Commited lo NudearExeffen Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC August 5, 2004 NRC-04-091 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Operating Rerort In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for July 2004 for Kewaunee Nuclear Power Plant.
Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc:
Administrator, Region Ill, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center I-"-
- 4 N490 Highway 42
- Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee August 5, 2004 Mary Anderson (920) 388-8453 Notes:
Unit continues to operate at 100%
steady state operation.
REPORTING PERIOD July, 2004
- 1.
DESIGN ELECTRICAL RATING (MWE-NET)
- 2.
MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 574 556 YEAR-TO-
- MONTH DATE CUMULATIVE
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4.
NUMBER OF HOURS GENERATOR WAS ON LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY (MWH) 744.0 744 0.0 420571 4755.6 4730.1 0.0 2613166 226175.3 223917.2 10.0 112414525
-U-,
- e UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee August 5,2004 Mary Anderson (920) 388-8453 July, 2004 METHOD OF NO.
DATE Type' DurTION REASON 2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours)
DOWN REACTOR3 4
07/03/04 S
0.0 B
N/A Load reduction to perform quarterly SP54-086, Turbine Stop and Governor Valve Operability Test, Aux Feedwater flow tests, and Heater Drain Pump A&B maintenance.
Duration 14.22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> (1)
F: Forced S: Scheduled (2)
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
Method:
1 - Manual 2 - Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)
Continuation 5 - Load Reductions 9 - Other
SUMMARY
The unit continues to operate at 100% steady state power