Text

I Committed to NucearExcell Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC June 14,2004 NRC-04-069 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Operating Report In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for May 2004 for the Kewaunee Nuclear Power Plant.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc:

Administrator, Region 1II, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center N490 Highway 42. Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560 191A l

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee June 14, 2004 Mary Anderson (920) 388-8453 Notes:

Unit continues to operate at 100%

steady state operation.

REPORTING PERIOD May, 2004

1.

DESIGN ELECTRICAL RATING (MWE-NET)

2.

MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 574 556 MONTH YEAR-TO-DATE CUMULATIVE

3.

NUMBER OF HOURS REACTOR WAS CRITICAL

4.

NUMBER OF HOURS GENERATOR WAS ON LINE

5.

UNIT RESERVE SHUTDOWN HOURS

6.

NET ELECTRICAL ENERGY (MWH) 744.0 744 0.0 425146 3291.6 3266.1 0.0 1782487 224711.3 222453.2 10.0 111583846

4-i UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee June 14, 2004 Mary Anderson (920) 388-8453 May, 2004 METHOD OF NO.

DATE Type' DURATION REASON2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours)

DOWN REACTOR3 No shutdowns or power reductions in May (1)

F: Forced S: Scheduled (2)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation 5 - Load Reductions 9-Other

SUMMARY