ML022410373
| ML022410373 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 08/06/2002 |
| From: | Coutu T Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-02-071 | |
| Download: ML022410373 (3) | |
Text
Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, Wl 54216-9511 9203882560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wl 54241 920 755 2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-07 1 August 6, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The monthly operating report for the Kewaunee Nuclear Power Plant for July 2002 is enclosed in accordance with Technical Specification 6.9.a.3.
S)2 ceey Thomas Coutu Manager-Kewaunee Plant MLA Enclosure cc -
US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning Committed to Nuclear Excellence
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD
- 1.
2.
50-305 KEWAUNEE AUGUST 1, 2002 MARY ANDERSON (920) 388-8453
" JULY, 2002 DESIGN ELECTRICAL RATING (MWE-NET)
MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 535 511 MONTH YEAR-TO-DATE
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4.
NUMBER OF HOURS GENERATOR WAS ON LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY (M-WH) 744.0 744.0 0.0 389404 4855.8 4841.7 0.0 2537143 CUMULATIVE 209821.7 207620.3 10.0 103710640 Notes: Unit continues to operate at 100%
power.
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 KEWAUNEE AUGUST 1, 2002 MARY ANDERSON (920) 388-8453 JULY, 2002 (1)
(2)
(3)
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method:
1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)
Continuation
SUMMARY
The unit continues to operate at 100% steady state power F: Forced S: Scheduled