ,

40 inverness C:ntr Parkw:y - ,

, Post Offco Box 1295 - i

'- Birmin0 ham, Alabama 35201 -

Telephone 205 868-5581 W. G. Hairston, lit :

Senior Vice President Nuclear Operation. . Alabama Power September 12, 1990 t tre southem t4ectic system r

Docket Nos. 50-348.  !

50-364 c

I L

U. S. Nuclear Regulatory Commission i Attention: . Document Control Desk t Washingtonr D. C. 20555 Gentlemen:~

Joseph M. Farley Nuclear Plant- t Operator Licensing National Examination Schedule.-

(Generic Intter 90-07) _

I~ By letter of August 10, 1990, the NRC requested Alabama Power Company's best estimate of the need for operator licensing examinations for fiscal years 1991 -e through 1994. In addition, requalification schedules for the same time: periods and the estimated number of candidates that are expected.to participate in the.-

Generic rundamental Examination Schedule were requested.

~

Enclosures 1, 2, and 3 to this letter provide the requested information. . If you have-any questions, please advise.

ILl. h)

W. G. Hairston, III:

ll WGH,III/DRCamgd 23.33  ;

Enclosures' ,

cc: S. D. Ebneter S. T. Hoffman G. F. Maxwell K. E. Perkins 9009190255 900912 PDR ADOCK 05000348 V PDC ]

^-

0 '"A /p

e: ...

r I

ENCIDSURE 1:

l PROPOSED OPERMTR LICENSING EKAMINATICM SCHEDULE FOIURT I

i FACILITY Farley 'NRC Region. II-FY 1991 _

FY 1992 FY 1993- FY 1994-i10/1/90-9/30/91) (10/1/91-9/30/92) (10/1/92-9/30/93). (10/1/93-9/30/94)

1. Assigned .

Date.

(GL 89-03) 4/91 4/92- 10/92 10/93

-(HLC-18) (HLC-19) (HLC-20) (HLC-22)

  1. RO 1 6 4 6
  1. SRO 12 7 4 7 ,

-s

  1. SRO Upgrade 2 2 2 2'
  1. SRO Limited 0- 0 '0 0
2. Assigned Date i

(GL 89-03) None None 4/93' 4/94

.(HLC-21) (HLC-23) ,

  1. RO 6- 6 l

I l #SRO 7 7

  1. SRO Upgrade 2 2
  1. SRO Limited .0 0' Please indicate initial cold license examinations by placing an ast'srisk (*).by the date.

l Please indicate examinations intended to extend an operator's lice.ase to a second or t subsequent unit with two asterisks (**). (For example, if Unit .1 is in' operation and Unit 2 is approaching fuel load, and three RO candidhtes with n', previous license are to be examined on both Units 1 and 2, and five RO candidates bcensed on' Unit 1 are to be examined to-extend their licenses to Unit 2, then indicate, "RO 3,5**.".) ,

_ . . . .. j

- r4 i

ENCLOSURE 2 ]

)

PROPOSED REQUhLIFICATION EKAMIlmTICH SCHEDULE FGUIAT

' FACILITY Farley NRC Region- II ,

FY 1991 rY 1992 FY 1993 FY 1994  ?

(10/1/90-9/30/91) (10/1/91-9/30/92) (10/1/92-9/30/93) (10/1/93-9/30/94)

1. Date 3-25-91 Date 3-23-92 Date 3-22-93. Date 3-21-94  ;
2. Date-4-1-91 Date 3-30 Date 3-29-93' Date 3-28-94 3.- Date 4-8-91 'Date 4-6-92 Date 4-5-93 Date 4-4-94
4. . Date 4-15-91, Date 4-13-92 Date 4-12-93_ Date 4-11 -j i
5. Date 4-22-91 Date 4-20-92 Date 4-19-93 Date 4-18-94  !

I i

4 r

l.

l

J .I $ .

=

!!NCIOSURE 3 PROPOSED GRERIC FLDBMENIE EKAKINNYICM SCHEDULE FCIDET Facility Farley NRC Region II OCKBER 1990 FEBRUARY 1991 JUNE 1991 Estimated .

Number of Candidates 2 0 13 ,

The Generic Fundamental Examination Schedule (GTES) is administered three times'a year, on the Wednesday following the first Sunday in February, June, and_ October. ,

4 i

i DRC:mgd 23.33 1

l t

. . _ - . . . - -