ML22157A010

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - NRC Acceptance Review of Braidwood Ultimate Heat Sink Temporary Temperature Increase to 102.8 Degrees Fahrenheit
ML22157A010
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/03/2022
From: Mahesh Chawla
NRC/NRR/DORL/LPL4
To: Elwood T
AmerenUE
References
Download: ML22157A010 (2)


Text

From: Wiebe, Joel Sent: Friday, June 3, 2022 5:45 PM To: Phillip Henderson (Phillip.Henderson@constellation.com)

Subject:

NRC Acceptance Review of Braidwood Ultimate Heat Sink Temporary Temperature Increase to 102.8 degrees Fahrenheit

Hi Phil,

By letter dated June 3, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22154A203), Constellation Energy Generation, LLC (Constellation) submitted a proposed license amendment to change Technical Specification (TS) Surveillance Requirement (SR) 3.7.9.2. Specifically, Constellation is requesting to change TS SR 3.7.9.2 to allow an Ultimate Heat Sink (UHS) temperature of 102.8°F until September 30, 2022. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 70 hours8.101852e-4 days <br />0.0194 hours <br />1.157407e-4 weeks <br />2.6635e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 2 months from the date of this acceptance, which is July 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me at (301) 415-6606 or Joel.Wiebe@nrc.gov.

Joel

Hearing Identifier: NRR_DRMA Email Number: 1658

Mail Envelope Properties (MN2PR09MB4971CF2A590E9DF135526B2D8BA19)

Subject:

NRC Acceptance Review of Braidwood Ultimate Heat Sink Temporary Temperature Increase to 102.8 degrees Fahrenheit Sent Date: 6/3/2022 5:44:49 PM Received Date: 6/3/2022 5:44:00 PM From: Wiebe, Joel

Created By: Joel.Wiebe@nrc.gov

Recipients:

"Phillip Henderson (Phillip.Henderson@constellation.com)" <Phillip.Henderson@constellation.com>

Tracking Status: None

Post Office: MN2PR09MB4971.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 2480 6/3/2022 5:44:00 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: