MONTHYEARML0211400622002-05-0202 May 2002
[Table View]Memo to File, Request for Withholding Information from Public for a Supplemental Letter on the Electrosleeve License Amendment Request for Callaway (Tac No. MB1214) Project stage: Withholding Request Acceptance ML0212807042002-05-23023 May 2002 Withholding from Public Disclosure, Re Issuance of Amendment on Steam Generator Tube Surveillance Program Project stage: Approval ML0226806292002-09-13013 September 2002 TS Page for Amendment 153 Steam Generator Electrosleeve Tube Surveillance Program Project stage: Other ML0221402302002-09-13013 September 2002 Issuance of License Amendment 153 Steam Generator Electrosleeve Tube Surveillance Program. (Tac No. MB1214) Project stage: Approval ML0226207212002-09-24024 September 2002 Memo, Proprietary Review of Safety Evaluation Dated September 13, 2002, for License Amendment No. 153 Regarding Steam Generator Electrosleeve Tube Surveillance Project stage: Approval 2002-05-23 |
ML021140062 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 05/02/2002 |
From: | Donohew J NRC/NRR/DLPM/LPD4 |
To: | |
References | |
TAC MB1214 | |
Download: ML021140062 (3) | |
Similar Documents at Callaway | |
---|---|
Category:E-Mail
MONTHYEARML24193A0362024-07-10010 July 2024
[Table view]NRR E-mail Capture - LIC-109 Acceptance Email - Callaway Plant, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition - EPID L-2024-LLA-0076 ML23362A0572023-12-28028 December 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - SUNSI Review of the Final Safety Analysis Report (FSAR) Revision OL-26 ML23338A0392023-12-0101 December 2023 NRR E-mail Capture - LIC-109 Acceptance Review - Unacceptable with Opportunity to Supplement - Callaway - RR from Requirements of ASME BPV Code, Section Xl, Subsect IWL-Exam & Test-Unbonded Post Tensioning System - EPID L-2023-LLR-0061 ML23208A1052023-07-27027 July 2023 NRR E-mail Capture - Callaway Plant, Unit No. 1 - Regulatory Audit Questions - LAR to Clarify Support System Requirements for the Residual Heat Removal & Control Room Air Conditioning Systems ML23200A2982023-07-19019 July 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - Final Request for Additional Information (RAI) - Request for Approval of Oqam, Revision 36a - EPID L-2023-LLQ-0000 ML23121A0112023-04-28028 April 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request to Revise TS to Adopt TSTF-501-A Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control - EPID L-2023-LLA-0046 ML23114A2302023-04-24024 April 2023 NRR E-mail Capture - Regulatory Audit Question - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 ML23107A1812023-04-17017 April 2023 NRR E-mail Capture - Regulatory Audit Questions - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 ML23096A0072023-04-0505 April 2023 NRR E-mail Capture - Final Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request to Revise TS 5.5.16 for Permanent Extension of Integrated Leak Rate Testing - EPID L-2022-LLA-0165 ML23073A0262023-03-13013 March 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - SG Inspection Report Review - EPID L-2022-LRO-0143 ML23037A7092023-02-0606 February 2023 April 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23037A0022023-02-0303 February 2023 NRR E-mail Capture - Callaway - LAR to Adopt AST - EPID L-2021-LLA-0177 - Revised Schedule for Completion of the Project ML23026A0212023-01-24024 January 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Changes to TS for SFP - ML23010A2902023-01-10010 January 2023 NRR E-mail Capture - LIC-109 Acceptance Review - Callaway Plant, Unit 1 - License Amendment Request to Clarify Support System Requirements for the RHR & Crac Systems - ML22346A0132022-12-0909 December 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of LAR to Revise TS 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies - EPID L-2022-LLA-0165 ML22322A0062022-11-17017 November 2022 NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) Callaway - LAR for Proposed Changes to TS and Exemption Request Use of Framatome Gaia Fuel - L-2022-LLA-0150 & L-2022-LLE-0030 ML22287A0952022-10-14014 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22280A1322022-10-0707 October 2022 NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway - License Amendment Request for Proposed Changes to Tech Spec Changes for Spent Fuel Pool Storage - EPID L-2022-LLA-0 ML22278A0122022-10-0404 October 2022 NRR E-mail Capture - Draft - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway License Amendment