mto Combffed to Ndsrxc en Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC May 12, 2004 NRC-04-057 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Operating Report In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for April 2004 for the Kewaunee Nuclear Power Plant.
Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc:
Administrator, Region Ill, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center N490 Highway 42
- Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560
lkt.
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee May 11, 2004 Mary Anderson (920) 388-8453 Notes:
The new licensed level of 1772 MWt is being used in this report. Unit continues to operate at 100% steady state operation.
REPORTING PERIOD March, 2004
- 1.
DESIGN ELECTRICAL RATING (MWE-NET)
- 2.
MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 574 556 YEAR-TO-DATE MONTH CUMULATIVE
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4.
NUMBER OF HOURS GENERATOR WAS ON LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY (MWH) 719.0 719 0.0 411416 2547.6 2522.1 0.0 1357341 223967.3 221709.2 10.0 111158700
- g..
- f at.
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee May 11, 2004 Mary Anderson (920) 388-8453 REPORTING PERIOD April, 2004 METHOD OF NO.
DATE Type DURATION REASON 2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours)
DOWN REACTOR3
=
=No shutdowns or power reductions in April (1)
F: Forced S: Scheduled (2)
Reason:
A -Equipment Failure (Explain)
B - Maintenance or Test C -Refueling D -Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
Method:
1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)
Continuation 5 - Load Reductions 9 - Other
SUMMARY
On March 24 KNPP performed the first load increase for stretch uprate and achieved the new licensed thermal power of 1772 MWt on March 25.
The unit continues to operate at 100% steady state power