April 2003 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML031340538
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/07/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-050
Download: ML031340538 (3)


Text

Nul Committed to Nuclear Excellenc Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-050 10 CFR 50.36 May 7, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for April 2003 is enclosed in accordance with Technical Specification 6.9.a.3.

Thomas Coutu Site Vice-President, Kewaunee Plant MLA cc US NRC, Region Il US NRC, Senior Resident Inspector INPO Records Center PSCW - Sharon Henning Attachment N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560 fr 1-

OPERATING DATA REPORT DOCKET NO.

UNIT NAIE DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee May 5, 2003 Mary Anderson (920) 388-8453 April, 2003

1.

DESIGN ELECTRICAL RATING (MWE-NET)

2.

IAXIMUM DEPENDABLE CAPACITY (MWE-NET)

YEAR-TO-DATE CUMULATIVE

3.

NUMBER OF HOURS REACTOR WAS CRITICAL

4.

NUMBER OF HOURS GENERATOR WAS ON LINE

5.

UNIT RESERVE SHUTDOWN HOURS

6.

NET ELECTRICAL ENERGY (MWH)

Notes: Unit is shutdown for refueling outage 535 511 MONTH 96.9 95.6 0.0 39977 2256.9 2255.5 0.0 1169112 215751.5 213548.8 10.0 106811343

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COIPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee May 5, 2003 Mary Anderson (920) 388-8453 April, 2003 (1)

F: Forced S: Scheduled (2)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation 5 - Load Reductions 9 - Other

SUMMARY

G-1 was opened on 04/04/03 at 2333. Startup is scheduled for early May.

METHOD OF NO.

DATE Type DURATION REASON 2 SHUTTING CAUSE/CORRECTIVE ACTIONS ypers)DONN REACTOR3 Commenced Cycle XXV-XXVI Refueling 7

04/04/03 S

624.45 1

Outage