September 2004 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML042940506
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/13/2004
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-04-120
Download: ML042940506 (3)


Text

Committed to Nuclear Excelen Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC October 13, 2004 NRC-04-120 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Oneratina ReDort In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for September 2004 for the Kewaunee Nuclear Power Plant.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc:

Administrator, Region Ill, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center N490 Highway 42

  • Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560

In OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE.

50-305 Kewaunee October 13, 2004 Mary Anderson (920) 388-8453 Notes:

Unit continues to operate at 100%

steady state operation.

REPORTING PERIOD September, 2004

1.

DESIGN ELECTRICAL RATING (MWE-NET)

2.

MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 574 556 MONTH YEAR-TO-DATE CUMULATIVE

3.

NUMBER OF HOURS REACTOR WAS CRITICAL

4.

NUMBER OF HOURS GENERATOR WAS ON LINE

5.

UNIT RESERVE SHUTDOWN HOURS

6.

NET ELECTRICAL ENERGY (MWH) 720.0 720 0.0 410377 6219.6 6194.1 0.0 3444184 227639.3 225381.2 10.0 113245543

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee October 13, 2004 Mary Anderson (920) 388-8453 REPORTING PERIOD September, 2004 METHOD OF NO.

DATE Type DURATION REASON2 DOTN CAUSE/CORRECTIVE ACTIONS REACTOR3 No shutdowns or power reductions in September (1)

F: Forced S: Scheduled (2)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation 5 - Load Reductions 9 - Other

SUMMARY

N/A