ML20195F062
| ML20195F062 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/07/1999 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NEL-99-0224, NEL-99-224, NUDOCS 9906140174 | |
| Download: ML20195F062 (2) | |
Text
- -
., V ' '.
' D:v3 Mor:y Sruthern N clear l
. Vice President Operating Compa:y. Inc.
- Farley Project Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 l
SOUTHERN June 7, 1999-COMP M Energy to Serve YourWorld" Docket No.
50-364 NEL-99-0224,
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Unit 2
' Revision to Unit 2 Steam Generator Tube Voltane-Based Renair Criteria Data Report Ladies and Gentlemen:
By letter dated August 7,1998, SNC transmitted the Farley Unit 21998 Voltage-Based Repair Criteria 90 Day Report. Since that time, the evaluated current cycle (13) length has been increased 72 days. As a result of this increase, the steam generator EOC steam line break (SLB) tube leak rate and burst probabilities were recalculated. The SLB tube leak rate increased from 2.0 to 2.2 gpm and the burst probability increased from 5.6x10" to 7.7x10". These results continue to be within the acceptance limits of 11.8 gpm and 1.0x102, If you have any questions, please advise. This letter contains no conunitments.
Respectfully submitted,
.fhp Dave Morey EWC/maf-u2revopaccessewc. doc
\\'
[
kOCI L
m c7 I
9906140174 990607 PDR ADOCK 05000364 PDR a p..
'i*.
.c,
Page 2 e.
U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Ooeratinn Comoany Mr. L. M. Stinson, General Manager - Farley.
U. S. Nucicar Reculatory Commission. Washincton. D. C.
Mr. L. Mark Padovan, Licensing Project Manager - Farley U. S. Nucicar Regulahrv Commission. Reaion II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley 1