May 2003 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML031750665
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/13/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-070
Download: ML031750665 (4)


Text

N Committed to Nuclear Excellen Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-070 10 CFR 50.36 June 13, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for May 2003 is enclosed in accordance with Technical Specification 6.9.a.3.

Thomas Coutu Site Vice-President, Kewaunee Plant MLA cc US NRC, Region Ill US NRC, Senior Resident Inspector INPO Records Center PSCW - Sharon Henning Attachment N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560
f

OPERATING DATA REPORT DOCKCET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee June 13,2003 Mary Anderson (920) 388-8453 May, 2003

1.

DESIGN ELECTRICAL RATING (MWE-NET)

2.

MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

3.

NUMBER OF HOURS REACTOR WAS CRITICAL

4.

NUMBER OF HOURS GENERATOR WAS ON LINE S.

UNIT RESERVE SHUTDOWN HOURS

6.

NET ELECTRICAL ENERGY (MWH)

MONTH 531.2 501.2 0.0 233410 YEAR-TO-DATE 2788.0 2756.8 0.0 1402523 CUMULATIVE 216282.7 214050.1 10.0 107044753 Notes: G-1 was closed on 05/11 @ 0201 Full power was reached on 05118 @

2234 Unit continues to operate at 100%

power Changes In Design Electrical Rating &

Maximum Dependable Capacity due to increase In Tave as part of 2003 KNPP Uprate Phase I 536 516

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee June 13, 2003 Mary Anderson (920) 388-8453 REPORTING PERIOD May, 2003 (1)

F: Forced S: Scheduled (2)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation 5 - Load Reductions 9 - Other

SUMMARY

The unit continues to operate at 100% steady state power.

Mechanical Maintenance:

Replaced Reactor Coolant Pump A Performed 18 month maintenance on Emergency Diesel Generators A and B Performed PMs on numerous safety related valves Replaced trim in both feed regulating valves in support of power up rate Replaced Pressurizer power operated relief valve block valves METHOD OF NO.

DATE Type DURATION REASON 2 SHUTTING CAUSE/CORRECTIVE ACIONS (Hours)

DON REACTOR3 05/01/03 S

242.02 c

4 Cycle XXV-XXVI Refueling Outage continued through 05/11. G-1 was closed at 0201.

G-1 was opened 0511 at 1428. An outage was taken to perform the Turbine Overspeed Trip 8

05/11/03 S

.75 B

NA Test. G-1 was closed for the final time 05/11 at 1513.

UNIT SHUTDOWNS Electrical Maintenance:

  • Performed 97 work activities on QA1 MOV's and associated MCC's
  • Performed 31 work activities on non QAl MOV's and associated MCC's
  • Performed 19 work activities on QAI motors (PM's/SP's)
  • Performed 31 work activities non QAI on motors (PM's/CWOs)
  • Performed 27 work activities on QAI circuit breakers/MCCs (PM's/SP's)
  • Performed 12 work activities on non QAI circuit breakers/MCCs (PM's/CWO's)
  • Performed 423 scheduled work activities in total for R26 I & C:
  • Rebuild Main Feedwater Regulating Valves (FW-7A/7B)

Installed new NUS R/E boxes Installed new NUS dynamic boxes Calibrated many plant parameters to reflect the new plant operating numbers for Power Uprate

  • Rebuild Pressurizer PORV AOV's (PR-2A/2B)
  • Replace 8 ESF Hi-Steam flow relays due to age
  • Perform AOV testing on SW Shroud Cooling AOV's Individual Rod Position Indication (IRPI) work, including:
  • Replace IRPI card edge connectors to address potential contact issues Perform extended calibration of the IRPrs to facilitate online calibration if needed Performed 602 I&C activities during the outage It