October 2002 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML023240449
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/11/2002
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-100
Download: ML023240449 (3)


Text

Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 9203882560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 920.755 2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-100 November 11, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The monthly operating report for the Kewaunee Nuclear Power Plant for October 2002 is enclosed in accordance with Technical Specification 6.9.a.3.

Sincerely, Thomas Coutu Site Vice President MLA Enclosure cc -

US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning NMCla Committed to Nuclear Excellence*

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD

1.

2.

50-305 KEWAUNEE NOVEMBER 6,2002 MARY ANDERSON (920) 388-8453 OCTOBER, 2002 DESIGN ELECTRICAL RATING (MWE-NET)

MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 535 511 MONTH YEAR-TO-DATE NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWIt) 745.0 745.0 0.0 393001 7064.8 7050.7 0.0 3697001 CUMULATIVE 212030.7 209829.3 10.0 104870498 Notes: Unit continues to operate at 100%

power.

3.
4.
5.

6.

'11;r

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 KEWAUNEE NOVEMBER 1, 2002 MARY ANDERSON (920) 388-8453 OCTOBER, 2002 (1)

F: Forced S: Scheduled (2)

(3)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation

SUMMARY

The unit continues to operate at 100% steady state power