-'-4 NMCP Committed to Nuclear Eccellen" Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-087 10 CFR 50.36 August 11, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for July 2003 is enclosed in accordance with Technical Specification 6.9.a.3.
Thomas Coutu Site Vice-President, Kewaunee Plant MLA cc US NRC, Region IlIl US NRC, Senior Resident Inspector INPO Records Center PSCW - Sharon Henning Attachment r
$ 6 (: t-I4 N490 Highway 42
- Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-305 Kewaunee August 11, 2003 Mary Anderson (920) 388-8453 D
July, 2003 Notes: Rx power was raised from 1650 MWt to new licensed level of 1673 MWt on July 28. As a result, new generation ratings will not be updated until August report.
1.
2.
DESIGN ELECTRICAL RATING (MWE-NET)
MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 536 516
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4.
NUMBER OF HOURS GENERATOR WAS ON LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY (MWH)
MONTH YEAR-TO-DATE 744.0 4252.0 744.0 4220.8 0.0 0.0 395677 2182026 CUMULATIVE 217746.7 215514.1 10.0 107824256
-.4 UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee August 11, 2003 Mary Anderson (920) 388-8453 REPORTING PERIOD July, 2003 (1)
(2)
(3)
F: Forced S: Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method:
1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)
Continuation 5 - Load Reductions 9 - Other
SUMMARY
The unit continues to operate at 100% steady state power.