February 2002 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML020850555
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/14/2002
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-023
Download: ML020850555 (5)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, Wl 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellen > Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-023 March 14, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative "Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for February 2002 are enclosed in accordance with Technical Specification 6.9.a.3.

Sincerely,

/

Thomas Coutu Manager-Kewaunee Plant MLA Enclosure cc - US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning

KEWAUNEE NUCLEAR POWER PLANT - DOCKET 50-305

SUMMARY

OF OPERATING EXPERIENCE February 2002 The unit continues to operate at 100%, steady state power.

Maintenance Group Activities for the Month Instrument and Control Group Activities for the Month I&C completed the following work orders for February:

"* Replaced the TD AFW Pump discharge pressure switch

"* Rebuilt the SW regulator on 1B2 SW pump

"* Replaced N32 circuit card to return N32 to service

"* Moved SOV on Waste Gas analyzer for proper drain flow

"* Replaced a u-bolt for instrument tubing tray on SW temperature gauge Electrical Maintenance Performed preventative maintenance and surveillance procedures on the following equipment:

"* Buses 1 & 2 UV/`UF Relays

"* SP42-320A & B Auto Sequencer Relays

"* Buses 5 & 6 UV Relays

"* Station Batteries

"* Substation Batteries

"* Substation Inspection

"* Misc's PM's on Motors & Starters Work Orders:

"* Demobilize SGR Facilities

"* Repair of BAHT circuit 17

"* Upgrade of QA Vault

"* Various KAP CA for cable identification and lighting breaker replacements Mechanical Maintenance

"* Cleaned SW strainer for Aux Bldg A/C Compressor

"* Flushed/Performed flow verification/ performance monitoring on Aux Bldg Basement Cooling Coil 1A& I B

"* Inspected suction piping for presence of a strainer and changed oil on IA Spent Fuel Pool Pump

"* Trouble shooting and repair to 1B2 Traveling Water Screen

"* Repair fuel oil leak on the 1A Emergency Diesel Generator

"* Repaired SW-1200B, Residual Heat Pump Pit Fan Coil No. 1B

"* PM's on A, B, & C Charging Pump Dampeners

"* Changed 1B Spent Fuel Pool Pump Oil The Following non-scheduled Safety Related items were worked by Mechanical Maintenance:

"* Sump Tank Pump IA, unclogging lines

"* Replaced C Charging Pump Seals

"* Replaced air sampler on the Green Bay Office Building roof

"* Replaced Sample Pump R-22

"* Replaced SW Chlorination Flush Valve

AVERAGE DA IL Y U NI T PO0WE R LE VE L DOCKET NO- 50-305 UNIT- KEWAUNEE COMPLETED BY- M. L. ANDERSON TELEPHONE- 920-388-8453 REPORT MONTH FEBRUARY, 2002 AVERAGE DAILY DAY POWER LEVEL (MWE-NET) 1 529 2 534 3 529 4 533 5 529 6 529 7 533 8 529 9 533 10 529 11 533 12 529 13 529 14 533 15 533 16 529 17 529 18 533 19 529 20 529 21 533 22 529 23 533 24 533 25 529 26 529 27 533 28 529

DOCKET NO: 50-305 UNIT NAME: Kewaunee DATE: March 11, 2002 COMP BY: Mary L. Anderson TELEPHONE: 920-388-8453 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH - FEBRUARY 2002 LER NO. DATE TYPE DURATION REASON METHOD NO. SYS COMPONENT COMMENTS No shutdowns or power reductions in February 4 4 + 4 4-4 4 + 4 +

TYPE REASON METHOD SYSTEM & COMPONENT CODES F: FORCED A-Equipment Failure (explain) 1 -Manual From NUREG-0161 S: SCHEDULED B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuations E-Operator Training & License Examination 5-Load Reductions F-Administrative 9-Other G-Operational Error (explain)

H-Other (explain)

OPERATING DATA REPORT DOCKET NO- 50-305 COMPLETED BY- M. L. ANDERSON 0 P E RA T I NG S TA T U S TELEPHONE- 920-388-8453 1 UNIT NAME KEWAUNEE 2 REPORTING PERIOD FEBRUARY, 2002

  • NOTES
  • 3 LICENSED THERMAL POWER (MWT) 1650
  • Unit continues to operate at 100% power
  • 4 NAMEPLATE RATING (GROSS MWE) 560 *
  • 5 DESIGN ELECTRICAL RATING (NET MWE) 535 *
  • 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) 537 *
  • 7 MAXIMUM DEPENDABLE CAPACITY (NET MWE) 511 **********************************************

8 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS None 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)

None 10 REASONS FOR RESTRICTIONS, IF ANY THIS MONTH YR-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 672 1416 242882 12 NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1416.0 206381.9 13 REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 2330.5 14 HOURS GENERATOR ON-LINE 672.0 1416.0 204194.5 15 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0 16 GROSS THERMAL ENERGY GENERATED (MWH) 1107933 2333371 322997854 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 373600 786400 107115300 18 NET ELECTRICAL ENERGY GENERATED (MWH) 356706 750815 101924312 19 UNIT SERVICE FACTOR 100.0 100.0 84.1 20 UNIT AVAILABILITY FACTOR 100.0 100.0 84.1 21 UNIT CAPACITY FACTOR (USING MDC NET) 103.9 103.8 81.9 22 UNIT CAPACITY FACTOR (USING DER NET) 99.2 99.1 78.4 23 UNIT FORCED OUTAGE RATE 0.0 0.0 1.6 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS N/A 25 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP - N/A