April 2003 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML031340538
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/07/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-050
Download: ML031340538 (3)


Text

fr Nul Committed to Nuclear Excellenc Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-050 10 CFR 50.36 May 7, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for April 2003 is enclosed in accordance with Technical Specification 6.9.a.3.

Thomas Coutu Site Vice-President, Kewaunee Plant MLA cc US NRC, Region Il US NRC, Senior Resident Inspector INPO Records Center PSCW - Sharon Henning Attachment N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 1-Telephone: 920.388.2560

OPERATING DATA REPORT DOCKET NO. 50-305 Notes: Unit is shutdown for refueling UNIT NAIE Kewaunee outage DATE May 5, 2003 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD April, 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 535
2. IAXIMUM DEPENDABLE CAPACITY (MWE-NET) 511 MONTH YEAR-TO-DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 96.9 2256.9 215751.5
4. NUMBER OF HOURS GENERATOR WAS ON LINE 95.6 2255.5 213548.8
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (MWH) 39977 1169112 106811343

UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME Kewaunee DATE May 5, 2003 COIPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD April, 2003 METHOD OF 2 CAUSE/CORRECTIVE ACTIONS NO. DATE Type DURATION REASON SHUTTING ypers)DONN 3

REACTOR Commenced Cycle XXV-XXVI Refueling 7 04/04/03 S 624.45 1 Outage (1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative 5 - Load Reductions G - Operational Error (Explain) 9 - Other H - Other (Explain)

SUMMARY

G-1 was opened on 04/04/03 at 2333. Startup is scheduled for early May.