November 2003 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML033500230
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/08/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-118
Download: ML033500230 (3)


Text

NEcn Committed to Nuclear Excellenct, Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-118 10 CFR 50.36 December 8, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for November 2003 is enclosed in accordance with Technical Specification 6.9.a.3.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC MLA Enclosure cc:

Administrator, Region ll, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center z /  " 67;  5; N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560

OPERATING DATA REPORT DOCKET NO.

51 UNIT NAME 1K DATE D

COMPLETED BY M

TELEPHONE (9

REPORTING PERIOD

[1-305

,ewaunee ecember 8, 2003

[ary Anderson 920) 388-8453 November, 2003 2.

2.

DESIGN ELECTRICAL RATING (MIWE-NET)

MAXMIMU DEPENDABLE CAPACITY (IMVE-NET) 544 526

3.

NUMBER OF HOURS REACTOR WAS CRITICAL

4.

NUMBER OF HOURS GENERATOR WAS ON LINE

5.

UNIT RESERVE SHUTDOWNN HOURS

6.

NET ELECTRICAL ENERGY (IWH)

MONTHI YEAR-TO-DATE CUMULATIVE 720.0 7181.0 220675.7 720.0 7149.8 218443.1 0.0 0.0 10.0 390525 3761805 109404035

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING 50-305 Kewaunee December 8, 2003 Mary Anderson (920) 388-8453 November, 2003 METHOD OF NO.

DATE Type' DURATION REASON2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours)

DOWN REACTOR3 No shutdowns or power reductions in November (1)

F: Forced S: Scheduled (2)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

Method:

I -Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation 5 - Load Reductions 9 - Other

SUMMARY

The unit continues to operate at 100% steady state power