-6 i.
' Alabama Power Comp;ny.
40 inverness C:ntr Parkw:y -
, Post Offco Box 1295 -
,i Birmin0 ham, Alabama 35201 -
Telephone 205 868-5581 W. G. Hairston, lit :
Senior Vice President Nuclear Operation.
. Alabama Power September 12, 1990 t
tre southem t4ectic system r
Docket Nos. 50-348.
50-364 I
c L
U. S. Nuclear Regulatory Commission i
Attention:. Document Control Desk t
Washingtonr D. C. 20555 Gentlemen:~
Joseph M. Farley Nuclear Plant-t Operator Licensing National Examination Schedule.-
(Generic Intter 90-07)
I~
By letter of August 10, 1990, the NRC requested Alabama Power Company's best estimate of the need for operator licensing examinations for fiscal years 1991
-e through 1994.
In addition, requalification schedules for the same time: periods and the estimated number of candidates that are expected.to participate in the.-
Generic rundamental Examination Schedule were requested.
~
Enclosures 1, 2, and 3 to this letter provide the requested information.. If you have-any questions, please advise.
ILl. h)
W. G. Hairston, III:
ll WGH,III/DRCamgd 23.33 Enclosures' cc:
S. D. Ebneter S. T. Hoffman G. F. Maxwell K. E. Perkins 9009190255 900912 PDR ADOCK 05000348
]
V PDC 0 '"A
^-
/p
e:
r I
ENCIDSURE 1:
PROPOSED OPERMTR LICENSING EKAMINATICM SCHEDULE FOIURT i
FACILITY Farley
'NRC Region.
II-FY 1992 FY 1993-FY 1994-FY 1991 i10/1/90-9/30/91)
(10/1/91-9/30/92)
(10/1/92-9/30/93). (10/1/93-9/30/94) 1.
Assigned Date.
(GL 89-03) 4/91 4/92-10/92 10/93
-(HLC-18)
(HLC-19)
(HLC-20)
(HLC-22)
- RO 1
6 4
6
- SRO 12 7
4 7
- s
- SRO Upgrade 2
2 2
2'
- SRO Limited 0-0
'0 0
2.
Assigned Date i
(GL 89-03)
None None 4/93' 4/94
.(HLC-21)
(HLC-23)
- RO 6-6 l
I l
- SRO 7
7
- SRO Upgrade 2
2
- SRO Limited
.0 0'
Please indicate initial cold license examinations by placing an ast'srisk (*).by the date.
l Please indicate examinations intended to extend an operator's lice.ase to a second or t
subsequent unit with two asterisks (**).
(For example, if Unit.1 is in' operation and Unit 2 is approaching fuel load, and three RO candidhtes with n', previous license are to be examined on both Units 1 and 2, and five RO candidates bcensed on' Unit 1 are to be examined to-extend their licenses to Unit 2, then indicate, "RO 3,5**.".)
j
- r4 i
ENCLOSURE 2
]
)
PROPOSED REQUhLIFICATION EKAMIlmTICH SCHEDULE FGUIAT
' FACILITY Farley NRC Region-II FY 1991 rY 1992 FY 1993 FY 1994
?
(10/1/90-9/30/91)
(10/1/91-9/30/92)
(10/1/92-9/30/93)
(10/1/93-9/30/94) 1.
Date 3-25-91 Date 3-23-92 Date 3-22-93.
Date 3-21-94 2.
Date-4-1-91 Date 3-30 Date 3-29-93' Date 3-28-94 3.-
Date 4-8-91
'Date 4-6-92 Date 4-5-93 Date 4-4-94
-j
- 4..
Date 4-15-91, Date 4-13-92 Date 4-12-93_
Date 4-11 i 5.
Date 4-22-91 Date 4-20-92 Date 4-19-93 Date 4-18-94 I
i 4
r l.
l
J
. I
=
!!NCIOSURE 3 PROPOSED GRERIC FLDBMENIE EKAKINNYICM SCHEDULE FCIDET Facility Farley NRC Region II OCKBER 1990 FEBRUARY 1991 JUNE 1991 Estimated Number of Candidates 2
0 13 The Generic Fundamental Examination Schedule (GTES) is administered three times'a year, on the Wednesday following the first Sunday in February, June, and_ October.
4 i
i DRC:mgd 23.33 1
l t
-... - -