January 2002 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML020580415
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/11/2002
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-012
Download: ML020580415 (5)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellene Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-0 12 February 11, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative "Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for January 2002 are enclosed in accordance with Technical Specification 6.9.a.3.

Sincerely, Thomas Coutu Manager-Kewaunee Plant MLA Enc.

cc - US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning

(

KEWAUNEE NUCLEAR POWER PLANT - DOCKET 50-305

SUMMARY

OF OPERATING EXPERIENCE January 2002 The unit continues to operate at 100%, steady state power.

Maintenance Group Activities for the Month Instrument and Control Group Activities for the Month I&C completed the following work orders for January:

"* Completed DCR 3339 for Core Exit Thermocouples

"* Performed troubleshooting for the /2degree shift in Tave when BRA 111 shifted.

"* Performed troubleshooting and repair of R-14 radiation monitor.

Electrical Maintenance Performed preventative maintenance and surveillance procedures on the following equipment:

"* Buses 1 & 2 UV/UF Relays

"* SP42-320A & B Auto Sequencer Relays

"* Buses 5 & 6 UV Relays

"* Station Batteries

"* Substation Batteries

"* Substation Inspection

"* Halon System

"* EBL - Group 4 Battery Work Orders:

"* Demobilize SGR Facilities

"* Repair Turbine Operating Floor C02 Horn

"* Repair Sewage Treatment Plant Lift Station & Transfer Pump

"* DCR 3364 Additional Power for LAN Servers

"* Install new Spent Fuel Pump B Motor Mechanical Maintenance

"* Spent Fuel Pump lB - replace pump shaft

"* Repack Service Water Strainer 1A2

"* Replace the HEPA filters on the Spent Fuel Exhaust Fan 1B

"* Charging Pump Dampener checks

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO- 50-305 UNIT- KEWAUNEE COMPLETED BY- M. L. ANDERSON TELEPHONE- 920-388-8453 REPORT MONTH JANUARY, 2002 AVERAGE DAILY DAY POWER LEVEL (MWE-NET) 1 529 2 533 3 529 4 529 5 529 6 529 7 533 8 529 9 533 10 529 11 529 12 529 13 533 14 529 15 529 16 533 17 529 18 529 19 517 20 529 21 529 22 529 23 529 24 533 25 533 26 529 27 529 28 529 29 529 30 533 31 529

DOCKET NO: 50-305 UNIT NAME: Kewaunee DATE: February 7, 2002 COMP BY: Mary L. Anderson TELEPHONE: 920-388-8453 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH - JANUARY 2002 LER NO. DATE TYPE DURATION REASON METHOD NO. SYS COMPONENT COMMENTS No shutdowns or power reductions in January TYPE REASON METHOD SYSTEM & COMPONENT CODES F: FORCED A-Equipment Failure (explain) 1-Manual From NUREG-0161 S: SCHEDULED B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuations E-Operator Training & License Examination 5-Load Reductions F-Administrative 9-Other G-Operational Error (explain)

H-Other (explain)

OPERATING DATA REPORT DOCKET NO- 50-305 COMPLETED BY- M. L. ANDERSON 0 P E RA T I N G S T A TU S TELEPHONE- 920-388-8453 1 UNIT NAME KEWAUNEE 2 REPORTING PERIOD JANUARY, 2002

  • NOTES
  • 3 LICENSED THERMAL POWER (MWT) 1650
  • Unit continues to operate at 100% power
  • 4 NAMEPLATE RATING (GROSS MWE) 560 *
  • 5 DESIGN ELECTRICAL RATING (NET MWE) 535 *
  • 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) 537 *
  • 7 MAXIMUM DEPENDABLE CAPACITY (NET MWE) 511
  • 8 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS None 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)None 10 REASONS FOR RESTRICTIONS, IF ANY THIS MONTH YR-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 744 744 242210 12 NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 205709.9 13 REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 2330.5 14 HOURS GENERATOR ON-LINE 744.0 744.0 203522.5 15 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0 16 GROSS THERMAL ENERGY GENERATED (MWH) 1225438 1225438 321889921 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 412800 412800 106741700 18 NET ELECTRICAL ENERGY GENERATED (MWH) 394109 394109 101567606 19 UNIT SERVICE FACTOR 100.0 100.0 84.0 20 UNIT AVAILABILITY FACTOR 100.0 100.0 84.0 21 UNIT CAPACITY FACTOR (USING MDC NET) 103.7 103.7 81.9 22 UNIT CAPACITY FACTOR (USING DER NET) 99.0 99.0 78.4 23 UNIT FORCED OUTAGE RATE 0.0 0.0 1.6 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS N/A 25 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP - N/A