Request for Proposed Changes to Tech Spec Changes for Spent Fuel Pool Storage - EPID L-2022-LLA-013 ML22269A4312022-09-26026 September 2022 November 2022 Emergency Preparedness Program Inspection - Request for Information NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22251A0122022-09-0707 September 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections - EPID L-2022-LLA-0110 NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22216A0072022-07-0808 July 2022 NRR E-mail Capture - Callaway Plant, Unit No. 1 - Draft Acceptance Review (Unacceptable for Review with Opportunity to Supplement) for Framatome Fuel Transition LAR and Exemption - EPIDs L-2022-LLA-0083 and L-2022-LLE-0019) ML22167A0252022-06-15015 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Revision to Radiological Emergency Response Plan Regarding Response & Notification Goals - EPID L-2022-LLA-0024 ML22157A0102022-06-0303 June 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood Ultimate Heat Sink Temporary Temperature Increase to 102.8 Degrees Fahrenheit ML22154A0122022-06-0202 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22151A0512022-05-27027 May 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22137A0292022-05-16016 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22096A0232022-04-0505 April 2022 NRR E-mail Capture - Callaway Plant - Final RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to GL 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) ML22089A0222022-03-29029 March 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LAR to Adopt TSTF-505 and TSTF-439 - Follow Up Clarifications for the Audit Questions - EPID L-2021-LLA-0197 ML22087A4022022-03-28028 March 2022 NRR E-mail Capture - Callaway - Draft RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to Generic Letter 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) ML22070A1362022-03-10010 March 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals - EPID L-2022-LLA-0024 ML22047A2312022-02-11011 February 2022 Email Between NRC NSIR and FEMA Regarding Callaway Sirens 021122 ML22003A0852022-01-0303 January 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-529, Clarify Use and Application Rules - EPID L-2021-LLA-0225 ML21334A5172021-11-30030 November 2021 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of Requested Licensing Action - Application to Adopt TSTF-439 and TSTF-505 - EPID L-2021-LLA-0197 ML21335A0172021-11-30030 November 2021 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of Requested Licensing Action - Application to Adopt TSTF-439 and TSTF-505 - EPID L-2021-LLA-0197 ML21308A0692021-11-0404 November 2021 NRR E-mail Capture - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Unit 1 - License Amendment Request - Adoption of Alternate Source Term and Revision of TSs - ML21258A0382021-09-14014 September 2021 NRR E-mail Capture - Final - Request for Additional Information - Callaway, Unit 1 - LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors- EPID L-2020-LLA-023 ML21195A0252021-07-13013 July 2021 Email 7-13-21 Request for Information - Callaway EP Exercise Inspection - Sept 2021 ML21125A0452021-05-0404 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Plant, Unit 1 - License Amendment Request - Final Resolution to Address Concerns of GSI-191 - EPID L-2021-LLA-0059 ML21007A1622021-01-0606 January 2021 NRR E-mail Capture - Final - Request for Additional Information - (COVID-19) Callaway Plant, Unit 1 - Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs - EPID L-2021-LLE-0242 ML20342A1802020-12-0606 December 2020 NRR E-mail Capture - Callaway - LIC-109 Acceptance Requested Licensing Action - Application to Adopt 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors EPID L-2020-LLA-0235 ML20296A6332020-10-22022 October 2020 NRR E-mail Capture - Callaway Plant, Unit 1 - Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L 2020 Lle 0140 (Covid 19)) - Revised Completion Schedule ML20205L4252020-07-22022 July 2020 NRR E-mail Capture - Callaway Plant, Unit 1 - Acceptance of Requested Licensing Action Request for One-Time License Amendment to Defer Upcoming Steam Generator Inspection (EPID L-2020-LLA-0142)(COVID-19) ML20203M3682020-07-21021 July 2020 NRR E-mail Capture - Draft Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request - Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and 5.3.1.2 - EPID L-2020-LLA-0046 ML20162A1882020-06-10010 June 2020 Request for Supporting Information for the Callaway SPRA Audit Review - Draft Supplement ML20153A7902020-05-29029 May 2020 Emai: RFI for Callaway EP Program Inspection ML20133K6742020-05-11011 May 2020 05000483, Request for Information 2020-002 ML20099G2422020-04-0808 April 2020 NRR E-mail Capture - Acceptance Callaway Containment Tendon COVID-19 Relief Request 2024-07-10 Category:Memoranda MONTHYEARML24297A6392024-10-30030 October 2024
