e Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC January 12, 2005 NRC-05-003 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Operating Report In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for December 2004 for the Kewaunee Nuclear Power Plant.
Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc:
Administrator, Region ll, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center 5e--
' -)(
N490 Highway 42
- Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee January 12,2005 Mary Anderson (920) 388-8453 December, 2004 METHOD NO AE Type DURATION REASON O
(o.
DATE Type 2
SHUTTING CAUSE/CORRECTIVE ACTIONS DOWN REACTOR3 Continuation/conclusion of Cycle XXVI-XXVII Refueling Outage.
5 12/01/04 S
79.83 C
4 G-1 was closed at 0750 on 12/04.
100% power was reached at 2114 on 12/14.
(1)
F: Forced S: Scheduled (2)
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
Method:
1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)
Continuation 5 - Load Reductions 9 - Other
SUMMARY
The unit continues to operate at 100%, steady state power.
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee January 12, 2005 Mary Anderson (920) 388-8453 Notes:
Unit continues to operate at 100%
steady state power.
REPORTING PERIOD December, 2004
- 1.
DESIGN ELECTRICAL RATING (MWE-NET)
- 2.
MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 574 556 YEAR-TO-DATE MONTH CUMULATIVE
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4.
NUMBER OF HOURS GENERATOR WAS ON LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY (MWH) 703.3 664.2 0.0 326962 7115.8 7050.3 0.0 3873882 228535.5 226237.3 10.0 113675241