October 2002 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML023240449
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/11/2002
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-100
Download: ML023240449 (3)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 9203882560 920.755 2321 NMCla Committed to NuclearExcellence* Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-100 November 11, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The monthly operating report for the Kewaunee Nuclear Power Plant for October 2002 is enclosed in accordance with Technical Specification 6.9.a.3.

Sincerely, Thomas Coutu Site Vice President MLA Enclosure cc - US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning

'11;r OPERATING DATA REPORT DOCKET NO. 50-305 Notes: Unit continues to operate at 100%

power.

UNIT NAME KEWAUNEE DATE NOVEMBER 6,2002 COMPLETED BY MARY ANDERSON TELEPHONE (920) 388-8453 REPORTING PERIOD OCTOBER, 2002

1. DESIGN ELECTRICAL RATING (MWE-NET) 535 511
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

MONTH YEAR-TO-DATE CUMULATIVE 745.0 7064.8 212030.7

3. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7050.7 209829.3
4. NUMBER OF HOURS GENERATOR WAS ON LINE 0.0 0.0 10.0
5. UNIT RESERVE SHUTDOWN HOURS 393001 3697001 104870498
6. NET ELECTRICAL ENERGY (MWIt)

UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME KEWAUNEE DATE NOVEMBER 1, 2002 COMPLETED BY MARY ANDERSON TELEPHONE (920) 388-8453 REPORTING PERIOD OCTOBER, 2002 (1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The unit continues to operate at 100% steady state power