December 2002 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML030150573
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 01/09/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-002
Download: ML030150573 (3)


Text

Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, Wl 54216-9511 920.388.2560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wl 54241 920.755.2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-03-002 January 9, 2003 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The monthly operating report for the Kewaunee Nuclear Power Plant for December 2002 is enclosed in accordance with Technical Specification 6.9.a.3.

Sincerely, ThomaCut Thomas Coutu Site Vice President MLA Enclosure cc -

US NRC - Region llI NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning

2x NMCe Committed to Nuclear Excellenc

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD

1.

2.

50-305 Kewaunee January 9, 2003 Mary Anderson (920) 388-8453 December, 2002 DESIGN ELECTRICAL RATING (MWE-NET)

MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 535 511 MONTH YEAR-TO-DATE NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWH) 744.0 744.0 0.0 390843 8528.8 8514.7 0.0 4468734 CUMULATIVE 213494.7 211293.3 10.0 105642231 Notes: Unit continues to operate at 100%

power.

3.
4.
5.

6.

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee January 9, 2003 Mary Anderson (920) 388-8453 December, 2002 (1)

F: Forced S: Scheduled (2)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation 5 - Load Reductions 9 - Other

SUMMARY

The unit continues to operate at 100% steady state power METHOD OF NO.

DATE Type' DURATION

REASON, SHUTTING CAUSEICORRECTIVE ACTIONS (Hours)

DOWN REACTOR' Performance of SP54-086, Turbine Stop and 5

12/07/02 S

22.55 B

5 Governor Valve Operability Test, and other reduced power procedures