[Table view]Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21216A2002021-08-11011 August 2021 Summary of Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commission 2020 Annual Assessment of Callaway Plant Docket No. 50-483 ML21111A0372021-05-0303 May 2021 Inspection Manual Chapter 0375 Recommendation for Callaway Plant ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML17170A3202017-06-20020 June 2017 Safety Evaluation Input - for Ameren Missouri Request to Amend Callaway Plant, Unit 1, Technical Specification 5.6.5, Core Operating Limits Report - ML16197A0102016-08-22022 August 2016 Staff Observations of Testing for Generic Safety Issue 191 During a June 28 to June 30, 2016 Trip to the Alden Test Facility for Performance Contracting Inc. Strainer Tests ML16091A1522016-03-31031 March 2016 Request to Review and Update Guidance in National Fire Protection Association (NFPA) 805 Frequently Asked Question (FAQ) 07-0040 ML15139A4842015-06-0202 June 2015 Staff Review of Callaway Plant Unit 1 Physical Security Plan Revision 12 for the Verification of ASM (EA-13-237) Incorporation (TAC No. L25009) ML14310A8362015-02-0909 February 2015 NRC Staff Evaluation of Final Rule for Continued Storage of Spent Nuclear Fuel for the License Renewal Environmental Review for Callaway, Unit 1 ML14177A5952014-07-0808 July 2014 Summary of Telephone Conference Call Held on February 12, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plant, Un ML14183A0212014-07-0101 July 2014 License Renewal Application ML14121A5532014-06-18018 June 2014 November 25, 2013, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14121A1062014-05-12012 May 2014 Advisory Committee on Reactor Safeguards Review of the Callaway Nuclear Plant License Renewal Application - Safety Evaluation Report ML14112A2762014-05-0707 May 2014 Summary of Public Meetings to Discuss Draft Supplement 51 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Callaway Plant, Unit 1 ML14104A8932014-04-23023 April 2014 U.S. Nuclear Regulatory Commission Staff'S Spot- Check Review of Ameren Missouri'S 100 Percent Ownership Interest in Callaway Energy Center, Docket No. 50-483, on April 8, 2014- Finding of No Potential Issue ML14087A2102014-04-0808 April 2014 Summary of 3/25/14 Verbal Relief Telephone Conference, Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval ML14035A5752014-03-25025 March 2014 January 28, 2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant Unit 1, LRA ML13246A3072013-09-0909 September 2013 Memorandum to File - Verbal Authorization of Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval ML13126A3202013-05-0707 May 2013 Summary of Telephone Conference, Verbal Authorization of Relief Request I3R-14. Proposed Alternative to ASME Code Requirements for Leakage Testing of RPV Head Flange Leakoff Lines, Third 10-Year ISI Interval. ML13059A8002013-03-11011 March 2013 Summary of Telephone Call Held on 11/5/12, Between NRC and Union Electric Company, Regarding Request for Clarification of Responses to the SAMA RAI Concerning Callaway Plant, Unit 1, LRA ML12298A4282012-10-26026 October 2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1, License Amendment Request to Change Licensing Basis and Analysis of Integrated Head Assembly Consistent with Regulatory Guide 1.61 Revision 1 ML12292A1212012-10-22022 October 2012 Updated ETE Quarterly Report for Q4 2012 ML12262A3112012-10-0202 October 2012 Summary of Telephone Conference Call Held on September 14, 2012, Between NRC and Union Electric Company, Concerning the SAMA RAI for the Callaway Plant, Unit 1, LRA ML12234A5232012-08-24024 August 2012 Quarterly Report of Activity Related to Updated Evacuation Time Estimates ML12227A3472012-08-14014 August 2012 8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 ML12227A3492012-08-14014 August 2012 8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request to Revise Technical Specification 3.7.9, Ultimate Heat Sink SR 3.7.9.1 and 3.7.9.2 at Callaway Plant, Unit 1 ML12167A5082012-06-15015 June 2012 Letter to the Honorable Jeannette Mott Oxford Related to the 10/21/2003, Shutdown at Callaway Plant ML1211502472012-05-0303 May 2012 Memo to File, Verbal