Commited lo NudearExeffen Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC August 5, 2004 NRC-04-091 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Operating Rerort In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for July 2004 for Kewaunee Nuclear Power Plant.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region Ill, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center I-"- ;4 N490 Highway 42

  • Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560

OPERATING DATA REPORT DOCKET NO. 50-305 Notes:

UNIT NAME Kewaunee Unit continues to operate at 100%

steady state operation.

DATE August 5, 2004 COMPLETED Mary Anderson BY TELEPHONE (920) 388-8453 REPORTING PERIOD July, 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 574
2. MAXIMUM DEPENDABLE CAPACITY (MWE- 556 NET)

YEAR-TO-

- MONTH DATE CUMULATIVE

3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4755.6 226175.3
4. NUMBER OF HOURS GENERATOR WAS ON LINE 744 4730.1 223917.2
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (MWH) 420571 2613166 112414525
e -U-,

UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME Kewaunee DATE August 5,2004 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD July, 2004 METHOD OF NO. DATE Type' DurTION REASON 2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours) DOWN 3

REACTOR 4 07/03/04 S 0.0 B N/A Load reduction to perform quarterly SP54-086, Turbine Stop and Governor Valve Operability Test, Aux Feedwater flow tests, and Heater Drain Pump A&B maintenance.

Duration 14.22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> (1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3- Automatic Trip/Scram D - Regulatory Restriction 4- Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative 5 - Load Reductions G - Operational Error (Explain) 9 - Other H - Other (Explain)

SUMMARY

The unit continues to operate at 100% steady state power