September 2002 Monthly Operating Report for Kewaunee
ML022900261
Person / Time
Site: Kewaunee 
(DPR-043)
Issue date: 10/04/2002
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-093
Download: ML022900261 (3)


Text

Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 920 388 2560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wl 54241 920 755 2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-093 October 4, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The monthly operating report for the Kewaunee Nuclear Power Plant for September 2002 is enclosed in accordance with Technical Specification 6.9.a.3.

Sincerely, Thomas Coutu Manager-Kewaunee Plant MLA Enclosure cc -

US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning NMCea Committed to Nuclear Excellenc

/2' claýý

OPERATING DATA REPORT DOCKET NO.

50-305 UNIT NAME KEWAUNEE DATE OCTOBER 1, 2002 COMPLETED BY MARY ANDERSON TELEPHONE (920) 388-8453 REPORTING PERIOD SEPTEMBER, 2002 DESIGN ELECTRICAL RATING (MWE-NET)

MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

MONTH YEAR-TO-DATE NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWH) 720.0 720.0 0.0 378133 6319.8 6305.7 0.0 3304000 CUMULATIVE 211285.7 209084.3 10.0 104477497 Notes: Unit continues to operate at 100%

power.

1.

2.

535 511

3.
4.
5.

6.

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 KEWAUNEE OCTOBER 1, 2002 MARY ANDERSON (920) 388-8453 SEPTEMBER, 2002 (1)

F: Forced S: Scheduled (2)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

Method:

I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation

SUMMARY

The unit continues to operate at 100% steady state power METHOD OF NO.

DATE Type' DURATION REASON 2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours)

DOWN REACTOR3 No shutdowns or power reductions in September