Authorization, Relief Request VR-01 from Requirements of ASME OM Code Mandatory Appendix I, One-time Extension Replacement of Main Steam Isolation Valve Actuator Rupture Disks ML12089A0992012-04-11011 April 2012 Summary of Public Scoping Meetings Conducted Related to the Review of the Callaway Plant, Unit 1 License Renewal Application ML12041A4792012-02-24024 February 2012 03/14/2012-Notice of Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Callaway Plant, Unit 1 ML12027A0202012-01-27027 January 2012 Acceptance of License Renewal Application, Callaway Plant Unit 1 ML1200300872011-12-29029 December 2011 Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Blocking P-4/Low Tavg Feedwater Isolation Signal at Callaway Plant, Unit 1 ML1136304032011-12-29029 December 2011 Correction Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 ML1131200872011-11-16016 November 2011 Verbal Authorization Memorandum, Relief Request 13R-13, Alternative to Requirements for Performance of Second Successive Exam of C Cold Leg Safe-End to Elbow Weld, Third 10-Year Inservice Inspection ML11192A2362011-07-12012 July 2011 Notice of Closed Meeting with Callaway to Discuss Lessons Learned from the Recent Triennial Force-On-Force Exercise at the Callaway Nuclear Power Plant IR 05000483/20110072011-06-27027 June 2011 IR 05000483-11-007, on 03/21-05/13/11, Callaway Plant, Special Inspection for Turbine-driven Auxiliary Feedwater Pump Bearing Degradation ML1113202252011-05-12012 May 2011 Notice of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1's Amendment Request to Adopt Risk-informed, Performance-Based Alternative Described in National Fire Protection Association Standard (NFPA) 805 ML1136103072011-05-0404 May 2011 CW-2011-06-Public Forms ML1109501212011-04-0505 April 2011 Notice of Meeting to Discuss NRC Reactor Oversight Process Annual Assessment of Callaway Plant ML1104001662011-02-22022 February 2011 Summary of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1101204702011-01-12012 January 2011 Notice of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1030202792010-11-0505 November 2010 Notice of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Related to Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML11363A1132010-08-0505 August 2010 Memo from M. Markley, NRR to M. Kotzalas, EDO on G20100476/EDATS: OEDO-2010-0609 - Briefing Package for Drop-In Visit by Union Electric Company Official with NRC Staff on August 13, 2010, for Callaway Plant ML1009105332010-04-0505 April 2010 U.S. Nuclear Regulatory Commission Staff Review of the Department of Homeland Security Consultation Reports ML0929300152009-10-20020 October 2009 Revised Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 ML0928003162009-10-16016 October 2009 Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 Sent 7/31/0209 and 8/27/2009, Respectively ML0924605592009-09-0404 September 2009 Notice of Meeting with Union Electric Company to Discuss a Proposed Risk Informed Change to Callaway, Unit 1, Technical Specifications ML0920306202009-07-31031 July 2009 Notice of Forthcoming Conference Call with Union Electric Company and Wolf Creek Nuclear Operating Company Re Draft Requests for Additional Information on Generic Letter 2004-02 for Callaway Plant and Wolf Creek Creek Generating Station 2024-10-30 Category:Proprietary Information Review MONTHYEARML23219A1392023-08-15015 August 2023
[Table view]Request for Withholding Information from Public Disclosure ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure ML23093A2092023-04-14014 April 2023 Request for Withholding Information from Public Disclosure ML23093A0462023-04-14014 April 2023 Request for Withholding Information from Public Disclosure ML22048C2192022-02-22022 February 2022 Request for Withholding Information from Public Disclosure ML21274A0012021-10-14014 October 2021 Request for Withholding Information from Public Disclosure ML20253A2532020-09-29029 September 2020 Request for Withholding Information from Public Disclosure (EPID L-2020-LLA-0142 (COVID-19)) ML20212L3652020-08-0606 August 2020 Request for Withholding Information from Public Disclosure (EPID L-2020-LLA-0142) (COVID-19) ML1108310262011-03-30030 March 2011 Request for Withholding Information from Public Disclosure - Proposed Denial of Request to Daryl M. Shapiro, Legal Counsel for Ameren Missouri ML0733004182007-11-29029 November 2007 Topical Report Withholding Information from Public Disclosure (Tac No. MD0197) ML0704705172007-02-21021 February 2007 Request for Withholding Information from Public Disclosure, TAC No. MD2654 ML0700302902007-01-24024 January 2007 Topical Report for Wolf Creek Generating Station - Request for Withholding Information from Public Disclosure ML0620704312006-07-31031 July 2006 Withholding of Information - Letter of Intent to Submit Combined License Application for Future Unit(S) at the Callaway Plant Site ML0524201542005-09-0707 September 2005 Withholding from Public Disclosure, Responses to NRC Request for Additional Information on WCAP-16265-P, Rev. 0, 'Callaway Replacement Steam Generator Program NSSS Licensing Report,' Dated February 2005 (CAW-05-1944) ML0524300462005-09-0707 September 2005 Withholding from Public Disclosure, Setpoint Methodology Portion of the Response to (NRC) Request for Additional Information, Questions 1 and 2 (CAW-05-1998) ML0524301332005-09-0707 September 2005 Callaway - Request for Withholding Information from Public Disclosure (CAW-05-2007) (Tac. MC4437) ML0410602032004-04-14014 April 2004 Request for Withholding Information from Public Disclosure for the Wolf Creek Generating Station and the Callaway Plant, Unit 1 ML0332406502003-11-20020 November 2003 Request for Withholding Information from Public Disclosure ML0319800992003-07-16016 July 2003 7/16/03 Callaway-Request for Withholding Info. from Public Disclosure-Application for Amd. Related to Steam Generator Tube Surveillance Program (CAW-03-1649/CAW-03-1650) (Tac. MB6478) ML0228805232002-11-0404 November 2002 Withholding from Public Disclosure, Steam Generator Tube Surveillance Program, TAC MB6478, CAW-02-1558 ML0212807042002-05-23023 May 2002 Withholding from Public Disclosure, Re Issuance of Amendment on Steam Generator Tube Surveillance Program ML0211400622002-05-0202 May 2002 Memo to File, Request for Withholding Information from Public for a Supplemental Letter on the Electrosleeve License Amendment Request for Callaway (Tac No. MB1214) 2023-08-15 |
Text
May 2, 2002 MEMORANDUM TO: File FROM: Jack N. Donohew, Senior Project Manager, Section 2 Project Directorate IV /RA/
Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
REQUEST TO WITHHOLD INFORMATION FROM THE PUBLIC FOR A SUPPLEMENTAL LETTER ON THE ELECTROSLEEVE LICENSE AMENDMENT REQUEST FOR CALLAWAY PLANT (TAC NO. MB1214)
Union Electric Company (the licensee) submitted an application dated February 15, 2001, for a license amendment to delete part of paragraph d.1.j)2) in Technical Specification (TS) 5.5.9, "Steam Generator (SG) Tube Surveillance Program," that requires all SG tubes containing an Electrosleeve, a Framatome proprietary process, to be removed from service within two operating cycles following installation of the first Electrosleeve. This requirement was incorporated in TS 5.5.9 in Amendment No. 132 issued May 21, 1999. The first Electrosleeve tube was installed in the Fall of 1999, and the two-cycle allowance will expire in the Fall of 2002.
During the NRC staffs review of the license amendment request, the licensee has submitted the supplemental letters of November 7, 2001, and March 3, 2002. In both letters, the licensee has responded to requests for additional information from the staff. In the November 7, 2001, letter, part of the information provided in Attachment 5 to the letter is considered proprietary and Framatone ANP has requested the NRC to withhold the proprietary information from the public.
The request to withhold the information was submitted in the attached e-mail dated December 5, 2001. The affidavit submitted in the e-mail is Attachment 2.
Docket No. 50-483
Attachment:
- 1. E-mail dated December 5, 2001
- 2. Affidavit (ADAMS Accession No. ML021090157)
DISTRIBUTION:
PUBLIC PDIV-1 R/F RidsNrrPMJDonohew RidsNrrLAEPeyton ACCESSION NO: ML021140062 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME JDonohew:as EPeyton SDembek DATE 5/1/2002 5/1/02 5/2/02 E-MAIL DATED DECEMBER 5, 2001 From: "Mallay, James F" <JMallay@framatech.com>
To: "JND@nrc.gov" <JND@nrc.gov>
Date: 12/5/01 5:30PM
Subject:
FW: Affidavit Jack, Here is the affidavit that I promised to send you last week when we were together. Let me know if you need anything else. Thanks, Jim
Original Message-----
From: Carr-Payne, Ella F Sent: Wednesday, December 05, 2001 4:25 PM To: Koep, Leslie Cc: Mallay, James F
Subject:
Affidavit Hello Leslie, Jim asked that I send you the attached signed affidavit.
Ella
[The affidavit file that was attached to the e-mail was an Adobe Acrobat pdf file. This affidavit was scanned into ADAMS and has ADAMS Accession No. ML021090157.]